- Jan 2016 to Apr 2026
57 permits since 2000 (engineer on 57 permits): 38 completed, 1 in progress, 12 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 23, 2026 | In progress issued Apr 2026 | 89 Ventura Av | Darc Ventures Inc Dba Spl Construction S | new interior stair to replace existing stair in same general location. project adds a shower to existing 1/f bathroom.Details
new interior stair to replace existing stair in same general location. project adds a shower to existing 1/f bathroom. | $50,000 |
| Oct 21, 2022 | Expired or cancelled expired Mar 2025 | 1501 Diamond St | Bailey General Contracting Co Inc | bakyard landscape and front porch remodel.Details
bakyard landscape and front porch remodel. | $15,000 |
| Oct 12, 2022 | Never finaled issued Nov 2022, no final | 139 24th Av | Jim Murphy & Associates | front building demolish & rebuild (e) concrete footing to expand laundry room on 1st level; excavate and build (n)concrete retaining walls to create (n) storage area at garage level. all work within existing envelope.Details
front building demolish & rebuild (e) concrete footing to expand laundry room on 1st level; excavate and build (n)concrete retaining walls to create (n) storage area at garage level. all work within existing envelope. | $20,000 |
| Sep 6, 2022 | Completed final sign-off Dec 2023 | 125 Presidio Av | Pete Moffat Construction Inc | interior remodel: relocate (e) entry closet. remove (e) office closet. relocate (e) partition, install two new pocket doors.Details
interior remodel: relocate (e) entry closet. remove (e) office closet. relocate (e) partition, install two new pocket doors. | $25,000 |
| Aug 31, 2022 | Never finaled issued Sep 2022, no final | 139 24th Av | Jim Murphy & Associates | front building - interior remodel: laundry and playroom, replace spiral stairs to garage w/ (n) elevator . lower sill and replace (e) front window with a door to create access to garage roof terrace. reinforce (e) garage roof framing to support (n) raised tile deck surface.Details
front building - interior remodel: laundry and playroom, replace spiral stairs to garage w/ (n) elevator . lower sill and replace (e) front window with a door to create access to garage roof terrace. reinforce (e) garage roof framing to support (n) raised tile deck surface. | $500,000 |
| Jun 27, 2022 | Expired or cancelled expired Mar 2025 | 1501 Diamond St | Bailey General Contracting Co Inc | rev to pa 202109178674 to include structural details for roof deck.Details
rev to pa 202109178674 to include structural details for roof deck. | |
| Feb 24, 2022 | Completed final sign-off Feb 2023 | 1035 Filbert St | Stonebridge Construction Inc | replace (e) deck with (n) deck.Details
replace (e) deck with (n) deck. | $20,000 |
| Feb 22, 2022 | Completed final sign-off Jun 2024 | 2151 Pacific Av | Clayton Timbrell & Co | revision to pa 2021-0727-5165 for change in height to retaining walls at unit #1 rear yardDetails
revision to pa 2021-0727-5165 for change in height to retaining walls at unit #1 rear yard | $95,000 |
| Feb 9, 2022 | Completed final sign-off Dec 2023 | 125 Presidio Av | Pete Moffat Construction Inc | voluntary seismic improvements & structural solutions for landscape improvements.Details
voluntary seismic improvements & structural solutions for landscape improvements. | $30,000 |
| Feb 3, 2022 | Expired or cancelled expired Mar 2025 | 1501 Diamond St | Bailey General Contracting Co Inc | 1) detached garage remodel. 2) new un-occupied vegetative roof over extg detatched garage. 3)garage door replacement. revision to permit pa#202104128306Details
1) detached garage remodel. 2) new un-occupied vegetative roof over extg detatched garage. 3)garage door replacement. revision to permit pa#202104128306 | $75,000 |
| Feb 3, 2022 | Never finaled issued Mar 2022, no final | 2151 Pacific Av | Clayton Timbrell & Co | addition of roof deck that is less than 500 sf.Details
addition of roof deck that is less than 500 sf. | $175,000 |
| Jan 20, 2022 | Completed final sign-off Jan 2024 | 2109 Broadway | Peter Downey Construction Co., Inc. | exterior rear yard work including patio modification, new steps, new retaining wall.Details
exterior rear yard work including patio modification, new steps, new retaining wall. | $30,000 |
| Jan 14, 2022 | Completed final sign-off Mar 2023 | 355 Oak Park Dr | to comply with boa 21-101 to reduce depth of deck to 9 feetDetails
to comply with boa 21-101 to reduce depth of deck to 9 feet | ||
