William Duff
- Listed as
- architect, authorized agent-others, designer, engineer, lessee
- Firm
- William Duff Architects
- Based in
- San Francisco
- On San Francisco permits
- Jun 2004 to Nov 2025
115 permits since 2000 (architect on 107 permits, authorized agent-others on 5 permits, designer on 2 permits, engineer on 2 permits, lessee on 1 permit): 80 completed, 3 in progress, 16 never finaled, 16 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 115.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 26, 2025 | In progress filed Nov 2025, not yet issued | 944 Market St | 4th floor: tenant improvement of existing 4th floor office space, new interior non-structural partitions. plumbinf, mechanical, electrical uner deferred submittal.Details
4th floor: tenant improvement of existing 4th floor office space, new interior non-structural partitions. plumbinf, mechanical, electrical uner deferred submittal. | $60,000 | |
| Dec 2, 2024 | In progress issued May 2026 | 26 Ofarrell St | Delvin Garcia Construction-A Partnership | revision to pa #202109077889 revise mezzanine framing. clarification notes for city planning purpose about future floor and column finishes. to comply with nov #202181969. add new restroom, adjust ramp and storage room, change occupancy at mezz to b occ. revise stairs, remove lift & dumbwaiter.Details
revision to pa #202109077889 revise mezzanine framing. clarification notes for city planning purpose about future floor and column finishes. to comply with nov #202181969. add new restroom, adjust ramp and storage room, change occupancy at mezz to b occ. revise stairs, remove lift & dumbwaiter. | $20,000 |
| Apr 4, 2024 | In progress issued Mar 2025 | 2630 Divisadero St | Superb Builders & Custom Made Cabinetry | 1st floor: interior adjustments to create nw guest room & relocate office room, nw exterior double door & double-hung windows at rear facade in nw guest rm: nw exterior door & casement windw at rear facade in office rm; 2nd fl: removal of extg wall between kitchen & family rm;Details
1st floor: interior adjustments to create nw guest room & relocate office room, nw exterior double door & double-hung windows at rear facade in nw guest rm: nw exterior door & casement windw at rear facade in office rm; 2nd fl: removal of extg wall between kitchen & family rm; | $20,000 |
| Apr 25, 2023 | Completed final sign-off Mar 2024 | 701 03rd St | Cookline Construction Inc | revision to pa#201910235416. t.i. of a grd flr bar & restaurant. (n) non structural partitions & finishes, lightings. millwork & kitchen equipment. includes (n) mep work associated w/ project. fire sprinklers is design/built under a separate permit.Details
revision to pa#201910235416. t.i. of a grd flr bar & restaurant. (n) non structural partitions & finishes, lightings. millwork & kitchen equipment. includes (n) mep work associated w/ project. fire sprinklers is design/built under a separate permit. | $244,228 |
| Apr 17, 2023 | Expired or cancelled cancelled Jan 2026 | 1275 Folsom St | erect one banner on (e) mountsDetails
erect one banner on (e) mounts | $1,380 | |
| Apr 8, 2022 | Completed final sign-off Mar 2024 | 1061 Folsom St | K Bali Construction | t.i. ground floor, convert retail store to office space. structural mech, plumbing, electrical upgradesDetails
t.i. ground floor, convert retail store to office space. structural mech, plumbing, electrical upgrades | $999,839 |
| Nov 19, 2021 | Completed final sign-off Jan 2022 | 701 03rd St | rooftop. rev to pa202105100080 to bar equipment layout. no work to egress componenets, plumbing,mech & electrical are design build and under a separtate permit. f/s is design build under sep permit. maher n/a.Details
rooftop. rev to pa202105100080 to bar equipment layout. no work to egress componenets, plumbing,mech & electrical are design build and under a separtate permit. f/s is design build under sep permit. maher n/a. | ||
| Nov 8, 2021 | Completed final sign-off Feb 2022 | 145 Jefferson St | Diamond One Construction Inc | removal of non structural partition and finishes, lighting, millwork and hvac equipment on basement and 1/f. ab-017 to remain vacant.Details
removal of non structural partition and finishes, lighting, millwork and hvac equipment on basement and 1/f. ab-017 to remain vacant. | $100,000 |
| Sep 13, 2021 | Completed final sign-off Mar 2024 | 3673 Jackson St | Van Acker Const Assoc Inc | conversion of (e) unconditioned pool enclosure building to new family room with small addition on connector to main house; remodel of existing kitchen and pantry with new appliances and plumbing fixtures.Details
conversion of (e) unconditioned pool enclosure building to new family room with small addition on connector to main house; remodel of existing kitchen and pantry with new appliances and plumbing fixtures. | $1,100,000 |
| Aug 18, 2021 | Completed final sign-off Jan 2022 | 3401 California St | 7 Hills Construction | tenant improvement of an (e) groung level resturant space, new interior non structural partitons and finishes, lighting, millwork, and kitchen equipment, fire sprinkler is design/build under a separtae permit mechanical is (e) and electrical are design/build under a sep permitDetails
tenant improvement of an (e) groung level resturant space, new interior non structural partitons and finishes, lighting, millwork, and kitchen equipment, fire sprinkler is design/build under a separtae permit mechanical is (e) and electrical are design/build under a sep permit | $146,385 |
| May 25, 2021 | Completed final sign-off Dec 2021 | 49 Stevenson St | Terra Nova Industries | basement: revision to pa 201910073701. reduced scope from original approved plans. install (n) walk-in coolers, (2) 3-compartment sinks, ventless dishwasher and hand sink. all mep work under separate deferred trade permitsDetails
basement: revision to pa 201910073701. reduced scope from original approved plans. install (n) walk-in coolers, (2) 3-compartment sinks, ventless dishwasher and hand sink. all mep work under separate deferred trade permits | |
