Block 3781, lot 003
555 09th St
- City’s use
- Commercial Retail
- Built
- 1991
- Stories
- 2
- Units
- 8
- Building
- 149,402 sq ft
- Lot
- 151,250 sq ft
- Zoning
- M2
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
131 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 20, 2026 | In progress issued Sep 2026 | 555 09th St | Tilton Pacific Const Inc. | ste 1b - core shell work ahead of t.i.. new stair, replacement of glazing @ 1st floor slab work.Details
ste 1b - core shell work ahead of t.i.. new stair, replacement of glazing @ 1st floor slab work. | $235,000 |
| Jul 6, 2026 | In progress issued Aug 2026 | 555 09th St | core & shell improvements, enlarged storefront opening, demising wall utility upgrades.Details
core & shell improvements, enlarged storefront opening, demising wall utility upgrades. | $119,955 | |
| Jul 2, 2026 | In progress issued Aug 2026 | 555 09th St | Dbsi Inc Dba Design Build Solutions & In | suite b. interior tenant improvement of a retail bank. demo of non structural partitions, ceiling and finishes. exterior improvements work painting, new night deposit and atm.Details
suite b. interior tenant improvement of a retail bank. demo of non structural partitions, ceiling and finishes. exterior improvements work painting, new night deposit and atm. | $670,000 |
| May 14, 2026 | In progress issued May 2026 | 555 09th St | California Fire Systems Inc | as-built for permit pa# 202512030795 to show accurate seismic bracing locations and piping per inspectors request.Details
as-built for permit pa# 202512030795 to show accurate seismic bracing locations and piping per inspectors request. | $45,000 |
| May 14, 2026 | Completed final sign-off Jun 2026 | 555 09th St | Tilton Pacific Const Inc. | deferred submittal to pa# 202512010601 for lv 1 box rigging.Details
deferred submittal to pa# 202512010601 for lv 1 box rigging. | |
| May 13, 2026 | In progress issued May 2026 | 555 09th St | Continental Signs, Inc | store #78: install front (1) illuminated channel letter "trader joes"Details
store #78: install front (1) illuminated channel letter "trader joes" | $9,000 |
| Apr 22, 2026 | In progress issued Apr 2026 | 555 09th St | Gigabyte Graphics Inc. Dba Fastsigns | install (5) identical non-electric double faced projecting signs: "trader joe's"Details
install (5) identical non-electric double faced projecting signs: "trader joe's" | $8,700 |
| Apr 3, 2026 | In progress issued Jun 2026 | 555 09th St | P S R West Coast Builders Inc | back of house expansion (e)ground level occupying additional 1393 sqft of former tenant sapce. work includes (n) relocated walk-in freezer, expanded breakroom. path of travel and facilities serving the expansion are to remain in compliance with cbc 11b-2024Details
back of house expansion (e)ground level occupying additional 1393 sqft of former tenant sapce. work includes (n) relocated walk-in freezer, expanded breakroom. path of travel and facilities serving the expansion are to remain in compliance with cbc 11b-2024 | $400,000 |
| Apr 2, 2026 | In progress issued Apr 2026 | 555 09th St | California Fire Systems Inc | as-built to 202512030795: add/remodel existing fire sprinkler system per nfpa 13Details
as-built to 202512030795: add/remodel existing fire sprinkler system per nfpa 13 | $45,000 |
| Mar 10, 2026 | In progress issued Jun 2026 | 555 09th St | Architectural Design & Signs Inc | sign d: installing (2) non illuminated projecting sign "club studio" 6" thick.Details
sign d: installing (2) non illuminated projecting sign "club studio" 6" thick. | $14,000 |
| Mar 10, 2026 | In progress issued Jun 2026 | 555 09th St | Architectural Design & Signs Inc | sign c & h: installing (2) halo illuminated wall sign "club studio" 3" thick.Details
sign c & h: installing (2) halo illuminated wall sign "club studio" 3" thick. | $18,000 |
| Mar 10, 2026 | In progress issued Jun 2026 | 555 09th St | Architectural Design & Signs Inc | sign j: installing (1) illuminated wall sign "club studio" 3" thick.Details
sign j: installing (1) illuminated wall sign "club studio" 3" thick. | $9,000 |
| Mar 10, 2026 | In progress issued Jun 2026 | 555 09th St | Architectural Design & Signs Inc | sign a: installing (1) halo illuminated wall sign "club studio" 3" thick.Details
sign a: installing (1) halo illuminated wall sign "club studio" 3" thick. | $12,000 |
| Mar 10, 2026 | In progress issued Jun 2026 | 555 09th St | Architectural Design & Signs Inc | sign b: installing (1) illuminated projecting sign "club studio" 12" thick.Details
sign b: installing (1) illuminated projecting sign "club studio" 12" thick. | $8,000 |
| Mar 10, 2026 | In progress issued Jun 2026 | 555 09th St | Architectural Design & Signs Inc | sign f: installing (2) illuminated wall sign "club studio" 10" thick.Details
