Permit GraphSan Francisco building permits since 2000

Block 3735, lot 012

95 Hawthorne St

25 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Oct 1, 2020Never finaled
filed Oct 2020, never issued
95 Hawthorne Stto erect 42 story, 6 basement, approximately 444' tall, type 1, multi family-mixed use structure, with 412 dwelling units. approximately 4,000 sq feet of ground floor retail.$180,000,000
Oct 1, 2020Never finaled
filed Oct 2020, never issued
95 Hawthorne Stto demo 5 story, 67' in height, 1 basement, b occupance, type 1 building.$65,000
Dec 4, 2017Completed
final sign-off May 2018
95 Hawthorne StC B 2 Builders Incorporated5/f -removal of door and bridge to 75 hawthorne. not ti work. no change in occupancy$4,000
Aug 15, 2012Completed
final sign-off May 2013
95 Hawthorne StHoward S. Wright Constructors Lptemporary shoring of sidewalk over basement along folsom street.$4,000
May 23, 2011Completed
final sign-off Sep 2011
95 Hawthorne StPlant Construction Co, Lprevision to pa# 2011.04.28.4967. changing the waiting area occup. load which effects the mech as well. original waiting area 61 going up to 95, total new occup. load is 113)
Apr 29, 2011Completed
final sign-off Aug 2011
95 Hawthorne StSimplex Grinnell5th floor - addition of 1 new mounted ceiling speaker/strobe. relocation of extg ceiling mounted speaker strobe.$3,000
Apr 28, 2011Completed
final sign-off Jul 2011
95 Hawthorne StPlant Construction Company Lp5th fl ti includes barrier removal at public and employee restrooms, build out ceiling height non structural partitions, new or revised life safety and sprinklers work design build separate permit. (non-sprinklered low rise) mep in this permit$375,000
Jun 26, 2009Never finaled
issued Jun 2009, no final
95 Hawthorne StTurner Construction Codemo e ceiling and lighting, provide new suspended ceiling, lighting, fire protection system at gr floor childcare area. existing building not sprinklered. fire protection system is design build.$225,000
Jan 16, 2009Completed
final sign-off May 2009
95 Hawthorne StSimplex Grinnelladdition of 3 conventional smoke detectors, 27 ceiling mounted speakers/strobes also 5 new ceiling mounted strobes, 4 sync control modules.$8,000
Aug 15, 2008Completed
final sign-off Jan 2009
95 Hawthorne StSimplex Grinnell5th floor fire life safety system: install (2) new smoke detectors, (1) door holder at adjoining corridor.$10,000
Jul 29, 2008Completed
final sign-off May 2009
95 Hawthorne St5th floor: tenant improvement includes bldg out a few full height and low height non structural partitions (new or revised life safety work will be design build submitted for pemti separately). building is non sprinklered lowrise$275,000
Mar 26, 2008Completed
final sign-off Jan 2009
95 Hawthorne St5th floor-revision to structural pa# 2008-0118-2844, 2008-0118-2842-change the way we are connecting the bridge between buildings
Jan 18, 2008Completed
final sign-off Jan 2009
95 Hawthorne St5th floor: new passage way to 75 hawthorne st. new stair landing wheelchairlift$30,000
Dec 10, 2007Never finaled
issued Dec 2007, no final
95 Hawthorne Ststreet space permit only.
Nov 30, 2007Completed
final sign-off Dec 2007
95 Hawthorne StPlant Construction Company Lpremove existing non-structural precast concrete panel decorative fins in void space between buildings to increase clearance in seismic event. (voluntary seismic upgrade)$68,500
Nov 7, 2007Never finaled
issued Nov 2007, no final
95 Hawthorne Ststreet space permit
Oct 4, 2007Never finaled
issued Oct 2007, no final
95 Hawthorne Ststreet space
Sep 6, 2007Never finaled
issued Sep 2007, no final
95 Hawthorne Ststreet space
Aug 3, 2007Never finaled
issued Aug 2007, no final
95 Hawthorne Ststreet space
Aug 10, 2006Completed
final sign-off Sep 2006
95 Hawthorne StAtlantis Fire Protectionnew sprinklers for coverage of non-rated glass "total of six sprnklers"$3,000
Jan 11, 2006Completed
final sign-off Sep 2006
95 Hawthorne StHallmark Construction Incsuite 201 - extg server room to be upgraded to 1 hr fire rated construction. mech/elec under separate permit$9,000
Oct 18, 2005Completed
final sign-off Sep 2006
95 Hawthorne StSimplex Grinnellfire alarm t.i. to 2/f. add 1 booster panel, 2 smoke detectors, 8 horn strobes & 3 strobes.interior work only.$10,600
Aug 30, 2005Completed
final sign-off Sep 2006
95 Hawthorne StAcco Engineered Systems Inc. Dba Acco Enadd new 7,5 ton rooftop condensing unit run new dx piping from roof to 2nd floor. modify low pressur$18,000
Jul 15, 2005Completed
final sign-off Sep 2006
95 Hawthorne StHallmark Construction Inc5 new offices with new ceiling and lighting and mechanical upgrade bathrooms to meet ada requirement$138,500
Aug 21, 2003Completed
final sign-off Dec 2003
95 Hawthorne StOxypower Inc Dba Occidental Powerto install 6 solar collectors on roof & pipe to 3 storage tanks in existing boiler room to preheat$56,000