| Sep 16, 2020 | Completed final sign-off Jan 2021 | 1275 Folsom St | Evolv Commercial Construction Inc | revision to pa 201912189874. mechanical revisions.Details
revision to pa 201912189874. mechanical revisions. | |
| Jun 5, 2020 | Completed final sign-off Feb 2021 | 1275 Folsom St | Evolv Commercial Construction Inc | removal of existing front facade door and replace with new window storefront systemDetails
removal of existing front facade door and replace with new window storefront system | $3,344 |
| Dec 18, 2019 | Completed final sign-off Jan 2021 | 1275 Folsom St | Evolv Commercial Construction Inc | tenant improvement of a 7,200 sq ft office building. scope includes new hvac and conversion of existing 2nd story to a mezzanine.Details
tenant improvement of a 7,200 sq ft office building. scope includes new hvac and conversion of existing 2nd story to a mezzanine. | $842,895 |
| Jun 6, 2019 | Completed final sign-off Oct 2020 | 1275 Folsom St | change of use/change of occupanct only. wholesale sales to design professional/office. mercantile to business t.i. under separate permit.(mezzanine plan)Details
change of use/change of occupanct only. wholesale sales to design professional/office. mercantile to business t.i. under separate permit.(mezzanine plan) | ||
| Apr 30, 2019 | Completed final sign-off May 2019 | 450 Hayes St | revision to occupancy calcuation on approved permit #201601207535.Details
revision to occupancy calcuation on approved permit #201601207535. | ||
| Jan 10, 2019 | Expired or cancelled cancelled Jan 2026 | 944 Market St | temant improvement of (e) lobbies on 3rd & 4th floors. new interior finishes and lighting. provide door actuator at entrance door.Details
temant improvement of (e) lobbies on 3rd & 4th floors. new interior finishes and lighting. provide door actuator at entrance door. | $58,296 | |
| Dec 28, 2018 | Never finaled issued Jan 2019, no final | 190 Lombard St | Evolv Commercial Construction Inc | open closetDetails
open closet | $40,000 |
| Apr 6, 2018 | Completed final sign-off Sep 2018 | 845 Market St | Michilli Inc | space 195 - ti of an existing ground floor level shell retail space. new interior non structural partitions and finishes, lighting, millwork restroom and associated mechanical, electrical & plumbing work. fire sprinkler & alarm are design/build under a separate permit. maher n/aDetails
space 195 - ti of an existing ground floor level shell retail space. new interior non structural partitions and finishes, lighting, millwork restroom and associated mechanical, electrical & plumbing work. fire sprinkler & alarm are design/build under a separate permit. maher n/a | $159,946 |
| Feb 5, 2018 | Completed final sign-off Aug 2018 | 276 05th St | Ducheney Construction Inc | ti of an extg ground level shell retail space into a restaurant. ref 900 folsom for mep. installation of interior non-structural partitions and finishes, lighting, millwork, kitchen equip/hood, plumbing, mech, and electrical. fire sprinkler, ansul and alarm plans under sep permits. n/a for maherDetails
ti of an extg ground level shell retail space into a restaurant. ref 900 folsom for mep. installation of interior non-structural partitions and finishes, lighting, millwork, kitchen equip/hood, plumbing, mech, and electrical. fire sprinkler, ansul and alarm plans under sep permits. n/a for maher | $215,000 |
| Dec 20, 2017 | Completed final sign-off Mar 2019 | 999 Brannan St | install one illuminated single faced wall sign (roof), "dolby family ventures". maher naDetails
install one illuminated single faced wall sign (roof), "dolby family ventures". maher na | $25,000 | |
| Oct 31, 2017 | Completed final sign-off Mar 2019 | 55 Ashbury Tr | Union Pierce Construction | revision to 201708104503: new skylight in bathroom, new fire rated window in master bath.Details
revision to 201708104503: new skylight in bathroom, new fire rated window in master bath. | $20,000 |
| Oct 12, 2017 | Never finaled issued Oct 2017, no final | 999 Brannan St | Lindquist Custom Construction Inc | ref pa 2016-0718-2636 restore 1 hr fire rating on original cantilevered moment frame per bldg inspector jeff barnes. special inspection required.product used is flame off (spracy on finish) fire rate paint, product name is flameoff fire barrier paint.Details
ref pa 2016-0718-2636 restore 1 hr fire rating on original cantilevered moment frame per bldg inspector jeff barnes. special inspection required.product used is flame off (spracy on finish) fire rate paint, product name is flameoff fire barrier paint. | $1,500 |
| Sep 6, 2017 | Never finaled issued Aug 2018, no final | 1225 Mission St | Andy's Roofing Co Inc | roof replacement for (e) leaking roof. new roof addition over (e) area well due to drainage concerns. new roof access hatches. removal of (2) skylights. temporary removal and replacement of (e) rooftop ahu and other misc. mech. mech & electrical permits submitted seperately by gc. maher naDetails
roof replacement for (e) leaking roof. new roof addition over (e) area well due to drainage concerns. new roof access hatches. removal of (2) skylights. temporary removal and replacement of (e) rooftop ahu and other misc. mech. mech & electrical permits submitted seperately by gc. maher na | $50,000 |
| Aug 10, 2017 | Completed final sign-off Mar 2019 | 55 Ashbury Tr | Union Pierce Construction | interior remodel of 3/f, add new bathroom. replace (e) front facade wood windows and doors in kind.Details
interior remodel of 3/f, add new bathroom. replace (e) front facade wood windows and doors in kind. | $140,000 |
| Jun 26, 2017 | Completed final sign-off Nov 2019 | 1235 Mission St | Pionic Unit Construction Co | barrier removal of extg, non compliant stair/guardrail and hanrail in 2 extg stairs. replace with new code compliant guardrail and handrail in all locations where feasible. n/a for maherDetails