| Jan 7, 2022 | Completed final sign-off May 2023 | 812 Scott St | Cello & Maudru Construction Co Inc | demo of (e) g/f restroom to accomodate reconfigured restroom. new fixtures and finieshes. moving the living room wall and its associated foundation. any futrurepermit for second floor should not be otc.Details
demo of (e) g/f restroom to accomodate reconfigured restroom. new fixtures and finieshes. moving the living room wall and its associated foundation. any futrurepermit for second floor should not be otc. | $55,000 |
| Dec 20, 2021 | Never finaled issued Dec 2021, no final | 1735 Beach St | remodel of (e) 1 bedroom ground floor rear apartment. work to include the removal of (e) kitchen cabinetry, bathroom cabinetry and fixtures, bathroom walls, bathroom floor and raised living room floor. the wall between kitchen and living room will be reduced to a half wall and the relocation of theDetails
remodel of (e) 1 bedroom ground floor rear apartment. work to include the removal of (e) kitchen cabinetry, bathroom cabinetry and fixtures, bathroom walls, bathroom floor and raised living room floor. the wall between kitchen and living room will be reduced to a half wall and the relocation of the | $100,000 | |
| Nov 10, 2021 | Expired or cancelled cancelled Mar 2023 | 2820 Scott St | Dollard Construction Inc. | roof deck: renovate(e) 500 sf deck to 1375 sf.install(new)porcelain pavers on bison system.intall (n) guardrail at 42" maximum.Details
roof deck: renovate(e) 500 sf deck to 1375 sf.install(new)porcelain pavers on bison system.intall (n) guardrail at 42" maximum. | $58,000 |
| Oct 14, 2021 | Completed final sign-off Mar 2023 | 355 Oak Park Dr | Bailey General Contracting Co Inc | (n) 230 sf deck, 2(n) windows & 2(n) doors @ rear. warren drive side of lot. 78 sf addition @ 1st level under (e) cantilever @ rear of residence. (n) bath and (n) half bath @ level 1. plumbing and electrical as reqDetails
(n) 230 sf deck, 2(n) windows & 2(n) doors @ rear. warren drive side of lot. 78 sf addition @ 1st level under (e) cantilever @ rear of residence. (n) bath and (n) half bath @ level 1. plumbing and electrical as req | $100,000 |
| Sep 17, 2021 | Completed final sign-off Sep 2024 | 47 Jordan Av | Di Vine Construction | to replace an existing non-forming deck with a new small deck in the setback. to fill in a bay window and add 11 sq ft.Details
to replace an existing non-forming deck with a new small deck in the setback. to fill in a bay window and add 11 sq ft. | $20,000 |
| Sep 10, 2021 | Completed final sign-off Dec 2023 | 125 Presidio Av | Pete Moffat Construction Inc | courtyard: replace wood siding due to dryrot. replace (e) wood windows and doors in kink in (e) openings. extend foundation at courtyard walls. repair balcony due to dryrot. exterior passageway: remove 2 doors from garage to ext. passageway. remove stucco from wall and ceiling.Details
courtyard: replace wood siding due to dryrot. replace (e) wood windows and doors in kink in (e) openings. extend foundation at courtyard walls. repair balcony due to dryrot. exterior passageway: remove 2 doors from garage to ext. passageway. remove stucco from wall and ceiling. | $300,000 |
| Aug 25, 2021 | Never finaled issued Oct 2021, no final | 700 Marina Bl | Justin Farrelly Incorporated | minor interior renovation: meeting room at south eash corner of ground floor. remove and replace interior non bearing walls and all finishes and fixtures. no exterior alterations. no structural alterations.Details
minor interior renovation: meeting room at south eash corner of ground floor. remove and replace interior non bearing walls and all finishes and fixtures. no exterior alterations. no structural alterations. | $73,280 |
| Jul 28, 2021 | Completed final sign-off Oct 2024 | 640 Cesar Chavez St | Truebeck Construction | improvement of (e) interior structural slab.Details
improvement of (e) interior structural slab. | $575,000 |
| Jul 27, 2021 | Completed final sign-off Jul 2024 | 2151 Pacific Av | Clayton Timbrell & Co | unit 2: interior remodel, foundation repair and re-roofing, new in-kind garage door.Details
unit 2: interior remodel, foundation repair and re-roofing, new in-kind garage door. | $250,000 |
| Jul 27, 2021 | Completed final sign-off Jul 2024 | 2151 Pacific Av | Clayton Timbrell & Co | unit 1: interior remodel, foundation repair and re-roofing, new in-kind garage door.Details
unit 1: interior remodel, foundation repair and re-roofing, new in-kind garage door. | $250,000 |
| May 27, 2021 | Completed final sign-off Sep 2022 | 2820 Scott St | Dollard Construction Inc. | repair of damaged roof joists. new infill concrete wall to create water proofing at property line.Details
