Unlimited Construction
- Based in
- San Rafael
- On San Francisco permits
- Mar 2011 to Jul 2026
- Last 24 months
- 2 permits filed
12 permits since 2000: 9 completed, 1 in progress, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 20, 2026 | In progress issued Aug 2026 | 1158 Sutter St | repair of existing concrete cracks on garage ceiling beams, wall surface and stairway column. structural stengtheningDetails
repair of existing concrete cracks on garage ceiling beams, wall surface and stairway column. structural stengthening | $46,000 |
| Jun 12, 2025 | Completed final sign-off Jun 2026 | 1158 Sutter St | repair (e) concrete cover cracks & add strengthing brackets to 2 balaconies . facing front. structural stengtheningDetails
repair (e) concrete cover cracks & add strengthing brackets to 2 balaconies . facing front. structural stengthening | $8,000 |
| Mar 9, 2023 | Completed final sign-off Aug 2023 | 2701 Van Ness Av | volunteer upgrading back stair shaft handrail and guardrail. less than 50% repair.Details
volunteer upgrading back stair shaft handrail and guardrail. less than 50% repair. | $25,000 |
| Jan 31, 2022 | Completed final sign-off Mar 2022 | 5 Burnett Ave North Av | repair a cracked 4x12 wood beam in an (e) four-story multifamily residential condo.Details
repair a cracked 4x12 wood beam in an (e) four-story multifamily residential condo. | $15,000 |
| Jan 21, 2020 | Completed final sign-off Dec 2020 | 3333 Clement St | fire damage top floor/framing burnt/water damage to units below/elec to code/ plumbing to code/roof rebuilt in kind/sheetrock/insulation. to comply with #202011541Details
fire damage top floor/framing burnt/water damage to units below/elec to code/ plumbing to code/roof rebuilt in kind/sheetrock/insulation. to comply with #202011541 | $100,000 |
| Apr 25, 2018 | Completed final sign-off May 2018 | 1591 Jackson St | repair/replace fire damaged lumber in kind.Details
repair/replace fire damaged lumber in kind. | $2,500 |
| Oct 28, 2015 | Never finaled issued Oct 2015, no final | 1 Burnett North Av | revision to app#201506098558. replace stucco with nw stucco assembly on extg bay wndw. install 4 nw replacement window in same size & configuration on bay window. structural scope: install nw steel channel & associated structural retrofitting work on the extg bay wndw wood beams to repair dryrot.Details
revision to app#201506098558. replace stucco with nw stucco assembly on extg bay wndw. install 4 nw replacement window in same size & configuration on bay window. structural scope: install nw steel channel & associated structural retrofitting work on the extg bay wndw wood beams to repair dryrot. | $25,000 |
| Jun 9, 2015 | Never finaled issued Jul 2015, no final | 1 Burnett North Av | repair the dry rot on the exterior deck which includes replacing the deck joists and decking surface. construction to be in like-kind configuration. work also includes replacing the extg deck guardrail to meet bldg code requirement.Details
repair the dry rot on the exterior deck which includes replacing the deck joists and decking surface. construction to be in like-kind configuration. work also includes replacing the extg deck guardrail to meet bldg code requirement. | $4,000 |
| Jun 9, 2015 | Completed final sign-off Nov 2016 | 5 Burnett Ave North Av | #2:repair the dry rot on the exterior deck which includes replacing the deck joists and decking surface. construction to be in like-kind configuration. work also includes replacing the extg deck guardrail to meet bldg code requirement.Details
#2:repair the dry rot on the exterior deck which includes replacing the deck joists and decking surface. construction to be in like-kind configuration. work also includes replacing the extg deck guardrail to meet bldg code requirement. | $5,500 |
| Jul 14, 2014 | Completed final sign-off Oct 2014 | 642 Central Av | soft story to add wood shear panels in crawl space. soft story retrofit per sfbc chapter 34b eingeering criteria: other rational design 2013 cbcDetails
soft story to add wood shear panels in crawl space. soft story retrofit per sfbc chapter 34b eingeering criteria: other rational design 2013 cbc | $7,500 |
| May 20, 2011 | Completed final sign-off Aug 2011 | 88 Hoff St | minor wood repair using woodepox, replace damaged osb using 1/2" struc 1 plywood +/-28 l.f. x 38 l.f. height. stack 02 patio elevation of units #104 & 204. refer to pa#201103041463 (revision) . 8d @ 4" @ edge, 12" field.Details
minor wood repair using woodepox, replace damaged osb using 1/2" struc 1 plywood +/-28 l.f. x 38 l.f. height. stack 02 patio elevation of units #104 & 204. refer to pa#201103041463 (revision) . 8d @ 4" @ edge, 12" field. | $4,500 |
| Mar 4, 2011 | Completed final sign-off Aug 2011 | 88 Hoff St | lath & stucco repair at rear wall section at units 104 & 204, not visible from street. lath-using 60 minute 2 ply grade d paper, 17 ga wire & furring nails. scratch coat-using sand & portland cement. brown coat-using sand & cement. third coat-using acrylic 5:34 sand texture.Details
lath & stucco repair at rear wall section at units 104 & 204, not visible from street. lath-using 60 minute 2 ply grade d paper, 17 ga wire & furring nails. scratch coat-using sand & portland cement. brown coat-using sand & cement. third coat-using acrylic 5:34 sand texture. | $41,500 |