barrier removal of extg, non compliant stair/guardrail and hanrail in 2 extg stairs. replace with new code compliant guardrail and handrail in all locations where feasible. n/a for maher | $40,000 |
| Mar 7, 2017 | Never finaled issued Mar 2017, no final | 999 Brannan St | Lindquist Custom Construction Inc | revision to 201607182636, structural revisions including replacement of roof joists with new structural joists and update to exterior seating area structureDetails
revision to 201607182636, structural revisions including replacement of roof joists with new structural joists and update to exterior seating area structure | $80,000 |
| Feb 23, 2017 | Completed final sign-off Jun 2017 | 51 Yerba Buena Ln | Hasz Construction Inc | revision to app#201609278943. removal of structural work. no longer in scope of work. remove special inspection requirements. n/a for maher.Details
revision to app#201609278943. removal of structural work. no longer in scope of work. remove special inspection requirements. n/a for maher. | |
| Sep 27, 2016 | Completed final sign-off Jun 2017 | 51 Yerba Buena Ln | Hasz Construction Inc | t.i. of an extg retail space to a new restaurant. new interior non-structural partitions, kitchen equipment, millwork, and finishes. new mechanical, electrical and plmg. all work to remain within the interior shell of the extg bldg. no increase in square footage. life safety deferred. n/a maherDetails
t.i. of an extg retail space to a new restaurant. new interior non-structural partitions, kitchen equipment, millwork, and finishes. new mechanical, electrical and plmg. all work to remain within the interior shell of the extg bldg. no increase in square footage. life safety deferred. n/a maher | $300,000 |
| Aug 9, 2016 | Completed final sign-off Nov 2016 | 2300 Polk St | Gotham Bay Construction | demolition of extg inerior finishes, non structural partitions, selective demolition of extg electrical/lighting and plumbing fixtures. all demolition work to remain within exterior walls. no work or demolition to exterior of bldg. remain vancancy under ab-017Details
demolition of extg inerior finishes, non structural partitions, selective demolition of extg electrical/lighting and plumbing fixtures. all demolition work to remain within exterior walls. no work or demolition to exterior of bldg. remain vancancy under ab-017 | $5,000 |
| Jul 28, 2016 | Completed final sign-off Nov 2016 | 2300 Polk St | Gotham Bay Construction | t.i. of an (e) restaurant space to a new restaurant. new int.non-structural partitions, kitchen equipment, millwork & finishes. all plumbing or mechanical work to be design/build under separate permit. all work to remain within interior shall be exisitng bldg, no exterior work, no increase in sq ft.Details
t.i. of an (e) restaurant space to a new restaurant. new int.non-structural partitions, kitchen equipment, millwork & finishes. all plumbing or mechanical work to be design/build under separate permit. all work to remain within interior shall be exisitng bldg, no exterior work, no increase in sq ft. | $170,000 |
| Jul 18, 2016 | Never finaled issued Mar 2017, no final | 999 Brannan St | Lindquist Custom Construction Inc | correct administrative permit #2013-0628-0728 construction type to be iia, 4-story and 1 basement. also, alteration of existing penthouse office space including interior, exterior, structural, and mep modications. existing roof structure and penthouse footprint to remain.Details
correct administrative permit #2013-0628-0728 construction type to be iia, 4-story and 1 basement. also, alteration of existing penthouse office space including interior, exterior, structural, and mep modications. existing roof structure and penthouse footprint to remain. | $500,000 |
| Jun 28, 2016 | Completed final sign-off Aug 2018 | 450 Toland St | Pyro-Comm Systems, Inc., H & M Fire Protection, Inc. | change of use from factory/story to motor vehicle repair garage. site permit for alteration to (e) bldg primarily interiors including site work & alterations to principal bldg facade facilty for light duty auto repair, paint shop w/ accessory spaces. life safety deferred.Details
change of use from factory/story to motor vehicle repair garage. site permit for alteration to (e) bldg primarily interiors including site work & alterations to principal bldg facade facilty for light duty auto repair, paint shop w/ accessory spaces. life safety deferred. | $9,200,000 |
| Jun 6, 2016 | Completed final sign-off May 2017 | 214 Shrader St | Gil Construction & Assoc Inc. | interior remodel of existing 3rd fl flat, remodel existing kitchen and existing bath. add 1 new bath, laundry room. convert e laundry room to office. no building expansion, no work visable from street, interior wall demo less than 75%Details
interior remodel of existing 3rd fl flat, remodel existing kitchen and existing bath. add 1 new bath, laundry room. convert e laundry room to office. no building expansion, no work visable from street, interior wall demo less than 75% | $200,000 |
| May 17, 2016 | Completed final sign-off Dec 2016 | 167 Dorantes Av | interior remodel: new stair from ground floor to 1st floor. kitchen remodel on 1st floor, two new bathrooms on 1st and 2nd floor. conversion of (e) storage space to laundry room at ground floor. legalize (e) bathroom on ground floor.Details
interior remodel: new stair from ground floor to 1st floor. kitchen remodel on 1st floor, two new bathrooms on 1st and 2nd floor. conversion of (e) storage space to laundry room at ground floor. legalize (e) bathroom on ground floor. | $115,000 | |
| Apr 6, 2016 | Completed final sign-off Sep 2016 | 240 Kearny St | Hasz Construction Inc | tenant improvement of existing ground flr & basement restaurant space. new,non-structural partitions & finishes,lighting,millwork & kitchen equipment.new plumbing,electrical & mechanical work.Details
