Stephen Weissberg
- Listed as
- architect, engineer
- Firm
- Stephen Weissberg, P.E.
- Based in
- San Francisco
- On San Francisco permits
- Jun 2012 to Apr 2026
19 permits since 2000 (engineer on 17 permits, architect on 2 permits): 16 completed, 1 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 20, 2026 | Completed final sign-off Aug 2026 | 45 Twin Peaks Bl | Frontside Construction | to abate 202545479- deck replace in kind at rearDetails
to abate 202545479- deck replace in kind at rear | $15,900 |
| May 2, 2024 | Completed final sign-off Oct 2025 | 455 Vallejo St | B C 10 Incorporated Dba K Squared | in kind kitchen refresh w/ new appliances, new cabinets replace two (e) sub standard posts. new light fixtures, new plumbing fixtures. new finishes. new electric fireplaceDetails
in kind kitchen refresh w/ new appliances, new cabinets replace two (e) sub standard posts. new light fixtures, new plumbing fixtures. new finishes. new electric fireplace | $200,000 |
| May 9, 2018 | Expired or cancelled expired Sep 2026 | 2000 Grove St | adu unit added per ord# 162-16 @ ground fl garage area. one bedrm, one kitchen & one bath in unit.Details
adu unit added per ord# 162-16 @ ground fl garage area. one bedrm, one kitchen & one bath in unit. | $150,000 | |
| Dec 27, 2017 | Completed final sign-off Jan 2020 | 1135 Francisco St | Community Reconstruction Solutions | administrative permit only: to comply with nov #201714514:separate original application for both buildings into 2: soft story retrofit ordinance 66-13 compliance for 1135 francisco street performaed under pa #201608013809. all work performed in comliance with mandatory soft-story ordinance #66-13.Details
administrative permit only: to comply with nov #201714514:separate original application for both buildings into 2: soft story retrofit ordinance 66-13 compliance for 1135 francisco street performaed under pa #201608013809. all work performed in comliance with mandatory soft-story ordinance #66-13. | |
| Jun 21, 2017 | Completed final sign-off Aug 2021 | 2000 Grove St | soft story per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 seismic retrofit add shear wallsDetails
soft story per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 seismic retrofit add shear walls | $100,000 | |
| Jun 15, 2017 | Expired or cancelled cancelled Jan 2026 | 2000 10th Av | concrete retaining wall <4ft high at backyardDetails
concrete retaining wall <4ft high at backyard | $15,000 | |
| Sep 1, 2016 | Completed final sign-off Jul 2017 | 1 Baker St | Community Reconstruction Solutions | bldg b - working common area, 6 units form 5a to 6c. replace siding/trim/windows/deck coatings.Details
bldg b - working common area, 6 units form 5a to 6c. replace siding/trim/windows/deck coatings. | $180,898 |
| Sep 1, 2016 | Completed final sign-off Jul 2017 | 1 Baker St | Community Reconstruction Solutions | bldg a - working common area. 12 units form 1a to 4c. replace siding/trim/windows/deck coatings.Details
bldg a - working common area. 12 units form 1a to 4c. replace siding/trim/windows/deck coatings. | $121,346 |
| Aug 1, 2016 | Completed final sign-off Jan 2020 | 1125 Francisco St | Community Reconstruction Solutions | add wood shear walls at parking garage level maher not reqDetails
add wood shear walls at parking garage level maher not req | $100,000 |
| Jul 14, 2016 | Completed final sign-off Jan 2023 | 4155 Cesar Chavez St | Community Reconstruction Solutions | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. additional of wood shear walls and four steel smf at on grade parking level.Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. additional of wood shear walls and four steel smf at on grade parking level. | $105,000 |
| Jan 20, 2016 | Completed final sign-off Aug 2020 | 643 33rd Av | Terry Mc Daniel Construction, Nicholas Spencer Firth Gen Contr | remove existing deck, rebuild new wood deck at back of single family residence. 1 exterior door to be remove and 1 window to be reconfigured to include doorDetails
remove existing deck, rebuild new wood deck at back of single family residence. 1 exterior door to be remove and 1 window to be reconfigured to include door | $5,000 |
| Jan 12, 2016 | Completed final sign-off Dec 2017 | 1142 Kearny St | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4. add shear walls to lower levelDetails
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4. add shear walls to lower level | $50,000 | |
| Sep 8, 2015 | Completed final sign-off Aug 2018 | 2155 Buchanan St | soft story retrofit. addition of wood shear walls and steel moment frames at lower level garage. maher naDetails
soft story retrofit. addition of wood shear walls and steel moment frames at lower level garage. maher na | $100,000 | |
| Sep 2, 2015 | Completed final sign-off Jan 2017 | 1736 Bryant St | repair and replace brick foundation. add shear walls at lower levelDetails
repair and replace brick foundation. add shear walls at lower level | $100,000 | |
| Jul 9, 2015 | Completed final sign-off Dec 2018 | 2025 Broderick St | soft story; 2012 iebc app. a4.Details
soft story; 2012 iebc app. a4. | $75,000 | |
| Apr 8, 2015 | Completed final sign-off May 2019 | 514 Visitacion Av | soft story seismic retrofit, add shear walls at gr fl tDetails
soft story seismic retrofit, add shear walls at gr fl t | $30,000 | |
| Feb 19, 2015 | Completed final sign-off Oct 2016 | 130 Acadia St | soft story seismic retrofitDetails
soft story seismic retrofit | $100,000 | |
| Jul 14, 2014 | Completed final sign-off Oct 2014 | 642 Central Av | Unlimited Construction | soft story to add wood shear panels in crawl space. soft story retrofit per sfbc chapter 34b eingeering criteria: other rational design 2013 cbcDetails
soft story to add wood shear panels in crawl space. soft story retrofit per sfbc chapter 34b eingeering criteria: other rational design 2013 cbc | $7,500 |
| Jun 20, 2012 | Never finaled issued Aug 2012, no final | 650 Alvarado St | Mw General Contracting | comply with complaint #201030892 - repair concrete & reinforce railing anchorage at deck edge, work at common area.Details
comply with complaint #201030892 - repair concrete & reinforce railing anchorage at deck edge, work at common area. | $12,000 |