sign f: installing (2) illuminated wall sign "club studio" 10" thick. | $12,000 |
| Mar 10, 2026 | In progress issued Jun 2026 | 555 09th St | Architectural Design & Signs Inc | sign e: installing (3) non-illuminated projecting sign "club studio" 6" thick.Details
sign e: installing (3) non-illuminated projecting sign "club studio" 6" thick. | $15,000 |
| Feb 10, 2026 | In progress issued Feb 2026 | 555 09th St | Everon Llc | fire alarm ti ref pa # 2025-1020-7737: add 1 power supply, 19 horn/strobes. 4 smoke detectors, 3 relays for elevator & 10 duct detectors with relays for ahv.Details
fire alarm ti ref pa # 2025-1020-7737: add 1 power supply, 19 horn/strobes. 4 smoke detectors, 3 relays for elevator & 10 duct detectors with relays for ahv. | $30,000 |
| Feb 5, 2026 | In progress issued Feb 2026 | 555 09th St | Tilton Pacific Const Inc. | revision to pa #202510207737 for new egress door and stair from loading dock.Details
revision to pa #202510207737 for new egress door and stair from loading dock. | $25,000 |
| Dec 3, 2025 | In progress issued Dec 2025 | 555 09th St | California Fire Systems Inc | change 592 existing pendent fire sprinklers to new upright fire sprinklers due to ceiling demolition. add 592 1' tees with plugged outlets to new s up for sprig future tenant improvement. add new seismic bracing to existing 2.5 " fire sprinkler line piping ref# 202509185610Details
change 592 existing pendent fire sprinklers to new upright fire sprinklers due to ceiling demolition. add 592 1' tees with plugged outlets to new s up for sprig future tenant improvement. add new seismic bracing to existing 2.5 " fire sprinkler line piping ref# 202509185610 | $45,000 |
| Dec 1, 2025 | In progress issued Apr 2026 | 555 09th St | Tilton Pacific Const Inc. | level 1 ti for build out of fitness facilityDetails
level 1 ti for build out of fitness facility | $4,154,208 |
| Nov 24, 2025 | In progress issued Dec 2025 | 555 09th St | Tilton Pacific Const Inc. | floor strengthening and hvac equipment replacement. wiring for hvac units on roof under separate ti permit.Details
floor strengthening and hvac equipment replacement. wiring for hvac units on roof under separate ti permit. | $215,394 |
| Nov 12, 2025 | In progress issued Dec 2025 | 555 09th St | Tilton Pacific Const Inc. | (n) non egress stair and elevatorDetails
(n) non egress stair and elevator | $168,973 |
| Nov 6, 2025 | In progress issued Apr 2026 | 555 09th St | Tilton Pacific Const Inc. | level 2 build out of fitness facilityDetails
level 2 build out of fitness facility | $3,709,488 |
| Oct 20, 2025 | In progress issued Oct 2025 | 555 09th St | Tilton Pacific Const Inc. | core shell work to (e) vacant tenant suite, (n) facade walls at interior courtyard, modified storefronts, new demising walls, new loading dock door.Details
core shell work to (e) vacant tenant suite, (n) facade walls at interior courtyard, modified storefronts, new demising walls, new loading dock door. | $105,000 |
| Sep 18, 2025 | In progress issued Oct 2025 | 555 09th St | Tilton Pacific Const Inc. | removal escalator, stair , elevator and unused chases. slab infills @ 2nd floor. reopening of (e) stairDetails
removal escalator, stair , elevator and unused chases. slab infills @ 2nd floor. reopening of (e) stair | $145,100 |
| Jul 15, 2024 | Completed final sign-off Sep 2024 | 555 09th St | Rod Heisler Construction | revision to pa#202309126411 to clarify special inspection requirments.Details
revision to pa#202309126411 to clarify special inspection requirments. | |
| Jun 14, 2024 | Completed final sign-off Jun 2024 | 555 09th St | United Systems Fire And Security Llc | 2/f: as built plans ref pa# 202402025131 & 202405172398, adding duct detectors on the operational matrix.Details
2/f: as built plans ref pa# 202402025131 & 202405172398, adding duct detectors on the operational matrix. | |
| Jun 10, 2024 | In progress issued Jun 2024 | 555 09th St | Rod Heisler Construction | #6 - floor anchored storage racking for retail storageDetails
#6 - floor anchored storage racking for retail storage | $30,000 |
| May 17, 2024 | Completed final sign-off Jul 2024 | 555 09th St | United Systems Fire And Security Llc | 2/f: fire alarm ti as built ref # 2024-0202-5131Details
2/f: fire alarm ti as built ref # 2024-0202-5131 | |
| May 6, 2024 | Completed final sign-off Oct 2024 | 555 09th St | Golden Gate Sign Company Inc. | double faced non illuminated pole sign in parking lot with printed " the container store" 18 inch diameter size.Details
double faced non illuminated pole sign in parking lot with printed " the container store" 18 inch diameter size. | $1,000 |
| Apr 22, 2024 | Completed final sign-off Oct 2024 | 555 09th St | Golden Gate Sign Company Inc. | sign a: install (1) electric single faced wall sign: "the container store" 2'10" x 40'4"Details