tenant improvement of existing ground flr & basement restaurant space. new,non-structural partitions & finishes,lighting,millwork & kitchen equipment.new plumbing,electrical & mechanical work. | $170,000 |
| Mar 30, 2016 | Never finaled issued Apr 2016, no final | 999 Brannan St | Newel&Co.Inc. Dba:Robertson- Jensen &Co. | 5th flr: interior demo ab-017. demo of all interior finishes, including non structural partitions and plumbing fixtures maher naDetails
5th flr: interior demo ab-017. demo of all interior finishes, including non structural partitions and plumbing fixtures maher na | $1,000 |
| Mar 1, 2016 | Expired or cancelled withdrawn Mar 2017 | 999 Brannan St | all work to occur within (e) penthouse footprint. replacement of exterior envelope & roof membrance @ penthouse level only. (e) roof structure to remain. ** maher: n/a **Details
all work to occur within (e) penthouse footprint. replacement of exterior envelope & roof membrance @ penthouse level only. (e) roof structure to remain. ** maher: n/a ** | $200,000 | |
| Jan 28, 2016 | Completed final sign-off May 2021 | 981 Grove St | Union Pierce Construction | replacement of (e) retaining wall between 981 grove st & 722 steiner st. new subgrade footing located on 981 grove st that is connected to (n) retaining wall on 722 steiner st. exterior work only (no work to residence). ref pa 2015-0825-5285Details
replacement of (e) retaining wall between 981 grove st & 722 steiner st. new subgrade footing located on 981 grove st that is connected to (n) retaining wall on 722 steiner st. exterior work only (no work to residence). ref pa 2015-0825-5285 | $1,500 |
| Jan 20, 2016 | Completed final sign-off Jun 2017 | 450 Hayes St | K Bali Construction | change of use: tenant improvement of g/f space previously approved as retail to a new restaurant. ** maher: n/a **Details
change of use: tenant improvement of g/f space previously approved as retail to a new restaurant. ** maher: n/a ** | $312,400 |
| Nov 3, 2015 | Never finaled issued Nov 2015, no final | 2512 Pacific Av | Siena Pacific, Inc. | interior remodel on all levels. replace 3 exterior windows and doors within exiting opening. repair and upgrade existing mechanical and dhw system under sep permit. no structural.Details
interior remodel on all levels. replace 3 exterior windows and doors within exiting opening. repair and upgrade existing mechanical and dhw system under sep permit. no structural. | $20,000 |
| Aug 25, 2015 | Completed final sign-off Jul 2018 | 722 Steiner St | Union Pierce Construction | remove (e) exterior rear yard stair, infill w/ earth and replace (e) retaining wall & fence between subject property & 981 grove st. administrative certificate of appropriateness submittal.Details
remove (e) exterior rear yard stair, infill w/ earth and replace (e) retaining wall & fence between subject property & 981 grove st. administrative certificate of appropriateness submittal. | $5,000 |
| Jun 12, 2015 | Completed final sign-off Jul 2016 | 1531 Mission St | Sf Town Builders Inc | interior t.i.of an existing 1st & 2nd level shell commericical office space within a 3 story comm'l bldg, scope includes: new interior non-structural finishes & partitions, doors, lighting, power distribution & signal cabling, millwork, toilet room fixtures accessories & finishe. life safety deferreDetails
interior t.i.of an existing 1st & 2nd level shell commericical office space within a 3 story comm'l bldg, scope includes: new interior non-structural finishes & partitions, doors, lighting, power distribution & signal cabling, millwork, toilet room fixtures accessories & finishe. life safety deferre | $9,500 |
| May 19, 2015 | Completed final sign-off Jan 2020 | 69 Maiden Ln | Turner Construction Co, Emery Companies Inc./ Dba M M Construct. | currently vacant bldg.stru&enclose upgrd to bldg core&shell including frt facade(separate planning case #2015-004086 pta).new struc fdns&bearing wall.(n)struc grd fl&roof deck.(n)mezze(n)rooftop skylte,sloped roof assy&membrane.(n)stairs.(n)elec&plumb rough-in for bathrm.(n)rooftop mech unit.Details
currently vacant bldg.stru&enclose upgrd to bldg core&shell including frt facade(separate planning case #2015-004086 pta).new struc fdns&bearing wall.(n)struc grd fl&roof deck.(n)mezze(n)rooftop skylte,sloped roof assy&membrane.(n)stairs.(n)elec&plumb rough-in for bathrm.(n)rooftop mech unit. | $500,000 |
| Apr 24, 2015 | Completed final sign-off Oct 2015 | 1264 Noe St | structural remodel in (e) garage. removal of (e) wood posts and beams and replacement w/new steel posts & beamsDetails
structural remodel in (e) garage. removal of (e) wood posts and beams and replacement w/new steel posts & beams | $10,000 | |
| Mar 19, 2015 | Completed final sign-off Aug 2015 | 451 Jackson St | Fisher Development Inc | ti of existing gr level retail space. new interior non structural partitons, finishes. mechanical elec, plumbing design build. maher not reqDetails
ti of existing gr level retail space. new interior non structural partitons, finishes. mechanical elec, plumbing design build. maher not req | $246,000 |
| Jan 23, 2015 | Completed final sign-off Feb 2016 | 1235 Mission St | K L W Construction Inc | revision to app#201312124003. minor changes to partitions, mechanical, plumbing electrical, lighting and ada correction. n/a for the maher.Details
revision to app#201312124003. minor changes to partitions, mechanical, plumbing electrical, lighting and ada correction. n/a for the maher. | $15,000 |
| Nov 20, 2014 | Completed final sign-off Jun 2015 | 560 Mission St | Hathaway Dinwiddie Co. | bring current restrooms to ada compliance, add one lavatory in each restroom to meet plumbing requirements for t.i. ref permit application 201409035308 (under review) plmbg, mech elec & fire sprinkler design build under sept permit.; maher n/aDetails
bring current restrooms to ada compliance, add one lavatory in each restroom to meet plumbing requirements for t.i. ref permit application 201409035308 (under review) plmbg, mech elec & fire sprinkler design build under sept permit.; maher n/a | $15,000 |
