Permit GraphShortlistSan Francisco building permits since 2000

P S R West Coast Builders Inc

Contractor license
919541
State license record
Based in
Lafayette
On San Francisco permits
May 2012 to May 2026
Last 24 months
2 permits filed

35 permits since 2000: 26 completed, 3 in progress, 6 never finaled.

Of the 6 never-finaled permits, 3 are 3 to 5 years old, 1 is 5 to 10 years old, 2 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

AllBathroom remodel 1
FiledOutcomeAddressWork described on the permitDeclared cost
May 27, 2026Completed
final sign-off Aug 2026
350 Treat Avalteration to existing interior non load bearing wall. relocation of existing door and creation of new convenience door connecting areas fo the facility.
Details
Permit
202605272021
Permit issued
Jun 30, 2026
Final sign-off
Aug 11, 2026

alteration to existing interior non load bearing wall. relocation of existing door and creation of new convenience door connecting areas fo the facility.

Open the permit page

$9,800
Apr 3, 2026Completed
final sign-off Oct 2026
555 09th Stback of house expansion (e)ground level occupying additional 1393 sqft of former tenant sapce. work includes (n) relocated walk-in freezer, expanded breakroom. path of travel and facilities serving the expansion are to remain in compliance with cbc 11b-2024
Details
Permit
202604038857
Permit issued
Jun 11, 2026
Final sign-off
Oct 23, 2026

back of house expansion (e)ground level occupying additional 1393 sqft of former tenant sapce. work includes (n) relocated walk-in freezer, expanded breakroom. path of travel and facilities serving the expansion are to remain in compliance with cbc 11b-2024

Open the permit page

$400,000
Sep 30, 2024Completed
final sign-off Jan 2025
2741 16th Stinstalling of a temporary pre fabricated vibration test room housing vibration test equipment. accessory to the existing light manufacturing use on the adjacemnt property. ref pa 201211214631
Details
Permit
202409302007
Permit issued
Oct 24, 2024
Final sign-off
Jan 13, 2025

installing of a temporary pre fabricated vibration test room housing vibration test equipment. accessory to the existing light manufacturing use on the adjacemnt property. ref pa 201211214631

Open the permit page

$18,000
Jul 11, 2024In progress
filed Jul 2024, not yet issued
350 Treat Avthis project is the construction of an accessory structure housing shaking test equipment.
Details
Permit
202407116330

this project is the construction of an accessory structure housing shaking test equipment.

Open the permit page

$18,000
Jan 16, 2024In progress
issued Feb 2024
555 Fulton Strevision to 202201115765. add refrigeration and froen cases to sales fl.expanded prep room to accomodate new equip.add produce walkin bix at back of house.new register layour (a202)modified drop ceiling height on sales fl in front of dairy box. larger mezzanine footprint above bathrooms w condensing
Details
Permit
202401164043
Permit issued
Feb 2, 2024

revision to 202201115765. add refrigeration and froen cases to sales fl.expanded prep room to accomodate new equip.add produce walkin bix at back of house.new register layour (a202)modified drop ceiling height on sales fl in front of dairy box. larger mezzanine footprint above bathrooms w condensing

Open the permit page

$18,000
Jan 18, 2023Completed
final sign-off Mar 2023
690 Stanyan Strevision to pa# 202206146339. flooring on issued permit is different current/existing floor is wood panel anchoring of self check outs updated to reflect existing floor.
Details
Permit
202301180335
Permit issued
Jan 18, 2023
Final sign-off
Mar 14, 2023

revision to pa# 202206146339. flooring on issued permit is different current/existing floor is wood panel anchoring of self check outs updated to reflect existing floor.

Open the permit page

Sep 19, 2022Completed
final sign-off Jan 2023
401 Bay Stthe project consists of adding an employee restrom to the back of house area
Details
Permit
202209192734
Permit issued
Oct 25, 2022
Final sign-off
Jan 19, 2023

the project consists of adding an employee restrom to the back of house area

Open the permit page

$36,000
Jun 14, 2022Completed
final sign-off Mar 2023
690 Stanyan Sttenant improvemnt to remove 1 standard checkstand. remove 7 express checkstands, and provide 8 new self-service checkstands includes minor updates to cored stanchion and belt system.
Details
Permit
202206146339
Permit issued
Jan 13, 2023
Final sign-off
Mar 14, 2023

tenant improvemnt to remove 1 standard checkstand. remove 7 express checkstands, and provide 8 new self-service checkstands includes minor updates to cored stanchion and belt system.

