Howard S. Wright Constructors Lp
- Based in
- Emeryville
- On San Francisco permits
- Mar 2007 to Jul 2013
- Last 24 months
- 0 permits filed
92 permits since 2000: 76 completed, 12 never finaled, 4 expired or cancelled.
Of the 12 never-finaled permits, 12 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 24, 2013 | Completed final sign-off Dec 2013 | 240 Stockton St | 8th floor: revision to permit #201211305228. restroom accessibility upgrades. revision consists of relocation of door hinge and change the swing of the new 90 min fire rated door and frame. floor is currently unoccupied. mep and life safety under seperate permit.Details
8th floor: revision to permit #201211305228. restroom accessibility upgrades. revision consists of relocation of door hinge and change the swing of the new 90 min fire rated door and frame. floor is currently unoccupied. mep and life safety under seperate permit. | |
| Jul 19, 2013 | Expired or cancelled cancelled Jul 2016 | 1017 Market St | painted non structural, non illuminated new signDetails
painted non structural, non illuminated new sign | $5,000 |
| Jul 2, 2013 | Completed final sign-off Apr 2016 | 360 Post St | 3rd-11th floors-replace of (e) fireproofing products & systems at floors 3 to 11 at (e) steel structure required by hvac replacement project under pa# 2012-0316-6226.Details
3rd-11th floors-replace of (e) fireproofing products & systems at floors 3 to 11 at (e) steel structure required by hvac replacement project under pa# 2012-0316-6226. | $500,000 |
| Jun 28, 2013 | Completed final sign-off Jul 2015 | 995 Market St | soft demolitoin of drywall, plaster and flooring materials on 4 floors. approx 25000 sq ft. includes 1st, 2nd, 3rd floors. (partial ground floor) - comply with nov# 200236116 & 20099315Details
soft demolitoin of drywall, plaster and flooring materials on 4 floors. approx 25000 sq ft. includes 1st, 2nd, 3rd floors. (partial ground floor) - comply with nov# 200236116 & 20099315 | $135,000 |
| Jun 7, 2013 | Completed final sign-off Apr 2016 | 360 Post St | ste 400: tenant build out of approx 2800 sq.ft. work includes drywall, concrete floors, acoustical ceilings, electrical, mechanical, plumbing and fire sprinklers and finishes such as paint, wall paper, use will be for doctor's office (dermatologist)Details
ste 400: tenant build out of approx 2800 sq.ft. work includes drywall, concrete floors, acoustical ceilings, electrical, mechanical, plumbing and fire sprinklers and finishes such as paint, wall paper, use will be for doctor's office (dermatologist) | $150,000 |
| May 29, 2013 | Completed final sign-off Dec 2013 | 1017 Market St | tenant improvements to the 5th floor, includes construction of reception area, break area, one conference room.Details
tenant improvements to the 5th floor, includes construction of reception area, break area, one conference room. | $189,000 |
| May 21, 2013 | Never finaled issued Sep 2013, no final | 1285 Sutter St | revision to pa #200712069866, addendum 3 arch, mech, elect, plumb sheet mo 02 only-smoke control matrix, in response to sffd comment.Details
revision to pa #200712069866, addendum 3 arch, mech, elect, plumb sheet mo 02 only-smoke control matrix, in response to sffd comment. | |
| Apr 18, 2013 | Completed final sign-off Nov 2013 | 140 Chestnut St | modification of (e) electrical, plumbing & mechanical for installation of ph monitoring station. architectural work submitted under pa# 2013-0411-4353 (not issued)Details
modification of (e) electrical, plumbing & mechanical for installation of ph monitoring station. architectural work submitted under pa# 2013-0411-4353 (not issued) | $100,000 |
| Apr 17, 2013 | Completed final sign-off Dec 2013 | 240 Stockton St | 7th floor-revision to pa# 2012-1130-5229-project consists of relocation of hunge of door, change door swing, floor is currently unoccupied. mep & life safety under seperate permitDetails
7th floor-revision to pa# 2012-1130-5229-project consists of relocation of hunge of door, change door swing, floor is currently unoccupied. mep & life safety under seperate permit | |
| Apr 11, 2013 | Completed final sign-off Jul 2013 | 140 Chestnut St | construction of new non structural interior partition & new 4'x7' doorDetails
construction of new non structural interior partition & new 4'x7' door | $5,000 |
| Mar 11, 2013 | Completed final sign-off May 2013 | 140 Chestnut St | barrier removal-renovate (e) accessible ramp to comply with current codeDetails