| Oct 29, 2014 | Completed final sign-off May 2017 | 984 Folsom St | Modern Construction Inc | 1st fl leveling to finish grade elevation at building entry at folsom st wood floor framing as indicated on a 2.1 maher not requiredDetails
1st fl leveling to finish grade elevation at building entry at folsom st wood floor framing as indicated on a 2.1 maher not required | $50,000 |
| Sep 23, 2014 | Completed final sign-off Jul 2016 | 69 Maiden Ln | Fisher Development Inc | removal & disposal of (e) non-structural interior tenant improvements including doors, suspended ceilings, walls & wall interior finishes as indicated. all (e) structural walls, columns & floors ot remain. all work to comply w/ab-017.Details
removal & disposal of (e) non-structural interior tenant improvements including doors, suspended ceilings, walls & wall interior finishes as indicated. all (e) structural walls, columns & floors ot remain. all work to comply w/ab-017. | $20,000 |
| Sep 3, 2014 | Completed final sign-off Aug 2015 | 560 Mission St | Gotham Bay Construction | ti of gr level food service space. new interior non structural walls and finishes, lighting, millwork, kitchen equipment, apcu and associated plumbing, mech, elec. ul 300, fire sprinkler, fire alarm, water to ul 300 sep permit. restroom upgrade under pa # 2014-1120-2160Details
ti of gr level food service space. new interior non structural walls and finishes, lighting, millwork, kitchen equipment, apcu and associated plumbing, mech, elec. ul 300, fire sprinkler, fire alarm, water to ul 300 sep permit. restroom upgrade under pa # 2014-1120-2160 | $261,362 |
| Aug 29, 2014 | Completed final sign-off Dec 2016 | 1267 Noe St | V And Company, Incorporated | vertical addition of new 3rd fl to include interior stair, 2 bedrms & 2 bathrms.(n) railing & fire wall for (n) rear deck space over (n) roof area within (e) bldg footprint. (n) deck space over (e) roof area west of vertical addition. interior remodel of 1st & 2nd fl (e) habitable space to includeDetails
vertical addition of new 3rd fl to include interior stair, 2 bedrms & 2 bathrms.(n) railing & fire wall for (n) rear deck space over (n) roof area within (e) bldg footprint. (n) deck space over (e) roof area west of vertical addition. interior remodel of 1st & 2nd fl (e) habitable space to include | $150,000 |
| Aug 15, 2014 | Completed final sign-off Aug 2016 | 984 Folsom St | Modern Construction Inc | removal & disposal of all existing non-structural inteiror tenant improvement including doors, suspended ceilings, etc. per plan. all existing sturctural walls, columns, & floor framing to remain. extent of exterior demo is to remove exterior signage on folsom st. space remain vacant (per ab-017);Details
removal & disposal of all existing non-structural inteiror tenant improvement including doors, suspended ceilings, etc. per plan. all existing sturctural walls, columns, & floor framing to remain. extent of exterior demo is to remove exterior signage on folsom st. space remain vacant (per ab-017); | $50,000 |
| Aug 14, 2014 | Completed final sign-off Jul 2015 | 564 Market St | 5th flr: removal of existing non-structural interior partitions & suspended ceilings, construction of rated enclosure around exit stairs for future t.i. per plan , work to comply with ab-017.Details
5th flr: removal of existing non-structural interior partitions & suspended ceilings, construction of rated enclosure around exit stairs for future t.i. per plan , work to comply with ab-017. | $80,000 | |
| Aug 14, 2014 | Expired or cancelled withdrawn Jun 2015 | 564 Market St | (basement) change of use from storage to office, removal of existing non-structurqal interior partitions & suspended ceilings, construction of rated enclosures around exit stair for future t.i. construction of ada compliant restroom & shower.Details
(basement) change of use from storage to office, removal of existing non-structurqal interior partitions & suspended ceilings, construction of rated enclosures around exit stair for future t.i. construction of ada compliant restroom & shower. | $80,000 | |
| Aug 14, 2014 | Completed final sign-off Jun 2016 | 564 Market St | 7th flr: minor modification to permit 201406168438; addition of kitchenette, new 20 min door @ elevator lobby, removal of 2 hr rated wall @ elevator lobby, 1 hr rated provided.Details
7th flr: minor modification to permit 201406168438; addition of kitchenette, new 20 min door @ elevator lobby, removal of 2 hr rated wall @ elevator lobby, 1 hr rated provided. | $20,000 | |
| Aug 13, 2014 | Completed final sign-off Oct 2014 | 1 Lombard St | Isidore Mahon Dba Izzy Construction | install chair lift for barrier removal for wheel chair access to mezzanine level, add blocking cut opening through guard wall on mezzanine. n/a ordinance #155-13Details
install chair lift for barrier removal for wheel chair access to mezzanine level, add blocking cut opening through guard wall on mezzanine. n/a ordinance #155-13 | $48,000 |
| Jun 30, 2014 | Completed final sign-off Oct 2016 | 36 Jordan Av | Fred Pavlow Co. Inc Dba Add-A-Garage, Upscale Construction Inc. | horizontal addition at basement,1st & 2nd fl rear southeast corner partial excavation of (e) basement to create legal head height, new rear deck 3' max above grade, partial interior remodel of kitchen, powder rm & basement bath, replace (e) windows in kind.Details
horizontal addition at basement,1st & 2nd fl rear southeast corner partial excavation of (e) basement to create legal head height, new rear deck 3' max above grade, partial interior remodel of kitchen, powder rm & basement bath, replace (e) windows in kind. | $350,000 |
| May 14, 2014 | Expired or cancelled expired May 2021 | 981 Grove St | Union Pierce Construction | proposed project includes vertical addtion, set back 15'-9" from the front of the house & extending 3'-2" avove (e) parapet, an entirely subgrade rear addition extension into the rear yard set back which has been submitted for variance under32014.0425v; a horizontal addition w rear of the 1st fl,Details