sign a: install (1) electric single faced wall sign: "the container store" 2'10" x 40'4" | $10,200 |
| Apr 22, 2024 | Completed final sign-off Oct 2024 | 555 09th St | Golden Gate Sign Company Inc. | sign d: install (1) electric single faced wall sign: "the container store" 2'0" x 28'6" (on roof level)Details
sign d: install (1) electric single faced wall sign: "the container store" 2'0" x 28'6" (on roof level) | $10,200 |
| Apr 22, 2024 | Completed final sign-off Oct 2024 | 555 09th St | Golden Gate Sign Company Inc. | sign e: reface (2) non-electric single faced panel on the existing projecting sign: "the container store" 2' x 12'(each), (in parking lot)Details
sign e: reface (2) non-electric single faced panel on the existing projecting sign: "the container store" 2' x 12'(each), (in parking lot) | $400 |
| Apr 22, 2024 | Completed final sign-off Oct 2024 | 555 09th St | Golden Gate Sign Company Inc. | sign c: install (1) electric single faced wall sign: "the container store" 3'1" x 43'11", (roof level entrance)Details
sign c: install (1) electric single faced wall sign: "the container store" 3'1" x 43'11", (roof level entrance) | $10,200 |
| Apr 22, 2024 | In progress issued Jun 2024 | 555 09th St | Golden Gate Sign Company Inc. | sign f: reface (2) non-electric single faced panel on the existing projecting sign: "the container store" 2' x 24'(each), (in parking lot)Details
sign f: reface (2) non-electric single faced panel on the existing projecting sign: "the container store" 2' x 24'(each), (in parking lot) | $400 |
| Mar 1, 2024 | Completed final sign-off Jul 2024 | 555 09th St | Rod Heisler Construction | revision 202306230793- to include structural in store front facing interior parking lotDetails
revision 202306230793- to include structural in store front facing interior parking lot | $29,000 |
| Feb 16, 2024 | Completed final sign-off Feb 2026 | 555 09th St | Tilton Pacific Const Inc. | (n) interior partition wall and door. mep work under separate ti.Details
(n) interior partition wall and door. mep work under separate ti. | $5,000 |
| Feb 2, 2024 | Completed final sign-off Jun 2024 | 555 09th St | United Systems Fire And Security Llc | new horn storbes and strobe only notification appliance are provided througout the space. new notification appliance will be powered using (e) power supply on level 1. control relay will be provided for an mute. new control relay and module for shutdown. ref pa# 202309126411Details
new horn storbes and strobe only notification appliance are provided througout the space. new notification appliance will be powered using (e) power supply on level 1. control relay will be provided for an mute. new control relay and module for shutdown. ref pa# 202309126411 | $25,000 |
| Jan 19, 2024 | Completed final sign-off May 2024 | 555 09th St | Aaa Restaurant Fire Control/Dba Aaa Fire | upgrade density of existing sprinkler system.Details
upgrade density of existing sprinkler system. | $162,000 |
| Dec 27, 2023 | Completed final sign-off Oct 2024 | 555 09th St | Rod Heisler Construction | demolition and removal of 3 back flow devices in 1st floor former nordstrom tenant space. these are not in use (per applicant).Details
demolition and removal of 3 back flow devices in 1st floor former nordstrom tenant space. these are not in use (per applicant). | $7,500 |
| Nov 15, 2023 | Completed final sign-off Jul 2024 | 555 09th St | United Systems Fire And Security Llc | this project is a t.i w/ fire alarm modification on the first floor ceiling to accomodate the additional beams being added for the floor strengthening, existing horns and strobes are being removed. new horn strobes are to be provided for minimal coverage. new smoke deterctors and synchromzation areDetails
this project is a t.i w/ fire alarm modification on the first floor ceiling to accomodate the additional beams being added for the floor strengthening, existing horns and strobes are being removed. new horn strobes are to be provided for minimal coverage. new smoke deterctors and synchromzation are | $20,645 |
| Sep 12, 2023 | Completed final sign-off Oct 2024 | 555 09th St | Rod Heisler Construction | interior ti for new retail store fit out. work includes full interior fitout including partitons, restrooms, doors, hardwarde, fixtures, finishesDetails
interior ti for new retail store fit out. work includes full interior fitout including partitons, restrooms, doors, hardwarde, fixtures, finishes | $1,200,000 |
| Jun 23, 2023 | Completed final sign-off Jul 2024 | 555 09th St | Rod Heisler Construction | storefront removal & install new storefront @ 2nd level. restripe parking & light replacement.Details