barrier removal-renovate (e) accessible ramp to comply with current code | $8,000 |
| Feb 28, 2013 | Completed final sign-off Aug 2014 | 1017 Market St | replace 1st & 2nd fl storefront & entries on market st. enlarge & replace 1st fl windows on stevenson st.Details
replace 1st & 2nd fl storefront & entries on market st. enlarge & replace 1st fl windows on stevenson st. | $125,000 |
| Feb 20, 2013 | Never finaled issued Oct 2013, no final | 320 Geary St | to erect electric, wall, single faced sign.Details
to erect electric, wall, single faced sign. | $500 |
| Feb 19, 2013 | Completed final sign-off Aug 2014 | 1017 Market St | interior modifications, building shaft for future tenant use per 708 exception 7. create new floor openings between 1st floor and basement, rebuild front half of 2nd floor infilling openings and making floor one level. build new building lobby.Details
interior modifications, building shaft for future tenant use per 708 exception 7. create new floor openings between 1st floor and basement, rebuild front half of 2nd floor infilling openings and making floor one level. build new building lobby. | $200,000 |
| Jan 17, 2013 | Never finaled issued Mar 2013, no final | 345 Stockton St | for 36th floor, provide deferred m.e.p. plans for tenant improvement #2012.0827.8321.Details
for 36th floor, provide deferred m.e.p. plans for tenant improvement #2012.0827.8321. | |
| Jan 10, 2013 | Completed final sign-off Jul 2013 | 240 Stockton St | revision to pa# 201211305229. removing concrete at interior column; coat column with intumescent paint to achieve a 3 hour fire rating.Details
revision to pa# 201211305229. removing concrete at interior column; coat column with intumescent paint to achieve a 3 hour fire rating. | |
| Jan 10, 2013 | Completed final sign-off May 2014 | 240 Stockton St | revision to pa# 201211305228. removing concrete at interior column; coat column with intumescent paint to achieve a 3 hour fire rating.Details
revision to pa# 201211305228. removing concrete at interior column; coat column with intumescent paint to achieve a 3 hour fire rating. | |
| Jan 9, 2013 | Completed final sign-off Jul 2013 | 140 Chestnut St | new electrical work to support commercial bldg renovation, tenant improvement under separate permit. new mech and plumbing under separate pa# 201212065649 (arch)Details
new electrical work to support commercial bldg renovation, tenant improvement under separate permit. new mech and plumbing under separate pa# 201212065649 (arch) | |
| Dec 20, 2012 | Completed final sign-off Jul 2013 | 140 Chestnut St | demolition of (e) mech, pumbing, new hvac & plumbing, new rch construction under pa #2012.12.06.5649. electrical and lighting under seperate permit.Details
demolition of (e) mech, pumbing, new hvac & plumbing, new rch construction under pa #2012.12.06.5649. electrical and lighting under seperate permit. | |
| Dec 11, 2012 | Completed final sign-off Dec 2013 | 1017 Market St | replace all windows at reroof building (southside) in kind, not visible from streetDetails
replace all windows at reroof building (southside) in kind, not visible from street | $90,000 |
| Dec 6, 2012 | Completed final sign-off Jul 2013 | 140 Chestnut St | change of occupancy to b and f-1. interior ceiling height walls/new 1 hour rated walls as noted. nw elect. for open area work space, shared office, conf. rooms, strorage room, & elect room. new light fixtures as indicated throughout. the space. nw plmg fixtures & new ada shower & restroom. chDetails
change of occupancy to b and f-1. interior ceiling height walls/new 1 hour rated walls as noted. nw elect. for open area work space, shared office, conf. rooms, strorage room, & elect room. new light fixtures as indicated throughout. the space. nw plmg fixtures & new ada shower & restroom. ch | $1,500,000 |
| Dec 5, 2012 | Completed final sign-off Aug 2014 | 1017 Market St | bldg core improvement. renovate stairs enclosure, toilet & elevators; enclose rooms for new main eletrical service. future permits for sprinklers, fire alarm, mech, plumb & elec submitted under separate permit. low rise buildingDetails
bldg core improvement. renovate stairs enclosure, toilet & elevators; enclose rooms for new main eletrical service. future permits for sprinklers, fire alarm, mech, plumb & elec submitted under separate permit. low rise building | $650,000 |
| Nov 30, 2012 | Completed final sign-off Jan 2014 | 240 Stockton St | 7th full floor tenant build out for building owner offices, project consists of new partitions, electrical lighting, hvac & finishes, floor is current;y unoccupied; any mep and life safety modifications will be under separate permitDetails