proposed project includes vertical addtion, set back 15'-9" from the front of the house & extending 3'-2" avove (e) parapet, an entirely subgrade rear addition extension into the rear yard set back which has been submitted for variance under32014.0425v; a horizontal addition w rear of the 1st fl, | $489,000 |
| May 2, 2014 | Never finaled issued May 2014, no final | 26 Ofarrell St | 8th floor - improvements for a single office including partitoins & finishes. plumbing, mechanical & electrical, fire sprinkler are design under separate permit.Details
8th floor - improvements for a single office including partitoins & finishes. plumbing, mechanical & electrical, fire sprinkler are design under separate permit. | $75,000 | |
| Mar 24, 2014 | Completed final sign-off Apr 2014 | 1620 Montgomery St | #140- revision to pa# 201207034032, interior tenant improvement, change of wall locations.Details
#140- revision to pa# 201207034032, interior tenant improvement, change of wall locations. | ||
| Feb 18, 2014 | Completed final sign-off Apr 2014 | 1620 Montgomery St | remove finishes, partitons, and other components as noted in plans, demo work only. approx 3400 sf of partition removal.Details
remove finishes, partitons, and other components as noted in plans, demo work only. approx 3400 sf of partition removal. | $18,500 | |
| Jan 10, 2014 | Never finaled issued Jan 2014, no final | 845 Market St | Fisher Development Inc | 2nd floor #225 - construct a new demising wall/access between two retail tenant spaces. compliance with ordinance #155-13 not required. excavation <50 cu. yd. ab-017 applies to suite 225Details
2nd floor #225 - construct a new demising wall/access between two retail tenant spaces. compliance with ordinance #155-13 not required. excavation <50 cu. yd. ab-017 applies to suite 225 | $180,000 |
| Dec 12, 2013 | Completed final sign-off Feb 2016 | 1235 Mission St | K L W Construction Inc | ground level waiting area tenant improvement including furniture, finishes, millwork, partitoin locations, egress & restroom upgrades. electrical work includes relocation of certain light fixtures due to revised partition layout. exterior work under separate permitDetails
ground level waiting area tenant improvement including furniture, finishes, millwork, partitoin locations, egress & restroom upgrades. electrical work includes relocation of certain light fixtures due to revised partition layout. exterior work under separate permit | $350,000 |
| Oct 30, 2013 | Completed final sign-off Feb 2016 | 1235 Mission St | 1st floor-in preparation for new work-demolition & removal of finishes, partitions, light fixtures & other bldg compents as shown for phase #1, refer to general notes & demolition notes for additional information. provide interior barricade, per ab-017Details
1st floor-in preparation for new work-demolition & removal of finishes, partitions, light fixtures & other bldg compents as shown for phase #1, refer to general notes & demolition notes for additional information. provide interior barricade, per ab-017 | $20,000 | |
| Sep 17, 2013 | Completed final sign-off Apr 2017 | 45 Grant Av | Build Group Inc. | tenant improvement of 4 level shell retail space. basement, ground, mezz, and 2nd fl. new interior non structural partitons, finishes, lighting, and millwork. fire sprinkler design build separate permitDetails
tenant improvement of 4 level shell retail space. basement, ground, mezz, and 2nd fl. new interior non structural partitons, finishes, lighting, and millwork. fire sprinkler design build separate permit | $600,000 |
| Sep 12, 2013 | Completed final sign-off Dec 2013 | 2614 Buchanan St | Canyon Construction | revision to pa# 2012-0416-8346-remove (e) unreinforced masonary chimney, patch (e) wall to match adjacent finish. infill & patch roof at chimney. remove (e) fireplaces on 2nd & 3rd floorsDetails
revision to pa# 2012-0416-8346-remove (e) unreinforced masonary chimney, patch (e) wall to match adjacent finish. infill & patch roof at chimney. remove (e) fireplaces on 2nd & 3rd floors | $2,000 |
| Sep 5, 2013 | Completed final sign-off Apr 2017 | 45 Grant Av | Fisher Development Inc | interior demolition. ab17.Details
interior demolition. ab17. | $60,000 |
| Aug 27, 2013 | Completed final sign-off Sep 2014 | 1190 Mission St | 1st time tenant improvement of an (e) ground level shell retail space. new interior non structural partitions & finishes, ligting, millwrok & kitchen equipment. fire sprinklers, fire alarm, hood and duct suppression system to be done under separate permits. compliance w/maher ord.#155-13 not req'dDetails
1st time tenant improvement of an (e) ground level shell retail space. new interior non structural partitions & finishes, ligting, millwrok & kitchen equipment. fire sprinklers, fire alarm, hood and duct suppression system to be done under separate permits. compliance w/maher ord.#155-13 not req'd | $225,000 | |
| Aug 27, 2013 | Never finaled filed Aug 2013, never issued | 45 Grant Av | Fisher Development Inc | decal - non electric, non illuminated.Details
decal - non electric, non illuminated. | $5,000 |
| Aug 27, 2013 | Completed final sign-off Apr 2017 | 45 Grant Av | Fisher Development Inc, Build Group Inc. | minor alterations to (e) storefront. replace 1st floor storefront glazing. add (n) brass backlit led signage to (e) canopy.Details
minor alterations to (e) storefront. replace 1st floor storefront glazing. add (n) brass backlit led signage to (e) canopy. | $250,000 |
| May 30, 2013 | Completed final sign-off Jul 2014 | 1440 Harrison St | Wci-Gc Inc | revision to appl #2011.06.23.8797: renovation to existing courtyard landscaping, regrading, new low retaining wall, new in grade planters.Details
revision to appl #2011.06.23.8797: renovation to existing courtyard landscaping, regrading, new low retaining wall, new in grade planters. | $80,000 |