storefront removal & install new storefront @ 2nd level. restripe parking & light replacement. | $360,000 |
| Jun 14, 2023 | Completed final sign-off Oct 2024 | 555 09th St | Rod Heisler Construction | demo of mezzanine to create warm shell space in advance of future tiDetails
demo of mezzanine to create warm shell space in advance of future ti | $85,000 |
| Jun 2, 2023 | Completed final sign-off Sep 2024 | 555 09th St | Aaa Restaurant Fire Control/Dba Aaa Fire | remove (e) sprinkler system in (e) sales area to make way for structral upgrades, reinstal new sprinkler pipe and upgrade eq bracingDetails
remove (e) sprinkler system in (e) sales area to make way for structral upgrades, reinstal new sprinkler pipe and upgrade eq bracing | $155,300 |
| Mar 17, 2023 | Completed final sign-off Jul 2024 | 555 09th St | Rod Heisler Construction | core and shell improvement: removal of elevator & shaft, removal of stair, slab infill and floor strengtheningDetails
core and shell improvement: removal of elevator & shaft, removal of stair, slab infill and floor strengthening | $360,000 |
| Mar 24, 2022 | Completed final sign-off Jul 2022 | 555 09th St | Battalion One Fire Protection | 1/f: relocate 5 pendernt fire sprinklers in new wall layout & add 2 pendents. pa 202110070027Details
1/f: relocate 5 pendernt fire sprinklers in new wall layout & add 2 pendents. pa 202110070027 | $3,500 |
| Mar 7, 2022 | Never finaled issued Mar 2022, no final | 555 09th St | P S R West Coast Builders Inc | relocating wiring for receptacles, switches and fixtures per drawings. electrical work at traders joe's only.Details
relocating wiring for receptacles, switches and fixtures per drawings. electrical work at traders joe's only. | $18,000 |
| Feb 16, 2022 | Expired or cancelled cancelled Jan 2026 | 555 09th St | remove (e) steel window awnings. remove (e) exterior wall plaster treatment. removeal of (e) exterior steel ornamentation cages. installation of new steel canopies. paint entire exterior. ada improvements.Details
remove (e) steel window awnings. remove (e) exterior wall plaster treatment. removeal of (e) exterior steel ornamentation cages. installation of new steel canopies. paint entire exterior. ada improvements. | $360,000 | |
| Oct 7, 2021 | Never finaled issued Feb 2022, no final | 555 09th St | P S R West Coast Builders Inc | remodel of existing 1 story retail grocery store project,new break room & relocation of restrooms in the(e) back of house path of travel & facilities serving the proposed expansion/alteration are to remain in compliance with cbc ib-2024. mep & fire deferredDetails
remodel of existing 1 story retail grocery store project,new break room & relocation of restrooms in the(e) back of house path of travel & facilities serving the proposed expansion/alteration are to remain in compliance with cbc ib-2024. mep & fire deferred | $110,000 |
| Sep 26, 2020 | Completed final sign-off Sep 2022 | 555 09th St | Red Hawk Fire & Security Ca Llc | emergency fire alarm panel replacement. replace (e) edwards panel w/new version. revise all (e) devices, notification appliances & wiring. add (1) remote annunciator, (1) wireless communicator. no ref bpa#Details
emergency fire alarm panel replacement. replace (e) edwards panel w/new version. revise all (e) devices, notification appliances & wiring. add (1) remote annunciator, (1) wireless communicator. no ref bpa# | $5,000 |
| Dec 11, 2018 | Never finaled issued Dec 2018, no final | 555 09th St | Lennox National Account Services Llc | remove and replace 3 roof top hvac units. replace in kind.Details
remove and replace 3 roof top hvac units. replace in kind. | $29,000 |
| Nov 27, 2018 | Completed final sign-off Jan 2019 | 555 09th St | Bolls Fire & Safety Inc | 2/f: add sprinklers to a converted portion of (e) stockroom space to office. 13=automatic sprinklers. ref pa#201810264293. maher n/a.Details
2/f: add sprinklers to a converted portion of (e) stockroom space to office. 13=automatic sprinklers. ref pa#201810264293. maher n/a. | $6,300 |
| Oct 26, 2018 | Never finaled issued Oct 2018, no final | 555 09th St | La Roza Construction Inc | construct interior partition walls & doors to convert retail stockroom space into office space. install new lights, hvac registers. accessibility upgrades at (e) restrooms & drinking fountain. maher n/aDetails
construct interior partition walls & doors to convert retail stockroom space into office space. install new lights, hvac registers. accessibility upgrades at (e) restrooms & drinking fountain. maher n/a | $138,950 |
| Mar 16, 2018 | Expired or cancelled cancelled Jan 2026 | 555 09th St | electrical plans only t-24 interior/exterior (e). r&r (e) lighting throughout maher naDetails