Open the permit page

$75,000
Jun 14, 2022Completed
final sign-off Mar 2023
3950 24th Sttenant improvement to remove 6 existing express checkstands and provide 6 new self service checkstands to include installation of cord station and belt system
Details
Permit
202206146289
Permit issued
Nov 3, 2022
Final sign-off
Mar 13, 2023

tenant improvement to remove 6 existing express checkstands and provide 6 new self service checkstands to include installation of cord station and belt system

Open the permit page

$58,000
Apr 29, 2022Completed
final sign-off Dec 2022
450 Rhode Island Stinterior remodel; equipment update and minor demolition create order pick up area(not visible from the street)
Details
Permit
202204293305
Permit issued
Oct 31, 2022
Final sign-off
Dec 12, 2022

interior remodel; equipment update and minor demolition create order pick up area(not visible from the street)

Open the permit page

$32,872
Mar 7, 2022Never finaled
issued Mar 2022, no final
555 09th Strelocating wiring for receptacles, switches and fixtures per drawings. electrical work at traders joe's only.
Details
Permit
202203079384
Permit issued
Mar 11, 2022

relocating wiring for receptacles, switches and fixtures per drawings. electrical work at traders joe's only.

Open the permit page

$18,000
Jan 11, 2022In progress
issued Dec 2023
555 Fulton Stproject consists of the t.i. of an extg ground level building. the new tenant will occupy 14,000 sf of leasable space. tenant is a retail store that sells prepackaged food items. new slab, partitions, suspended ceiling, new restrooms, and new store fixtures.
Details
Permit
202201115765
Permit issued
Dec 11, 2023

project consists of the t.i. of an extg ground level building. the new tenant will occupy 14,000 sf of leasable space. tenant is a retail store that sells prepackaged food items. new slab, partitions, suspended ceiling, new restrooms, and new store fixtures.

Open the permit page

$1,000,000
Nov 1, 2021Never finaled
issued Jan 2022, no final
450 Rhode Island Stthis is a ti to upgradee (e) refrigerated cases. the fixtures will be replaced with similar new ones on the (e) refrigeration plus electrical systems. no changes to structural, plumbing or mechnical systems.
Details
Permit
202111011560
Permit issued
Jan 31, 2022

this is a ti to upgradee (e) refrigerated cases. the fixtures will be replaced with similar new ones on the (e) refrigeration plus electrical systems. no changes to structural, plumbing or mechnical systems.

Open the permit page

$160,000
Oct 7, 2021Never finaled
issued Feb 2022, no final
555 09th Stremodel of existing 1 story retail grocery store project,new break room & relocation of restrooms in the(e) back of house path of travel & facilities serving the proposed expansion/alteration are to remain in compliance with cbc ib-2024. mep & fire deferred
Details
Permit
202110070027
Permit issued
Feb 4, 2022

remodel of existing 1 story retail grocery store project,new break room & relocation of restrooms in the(e) back of house path of travel & facilities serving the proposed expansion/alteration are to remain in compliance with cbc ib-2024. mep & fire deferred

Open the permit page

$110,000
Jun 21, 2021Completed
final sign-off Mar 2023
1765 California Stt.i for (e) whole foods. interior metal stud framing, interior concrete slab modifications for utility piping and conduit, interior finishes, new/relocated equipment, lighting, hvac, updates to sales flr, offices, and basement team member lounge.
Details
Permit
202106212853
Permit issued
Dec 16, 2021
Final sign-off
Mar 21, 2023

t.i for (e) whole foods. interior metal stud framing, interior concrete slab modifications for utility piping and conduit, interior finishes, new/relocated equipment, lighting, hvac, updates to sales flr, offices, and basement team member lounge.

Open the permit page

$989,966
Apr 21, 2021Completed
final sign-off Dec 2021
788 Harrison Stwhole food market- minor upgrade to remove 3 express checkstands and install 6 self-check stands. no changes to building structure, plumbing or mech systems shall be made to this permit.
Details
Permit
202104219023
Permit issued
May 20, 2021
Final sign-off
Dec 14, 2021

whole food market- minor upgrade to remove 3 express checkstands and install 6 self-check stands. no changes to building structure, plumbing or mech systems shall be made to this permit.