7th full floor tenant build out for building owner offices, project consists of new partitions, electrical lighting, hvac & finishes, floor is current;y unoccupied; any mep and life safety modifications will be under separate permit | $1,091,232 |
| Nov 30, 2012 | Completed final sign-off Dec 2013 | 240 Stockton St | full 8th flr tenant build out for building owners offices. project consist of new partitions, electrical, lighting, hvac, & finishes, floor is currently occupied, any mep and life safety modification will be under separate permitDetails
full 8th flr tenant build out for building owners offices. project consist of new partitions, electrical, lighting, hvac, & finishes, floor is currently occupied, any mep and life safety modification will be under separate permit | $1,091,237 |
| Nov 28, 2012 | Completed final sign-off Jul 2013 | 140 Chestnut St | work on the 1st & 2nd floor: demolition of (e) non-structural interior ceiling height walls, remaining partitions, (e) ceiling height walls, remaining partitions, (e) associated elect, (e) light fixts & finishes as indicated.Details
work on the 1st & 2nd floor: demolition of (e) non-structural interior ceiling height walls, remaining partitions, (e) ceiling height walls, remaining partitions, (e) associated elect, (e) light fixts & finishes as indicated. | $45,000 |
| Nov 19, 2012 | Expired or cancelled cancelled Jan 2026 | 320 Geary St | revision approved pa#2012-0711-4541. lighting changes only.Details
revision approved pa#2012-0711-4541. lighting changes only. | $1,000 |
| Nov 14, 2012 | Completed final sign-off Dec 2013 | 1017 Market St | remove plaster from brick walls and ceiling. demo corridor partitions, misc partitions remove doors and framesDetails
remove plaster from brick walls and ceiling. demo corridor partitions, misc partitions remove doors and frames | $300,000 |
| Nov 13, 2012 | Completed final sign-off Jan 2013 | 101 California St | demolition of existing non load bearing partitions, glazing, and lighting. new non rated partitons, doors, glazing, and finishes. mep, life safety and fire sprinkler under separate permitDetails
demolition of existing non load bearing partitions, glazing, and lighting. new non rated partitons, doors, glazing, and finishes. mep, life safety and fire sprinkler under separate permit | $83,500 |
| Nov 2, 2012 | Never finaled issued Nov 2012, no final | 320 Geary St | revision to pa# 2012-0711-4541-changes proposed include a new 120 minute rated assembly at the east side of the bar seating area, changes to the light fixture specsDetails
revision to pa# 2012-0711-4541-changes proposed include a new 120 minute rated assembly at the east side of the bar seating area, changes to the light fixture specs | $8,500 |
| Sep 10, 2012 | Completed final sign-off Mar 2013 | 320 Geary St | facade alteration to install (n) entrance at storefront and (n) louvers to replace (e) per historic code 8-901.5 this work is exempt from energy compliance ti under separate permit.Details
facade alteration to install (n) entrance at storefront and (n) louvers to replace (e) per historic code 8-901.5 this work is exempt from energy compliance ti under separate permit. | $17,500 |
| Aug 15, 2012 | Completed final sign-off May 2013 | 95 Hawthorne St | temporary shoring of sidewalk over basement along folsom street.Details
temporary shoring of sidewalk over basement along folsom street. | $4,000 |
| Jul 27, 2012 | Completed final sign-off May 2013 | 435 China Basin St | tenant improvement of interior ground floor space including structural floor, exterior storefront alterations & interior finishes & restroom.Details
tenant improvement of interior ground floor space including structural floor, exterior storefront alterations & interior finishes & restroom. | $449,000 |
| Jul 18, 2012 | Never finaled issued Aug 2012, no final | 345 Stockton St | refer ot to pa# 2011-0908-4161-temporary install wood ada ramp with overhead canopy & lighting to provide ada access during construction of main entry area. for main entry constructionDetails
refer ot to pa# 2011-0908-4161-temporary install wood ada ramp with overhead canopy & lighting to provide ada access during construction of main entry area. for main entry construction | $8,000 |