electrical plans only t-24 interior/exterior (e). r&r (e) lighting throughout maher na | $9,000 | |
| Jul 18, 2017 | Never finaled issued Jul 2017, no final | 555 09th St | Superior Automatic Sprinkler | work involves 10 relocates & 2 adds ref pa 2017-0510-6165. n/a maherDetails
work involves 10 relocates & 2 adds ref pa 2017-0510-6165. n/a maher | $7,300 |
| May 10, 2017 | Completed final sign-off Oct 2017 | 555 09th St | Brennan Construction Co. Inc. | new toilet rm, relocate exiting trash bailer, mep deferredDetails
new toilet rm, relocate exiting trash bailer, mep deferred | $115,000 |
| Nov 9, 2016 | Completed final sign-off Nov 2016 | 555 09th St | Red Hawk Fire & Security Ca Llc | revision to 201608296199 addition of notification appliances to new retail maher naDetails
revision to 201608296199 addition of notification appliances to new retail maher na | $10,000 |
| Oct 18, 2016 | Never finaled issued Oct 2016, no final | 555 09th St | All Valley Fire Protection **See Notes* | relocate 92 pendent heads to new ceiling height and wall layout maher na; ref ti bpa201604296169Details
relocate 92 pendent heads to new ceiling height and wall layout maher na; ref ti bpa201604296169 | $14,000 |
| Sep 20, 2016 | Expired or cancelled cancelled Jan 2026 | 555 09th St | Ad Art Inc. | install 3 awnings 3x12 x 4 dropDetails
install 3 awnings 3x12 x 4 drop | $5,000 |
| Sep 8, 2016 | Completed final sign-off Nov 2016 | 555 09th St | Mikes Custom Awnings & Covers | graphic on canvas maher naDetails
graphic on canvas maher na | $300 |
| Sep 8, 2016 | Completed final sign-off Nov 2016 | 555 09th St | Mikes Custom Awnings & Covers | install 3 awnings ( canvas ) maherDetails
install 3 awnings ( canvas ) maher | $2,200 |
| Aug 29, 2016 | Completed final sign-off Nov 2016 | 555 09th St | Red Hawk Fire & Security Ca Llc | adding notification alert throughout space, 1 power supply, 1 smoke, 7 ada multi candela horn/strobes, 5 multi candela strobes. reference 2016.0429.6169. maher naDetails
adding notification alert throughout space, 1 power supply, 1 smoke, 7 ada multi candela horn/strobes, 5 multi candela strobes. reference 2016.0429.6169. maher na | $11,300 |
| Aug 24, 2016 | Completed final sign-off Nov 2016 | 555 09th St | change of use from retail to retail- personal service for ulta (formula retail per cua pc motion 19647) revision to pa#2016-0429-6169Details
change of use from retail to retail- personal service for ulta (formula retail per cua pc motion 19647) revision to pa#2016-0429-6169 | ||
| Aug 11, 2016 | Completed final sign-off Nov 2016 | 555 09th St | Bogart Construction Inc . | revision to ref pa 201604296167: install new topping concrete slab maher naDetails
revision to ref pa 201604296167: install new topping concrete slab maher na | $65,000 |
| Jul 25, 2016 | Never finaled issued Sep 2016, no final | 555 09th St | Ad Art Inc. | install electric single-faced wall signDetails
install electric single-faced wall sign | $5,000 |
| Jul 25, 2016 | Never finaled issued Sep 2016, no final | 555 09th St | Ad Art Inc. | install electric projecting double-faced signDetails
install electric projecting double-faced sign | $5,000 |
| Jul 18, 2016 | Completed final sign-off Aug 2016 | 555 09th St | Bigham Taylor Roofing Co | re-roofingDetails
re-roofing | $80,000 |
| Apr 29, 2016 | Completed final sign-off Nov 2016 | 555 09th St | Bogart Construction Inc . | interior t.i. within existing shell bldg. to include new fixtures, finishes and equipment. mep included. n/a ordinance #155-13Details
interior t.i. within existing shell bldg. to include new fixtures, finishes and equipment. mep included. n/a ordinance #155-13 | $654,295 |
| Dec 1, 2015 | Expired or cancelled cancelled Mar 2020 | 555 09th St | install shelving in sales floor & electrical work. bed, bath & beyond is working on a a project to offer customers an expanded variety of pre-packaged & shelf stable gourmet foods for consumption off the premises. maher naDetails
install shelving in sales floor & electrical work. bed, bath & beyond is working on a a project to offer customers an expanded variety of pre-packaged & shelf stable gourmet foods for consumption off the premises. maher na | $200,000 | |
| Sep 2, 2014 | Never finaled issued Sep 2014, no final | 555 09th St | street space permitDetails
street space permit | ||
| Aug 19, 2014 | Never finaled issued Aug 2014, no final | 555 09th St | street spaceDetails
street space | ||
| Aug 15, 2013 | Completed final sign-off Sep 2013 | 555 09th St | Red Hawk Fire & Security Ca Llc | add one smoke detector, 2 booster power supplies, one synch module, 26 horn/strobes and 21 strobes. t.i. 201301228372Details
add one smoke detector, 2 booster power supplies, one synch module, 26 horn/strobes and 21 strobes. t.i. 201301228372 | $10,000 |