Open the permit page

$30,000
May 13, 2020Completed
final sign-off Aug 2020
1765 California Stremove existing coffee bar, safe off existing electrical as required, cap existing plumbing; no food prep shall be performed in this area of the store as a result of this scope, unless part of a future, permitted project. relocate existing self-contained coolers. providing dedicated circuits
Details
Permit
202005137482
Permit issued
Jul 23, 2020
Final sign-off
Aug 17, 2020

remove existing coffee bar, safe off existing electrical as required, cap existing plumbing; no food prep shall be performed in this area of the store as a result of this scope, unless part of a future, permitted project. relocate existing self-contained coolers. providing dedicated circuits

Open the permit page

$60,000
Dec 30, 2016Completed
final sign-off Jun 2017
10 04th Stacoustic wall enclosure around existing refrigeration equipment per sfdph. ** maher: n/a **
Details
Permit
201612306355
Permit issued
Mar 23, 2017
Final sign-off
Jun 5, 2017

acoustic wall enclosure around existing refrigeration equipment per sfdph. ** maher: n/a **

Open the permit page

$65,000
Nov 22, 2016Never finaled
issued Dec 2016, no final
180 Post Stmain coffee bar on the mezz level and an "equivalent facilitation" on the 2nd flr. work consists of new countertops, equipment, fixtures, and finishes. electrical and plumbing on deferred permit. ref pa 201609309292
Details
Permit
201611223351
Permit issued
Dec 1, 2016

main coffee bar on the mezz level and an "equivalent facilitation" on the 2nd flr. work consists of new countertops, equipment, fixtures, and finishes. electrical and plumbing on deferred permit. ref pa 201609309292

Open the permit page

$50,800
Sep 30, 2016Completed
final sign-off Jun 2017
180 Post St2nd floor - minor non-structural demolition of existing coffee bar & related cabinetry of north face in preparation for future work on upcoming permit. work complies with ab-017.
Details
Permit
201609309292
Permit issued
Sep 30, 2016
Final sign-off
Jun 5, 2017

2nd floor - minor non-structural demolition of existing coffee bar & related cabinetry of north face in preparation for future work on upcoming permit. work complies with ab-017.

Open the permit page

$4,000
Sep 29, 2016Completed
final sign-off Dec 2016
5900 03rd Strevision to pa #201602089065 - tenant improvement for new coffee bar in (e) reatil market.
Details
Permit
201609299115
Permit issued
Oct 5, 2016
Final sign-off
Dec 16, 2016

revision to pa #201602089065 - tenant improvement for new coffee bar in (e) reatil market.

Open the permit page

$65,000
Aug 18, 2016Completed
final sign-off Dec 2016
5900 03rd Strefrigeration system, ref pa 2016-0317-2292 and 2016-0208-9065
Details
Permit
201608185380
Permit issued
Sep 8, 2016
Final sign-off
Dec 16, 2016

refrigeration system, ref pa 2016-0317-2292 and 2016-0208-9065

Open the permit page

Jul 18, 2016Completed
final sign-off Jun 2017
10 04th Stnew equipment platform for future refrigeration compressor and condenser. n/a maher ordinance
Details
Permit
201607182561
Permit issued
Mar 23, 2017
Final sign-off
Jun 5, 2017

new equipment platform for future refrigeration compressor and condenser. n/a maher ordinance

Open the permit page

$120,000
Jul 15, 2016Completed
final sign-off Jan 2017
10 04th Stlower level- demo extg toilet rooms with all fixtures and lights in basement. remove unused electrical panels and ducting. n/a for maher. ab-017.
Details
Permit
201607152487
Permit issued
Jul 18, 2016
Final sign-off
Jan 25, 2017

lower level- demo extg toilet rooms with all fixtures and lights in basement. remove unused electrical panels and ducting. n/a for maher. ab-017.