repair of damaged roof joists. new infill concrete wall to create water proofing at property line. | $34,500 |
| Apr 19, 2021 | Never finaled issued May 2021, no final | 65 Raycliff Tr | Stroub Construction | interior remodel of l1 and l2. structural improvments for possible future work. no alterations to exterior building envelope. plumbing, electrical work as required. replacement of (e) exterior windows and doors.Details
interior remodel of l1 and l2. structural improvments for possible future work. no alterations to exterior building envelope. plumbing, electrical work as required. replacement of (e) exterior windows and doors. | $60,000 |
| Feb 16, 2021 | Never finaled issued Apr 2021, no final | 65 Raycliff Tr | Stroub Construction | revision to pa 202003025863: partial demolition of interior walls, doors, mill work, lighting and finishes. no change to exterior building envelope. no change to fixture count. m.e.p are design-build as required.Details
revision to pa 202003025863: partial demolition of interior walls, doors, mill work, lighting and finishes. no change to exterior building envelope. no change to fixture count. m.e.p are design-build as required. | $20,000 |
| Nov 24, 2020 | Completed final sign-off Feb 2024 | 375 Edgehill Wy | Aaron Gordon Construction Inc | revision to pa# 201908229631. (e) interior wall to be replaced and reinforced due to framing deficiencies to make the roof safe.Details
revision to pa# 201908229631. (e) interior wall to be replaced and reinforced due to framing deficiencies to make the roof safe. | $4,000 |
| Nov 17, 2020 | Never finaled issued Jan 2021, no final | 815 Pierce St | Vision Builders | revision to pa# 202001222512 storage alteration. deletion of undesired structural sheets from adu pa# 201612165219 r1 and mew structural pages to replace deleted pages.Details
revision to pa# 202001222512 storage alteration. deletion of undesired structural sheets from adu pa# 201612165219 r1 and mew structural pages to replace deleted pages. | $25,000 |
| Sep 9, 2020 | Never finaled issued Feb 2022, no final | 37 Rivoli St | Dollard Construction Inc. | lower level, rear addition under existing upper level footprint with partial lowering of slab in area of work. two new windows at addition. replacing four existing windows at rear. replacing existing sliding patio door at rear. see a6.01 for all specs. new restrooms on both levels.Details
lower level, rear addition under existing upper level footprint with partial lowering of slab in area of work. two new windows at addition. replacing four existing windows at rear. replacing existing sliding patio door at rear. see a6.01 for all specs. new restrooms on both levels. | $200,000 |
| Sep 1, 2020 | Completed final sign-off May 2024 | 551 Duboce Av | Vision Builders, Tn Building | temporary building shoring for excavation to replace perimeter wall foundations and for alteration of existing framing for adu and new garage at ground floor. (building permit for construction is under separate apn:#201809200916)Details
temporary building shoring for excavation to replace perimeter wall foundations and for alteration of existing framing for adu and new garage at ground floor. (building permit for construction is under separate apn:#201809200916) | $10,000 |
| Aug 29, 2020 | Completed final sign-off Jan 2023 | 3070 Pacific Av | Colindres & Associates | interior remodel including basement bath, 1st fl kitchen, 2nd fl bathrooms, and reconfiguration of 3rd fl. exterior work includes replacements of 3 windows in-kind on north elevation. 1 window & 4 doors in kind on east. replace glass only on 5 windows & doors on east & south.Details
interior remodel including basement bath, 1st fl kitchen, 2nd fl bathrooms, and reconfiguration of 3rd fl. exterior work includes replacements of 3 windows in-kind on north elevation. 1 window & 4 doors in kind on east. replace glass only on 5 windows & doors on east & south. | $465,000 |
| Aug 27, 2020 | Completed final sign-off Mar 2022 | 99 Missouri St | Oliver & Company Inc. | two structures combined into single retail building. reconstruct portions of exterior facade, install new windows and entrances, site work in rear parking lot and sidewalk landscaping, new partitions, ceilings, finishes. utility upgrades. separate permit filed for first floor slab on grade.Details
two structures combined into single retail building. reconstruct portions of exterior facade, install new windows and entrances, site work in rear parking lot and sidewalk landscaping, new partitions, ceilings, finishes. utility upgrades. separate permit filed for first floor slab on grade. | $4,000,000 |