| Aug 13, 2013 | Never finaled issued Aug 2013, no final | 555 09th St | street space permitDetails
street space permit | ||
| Jul 29, 2013 | Never finaled issued Jul 2013, no final | 555 09th St | parking meterDetails
parking meter | ||
| Jul 25, 2013 | Never finaled issued Jul 2013, no final | 555 09th St | street spaceDetails
street space | ||
| Jul 9, 2013 | Completed final sign-off Oct 2013 | 555 09th St | Viking Sign Installations | to erect 2 single faced illuminated signs.Details
to erect 2 single faced illuminated signs. | $10,000 |
| Jul 9, 2013 | Completed final sign-off Oct 2013 | 555 09th St | Viking Sign Installations | to erect 3 single faced illuminated signs.Details
to erect 3 single faced illuminated signs. | $15,000 |
| Jun 12, 2013 | Completed final sign-off Jul 2013 | 555 09th St | Ayoob & Peery Plumbing Co Inc | fire sprinkler ti-add 1 sprinkler, relocate 22 sprinklers & plug 2 sprinklers. reference t.i. 2013.0122.8372Details
fire sprinkler ti-add 1 sprinkler, relocate 22 sprinklers & plug 2 sprinklers. reference t.i. 2013.0122.8372 | $11,800 |
| May 29, 2013 | Never finaled issued May 2013, no final | 555 09th St | Dome Construction Corp | install shoe shelving located @ 1st floor.Details
install shoe shelving located @ 1st floor. | $50,000 |
| Jan 22, 2013 | Completed final sign-off Sep 2013 | 555 09th St | Dome Construction Corp | interior tenant remodel for an extg 2 story nordstrom rack dept. store. t.i. work includes new finishes, new non structural partitions. new carework for a retail sales floor. personnel offices. stock storage and associated electrical, plmg and mechanical system.Details
interior tenant remodel for an extg 2 story nordstrom rack dept. store. t.i. work includes new finishes, new non structural partitions. new carework for a retail sales floor. personnel offices. stock storage and associated electrical, plmg and mechanical system. | $450,000 |
| Oct 2, 2012 | Completed final sign-off Jan 2013 | 555 09th St | Arrow Sign Company | erect 1 electric, double faced, projecting sign.Details
erect 1 electric, double faced, projecting sign. | $3,000 |
| Jun 27, 2012 | Completed final sign-off Sep 2012 | 555 09th St | Red Hawk Fire & Security Ca Llc | 1st floor fire alarm t.i. - adding: (1) power supply, (4) strobes, (8) horn/strobes, (2) relays, (5) smoke detectors, (1) sync module.Details
1st floor fire alarm t.i. - adding: (1) power supply, (4) strobes, (8) horn/strobes, (2) relays, (5) smoke detectors, (1) sync module. | $6,000 |
| Jun 12, 2012 | Completed final sign-off Aug 2012 | 555 09th St | One Source Security & Sound Inc | remove existing atm and kiosk . demo concrete pad. dreplace with new atm and kioskDetails
remove existing atm and kiosk . demo concrete pad. dreplace with new atm and kiosk | $8,700 |
| Jun 8, 2012 | Completed final sign-off Aug 2012 | 555 09th St | Westates Mechanical Corporation Inc | #83 - relocate 45 sprinkler heads for new t-bar ceiling, t.i. pa #2011.0608.7639Details
#83 - relocate 45 sprinkler heads for new t-bar ceiling, t.i. pa #2011.0608.7639 | $16,000 |
| Apr 30, 2012 | Completed final sign-off Sep 2012 | 555 09th St | Signtech Electrical Advertising Inc. | erect a electric wall single faced direct new signDetails
erect a electric wall single faced direct new sign | $3,000 |
| Apr 23, 2012 | Never finaled issued Apr 2012, no final | 555 09th St | street space permit.Details
street space permit. | ||
| Nov 4, 2011 | Completed final sign-off Sep 2012 | 555 09th St | Signtech Electrical Advertising Inc. | #b3:to erect 9 illuminated wall signs.Details
#b3:to erect 9 illuminated wall signs. | $20,000 |
| Nov 4, 2011 | Completed final sign-off Sep 2012 | 555 09th St | Signtech Electrical Advertising Inc. | #b3:to erect 2 illuminated projecting electrical signs.Details
#b3:to erect 2 illuminated projecting electrical signs. | $5,000 |
| Nov 4, 2011 | Completed final sign-off Sep 2012 | 555 09th St | Signtech Electrical Advertising Inc. | #b3:to erect 3 non-illuminated wall signs.Details
#b3:to erect 3 non-illuminated wall signs. | $4,000 |
| Jun 8, 2011 | Completed final sign-off Sep 2012 | 555 09th St | Howard S. Wright Constructors Lp | #83 new 4715 sf tenant improvement of existing gr floor retail space ina 2 story building for branch bank. work includes new interior atm. non structural partitions, ceilings, soffits, finishes, furniture, related hvac, elec, plumbing.Details
#83 new 4715 sf tenant improvement of existing gr floor retail space ina 2 story building for branch bank. work includes new interior atm. non structural partitions, ceilings, soffits, finishes, furniture, related hvac, elec, plumbing. | $513,935 |
| May 10, 2011 | Completed final sign-off Sep 2012 | 555 09th St | Howard S. Wright Constructors Lp | #83 - add new walk up atm to 9th street & mall concourse storefronts.Details
