Michael Bech
- Listed as
- architect
- Firm
- Ai Architecture
- On San Francisco permits
- Jul 2026 to Sep 2026
3 permits since 2000 (architect on 3 permits): 3 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 25, 2026 | In progress filed Sep 2026, not yet issued | 2701 Mission St | selective exterior renovation minor facade repairs, painting new window film, anti graffiti caoting. site improvement repair existing sidewalk, curbs and parking areas installation of new bollards sealcoat and re restriping of parking lot/ in kind, new convex traffic minor general repairs, maintenanDetails
selective exterior renovation minor facade repairs, painting new window film, anti graffiti caoting. site improvement repair existing sidewalk, curbs and parking areas installation of new bollards sealcoat and re restriping of parking lot/ in kind, new convex traffic minor general repairs, maintenan | $160,000 | |
| Jul 29, 2026 | In progress issued Aug 2026 | 2675 Geary Bl | Dbsi Inc Dba Design Build Solutions & In | 2nd floor: interior tenant improvement for a retail bank. structural work for cash safe, atm. mep upgrades. demo of non structural partitions. new finishes and ceiling.Details
2nd floor: interior tenant improvement for a retail bank. structural work for cash safe, atm. mep upgrades. demo of non structural partitions. new finishes and ceiling. | $869,000 |
| Jul 2, 2026 | In progress issued Aug 2026 | 555 09th St | Dbsi Inc Dba Design Build Solutions & In | suite b. interior tenant improvement of a retail bank. demo of non structural partitions, ceiling and finishes. exterior improvements work painting, new night deposit and atm.Details
suite b. interior tenant improvement of a retail bank. demo of non structural partitions, ceiling and finishes. exterior improvements work painting, new night deposit and atm. | $670,000 |