| Jul 11, 2012 | Completed final sign-off Mar 2013 | 320 Geary St | the interior remodel of 2 extg adjacent retail shops to create a single tenant space that shall serve as a new wine bar. an opening in an extg demising wall will be made to connect the 2 spaces. an extg 2/f space will be removed. add 2 restrooms. exterior alteration under seperate facade permit.Details
the interior remodel of 2 extg adjacent retail shops to create a single tenant space that shall serve as a new wine bar. an opening in an extg demising wall will be made to connect the 2 spaces. an extg 2/f space will be removed. add 2 restrooms. exterior alteration under seperate facade permit. | $159,709 |
| Jun 21, 2012 | Completed final sign-off Sep 2012 | 101 California St | 9th floor-partial floor t.i-demo of (e) partitions, new millwork, partitions, doors & glazingDetails
9th floor-partial floor t.i-demo of (e) partitions, new millwork, partitions, doors & glazing | $138,420 |
| May 3, 2012 | Completed final sign-off Jan 2013 | 345 Stockton St | revision to 201109084161. structural framing revision per plansDetails
revision to 201109084161. structural framing revision per plans | |
| Apr 6, 2012 | Never finaled issued May 2012, no final | 101 Spear St | tenant improvement of existing leased space for a branch bank. work includes 2 atms, non structural partitions, ceilings, soffits, finishes, furniture and related hvac, elec, and plumbingDetails
tenant improvement of existing leased space for a branch bank. work includes 2 atms, non structural partitions, ceilings, soffits, finishes, furniture and related hvac, elec, and plumbing | $466,302 |
| Apr 2, 2012 | Completed final sign-off Jan 2013 | 345 Stockton St | 34th floor:guest room renovation floor 34, new finishes throughout new millwork, closet doors and shelving, new lighting to replace extg bathroom renovation floor 34. replace tubs, tiles, toilet, vanities, mirrors, lights, doors; replace fan coil unitsDetails
34th floor:guest room renovation floor 34, new finishes throughout new millwork, closet doors and shelving, new lighting to replace extg bathroom renovation floor 34. replace tubs, tiles, toilet, vanities, mirrors, lights, doors; replace fan coil units | $850,000 |
| Mar 16, 2012 | Completed final sign-off Apr 2016 | 360 Post St | interior renovation of 12 story bldg on all floors, including architectural, mechanical, electrical & plumbing, lighting, ceiling system replacement, bathrooms, elevator lobbies & corridors. no ext'r work under this permit. fire protectn under separate permit. primary work is hvac replacement.Details
interior renovation of 12 story bldg on all floors, including architectural, mechanical, electrical & plumbing, lighting, ceiling system replacement, bathrooms, elevator lobbies & corridors. no ext'r work under this permit. fire protectn under separate permit. primary work is hvac replacement. | $11,000,000 |
| Jan 30, 2012 | Completed final sign-off Feb 2012 | 555 Market St | lobby- revision to app#201111028105. original permit was to install 5 new windows. revision adds the replacement of 4 extg windows, same size, same location.Details
lobby- revision to app#201111028105. original permit was to install 5 new windows. revision adds the replacement of 4 extg windows, same size, same location. | $10,000 |
| Jan 12, 2012 | Completed final sign-off Jan 2013 | 345 Stockton St | ground floor-interior exploration demo at lobby & mezzanine, no cfc. ada compliance under permit #2011-0908-4161Details
ground floor-interior exploration demo at lobby & mezzanine, no cfc. ada compliance under permit #2011-0908-4161 | $20,000 |
| Dec 15, 2011 | Completed final sign-off Jan 2012 | 500 Post St | basement level-refer to arch pa# 2011-0804-1755-structural support for installation of new sliding doors systemDetails
basement level-refer to arch pa# 2011-0804-1755-structural support for installation of new sliding doors system | $7,500 |
| Nov 21, 2011 | Completed final sign-off Sep 2013 | 1285 Sutter St | erect temporary crane for construction authorized by bpn# 2007-1206-9866sDetails
erect temporary crane for construction authorized by bpn# 2007-1206-9866s | $20,000 |
| Nov 21, 2011 | Completed final sign-off Jul 2013 | 850 Bryant St | select demolition of internal walls and finishes. install of new interior walls, 2 new restrooms (non public) and associated utilities. new furred ceiling, new raised floor. new finishes. fa, sprinkler, & occupant load calc's separate permit.Details
select demolition of internal walls and finishes. install of new interior walls, 2 new restrooms (non public) and associated utilities. new furred ceiling, new raised floor. new finishes. fa, sprinkler, & occupant load calc's separate permit. | $505,808 |