#83 - add new walk up atm to 9th street & mall concourse storefronts. | $20,000 |
| Oct 27, 2010 | Expired or cancelled expired Sep 2012 | 555 09th St | Lennox National Account Services Llc | remove & replace 2 (e) 7.5 ton package rtu's-air conditioning unitsDetails
remove & replace 2 (e) 7.5 ton package rtu's-air conditioning units | $13,401 |
| May 5, 2009 | Never finaled issued May 2009, no final | 555 09th St | street space & mtaDetails
street space & mta | ||
| Feb 11, 2009 | Completed final sign-off Sep 2009 | 555 09th St | Brennan Construction Co. Inc. | expansion of cooler box, new roll-up door, replacement of 12' door with 9' door with man door at rear of building. new accessible upgrades to include: (n) accessible for (e) threshold at primary entrance, accessible parking upgrades and restroom signage and wing walls at restroom entrances.Details
expansion of cooler box, new roll-up door, replacement of 12' door with 9' door with man door at rear of building. new accessible upgrades to include: (n) accessible for (e) threshold at primary entrance, accessible parking upgrades and restroom signage and wing walls at restroom entrances. | $40,000 |
| Jun 25, 2008 | Completed final sign-off Jul 2008 | 555 09th St | Mina-Tree Signs, Inc | renew pa#200707096295 for final inspection.Details
renew pa#200707096295 for final inspection. | |
| Feb 28, 2008 | Completed final sign-off Jul 2008 | 555 09th St | tenant improvement on the 1st fl. overhead light fixtures, basic maintenance of (e) registers and relocation of remote service desksDetails
tenant improvement on the 1st fl. overhead light fixtures, basic maintenance of (e) registers and relocation of remote service desks | $175,000 | |
| Nov 8, 2007 | Completed final sign-off Dec 2007 | 555 09th St | (n) furrout around (e)4" steel columns in shared mall bathroom. work includes (n)finsohes, flooring and painting in same bathroom. no work in tenant space or any other consytruction. no lighting or mechanical work.Details
(n) furrout around (e)4" steel columns in shared mall bathroom. work includes (n)finsohes, flooring and painting in same bathroom. no work in tenant space or any other consytruction. no lighting or mechanical work. | $8,000 | |
| Oct 15, 2007 | Completed final sign-off Dec 2007 | 555 09th St | Sure Fire Protection | 1st floor - 18 relocates of sprinklers below new ceiling. ref. arch. #2007.04.06.8242.Details
1st floor - 18 relocates of sprinklers below new ceiling. ref. arch. #2007.04.06.8242. | $3,800 |
| Sep 13, 2007 | Completed final sign-off Dec 2007 | 555 09th St | Andre Del Valle Construction | suite b5 - erect sign - electric, wall, projecting, double faced.Details
suite b5 - erect sign - electric, wall, projecting, double faced. | |
| Sep 13, 2007 | Never finaled issued Sep 2007, no final | 555 09th St | Andre Del Valle Construction | suite b5 - erect sign - non-electric, wall single faced. reface 2 existing illuminated signs at rear of building.Details
suite b5 - erect sign - non-electric, wall single faced. reface 2 existing illuminated signs at rear of building. | |
| Sep 5, 2007 | Never finaled issued Sep 2007, no final | 555 09th St | street spaceDetails
street space | ||
| Sep 4, 2007 | Completed final sign-off Dec 2007 | 555 09th St | revision to app# 200704068242/ to include equipment locations,lighting & mechanical, add louver over door @ interior mall entrance.Details
revision to app# 200704068242/ to include equipment locations,lighting & mechanical, add louver over door @ interior mall entrance. | ||
| Jul 9, 2007 | Completed final sign-off Dec 2007 | 555 09th St | erect double faced signDetails
erect double faced sign | ||
| May 21, 2007 | Never finaled issued May 2007, no final | 555 09th St | streetspaceDetails
streetspace | ||
| May 10, 2007 | Completed final sign-off Dec 2007 | 555 09th St | install self contained atm machine in covered walkwayDetails
install self contained atm machine in covered walkway | $6,000 | |
| Apr 6, 2007 | Completed final sign-off Dec 2007 | 555 09th St | interior t.i for coffee cafe & retail sales, interior soft demo, (n) walls, (n) lighting, (n) ducting, (n) finishes, (n) casework, (n) equipment. change of use.Details
interior t.i for coffee cafe & retail sales, interior soft demo, (n) walls, (n) lighting, (n) ducting, (n) finishes, (n) casework, (n) equipment. change of use. | $225,000 | |
| Sep 25, 2003 | Completed final sign-off Feb 2004 | 555 09th St | remodel existing floor planDetails
remodel existing floor plan | $16,340 | |
| Jun 3, 2003 | Completed final sign-off Jun 2003 | 555 09th St | D & D Fire Protection Inc | rev to approved bldg permit 200205317946; as build sprinkler planDetails
