Block 3735, lot 012
95 Hawthorne St
25 permits filed for this property since 2000.
CompletedIn progressNever finaledExpired or cancelled
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 1, 2020 | Never finaled filed Oct 2020, never issued | 95 Hawthorne St | to erect 42 story, 6 basement, approximately 444' tall, type 1, multi family-mixed use structure, with 412 dwelling units. approximately 4,000 sq feet of ground floor retail. | $180,000,000 | |
| Oct 1, 2020 | Never finaled filed Oct 2020, never issued | 95 Hawthorne St | to demo 5 story, 67' in height, 1 basement, b occupance, type 1 building. | $65,000 | |
| Dec 4, 2017 | Completed final sign-off May 2018 | 95 Hawthorne St | C B 2 Builders Incorporated | 5/f -removal of door and bridge to 75 hawthorne. not ti work. no change in occupancy | $4,000 |
| Aug 15, 2012 | Completed final sign-off May 2013 | 95 Hawthorne St | Howard S. Wright Constructors Lp | temporary shoring of sidewalk over basement along folsom street. | $4,000 |
| May 23, 2011 | Completed final sign-off Sep 2011 | 95 Hawthorne St | Plant Construction Co, Lp | revision to pa# 2011.04.28.4967. changing the waiting area occup. load which effects the mech as well. original waiting area 61 going up to 95, total new occup. load is 113) | |
| Apr 29, 2011 | Completed final sign-off Aug 2011 | 95 Hawthorne St | Simplex Grinnell | 5th floor - addition of 1 new mounted ceiling speaker/strobe. relocation of extg ceiling mounted speaker strobe. | $3,000 |
| Apr 28, 2011 | Completed final sign-off Jul 2011 | 95 Hawthorne St | Plant Construction Company Lp | 5th fl ti includes barrier removal at public and employee restrooms, build out ceiling height non structural partitions, new or revised life safety and sprinklers work design build separate permit. (non-sprinklered low rise) mep in this permit | $375,000 |
| Jun 26, 2009 | Never finaled issued Jun 2009, no final | 95 Hawthorne St | Turner Construction Co | demo e ceiling and lighting, provide new suspended ceiling, lighting, fire protection system at gr floor childcare area. existing building not sprinklered. fire protection system is design build. | $225,000 |
| Jan 16, 2009 | Completed final sign-off May 2009 | 95 Hawthorne St | Simplex Grinnell | addition of 3 conventional smoke detectors, 27 ceiling mounted speakers/strobes also 5 new ceiling mounted strobes, 4 sync control modules. | $8,000 |
| Aug 15, 2008 | Completed final sign-off Jan 2009 | 95 Hawthorne St | Simplex Grinnell | 5th floor fire life safety system: install (2) new smoke detectors, (1) door holder at adjoining corridor. | $10,000 |
| Jul 29, 2008 | Completed final sign-off May 2009 | 95 Hawthorne St | 5th floor: tenant improvement includes bldg out a few full height and low height non structural partitions (new or revised life safety work will be design build submitted for pemti separately). building is non sprinklered lowrise | $275,000 | |
| Mar 26, 2008 | Completed final sign-off Jan 2009 | 95 Hawthorne St | 5th floor-revision to structural pa# 2008-0118-2844, 2008-0118-2842-change the way we are connecting the bridge between buildings | ||
| Jan 18, 2008 | Completed final sign-off Jan 2009 | 95 Hawthorne St | 5th floor: new passage way to 75 hawthorne st. new stair landing wheelchairlift | $30,000 | |
| Dec 10, 2007 | Never finaled issued Dec 2007, no final | 95 Hawthorne St | street space permit only. | ||
| Nov 30, 2007 | Completed final sign-off Dec 2007 | 95 Hawthorne St | Plant Construction Company Lp | remove existing non-structural precast concrete panel decorative fins in void space between buildings to increase clearance in seismic event. (voluntary seismic upgrade) | $68,500 |
| Nov 7, 2007 | Never finaled issued Nov 2007, no final | 95 Hawthorne St | street space permit | ||
| Oct 4, 2007 | Never finaled issued Oct 2007, no final | 95 Hawthorne St | street space | ||
| Sep 6, 2007 | Never finaled issued Sep 2007, no final | 95 Hawthorne St | street space | ||
| Aug 3, 2007 | Never finaled issued Aug 2007, no final | 95 Hawthorne St | street space | ||
| Aug 10, 2006 | Completed final sign-off Sep 2006 | 95 Hawthorne St | Atlantis Fire Protection | new sprinklers for coverage of non-rated glass "total of six sprnklers" | $3,000 |
| Jan 11, 2006 | Completed final sign-off Sep 2006 | 95 Hawthorne St | Hallmark Construction Inc | suite 201 - extg server room to be upgraded to 1 hr fire rated construction. mech/elec under separate permit | $9,000 |
| Oct 18, 2005 | Completed final sign-off Sep 2006 | 95 Hawthorne St | Simplex Grinnell | fire alarm t.i. to 2/f. add 1 booster panel, 2 smoke detectors, 8 horn strobes & 3 strobes.interior work only. | $10,600 |
| Aug 30, 2005 | Completed final sign-off Sep 2006 | 95 Hawthorne St | Acco Engineered Systems Inc. Dba Acco En | add new 7,5 ton rooftop condensing unit run new dx piping from roof to 2nd floor. modify low pressur | $18,000 |
| Jul 15, 2005 | Completed final sign-off Sep 2006 | 95 Hawthorne St | Hallmark Construction Inc | 5 new offices with new ceiling and lighting and mechanical upgrade bathrooms to meet ada requirement | $138,500 |
| Aug 21, 2003 | Completed final sign-off Dec 2003 | 95 Hawthorne St | Oxypower Inc Dba Occidental Power | to install 6 solar collectors on roof & pipe to 3 storage tanks in existing boiler room to preheat | $56,000 |