Brennan Construction Co. Inc.
- Based in
- Danville
- On San Francisco permits
- Feb 2009 to Jan 2018
- Last 24 months
- 0 permits filed
12 permits since 2000: 7 completed, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 22, 2018 | Completed final sign-off Apr 2018 | 265 Winston Dr | work consists entirely of hc barrier removal: 1)new hc signage. 2)upgrade extg restrooms to current accessiblity code. note: meps on seperate permits. n/a for maherDetails
work consists entirely of hc barrier removal: 1)new hc signage. 2)upgrade extg restrooms to current accessiblity code. note: meps on seperate permits. n/a for maher | $110,000 |
| Jul 24, 2017 | Expired or cancelled cancelled Jan 2026 | 265 Winston Dr | work consist entirely of hc barrier removal, new hc signage, upgrade existing restrooms to current accessibility codeDetails
work consist entirely of hc barrier removal, new hc signage, upgrade existing restrooms to current accessibility code | $110,000 |
| May 30, 2017 | Expired or cancelled expired Sep 2022 | 401 Bay St | work consists entirely of handicap barrier removal, restroom modifications; parking striping; ramp handrail extensions; ramp wheel guides; updated signage. mep deferredDetails
work consists entirely of handicap barrier removal, restroom modifications; parking striping; ramp handrail extensions; ramp wheel guides; updated signage. mep deferred | $65,000 |
| May 10, 2017 | Completed final sign-off Oct 2017 | 555 09th St | new toilet rm, relocate exiting trash bailer, mep deferredDetails
new toilet rm, relocate exiting trash bailer, mep deferred | $115,000 |
| Aug 8, 2016 | Never finaled issued Aug 2016, no final | 3 Masonic Av | revision to pa# 201606109618. relocate toilet. show electrical on permit drawingsDetails
revision to pa# 201606109618. relocate toilet. show electrical on permit drawings | |
| Jun 10, 2016 | Never finaled issued Jul 2016, no final | 3 Masonic Av | new hc accessible checkout stands. upgrade extg restrooms to meet current hc accessibility. permit consists entirely of hc barrier removal.Details
new hc accessible checkout stands. upgrade extg restrooms to meet current hc accessibility. permit consists entirely of hc barrier removal. | $105,000 |
| Mar 15, 2016 | Completed final sign-off Mar 2016 | 401 Bay St | revision to pa 2015-1102-1446, extend guard rails angle truncated domes.Details
revision to pa 2015-1102-1446, extend guard rails angle truncated domes. | |
| Nov 2, 2015 | Completed final sign-off Mar 2016 | 401 Bay St | abandonment & enclosure of an existing entry door from an underground parking garage into the existing retail space, not visible from street. n/a maher ordinanceDetails
abandonment & enclosure of an existing entry door from an underground parking garage into the existing retail space, not visible from street. n/a maher ordinance | $5,000 |
| Jul 30, 2015 | Never finaled issued Jul 2015, no final | 265 Winston Dr | move bathroom wall to get proper ada clearances, revised to permit 201504012555.Details
move bathroom wall to get proper ada clearances, revised to permit 201504012555. | $1,200 |
| Apr 1, 2015 | Completed final sign-off Aug 2015 | 265 Winston Dr | new employee room, locker room, storage room. extension of hvac into new rooms, new elect. outlets, lighting in new rooms.Details
new employee room, locker room, storage room. extension of hvac into new rooms, new elect. outlets, lighting in new rooms. | $25,000 |
| Nov 10, 2010 | Completed final sign-off Jun 2011 | 3 Masonic Av | remove & replace some of the refrigerated fresh cases, add 1 floor sink, relocate tasting area, demo station, eliminate existing tasting area, demo station, build small drywall soffit for interior signage.Details
remove & replace some of the refrigerated fresh cases, add 1 floor sink, relocate tasting area, demo station, eliminate existing tasting area, demo station, build small drywall soffit for interior signage. | $60,000 |
| Feb 11, 2009 | Completed final sign-off Sep 2009 | 555 09th St | expansion of cooler box, new roll-up door, replacement of 12' door with 9' door with man door at rear of building. new accessible upgrades to include: (n) accessible for (e) threshold at primary entrance, accessible parking upgrades and restroom signage and wing walls at restroom entrances.Details
expansion of cooler box, new roll-up door, replacement of 12' door with 9' door with man door at rear of building. new accessible upgrades to include: (n) accessible for (e) threshold at primary entrance, accessible parking upgrades and restroom signage and wing walls at restroom entrances. | $40,000 |