rev to approved bldg permit 200205317946; as build sprinkler plan | |
| Oct 9, 2002 | Completed final sign-off Feb 2003 | 555 09th St | U S Sign & Lighting Maintenance Co. | erect a single faced wall signDetails
erect a single faced wall sign | |
| Aug 27, 2002 | Completed final sign-off Jun 2003 | 555 09th St | fire alarm permit for first + second floorDetails
fire alarm permit for first + second floor | $35,000 | |
| May 31, 2002 | Completed final sign-off Jun 2003 | 555 09th St | fire sprinkler for 1st and 2nd floorDetails
fire sprinkler for 1st and 2nd floor | $50,000 | |
| Apr 11, 2002 | Completed final sign-off Jul 2002 | 555 09th St | 2/fl- install of storage shelving in an (e) retail storeDetails
2/fl- install of storage shelving in an (e) retail store | $100,000 | |
| Apr 4, 2002 | Expired or cancelled expired Sep 2002 | 555 09th St | 1 & 2/fl - mechanical & electrical- architectural review for appl#200201227392Details
1 & 2/fl - mechanical & electrical- architectural review for appl#200201227392 | ||
| Jan 22, 2002 | Completed final sign-off Jun 2003 | 555 09th St | remodel (e) 1 & 2 floor retail, new partition/electrical/bridge to connect 2 retail areaDetails
remodel (e) 1 & 2 floor retail, new partition/electrical/bridge to connect 2 retail area | $2,000,000 | |
| Jan 10, 2002 | Completed final sign-off Jun 2003 | 555 09th St | 2/f interior remodel remodel new partitions ceilings lighting electrical mechanical plumbing fire prDetails
2/f interior remodel remodel new partitions ceilings lighting electrical mechanical plumbing fire pr | $500,000 | |
| Nov 15, 2001 | Expired or cancelled expired Mar 2002 | 555 09th St | Mayta Commercial Inc | fire sprinkler supervisory system, floors 1, 2, "as builts"Details
fire sprinkler supervisory system, floors 1, 2, "as builts" | |
| Oct 24, 2001 | Expired or cancelled expired Feb 2002 | 555 09th St | Aquamatic Fire Protection | rev. to appl#200110110444 as built plans onlyDetails
rev. to appl#200110110444 as built plans only | |
| Oct 11, 2001 | Expired or cancelled expired Feb 2002 | 555 09th St | Aquamatic Fire Protection | sprinklers modifcation-tenant improvementuDetails
sprinklers modifcation-tenant improvementu | $1,100 |
| Sep 6, 2001 | Completed final sign-off Dec 2001 | 555 09th St | R 3 Builders Inc. | relocate ofice/entrance/install cheese cases/frozen food casesDetails
relocate ofice/entrance/install cheese cases/frozen food cases | $50,000 |
| Aug 23, 2001 | Completed final sign-off Nov 2001 | 555 09th St | Ayoob & Peery Plumbing Co Inc | as built fire sprinkler to renew 2001/05/22/9750.Details
as built fire sprinkler to renew 2001/05/22/9750. | |
| Aug 9, 2001 | Completed final sign-off Nov 2001 | 555 09th St | Mayta Commercial Inc | fire alarm supervisory system at nordstrom portion 1st and 2nd floorDetails
fire alarm supervisory system at nordstrom portion 1st and 2nd floor | $100,000 |
| Jul 10, 2001 | Expired or cancelled expired Sep 2002 | 555 09th St | tenant improvement to build a coffee stand in existng space in existng retail complex demo walls, alDetails
tenant improvement to build a coffee stand in existng space in existng retail complex demo walls, al | $60,000 | |
| Jun 15, 2001 | Completed final sign-off Apr 2002 | 555 09th St | Mayta Commercial Inc | to erect double faced electric signDetails
to erect double faced electric sign | $90,000 |
| Jun 14, 2001 | Completed final sign-off Oct 2001 | 555 09th St | relocate storefront entry @ 9th st & replace tile @ 9th st mis doorwys other sidew new roof unitsDetails
relocate storefront entry @ 9th st & replace tile @ 9th st mis doorwys other sidew new roof units | $50,000 | |
| May 22, 2001 | Completed final sign-off Nov 2001 | 555 09th St | Ayoob & Peery Plumbing Co Inc | relocate existing uprights and or pendents, to accomodate new retail tenant on 1st & 2nd flDetails
relocate existing uprights and or pendents, to accomodate new retail tenant on 1st & 2nd fl | $42,000 |
| Mar 29, 2001 | Completed final sign-off Jul 2002 | 555 09th St | remove interior walls interior non structural demolition onlyDetails
remove interior walls interior non structural demolition only | $15,000 | |
| Mar 13, 2001 | Completed final sign-off Oct 2001 | 555 09th St | Details
| $100,000 | |
| Mar 13, 2001 | Completed final sign-off Nov 2001 | 555 09th St | provide mechanical and electrical per plansDetails
provide mechanical and electrical per plans | ||
| Feb 22, 2001 | Completed final sign-off Oct 2001 | 555 09th St | Mayta Commercial Inc | non-structural demo onlyDetails
non-structural demo only | $57,900 |
| Aug 30, 2000 | Expired or cancelled expired Dec 2000 | 555 09th St | Bill Moore & Associates Graphics Inc | erect signDetails
erect sign |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.