Open the permit page

$75,000
Jun 27, 2016Completed
final sign-off Dec 2016
5900 03rd Ststructural steel frame for interior mechanical equipment amend permit # 2016 0208 9065. maher na
Details
Permit
201606270965
Permit issued
Jul 11, 2016
Final sign-off
Dec 16, 2016

structural steel frame for interior mechanical equipment amend permit # 2016 0208 9065. maher na

Open the permit page

$15,000
Jun 9, 2016Completed
final sign-off Dec 2016
5900 03rd Strevision to pa #201603172292 - revision of sales area light fixtures. n/a maher ordinance
Details
Permit
201606099551
Permit issued
Jun 13, 2016
Final sign-off
Dec 16, 2016

revision to pa #201603172292 - revision of sales area light fixtures. n/a maher ordinance

Open the permit page

Mar 17, 2016Completed
final sign-off Dec 2016
5900 03rd Stt.i. for new grocery store. (mechanical, electrical, plumbing only). ref app#201602089065/ r1
Details
Permit
201603172292
Permit issued
Mar 25, 2016
Final sign-off
Dec 16, 2016

t.i. for new grocery store. (mechanical, electrical, plumbing only). ref app#201602089065/ r1

Open the permit page

$1,500,000
Feb 8, 2016Completed
final sign-off Dec 2016
5900 03rd Stti for grocery market. n/a maher ord. #155-13
Details
Permit
201602089065
Permit issued
Feb 26, 2016
Final sign-off
Dec 16, 2016

ti for grocery market. n/a maher ord. #155-13

Open the permit page

$700,000
Dec 31, 2015Completed
final sign-off May 2016
2200 Mission Strepair damaged storefront
Details
Permit
201512316232
Permit issued
Feb 9, 2016
Final sign-off
May 3, 2016

repair damaged storefront

Open the permit page

$4,000
Dec 8, 2015Completed
final sign-off Apr 2016
5900 03rd Stdemolish portion of non-bearing partitions (interior) abandoned by prior tenant. remove and cap existing floor sinks abandoned by tenant. 1st floor commercial space (ab-017); maher n/a
Details
Permit
201512084528
Permit issued
Dec 9, 2015
Final sign-off
Apr 13, 2016

demolish portion of non-bearing partitions (interior) abandoned by prior tenant. remove and cap existing floor sinks abandoned by tenant. 1st floor commercial space (ab-017); maher n/a

Open the permit page

$80,000
Sep 15, 2014Never finaled
issued Mar 2015, no final
498 Castro Sttenant improvements: interior renovations, replace with new fixtures and finishes, thorough cleaning; maher n/a
Details
Permit
201409156301
Permit issued
Mar 16, 2015

tenant improvements: interior renovations, replace with new fixtures and finishes, thorough cleaning; maher n/a

Open the permit page

$143,303
Jun 4, 2013Completed
final sign-off Aug 2013
1200 Irving Stcreating a coffee bar in (e) area, using existing electrical for lighting, adding 1 sink
Details
Permit
201306048609
Permit issued
Jun 20, 2013
Final sign-off
Aug 29, 2013

creating a coffee bar in (e) area, using existing electrical for lighting, adding 1 sink

Open the permit page

$100,000
Sep 10, 2012Never finaled
issued Sep 2012, no final
1095 Hyde Strevision to appl #2012.0530.1508 - minor lighting revision, no other work.
Details
Permit
201209109305
Permit issued
Sep 10, 2012

revision to appl #2012.0530.1508 - minor lighting revision, no other work.

Open the permit page

Jun 14, 2012Completed
final sign-off Nov 2012
1401 California Stdocumentation of accessibilit in parking area, entry doors, elevators for core upgrade to e building. no construction work.
Details
Permit
201206142606
Permit issued
Jun 21, 2012
Final sign-off
Nov 21, 2012

documentation of accessibilit in parking area, entry doors, elevators for core upgrade to e building. no construction work.

Open the permit page

May 30, 2012Completed
final sign-off Dec 2012
1095 Hyde Sttenant improvement for new trader joe's retail space-work includes new partitions, fixtures, finishes, equipment. new m.e.p, new restrooms. no exterior work, fire protection under seperate permit
Details
Permit
201205301508
Permit issued
Jul 9, 2012
Final sign-off
Dec 3, 2012

tenant improvement for new trader joe's retail space-work includes new partitions, fixtures, finishes, equipment. new m.e.p, new restrooms. no exterior work, fire protection under seperate permit

Open the permit page

$450,000