| Nov 9, 2011 | Completed final sign-off Apr 2012 | 2429 California St | interior tenant improvement. change of use from laundromat to bank. non structural partitions, finishes, breakroom, restrooms, interior atms, hvac, elec, plumb.Details
interior tenant improvement. change of use from laundromat to bank. non structural partitions, finishes, breakroom, restrooms, interior atms, hvac, elec, plumb. | $506,000 |
| Nov 1, 2011 | Completed final sign-off Oct 2012 | 400 Post St | 3,820 sf ground fl tenant improvemt for (n) banking ctr incl (n) atms cust areas, teller line, offices, employee break areas, restrm & back of house support spaces. work includes struct, elect, mech, plumbing & finishes. related work under separate permit app for ext/storefront: ref #201110217364Details
3,820 sf ground fl tenant improvemt for (n) banking ctr incl (n) atms cust areas, teller line, offices, employee break areas, restrm & back of house support spaces. work includes struct, elect, mech, plumbing & finishes. related work under separate permit app for ext/storefront: ref #201110217364 | $960,000 |
| Sep 29, 2011 | Completed final sign-off Apr 2013 | 555 North Point St | new ingress / access corridor to allow independant accessible path of travel to 4 meeting rooms. (e) meeting rooms will receive new finishes, paint, carpet, trim, wall covering, some rooms will receive new / replaced light fixtures. toilet facilities being renovated completly & fully accessible.Details
new ingress / access corridor to allow independant accessible path of travel to 4 meeting rooms. (e) meeting rooms will receive new finishes, paint, carpet, trim, wall covering, some rooms will receive new / replaced light fixtures. toilet facilities being renovated completly & fully accessible. | $962,576 |
| Sep 8, 2011 | Completed final sign-off Jan 2013 | 345 Stockton St | 1st. flr. t.i.: reconfig. lobby space including finish upgrades, millwork, lighting clg., mech. & elec. upgrades & improvements, mezz. t.i.: reconfig. flr. to create restaurant bar & small kitchen, (n) unisex bathroom mech., lighting, elec. upgrades. 2nd. flr. t.i.: meeting rms. upgrades to lobby...Details
1st. flr. t.i.: reconfig. lobby space including finish upgrades, millwork, lighting clg., mech. & elec. upgrades & improvements, mezz. t.i.: reconfig. flr. to create restaurant bar & small kitchen, (n) unisex bathroom mech., lighting, elec. upgrades. 2nd. flr. t.i.: meeting rms. upgrades to lobby... | $850,000 |
| Aug 22, 2011 | Expired or cancelled expired Jun 2013 | 500 Post St | expand and remodel existing fitness center on the 5th floorDetails
expand and remodel existing fitness center on the 5th floor | $50,000 |
| Aug 22, 2011 | Completed final sign-off Jun 2013 | 345 Stockton St | ground floor tenant improvement: removal and replacement of selective store fronts.exterior improvements including landscaping and canopy replacement.Details
ground floor tenant improvement: removal and replacement of selective store fronts.exterior improvements including landscaping and canopy replacement. | $25,000 |
| Aug 15, 2011 | Never finaled issued Sep 2011, no final | 345 Stockton St | revision to pa# 2010.12.28.7483. revise and correct dwelling room count from 685 to 661 roomsDetails
revision to pa# 2010.12.28.7483. revise and correct dwelling room count from 685 to 661 rooms | |
| Aug 4, 2011 | Completed final sign-off Jan 2012 | 500 Post St | basement level-existing meeting space on lower level remodel. addition of accessible unisex bathroom. no new lightingDetails
basement level-existing meeting space on lower level remodel. addition of accessible unisex bathroom. no new lighting | $128,000 |
| Jun 9, 2011 | Completed final sign-off Aug 2011 | 925 Mission St | 2nd flr: revision to pa# 2011.04.26.4783 to show minor changes to non struc wall detail and new interior glassDetails
2nd flr: revision to pa# 2011.04.26.4783 to show minor changes to non struc wall detail and new interior glass | |
| Jun 8, 2011 | Completed final sign-off Sep 2012 | 555 09th St | #83 new 4715 sf tenant improvement of existing gr floor retail space ina 2 story building for branch bank. work includes new interior atm. non structural partitions, ceilings, soffits, finishes, furniture, related hvac, elec, plumbing.Details