| Mar 15, 2013 | Completed final sign-off Apr 2014 | 2732 Vallejo St | Upscale Construction Inc. | add new brick to existing brick wall at front of property. add new gate to existing brick wall at front of property.Details
add new brick to existing brick wall at front of property. add new gate to existing brick wall at front of property. | $150 |
| Feb 12, 2013 | Completed final sign-off Oct 2014 | 1440 Harrison St | Wci-Gc Inc | revision to pa# 201106238797: maintain existing egress door on the 2nd floor instead of moving it to meet diagonal distance due to no occupancy changes.Details
revision to pa# 201106238797: maintain existing egress door on the 2nd floor instead of moving it to meet diagonal distance due to no occupancy changes. | |
| Nov 29, 2012 | Never finaled issued Apr 2013, no final | 1440 Harrison St | Wci-Gc Inc | revision to appl #2011.0623.8797: remove 3 (e) roll up doors & replace with low wall & alum storefront, replace (e) aluminum front doors with new alum storefront doors, replace double doors at rear of bldg with alum storefront.Details
revision to appl #2011.0623.8797: remove 3 (e) roll up doors & replace with low wall & alum storefront, replace (e) aluminum front doors with new alum storefront doors, replace double doors at rear of bldg with alum storefront. | $45,000 |
| Nov 26, 2012 | Completed final sign-off Jul 2014 | 1440 Harrison St | Wci-Gc Inc | revision to appl #2011.0623.8797 - in lieu of demolishing concrete walls per original permit, sawcut 1 (one) new opening in existing concrete wall & reinforce with steel elements per plan, accessibility to be provided under original permit..Details
revision to appl #2011.0623.8797 - in lieu of demolishing concrete walls per original permit, sawcut 1 (one) new opening in existing concrete wall & reinforce with steel elements per plan, accessibility to be provided under original permit.. | |
| Nov 6, 2012 | Completed final sign-off Apr 2014 | 2732 Vallejo St | Upscale Construction Inc. | comply with nov# 201273981-revision to pa# 2012-0224-4828-new retaining walls in garden area at rear yard in order to retain potting areas & enlarge turn about at the driveway off of the garage. new slab on patio off house & new concrete drivewayDetails
comply with nov# 201273981-revision to pa# 2012-0224-4828-new retaining walls in garden area at rear yard in order to retain potting areas & enlarge turn about at the driveway off of the garage. new slab on patio off house & new concrete driveway | $50,000 |
| Apr 16, 2012 | Expired or cancelled expired Oct 2020 | 2614 Buchanan St | Canyon Construction, Dijeau Poage Construction Inc. | revision to appl #2011.07.01.9358 - revision per post demolition discoveries, interior renovation (kitchen & bath), window revisions to unit #2, interior renovation (kitchen & bath), add sink to unit #1.Details
revision to appl #2011.07.01.9358 - revision per post demolition discoveries, interior renovation (kitchen & bath), window revisions to unit #2, interior renovation (kitchen & bath), add sink to unit #1. | $300,000 |
| Feb 3, 2012 | Expired or cancelled expired Oct 2020 | 2614 Buchanan St | Canyon Construction, Dijeau Poage Construction Inc. | revision to appl #2011.07.01.9358 - replacement of existing masonry footings at 2 locations (total of approx. 40 l.f.).Details
revision to appl #2011.07.01.9358 - replacement of existing masonry footings at 2 locations (total of approx. 40 l.f.). | $5,000 |
| Jan 11, 2012 | Completed final sign-off Apr 2014 | 2732 Vallejo St | Upscale Construction Inc. | horizontal addition to (e) ground floor dining room and roof deck above at front of house. replacement and extension of existing rear deck at second floor. removal of (e) sloped roof between two roof dormers at rear and replacement with flat roof.Details
horizontal addition to (e) ground floor dining room and roof deck above at front of house. replacement and extension of existing rear deck at second floor. removal of (e) sloped roof between two roof dormers at rear and replacement with flat roof. | $45,000 |
| Jul 12, 2011 | Completed final sign-off Jan 2012 | 185 Berry St | unit #1430: 1st floor-remodel of (e) ground floor food sales space. new interior non structural partitions & finishes. modifications of (e) hvac, plumbing & electrical. relocate (e) type 2 hoodDetails
unit #1430: 1st floor-remodel of (e) ground floor food sales space. new interior non structural partitions & finishes. modifications of (e) hvac, plumbing & electrical. relocate (e) type 2 hood | $75,000 | |
| Jul 1, 2011 | Expired or cancelled expired Oct 2020 | 2614 Buchanan St | Canyon Construction, Dijeau Poage Construction Inc. | repairs to existing finishes & structure due to construction defects and waer instrusion.Details
repairs to existing finishes & structure due to construction defects and waer instrusion. | $1,400,000 |
| Jun 23, 2011 | Completed final sign-off Jul 2014 | 1440 Harrison St | Wci-Gc Inc | redesign of 1st floor client reception, waiting area & lobby; new cubicle layout, demolition of private offices, floor finishes, pony walls & closets, new floor finishes, remodel (e) breakrooms (1st & 2nd floors), new breakroom (3rd floor).Details
redesign of 1st floor client reception, waiting area & lobby; new cubicle layout, demolition of private offices, floor finishes, pony walls & closets, new floor finishes, remodel (e) breakrooms (1st & 2nd floors), new breakroom (3rd floor). | $479,000 |
| May 31, 2011 | Completed final sign-off Aug 2011 | 989 Market St | D A Pope Inc | office ti on the 3rd fl. renov. of(e) conf rm to 1 conf rm and office. renov of work rm into 3 offices, store rm to employer break rm. add 4 phone rooms.Details
office ti on the 3rd fl. renov. of(e) conf rm to 1 conf rm and office. renov of work rm into 3 offices, store rm to employer break rm. add 4 phone rooms. | $98,914 |
