Unlimited Construction
- Based in
- San Rafael
- On San Francisco permits
- Mar 2011 to Jul 2026
- Last 24 months
- 2 permits filed
12 permits since 2000: 9 completed, 1 in progress, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 1 completed, 1 never finaled. Typically 23 days from filing to permit and 495 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 9, 2015 | Completed final sign-off Nov 2016 | 5 Burnett Ave North Av | #2:repair the dry rot on the exterior deck which includes replacing the deck joists and decking surface. construction to be in like-kind configuration. work also includes replacing the extg deck guardrail to meet bldg code requirement.Details
#2:repair the dry rot on the exterior deck which includes replacing the deck joists and decking surface. construction to be in like-kind configuration. work also includes replacing the extg deck guardrail to meet bldg code requirement. | $5,500 |
| Jun 9, 2015 | Never finaled issued Jul 2015, no final | 1 Burnett North Av | repair the dry rot on the exterior deck which includes replacing the deck joists and decking surface. construction to be in like-kind configuration. work also includes replacing the extg deck guardrail to meet bldg code requirement.Details
repair the dry rot on the exterior deck which includes replacing the deck joists and decking surface. construction to be in like-kind configuration. work also includes replacing the extg deck guardrail to meet bldg code requirement. | $4,000 |