#83 new 4715 sf tenant improvement of existing gr floor retail space ina 2 story building for branch bank. work includes new interior atm. non structural partitions, ceilings, soffits, finishes, furniture, related hvac, elec, plumbing. | $513,935 |
| May 20, 2011 | Completed final sign-off Sep 2013 | 1285 Sutter St | shoring & tiebacks & grading excavation for new construction of mixed use building. pa# 2007/12/06/9866's'. grading pa# 2007/12/06/9869.Details
shoring & tiebacks & grading excavation for new construction of mixed use building. pa# 2007/12/06/9866's'. grading pa# 2007/12/06/9869. | $1,800,000 |
| May 17, 2011 | Completed final sign-off Aug 2011 | 925 Mission St | 2/f- revision to 201104264783: add spiral stair to connect new 2nd floor office with 1st floor office. this is a convenience stair within a tenant space, not an exit stair. cost of cutting out slab included in previous permit.Details
2/f- revision to 201104264783: add spiral stair to connect new 2nd floor office with 1st floor office. this is a convenience stair within a tenant space, not an exit stair. cost of cutting out slab included in previous permit. | $1,000 |
| May 17, 2011 | Completed final sign-off Jun 2011 | 110 05th St | 2nd floor-2 (e) windows to be enlarged, work is on 2nd floor in 1970 addition to building west sideDetails
2nd floor-2 (e) windows to be enlarged, work is on 2nd floor in 1970 addition to building west side | $45,000 |
| May 13, 2011 | Completed final sign-off Dec 2011 | 110 05th St | revised construction of new partitions, doors, millwork and finishes. mech, elect, and plumbing to be submitted under seperate permit per original permit 201103111926 amend.Details
revised construction of new partitions, doors, millwork and finishes. mech, elect, and plumbing to be submitted under seperate permit per original permit 201103111926 amend. | $500,000 |
| May 10, 2011 | Completed final sign-off Sep 2012 | 555 09th St | #83 - add new walk up atm to 9th street & mall concourse storefronts.Details
#83 - add new walk up atm to 9th street & mall concourse storefronts. | $20,000 |
| Apr 26, 2011 | Completed final sign-off Aug 2011 | 925 Mission St | 2nd floor office tenant improvement - demol (e) ofice improvements, provide 2 new exits to (e) corridor; build offices, meeting rooms & open office areas with cabinetry & related coffee bar plumbing.Details
2nd floor office tenant improvement - demol (e) ofice improvements, provide 2 new exits to (e) corridor; build offices, meeting rooms & open office areas with cabinetry & related coffee bar plumbing. | $390,000 |
| Apr 19, 2011 | Completed final sign-off Jul 2011 | 925 Mission St | (4) existing windows to be enlarged (west side of bldg).Details
(4) existing windows to be enlarged (west side of bldg). | $45,000 |
| Mar 17, 2011 | Completed final sign-off Aug 2011 | 555 Mission St | new 3245 sq ft ground floor t.i. of (e) leased space for a branch bank. work includes new exterior & interior atm's, no9n structural partitions, ceilings, soffits, finishes, furniture, related hvac, electrical & plumbing workDetails
new 3245 sq ft ground floor t.i. of (e) leased space for a branch bank. work includes new exterior & interior atm's, no9n structural partitions, ceilings, soffits, finishes, furniture, related hvac, electrical & plumbing work | $353,705 |
| Mar 11, 2011 | Completed final sign-off Dec 2011 | 110 05th St | construction of (n) partitions, doors, millwork & finishes, mechanical, elec. & plumbing to be performed under separate permit.Details
construction of (n) partitions, doors, millwork & finishes, mechanical, elec. & plumbing to be performed under separate permit. | $100,000 |
| Nov 22, 2010 | Completed final sign-off Aug 2011 | 110 05th St | construction of new partitions, door, millwork & finishes. mep and sprinklers under separate permit.Details
construction of new partitions, door, millwork & finishes. mep and sprinklers under separate permit. | $85,000 |
| Nov 12, 2010 | Completed final sign-off Jun 2011 | 1318 Stockton St | tenant improvement of existing 4,757 sf bank space. work includes removal of non-structural partitions, stairs, atm, storefront and installation of new partitions, ceiling, storefront, elevator, mechanical system, electrical service and plumbing.Details
tenant improvement of existing 4,757 sf bank space. work includes removal of non-structural partitions, stairs, atm, storefront and installation of new partitions, ceiling, storefront, elevator, mechanical system, electrical service and plumbing. | $500,000 |