| Mar 2, 2020 | Never finaled issued Oct 2020, no final | 65 Raycliff Tr | Stroub Construction | revision to pa# 201810264317. voluntary seismic retrofit. top floor interior fixtures & finishes & wet bar.Details
revision to pa# 201810264317. voluntary seismic retrofit. top floor interior fixtures & finishes & wet bar. | $305,000 |
| Feb 12, 2020 | Completed final sign-off Aug 2021 | 3522 Clay St | Peter Downey Construction Co., Inc. | horizontal addition on the 3rd flr over (e) bay window below. all other work under separate permit.Details
horizontal addition on the 3rd flr over (e) bay window below. all other work under separate permit. | $6,000 |
| Dec 27, 2019 | Completed final sign-off Mar 2023 | 355 Oak Park Dr | Bailey General Contracting Co Inc | residential alterations including bathroom renovation, kitchen renovation, removal of flat ceilings, adding skylights, and roof structural upgrades. legalize gr fl family room and bathroomDetails
residential alterations including bathroom renovation, kitchen renovation, removal of flat ceilings, adding skylights, and roof structural upgrades. legalize gr fl family room and bathroom | $100,000 |
| Oct 21, 2019 | Expired or cancelled expired Feb 2022 | 2908 Baker St | Aspect Builders Llc. | to comply with nov #201935262. replacing an (e) unreinforced site concrete retaining wall along the northern property line with a new reinforced concrete wall. 41 cu yd excavation. new fence not exceeding 6'-0" height.Details
to comply with nov #201935262. replacing an (e) unreinforced site concrete retaining wall along the northern property line with a new reinforced concrete wall. 41 cu yd excavation. new fence not exceeding 6'-0" height. | $20,000 |
| Sep 27, 2019 | Completed final sign-off May 2020 | 1035 Filbert St | Aspect Builders Llc. | excavation and shoring for voluntary soft story retrofit in ref pa 2019-0823-9654Details
excavation and shoring for voluntary soft story retrofit in ref pa 2019-0823-9654 | $2,000 |
| Aug 23, 2019 | Completed final sign-off May 2020 | 1035 Filbert St | Aspect Builders Llc. | seismic retrofit of the ground level soft story per ab-094Details
seismic retrofit of the ground level soft story per ab-094 | $75,000 |
| Aug 22, 2019 | Expired or cancelled expired Jul 2025 | 375 Edgehill Wy | Aaron Gordon Construction Inc | revision/reduced to pa 2015-0820-4819. 2nd fl - no horizontal extensions. remove habitable spae @ crawl space. propose renovation of (e) space; 3rd fl -no extension at kitchen & reduce extension @ dining;reduced extension at (n) vestibule lift adjacent (e) garage; reno (e) space & carport. rebuild &Details
revision/reduced to pa 2015-0820-4819. 2nd fl - no horizontal extensions. remove habitable spae @ crawl space. propose renovation of (e) space; 3rd fl -no extension at kitchen & reduce extension @ dining;reduced extension at (n) vestibule lift adjacent (e) garage; reno (e) space & carport. rebuild & | |
| Jun 6, 2019 | Completed final sign-off May 2020 | 320 Seacliff Av | Stonebridge Construction Inc | voluntary seismic improvement @ ground floor level of existing single family residenceDetails
voluntary seismic improvement @ ground floor level of existing single family residence | $50,000 |
| Feb 13, 2019 | Completed final sign-off Dec 2019 | 120 27th Av | Bicardo Builders | new front entry stairs. replace (e) terrazzo with concrete collaborative terrazza. color to be medium gray with bullnose detail.Details
new front entry stairs. replace (e) terrazzo with concrete collaborative terrazza. color to be medium gray with bullnose detail. | $60,000 |
| May 16, 2018 | Never finaled issued Jun 2018, no final | 1290 30th Av | Schrobsdorff Construction | remove walls, install new kitchen, install relocate stairs, partial new foundation, to support new/exterior wall. new lights. new roof. no exterior workDetails
remove walls, install new kitchen, install relocate stairs, partial new foundation, to support new/exterior wall. new lights. new roof. no exterior work | $75,000 |
| Apr 6, 2018 | Completed final sign-off Feb 2019 | 2230 Green St | Thompson Suskind L P | voluntary seismic upgrade of ground floor level. n/a for maher.Details
voluntary seismic upgrade of ground floor level. n/a for maher. | $65,000 |
| Feb 6, 2018 | Completed final sign-off Aug 2018 | 89 Ventura Av | Bailey General Contracting Co Inc | voluntary structural improvement at ground floorDetails
voluntary structural improvement at ground floor | $45,000 |
