Block 2184, lot 004
2127 33rd Ave
- City’s use
- Single Family Residential
- Built
- 1945
- Stories
- 1
- Units
- 1
- Rooms
- 3 bedrooms, 4 bathrooms
- Building
- 2,636 sq ft
- Lot
- 2,996 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 3, 2025 | Completed final sign-off Apr 2025 | 2127 33rd Av | Quilt Systems Inc | install ductless minisplit, 1 outdoor unit, 2 indoor unit(s). install 2 15a breakers in the panel, 115a for each unit. electrical will run from the main panel to the roof and over the patio. electrical dissconnect and receptable will be installed.Details
install ductless minisplit, 1 outdoor unit, 2 indoor unit(s). install 2 15a breakers in the panel, 115a for each unit. electrical will run from the main panel to the roof and over the patio. electrical dissconnect and receptable will be installed. | $12,988 |
| Dec 5, 2016 | Never finaled issued Dec 2016, no final | 2127 33rd Av | Jim Parr Dba Plumbing | install 30 sprinklers througout per nfpa 13r underground per nfpa 24Details
install 30 sprinklers througout per nfpa 13r underground per nfpa 24 | $12,000 |
| Oct 19, 2016 | Expired or cancelled cancelled Aug 2017 | 2127 33rd Av | Schmitt Heating Co Inc | repalce (e) duct work with new flex in ceiling and new 26 gauge steel ductwork in graage in conjuction with replacement of (e) furnaces.Details
repalce (e) duct work with new flex in ceiling and new 26 gauge steel ductwork in graage in conjuction with replacement of (e) furnaces. | $8,900 |
| Jul 5, 2016 | Completed final sign-off Oct 2017 | 2127 33rd Av | San Francisco Design & Constr. | foundation and partial slab replacements.Details
foundation and partial slab replacements. | $25,000 |
| Jan 8, 2016 | Completed final sign-off Nov 2017 | 2127 33rd Av | San Francisco Design & Constr. | vertical addition to create third floor including master suite, home office & roof deck, remodel of existing home interior, new windows, in-fill at existing tunnel entrance.Details
vertical addition to create third floor including master suite, home office & roof deck, remodel of existing home interior, new windows, in-fill at existing tunnel entrance. | $400,000 |
| Nov 18, 2013 | Completed final sign-off Nov 2013 | 2127 33rd Av | Sure Roofing Systems/R.O.Choy | remove (e) roof layers down to wood sheathing. re-roofingDetails
remove (e) roof layers down to wood sheathing. re-roofing | $11,500 |
| Aug 8, 2006 | Completed final sign-off Feb 2007 | 2127 33rd Av | new bedroom, bath, entertainment, garage on first floorDetails
new bedroom, bath, entertainment, garage on first floor | $60,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- San Francisco Design & Constr. (2), Jim Parr Dba Plumbing, Quilt Systems Inc, Schmitt Heating Co Inc, Sure Roofing Systems/R.O.Choy
- Architects
- Peter Petruzzi
- Engineers
- Larry Wong
- Authorized agent-otherss
- Kyle Thayer
- Designers
- Quilt Systems Inc.
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.