Kyle Thayer
- License
- C23269
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C23269 at the Board for Professional Engineers
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Thayer Architecture Inc.
- Based in
- San Anselmo
- On San Francisco permits
- Mar 2009 to Jul 2026
6 permits since 2000 (authorized agent-others on 3 permits, architect on 2 permits, engineer on 1 permit): 5 completed, 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Foxtail Hill Windows & Doors Inc, San Francisco Design & Constr., Sexton Construction, W. Wong Construction Co. Inc., Young & Burton Inc
- Engineers
- Kevin O'sullivan
- Authorized agents
- Michael Keehan
Where they worked
- Single-family 4
- Multi-family (2-family, apartments) 1
- Commercial 1
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 9, 2026 | In progress issued Sep 2026 | 2587 20th Av | Foxtail Hill Windows & Doors Inc | converting portion of the garage into living area. adding a bathroom, concrete patio in the rear yard, and adding a small elevator. all work is within the existing building footprint. new garage door (same size, same location).Details
converting portion of the garage into living area. adding a bathroom, concrete patio in the rear yard, and adding a small elevator. all work is within the existing building footprint. new garage door (same size, same location). | $200,000 |
| Jul 5, 2016 | Completed final sign-off Oct 2017 | 2127 33rd Av | San Francisco Design & Constr. | foundation and partial slab replacements.Details
foundation and partial slab replacements. | $25,000 |
| Jan 23, 2015 | Completed final sign-off Sep 2015 | 19 Arago St | Sexton Construction | new header on 1st floor, new skylight.Details
new header on 1st floor, new skylight. | $5,000 |
| Jan 8, 2015 | Completed final sign-off Jul 2015 | 21 South Park | Young & Burton Inc | 1st floor : full floor t.i. demolition of non-structural finishes.new partitions, finishes and millwork. mep and fire alarm and sprinkler under separate permit. maher n/a.Details
1st floor : full floor t.i. demolition of non-structural finishes.new partitions, finishes and millwork. mep and fire alarm and sprinkler under separate permit. maher n/a. | $300,000 |
| Feb 22, 2012 | Completed final sign-off May 2013 | 455 Vallejo St | W. Wong Construction Co. Inc. | penthouse 7- revision to to pa# 201111309769. reconfigure bathroom layoutDetails
penthouse 7- revision to to pa# 201111309769. reconfigure bathroom layout | |
| Mar 18, 2009 | Completed final sign-off Aug 2009 | 98 Cortland Av | kitchen, bathroom & laundry remodel, reconfigure rooms o first fl and interior stair, no work on 2nd fl, new french door & two new windows at rear facade.Details
kitchen, bathroom & laundry remodel, reconfigure rooms o first fl and interior stair, no work on 2nd fl, new french door & two new windows at rear facade. | $38,000 |