| Nov 27, 2017 | Completed final sign-off Nov 2018 | 186 Lexington St | Sf Town Builders Inc | repair basement access concrete slab under sidewalk and partial replacement of concrete sidewaolk along building wallDetails
repair basement access concrete slab under sidewalk and partial replacement of concrete sidewaolk along building wall | $1,000 |
| Nov 2, 2017 | Completed final sign-off Nov 2020 | 3255 Sacramento St | Mulhall Construction Inc. | mandatory soft story retrofit per sfebc chapter 4d, using 2016 cebc appendix a-4, for commercial retail portion (residential portion under pa #201711022925)Details
mandatory soft story retrofit per sfebc chapter 4d, using 2016 cebc appendix a-4, for commercial retail portion (residential portion under pa #201711022925) | $25,000 |
| Nov 2, 2017 | Completed final sign-off Nov 2020 | 3255 Sacramento St | Mulhall Construction Inc. | mandatory soft story retrofit per sfebc chapter 4d, using 2016 cebc appendix a-4 for residential portion. (commercial under pa #201711022921)Details
mandatory soft story retrofit per sfebc chapter 4d, using 2016 cebc appendix a-4 for residential portion. (commercial under pa #201711022921) | $25,000 |
| Oct 20, 2017 | Completed final sign-off Feb 2018 | 1278 Page St | Aspect Builders Llc. | underpin existing foundation at west property lineDetails
underpin existing foundation at west property line | $5,000 |
| Jul 11, 2017 | Completed final sign-off Apr 2018 | 2937 Scott St | Mulhall Construction Inc. | ab-094 voluntary soft story retrofit per 2016 cebc appendix a-4Details
ab-094 voluntary soft story retrofit per 2016 cebc appendix a-4 | $85,000 |
| Jun 7, 2017 | Completed final sign-off Dec 2020 | 1743 46th Av | change approved & permitted addition from steel moment frame construction to wood shear wall design. no changes to plans & elevation only structural ref: p/a#201309096255.Details
change approved & permitted addition from steel moment frame construction to wood shear wall design. no changes to plans & elevation only structural ref: p/a#201309096255. | $35,000 | |
| May 31, 2017 | Completed final sign-off Jan 2018 | 366 12th Av | Bailey General Contracting Co Inc | mandatory soft story retrofit of soft story mandate using fema p-807.Details
mandatory soft story retrofit of soft story mandate using fema p-807. | $85,000 |
| Feb 13, 2017 | Completed final sign-off Apr 2017 | 1000 Union St | Bay Area Fire Protection Llc | revision modification of details due to (e) field condition to permit 201612225657,to remove redundant subdrainDetails
revision modification of details due to (e) field condition to permit 201612225657,to remove redundant subdrain | |
| Jan 25, 2017 | Completed final sign-off Mar 2018 | 1265 Grove St | Seismic Retrofitters Inc. | mandatory soft story retrofit per soft story mandate using fema p-807.Details
mandatory soft story retrofit per soft story mandate using fema p-807. | $85,000 |
| Jan 13, 2017 | Completed final sign-off Jun 2017 | 3559 Jackson St | Aspect Builders Llc. | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4, no exterior work doneDetails
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4, no exterior work done | $50,000 |
| Oct 14, 2016 | Never finaled issued Oct 2016, no final | 2471 Francisco St | Adamas Builders Inc | foundation underpinning in reflection to building project at adjacent (west) neighbor at 2479 francisco street to pa#201304094047. n/a ordinance #155-13Details
foundation underpinning in reflection to building project at adjacent (west) neighbor at 2479 francisco street to pa#201304094047. n/a ordinance #155-13 | $5,000 |
| Jun 6, 2016 | Completed final sign-off May 2017 | 214 Shrader St | Gil Construction & Assoc Inc. | interior remodel of existing 3rd fl flat, remodel existing kitchen and existing bath. add 1 new bath, laundry room. convert e laundry room to office. no building expansion, no work visable from street, interior wall demo less than 75%Details
interior remodel of existing 3rd fl flat, remodel existing kitchen and existing bath. add 1 new bath, laundry room. convert e laundry room to office. no building expansion, no work visable from street, interior wall demo less than 75% | $200,000 |
| Jan 20, 2016 | Completed final sign-off Aug 2020 | 643 33rd Av | Terry Mc Daniel Construction, Nicholas Spencer Firth Gen Contr | remove existing deck, rebuild new wood deck at back of single family residence. 1 exterior door to be remove and 1 window to be reconfigured to include doorDetails
remove existing deck, rebuild new wood deck at back of single family residence. 1 exterior door to be remove and 1 window to be reconfigured to include door | $5,000 |