| Mar 30, 2010 | Completed final sign-off Aug 2010 | 111 Sutter St | minor interior tenant improvement. new interior partitions, millwork & minor electrical, mechanical is (e). demolition of (e) walls.Details
minor interior tenant improvement. new interior partitions, millwork & minor electrical, mechanical is (e). demolition of (e) walls. | $95,000 |
| Jan 25, 2010 | Completed final sign-off Mar 2010 | 444 De Haro St | interior ti on 2nd floor suite 203. new wall, new ceiling and relocating existing light fixturesDetails
interior ti on 2nd floor suite 203. new wall, new ceiling and relocating existing light fixtures | $15,000 |
| Dec 7, 2009 | Completed final sign-off Jun 2010 | 360 Post St | 5th fl - replacement of existing ceiling & light fixtures and 20% ada bathroom upgrades. (n) t-bar clg.Details
5th fl - replacement of existing ceiling & light fixtures and 20% ada bathroom upgrades. (n) t-bar clg. | $83,000 |
| Dec 4, 2009 | Completed final sign-off Jun 2010 | 360 Post St | 4th floor-replace of (e) ceiling & lights, 20% ada bathroom upgradesDetails
4th floor-replace of (e) ceiling & lights, 20% ada bathroom upgrades | $28,000 |
| Dec 4, 2009 | Completed final sign-off Jun 2010 | 360 Post St | 7th floor-replace of (e) ceiling & lights, 20% ada bathroom upgradesDetails
7th floor-replace of (e) ceiling & lights, 20% ada bathroom upgrades | $47,000 |
| Nov 16, 2009 | Completed final sign-off Jun 2010 | 360 Post St | 3rd floor. replacement of existing ceiling grid and existing lights fixtures. field verify life safety (fa/sprinkler) is required under separate permits.Details
3rd floor. replacement of existing ceiling grid and existing lights fixtures. field verify life safety (fa/sprinkler) is required under separate permits. | $8,500 |
| Nov 16, 2009 | Completed final sign-off May 2010 | 360 Post St | 1st floor. replacement of existing ceiling grid and existing lights fixtures.Details
1st floor. replacement of existing ceiling grid and existing lights fixtures. | $7,500 |
| Jun 22, 2009 | Completed final sign-off Jun 2009 | 475 Brannan St | 3rd floor install 2 fire smoke dampers.Details
3rd floor install 2 fire smoke dampers. | $1,500 |
| Jun 12, 2009 | Completed final sign-off Jun 2009 | 475 Brannan St | upgrade existing computer room walls to 1-hr. at 3rd. flr. repair/replace bathroom door closers. mep under separate permitDetails
upgrade existing computer room walls to 1-hr. at 3rd. flr. repair/replace bathroom door closers. mep under separate permit | $3,300 |
| Feb 12, 2009 | Completed final sign-off Nov 2009 | 905 California St | new paving & planters in auto court. new disabled access van parking space. reconfigure conutertop @ restaurant bar, reconfigure elevator lobby at lower level, fire alarm & sprinkler under separate permit.Details
new paving & planters in auto court. new disabled access van parking space. reconfigure conutertop @ restaurant bar, reconfigure elevator lobby at lower level, fire alarm & sprinkler under separate permit. | $70,000 |
| Dec 24, 2008 | Never finaled issued Mar 2009, no final | 480 Sutter St | new exterior composite metal panel cladding - submitted as a deferred to main bldg appl #200805162267.Details
new exterior composite metal panel cladding - submitted as a deferred to main bldg appl #200805162267. | $254,000 |
| Dec 12, 2008 | Never finaled issued Feb 2009, no final | 480 Sutter St | exterior glazing and store front systems, 1st and 2nd floors submitted for deffered approval. reference main building permit pa# 2008/05/16/2267.Details
exterior glazing and store front systems, 1st and 2nd floors submitted for deffered approval. reference main building permit pa# 2008/05/16/2267. | $269,000 |
| Nov 19, 2008 | Completed final sign-off Jan 2009 | 450 Powell St | relocating 6 existing perdants, and adding 3 new perdants. tie into existing 2" branch & run new 2" branch to supply.Details
relocating 6 existing perdants, and adding 3 new perdants. tie into existing 2" branch & run new 2" branch to supply. | $1,950 |
| Oct 15, 2008 | Never finaled issued Nov 2008, no final | 480 Sutter St | new architectural precast (gfrc cladding) at levels 1st & 2nd only. submitted for deffered approval, ref. to appl#200805162267.Details
new architectural precast (gfrc cladding) at levels 1st & 2nd only. submitted for deffered approval, ref. to appl#200805162267. | $135,000 |
| Aug 18, 2008 | Completed final sign-off Sep 2010 | 1250 Columbus Av | 1st thru 5th floors - guest room & guest corridor finish replacements, ada upgrades to guest room & guest corridor, mechanical, electrical & plumbing.Details
