Tobin Alexander White
- Listed as
- architect
- Firm
- Side Studio
- On San Francisco permits
- Feb 2022 to Jun 2023
5 permits since 2000 (architect on 5 permits): 4 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 23, 2023 | Completed final sign-off Jul 2024 | 555 09th St | Rod Heisler Construction | storefront removal & install new storefront @ 2nd level. restripe parking & light replacement.Details
storefront removal & install new storefront @ 2nd level. restripe parking & light replacement. | $360,000 |
| Jun 14, 2023 | Completed final sign-off Oct 2024 | 555 09th St | Rod Heisler Construction | demo of mezzanine to create warm shell space in advance of future tiDetails
demo of mezzanine to create warm shell space in advance of future ti | $85,000 |
| Mar 17, 2023 | Completed final sign-off Jul 2024 | 555 09th St | Rod Heisler Construction | core and shell improvement: removal of elevator & shaft, removal of stair, slab infill and floor strengtheningDetails
core and shell improvement: removal of elevator & shaft, removal of stair, slab infill and floor strengthening | $360,000 |
| Feb 16, 2022 | Expired or cancelled cancelled Jan 2026 | 555 09th St | remove (e) steel window awnings. remove (e) exterior wall plaster treatment. removeal of (e) exterior steel ornamentation cages. installation of new steel canopies. paint entire exterior. ada improvements.Details
remove (e) steel window awnings. remove (e) exterior wall plaster treatment. removeal of (e) exterior steel ornamentation cages. installation of new steel canopies. paint entire exterior. ada improvements. | $360,000 | |
| Feb 16, 2022 | Completed final sign-off Oct 2023 | 2675 Geary Bl | Rod Heisler Construction | 1-story horizontal addition -space e-100: raw shell improvement. addtion of 480sf to tenant space. addition to (n) storage front system. addition of 3 landscaope planters. removal of (e) asphalt paving with new concrete paving for the addition of 5 standard parking stalls.Details
1-story horizontal addition -space e-100: raw shell improvement. addtion of 480sf to tenant space. addition to (n) storage front system. addition of 3 landscaope planters. removal of (e) asphalt paving with new concrete paving for the addition of 5 standard parking stalls. | $125,000 |