| Sep 29, 2010 | Never finaled issued Sep 2010, no final | 455 Market St | Mdb Interiors Inc | 1st floor demolition of interior non-structural partitions & suspended ceiling per ab-017.Details
1st floor demolition of interior non-structural partitions & suspended ceiling per ab-017. | $10,000 |
| Sep 22, 2010 | Completed final sign-off Apr 2011 | 455 Market St | Mdb Interiors Inc | ground floor-interior demolition, new interior non structural partitions, finishes, hvac, plumbing, lighting & electrical for tenant improvement. sprinklers and fire alarm separte permit. new (3) fsd and 2 type hoods - new rotisserie.Details
ground floor-interior demolition, new interior non structural partitions, finishes, hvac, plumbing, lighting & electrical for tenant improvement. sprinklers and fire alarm separte permit. new (3) fsd and 2 type hoods - new rotisserie. | $238,000 |
| Apr 12, 2010 | Expired or cancelled expired Nov 2016 | 3228 Washington St | 9'-4" vertical addition @ roof level - mezzanine. modify (e) bldg. stair - new roof stair from 3rd. story. (n) roof decks-8'-6" solid wall @ roof level. interior remodel to include kitchen $ bath.Details
9'-4" vertical addition @ roof level - mezzanine. modify (e) bldg. stair - new roof stair from 3rd. story. (n) roof decks-8'-6" solid wall @ roof level. interior remodel to include kitchen $ bath. | $190,000 | |
| Feb 9, 2010 | Expired or cancelled cancelled Feb 2011 | 2614 Buchanan St | 41 sq.ft. horizontal addition to (e) 4th. floor east (rea) deck & new guardrail.Details
41 sq.ft. horizontal addition to (e) 4th. floor east (rea) deck & new guardrail. | $9,520 | |
| Dec 23, 2009 | Expired or cancelled withdrawn Jul 2011 | 1440 Harrison St | 1st, 2nd & 3rd floor tenant improvement, redesign of 1st floor client reception, waiting area & lobby, new cubicle layout list @ 2nd & 3rd floor, new play area for children, demo private offices @ 1st flr, pony wall @ 2nd flr, closets @ 3rd flr, remodel (e) 1,2,3 flr breakrm, new breakrm @ 3rd flr.Details
1st, 2nd & 3rd floor tenant improvement, redesign of 1st floor client reception, waiting area & lobby, new cubicle layout list @ 2nd & 3rd floor, new play area for children, demo private offices @ 1st flr, pony wall @ 2nd flr, closets @ 3rd flr, remodel (e) 1,2,3 flr breakrm, new breakrm @ 3rd flr. | $479,000 | |
| Apr 30, 2008 | Completed final sign-off Mar 2009 | 2000 Washington St | unit #6: model master bath w/extra closet space (364 sf) & move existing laundry to existing exercise area (155 sf). update lighting in library, dining, & living rooms.Details
unit #6: model master bath w/extra closet space (364 sf) & move existing laundry to existing exercise area (155 sf). update lighting in library, dining, & living rooms. | $90,000 | |
| Nov 13, 2007 | Expired or cancelled expired Sep 2012 | 1949 Oak St | horizontal addition: new deck at rear on 2nd floor, interior remodel restoration of (e) structure & facade, new ext. space & retaining wall @ rear. horizontal addition to include bedroom, kitchen, bath on all floors.Details
horizontal addition: new deck at rear on 2nd floor, interior remodel restoration of (e) structure & facade, new ext. space & retaining wall @ rear. horizontal addition to include bedroom, kitchen, bath on all floors. | $993,500 | |
| Oct 23, 2007 | Completed final sign-off Jan 2010 | 642 Spruce St | horizontal addition at rear three stories with second story deck. interior remodel to dinning, kitchen, and water closet on second floor. new roof at horizontal addition to match existing ridge and slope.Details
horizontal addition at rear three stories with second story deck. interior remodel to dinning, kitchen, and water closet on second floor. new roof at horizontal addition to match existing ridge and slope. | $329,000 | |
| May 10, 2007 | Completed final sign-off Aug 2007 | 3533 California St | oti-1 ground floor el meDetails
oti-1 ground floor el me | $80,168 | |
| May 3, 2007 | Never finaled issued May 2007, no final | 475 Sansome St | Gci, Inc | to erect non-electrical signDetails
to erect non-electrical sign | |
| Nov 3, 2006 | Completed final sign-off Mar 2009 | 238 Day St | 22'4" ground floor addi5ion @ rear, 11'4"2nd , 3rd floor addition 2 rear w/new deck - new dormers & loft roof alteration to 39' prev. ridge 38'2" , front facade refurbishment (new windows, doors, siding trim & paint.)Details
22'4" ground floor addi5ion @ rear, 11'4"2nd , 3rd floor addition 2 rear w/new deck - new dormers & loft roof alteration to 39' prev. ridge 38'2" , front facade refurbishment (new windows, doors, siding trim & paint.) | $533,000 | |
| Oct 27, 2006 | Never finaled issued Oct 2006, no final | 500 Hayes St | K L K Engineering | flat slab floor @ (e) egress corridor. revision to pa# 2006/06/02/3101.Details
flat slab floor @ (e) egress corridor. revision to pa# 2006/06/02/3101. | $3,000 |
| Oct 19, 2006 | Expired or cancelled cancelled Nov 2007 | 2525 16th St | construction of new demising walls, partitions, new finishes, new storefront, mechanical & electrical.Details
construction of new demising walls, partitions, new finishes, new storefront, mechanical & electrical. | $120,000 | |
| Aug 15, 2006 | Completed final sign-off Jun 2007 | 845 Market St | Rcm Fire Protection Inc. | kozo arts, space# 283. cti-4, 2nd floor, sp.Details
kozo arts, space# 283. cti-4, 2nd floor, sp. | $10,000 |
| Aug 4, 2006 | Completed final sign-off Mar 2007 | 649 Front St | oti-1, 3rd floor, el, spDetails
oti-1, 3rd floor, el, sp | $100,000 | |
| Jul 13, 2006 | Never finaled issued Aug 2006, no final | 75 Hawthorne St | Novo Construction Inc | suite #2001 - demising (e) single floor tenant space into 2 seperate spaces. creating 1 hr. fire rated corridor with new partitions, ceilings, lighting & finishes. mep under seperate permit-design/build.Details
suite #2001 - demising (e) single floor tenant space into 2 seperate spaces. creating 1 hr. fire rated corridor with new partitions, ceilings, lighting & finishes. mep under seperate permit-design/build. | $50,000 |