Block 0144, lot 078
455 Vallejo St
- City’s use
- Single Family Residential
- Built
- 1973
- Stories
- 1
- Units
- 1
- Rooms
- 3 bedrooms, 3 bathrooms
- Building
- 1,050 sq ft
- Zoning
- RM2
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
13 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 14, 2025 | Completed final sign-off Aug 2025 | 455 Vallejo St | West Coast Builders | rev to pa# 2024-0814-8697 replace front door 3/0x6/8 and maintain egresss. in-kind replacementDetails
rev to pa# 2024-0814-8697 replace front door 3/0x6/8 and maintain egresss. in-kind replacement | $1,700 |
| Nov 18, 2024 | Expired or cancelled withdrawn Oct 2025 | 455 Vallejo St | Solution One Inc | revision to pa#202405021282. moving and relocating 2 horn storbes approximately 20-25 feet.Details
revision to pa#202405021282. moving and relocating 2 horn storbes approximately 20-25 feet. | |
| Sep 26, 2024 | Completed final sign-off Oct 2024 | 455 Vallejo St | L P G Fire Protection Inc | relocate 3 spp-sprinkler and add 1 ssp for it. work.Details
relocate 3 spp-sprinkler and add 1 ssp for it. work. | $5,345 |
| Aug 14, 2024 | Completed final sign-off Aug 2025 | 455 Vallejo St | West Coast Builders | #7: install insulation & sheetrock in kitchen, living room and bed room. repair in kind.Details
#7: install insulation & sheetrock in kitchen, living room and bed room. repair in kind. | $17,000 |
| May 2, 2024 | Completed final sign-off Oct 2025 | 455 Vallejo St | B C 10 Incorporated Dba K Squared | in kind kitchen refresh w/ new appliances, new cabinets replace two (e) sub standard posts. new light fixtures, new plumbing fixtures. new finishes. new electric fireplaceDetails
in kind kitchen refresh w/ new appliances, new cabinets replace two (e) sub standard posts. new light fixtures, new plumbing fixtures. new finishes. new electric fireplace | $200,000 |
| Jul 10, 2012 | Completed final sign-off May 2013 | 455 Vallejo St | Dominican Real Estate Inc | new roofing material on south side of building, residing top unit at east side, south side & west side.Details
new roofing material on south side of building, residing top unit at east side, south side & west side. | $100,000 |
| Jun 22, 2012 | Expired or cancelled cancelled Jan 2026 | 455 Vallejo St | replace skylight per plan. replace exterior windows and sliding glass doors. replace e railing to glass/stainless steel railings. replace partial roofing, paintDetails
replace skylight per plan. replace exterior windows and sliding glass doors. replace e railing to glass/stainless steel railings. replace partial roofing, paint | $70,000 | |
| Mar 29, 2012 | Completed final sign-off Apr 2013 | 455 Vallejo St | Draeger Construction Inc. | repair of damaged roof beams per engineers specifications at three locatioins due to deflection from roof loadDetails
repair of damaged roof beams per engineers specifications at three locatioins due to deflection from roof load | $25,000 |
| Feb 27, 2012 | Never finaled issued Feb 2012, no final | 455 Vallejo St | 13-D Fire Systems | penthouse #7: sprinklers only to trim out in new ceiling. relocate (e) fire sprinkler due to remodel.Details
penthouse #7: sprinklers only to trim out in new ceiling. relocate (e) fire sprinkler due to remodel. | $6,000 |
| Feb 22, 2012 | Completed final sign-off May 2013 | 455 Vallejo St | W. Wong Construction Co. Inc. | penthouse 7- revision to to pa# 201111309769. reconfigure bathroom layoutDetails
penthouse 7- revision to to pa# 201111309769. reconfigure bathroom layout | |
| Dec 20, 2011 | Never finaled issued Dec 2011, no final | 455 Vallejo St | street spaceDetails
street space | ||
| Nov 30, 2011 | Completed final sign-off May 2013 | 455 Vallejo St | W. Wong Construction Co. Inc. | penthouse #7-remodel (e) unit to include relocation of kitchen, remodel all bathrooms. add 1 bathroom & 1 powder room. new floor & wall. repair sagging beams, replace all windows & skylights with double pane glass, remove (e) skylights as shown. replace terrace railingsDetails
penthouse #7-remodel (e) unit to include relocation of kitchen, remodel all bathrooms. add 1 bathroom & 1 powder room. new floor & wall. repair sagging beams, replace all windows & skylights with double pane glass, remove (e) skylights as shown. replace terrace railings | $450,000 |
| Mar 2, 2011 | Completed final sign-off Mar 2011 | 455 Vallejo St | Draeger Construction Inc. | south/west elv ph#7 remove and replace 2 windows to integrate new window pan flashing due to water intrusion at sill. water proof windows, install new ti-11 siding as needed around window. approx. 85 sq ft. to match extgDetails
south/west elv ph#7 remove and replace 2 windows to integrate new window pan flashing due to water intrusion at sill. water proof windows, install new ti-11 siding as needed around window. approx. 85 sq ft. to match extg | $10,250 |