1st thru 5th floors - guest room & guest corridor finish replacements, ada upgrades to guest room & guest corridor, mechanical, electrical & plumbing. | $4,500,000 |
| Jul 25, 2008 | Never finaled issued Jul 2008, no final | 480 Sutter St | 1st & 2nd floors-demolition of 1st and 2nd flrs interior public area floors. lobby & meeting rooms. t.i. application #2008-0708-6221-demolition includes non-load bearing walls, ceiling finishes and floor finishes. comply with ab-017Details
1st & 2nd floors-demolition of 1st and 2nd flrs interior public area floors. lobby & meeting rooms. t.i. application #2008-0708-6221-demolition includes non-load bearing walls, ceiling finishes and floor finishes. comply with ab-017 | $100,000 |
| Jul 8, 2008 | Completed final sign-off Jun 2009 | 480 Sutter St | ti on the 2nd floor. reconfiguration of banquet kitchen eqpmt and addition of an office. reconfiguration and addition of doors to meeting rms, reworking of finishes and millwork thru-out. reworking of mep thruout area of work. fire safety under separate permit.Details
ti on the 2nd floor. reconfiguration of banquet kitchen eqpmt and addition of an office. reconfiguration and addition of doors to meeting rms, reworking of finishes and millwork thru-out. reworking of mep thruout area of work. fire safety under separate permit. | $1,466,500 |
| Jun 24, 2008 | Completed final sign-off Dec 2008 | 625 02nd St | 1st floor- demo 2 doors & addition of 3 doors. 2nd floor, demo of 2 walls, addition of millwork & flooring. upgrade drinking fountain.Details
1st floor- demo 2 doors & addition of 3 doors. 2nd floor, demo of 2 walls, addition of millwork & flooring. upgrade drinking fountain. | $20,000 |
| May 30, 2008 | Completed final sign-off Jun 2009 | 480 Sutter St | interior remodel of hotel rooms and corridors for floors 21-25. work includes bathroom remodel throughout including n sinks, toilets, finishes, lighting, n carptets finishes, lighting in corridors, throughout ada bathrooms to be upgraded. vending and ice machines relocated. fire sep permDetails
interior remodel of hotel rooms and corridors for floors 21-25. work includes bathroom remodel throughout including n sinks, toilets, finishes, lighting, n carptets finishes, lighting in corridors, throughout ada bathrooms to be upgraded. vending and ice machines relocated. fire sep perm | $1,500,000 |
| Dec 21, 2007 | Completed final sign-off Jan 2013 | 345 Stockton St | guestrooms renovations (floors 3-34) installing (n) finishes,(n) electrical outlets. (n) lighting to replace existing. bathroom renovation & install (n) finishes throughout guestroom corridors. (see attached plans for details & full description of work.Details
guestrooms renovations (floors 3-34) installing (n) finishes,(n) electrical outlets. (n) lighting to replace existing. bathroom renovation & install (n) finishes throughout guestroom corridors. (see attached plans for details & full description of work. | $1,200,000 |
| Dec 6, 2007 | Completed final sign-off Oct 2013 | 1285 Sutter St | to demolish 2 story theaterDetails
to demolish 2 story theater | |
| Dec 6, 2007 | Never finaled issued Aug 2011, no final | 1285 Sutter St | grading and shoringDetails
grading and shoring | $2,872,500 |
| Nov 28, 2007 | Completed final sign-off Nov 2007 | 425 North Point St | renw pa#200612149849,#200705020276 for final inpseciton.Details
renw pa#200612149849,#200705020276 for final inpseciton. | |
| Nov 20, 2007 | Completed final sign-off Nov 2007 | 450 Powell St | renew pa# 2006/06/19/4427 for final inspection only.Details
renew pa# 2006/06/19/4427 for final inspection only. | |
| Oct 12, 2007 | Completed final sign-off Jan 2008 | 480 Sutter St | install supply fan to obtain stairwell pressurization in the east stairwell only. this is voluntary work requested by owner.Details
install supply fan to obtain stairwell pressurization in the east stairwell only. this is voluntary work requested by owner. | $40,000 |
| May 1, 2007 | Expired or cancelled expired Sep 2009 | 2001 Union St | suite 570:mechanical permit - building permit #2007/03/21/6830 2 heat pumps, relocated and revised piping and duct work runsDetails
suite 570:mechanical permit - building permit #2007/03/21/6830 2 heat pumps, relocated and revised piping and duct work runs | $10,000 |
| Mar 21, 2007 | Completed final sign-off Jun 2007 | 2001 Union St | oti-1, union street plaza, 5th floor, el, me. complaint 200447696.Details
oti-1, union street plaza, 5th floor, el, me. complaint 200447696. | $113,000 |