Kenneth A Lowney
- Listed as
- architect
- Firm
- Lowney Architecture
- Based in
- Oakland
- On San Francisco permits
- May 2007 to Nov 2023
8 permits since 2000 (architect on 8 permits): 6 completed, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 21, 2023 | Completed final sign-off Sep 2024 | 2300 Harrison St | Field Construction Inc. | rooftop: install (n) trellis shade structure.Details
rooftop: install (n) trellis shade structure. | $195,000 |
| Sep 12, 2023 | Completed final sign-off Oct 2024 | 2300 Harrison St | Field Construction Inc. | roof deck to be enlarged & enhancced. increase the perimeter of deck by 4' along 3 sides, reconfigure the ramp system to be compliant w/accessibilityDetails
roof deck to be enlarged & enhancced. increase the perimeter of deck by 4' along 3 sides, reconfigure the ramp system to be compliant w/accessibility | $600,000 |
| Oct 28, 2016 | Completed final sign-off Mar 2017 | 44 Montgomery St | 36/f- addition of 3 (n) enclosed offices in (e) open office. n/a ordinance #155-13Details
36/f- addition of 3 (n) enclosed offices in (e) open office. n/a ordinance #155-13 | $6,000 | |
| Apr 26, 2016 | Never finaled issued May 2016, no final | 865 Market St | Truebeck Construction | ste 136: revision/add to pa 2016-0216-9602, steel stair and railing drawings. maher naDetails
ste 136: revision/add to pa 2016-0216-9602, steel stair and railing drawings. maher na | |
| Feb 16, 2016 | Never finaled issued Mar 2016, no final | 865 Market St | Truebeck Construction | suite 136 - tenant improvement of a retail space consisting of demolitoin of int non-struct non-rated walls, new walls, ceiling & floor finishes. electrical, fire alarm, srpinkler upgrades will be deferred. no hvac, no plumbing, no lighting; maher n/aDetails
suite 136 - tenant improvement of a retail space consisting of demolitoin of int non-struct non-rated walls, new walls, ceiling & floor finishes. electrical, fire alarm, srpinkler upgrades will be deferred. no hvac, no plumbing, no lighting; maher n/a | $400,000 |
| Feb 16, 2016 | Completed final sign-off Apr 2016 | 865 Market St | Truebeck Construction | suite 136:demolition of non-structural,non rated walls,demo of wood framed stair & landing,reclaim wood floor,removal of sheetrock for future rough-in(ti application) work will not affect the design of oepration of (e)smoke control system,demo will be performed per sfab-017; maher n/aDetails
suite 136:demolition of non-structural,non rated walls,demo of wood framed stair & landing,reclaim wood floor,removal of sheetrock for future rough-in(ti application) work will not affect the design of oepration of (e)smoke control system,demo will be performed per sfab-017; maher n/a | $13,000 |
| Jun 4, 2013 | Completed final sign-off Aug 2013 | 1200 Irving St | P S R West Coast Builders Inc | creating a coffee bar in (e) area, using existing electrical for lighting, adding 1 sinkDetails
creating a coffee bar in (e) area, using existing electrical for lighting, adding 1 sink | $100,000 |
| May 15, 2007 | Completed final sign-off Jan 2009 | 2125 19th St | Counterforce Inc. | add second floor, structural revisions at basement/garage. add stair, modify electrical & plumbing, refer to dcp 20051212evDetails
add second floor, structural revisions at basement/garage. add stair, modify electrical & plumbing, refer to dcp 20051212ev | $150,000 |