Adamas Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2013 to Feb 2026
- Last 24 months
- 1 permit filed
37 permits since 2000: 28 completed, 8 never finaled, 1 expired or cancelled.
Of the 8 never-finaled permits, 5 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 2, 2026 | Completed final sign-off Jun 2026 | 157 28th Av | recommencement and completion of work approved under permit 202208029723Details
recommencement and completion of work approved under permit 202208029723 | |
| Aug 2, 2022 | Expired or cancelled expired Jun 2026 | 157 28th Av | to comply with planning enf case no 2021-008117enf replace front windows, legalize dormer size, remove unpermitted deck.Details
to comply with planning enf case no 2021-008117enf replace front windows, legalize dormer size, remove unpermitted deck. | $78,000 |
| Aug 31, 2021 | Never finaled issued Sep 2021, no final | 4230 18th St | install evacuation maps on floors 1-5 "hotel castro"Details
install evacuation maps on floors 1-5 "hotel castro" | $4,500 |
| Sep 18, 2020 | Never finaled issued Jan 2021, no final | 2809 Polk St | ref bpa #201802131196 - relocate kitchen on same level, relocate powder room on same level - see reference plans - no structuralDetails
ref bpa #201802131196 - relocate kitchen on same level, relocate powder room on same level - see reference plans - no structural | $40,000 |
| Feb 7, 2020 | Completed final sign-off Jul 2020 | 2809 Polk St | rev to pa# 201802131196; reconfigure entryway to create entry foyer with common door and unit doors behindDetails
rev to pa# 201802131196; reconfigure entryway to create entry foyer with common door and unit doors behind | |
| Jun 5, 2018 | Completed final sign-off Sep 2020 | 2479 Francisco St | to obtain final inspection for work approaved under pa# 201304094047, 201609238614. all work is finalDetails
to obtain final inspection for work approaved under pa# 201304094047, 201609238614. all work is final | |
| Feb 13, 2018 | Completed final sign-off Jul 2020 | 2809 Polk St | rev to 201402289613, reconfig of int space w/in (e) envelope. basement plan - conversion of 2 study rms to new master suite. (n) conversion of storage to lounge, add 784 sqft conditioned space. garage-study rm into bed. 2/f-move kitchen to 3/f. 3/f-removal of bedrm & convert kitchen to bedrm.Details
rev to 201402289613, reconfig of int space w/in (e) envelope. basement plan - conversion of 2 study rms to new master suite. (n) conversion of storage to lounge, add 784 sqft conditioned space. garage-study rm into bed. 2/f-move kitchen to 3/f. 3/f-removal of bedrm & convert kitchen to bedrm. | |
| Jan 11, 2018 | Completed final sign-off Apr 2022 | 4230 18th St | to erect 4 stories, no basement, 12 resential hotel & restaurant building.Details
to erect 4 stories, no basement, 12 resential hotel & restaurant building. | $1,687,500 |
| Aug 14, 2017 | Completed final sign-off Nov 2021 | 2742 Baker St | internal remodel of (2) units & rear yard excavation. lightwell infill @ both sides. (4) full baths (1) power (2) kitchens (1) roof deck (no penthouse) (1) skylight. rear addition @ ground level under area of (e) lower deckDetails
internal remodel of (2) units & rear yard excavation. lightwell infill @ both sides. (4) full baths (1) power (2) kitchens (1) roof deck (no penthouse) (1) skylight. rear addition @ ground level under area of (e) lower deck | $1,000,000 |
| Jul 18, 2017 | Completed final sign-off Sep 2017 | 1365 Union St | reconfigure doors and windows back to original same size. to abate planning 2017-003118 enf. replace standing seam metal roof with clay tile roof at front bay and front parapets. create accent feature at locationof original breezeway doorDetails
reconfigure doors and windows back to original same size. to abate planning 2017-003118 enf. replace standing seam metal roof with clay tile roof at front bay and front parapets. create accent feature at locationof original breezeway door | $5,000 |
| Jun 13, 2017 | Completed final sign-off Oct 2017 | 3551 Scott St | revision to 201402108218. changes to window at 2nd & 3rd story on front facade. change entry door at front facade to 2 new windows at sides of rear popout. revised demo calcs.Details
revision to 201402108218. changes to window at 2nd & 3rd story on front facade. change entry door at front facade to 2 new windows at sides of rear popout. revised demo calcs. | $500 |
| May 12, 2017 | Completed final sign-off Dec 2019 | 2328 North Point St | per boa# 17-004, dated 5/2/2017.altersite for pa# 2015/02/26/9477-s. reshape rear addition @ ground level. infill lightwell @ ground fl. pull railing @ 2nd fl. rear deck in 5' from lot lines. resize terrace @ front over 3rd story. slope roof over stair @ top story. move wine cooling unit to garage.Details
per boa# 17-004, dated 5/2/2017.altersite for pa# 2015/02/26/9477-s. reshape rear addition @ ground level. infill lightwell @ ground fl. pull railing @ 2nd fl. rear deck in 5' from lot lines. resize terrace @ front over 3rd story. slope roof over stair @ top story. move wine cooling unit to garage. | |
| Mar 24, 2017 | Completed final sign-off Nov 2023 | 2030 Greenwich St | add a 4th story. condition space behind garage. (n) windows & doors in (n) config. replace furnaces & water heaters w/ hydronic heat. roof deck over 4th story. roof terraces over 3rd story @ front & rear.Details
add a 4th story. condition space behind garage. (n) windows & doors in (n) config. replace furnaces & water heaters w/ hydronic heat. roof deck over 4th story. roof terraces over 3rd story @ front & rear. | $900,000 |
| Oct 18, 2016 | Completed final sign-off Nov 2016 | 157 28th Av | revision to 201509036086 to comply with complaint 201641162: 585 sq ft of new conditioned space converted from garage. extension to (e) deck in rear. new retaining wall for planter in rear.Details
revision to 201509036086 to comply with complaint 201641162: 585 sq ft of new conditioned space converted from garage. extension to (e) deck in rear. new retaining wall for planter in rear. | $5,000 |
| Oct 14, 2016 | Never finaled issued Oct 2016, no final | 2471 Francisco St | foundation underpinning in reflection to building project at adjacent (west) neighbor at 2479 francisco street to pa#201304094047. n/a ordinance #155-13Details
foundation underpinning in reflection to building project at adjacent (west) neighbor at 2479 francisco street to pa#201304094047. n/a ordinance #155-13 | $5,000 |
| Sep 23, 2016 | Completed final sign-off Jun 2018 | 2479 Francisco St | change foundation design from continuous footing to structural concrete mat slab ref 201304094047 maher naDetails
change foundation design from continuous footing to structural concrete mat slab ref 201304094047 maher na | $50,000 |
| Jul 15, 2016 | Completed final sign-off Jan 2019 | 1436 Jefferson St | horiz. additions to top, rear sides. reconfiguration of interior walls; add 1862 sf. conditions space within + outside of envelope; reconfuration of interior walls. reconfig window + doors. add 609 sq fto envelope (ref #201604074202 valuation for this was $750,000 (maher ordinance n/a)Details
horiz. additions to top, rear sides. reconfiguration of interior walls; add 1862 sf. conditions space within + outside of envelope; reconfuration of interior walls. reconfig window + doors. add 609 sq fto envelope (ref #201604074202 valuation for this was $750,000 (maher ordinance n/a) | $150,000 |
| May 16, 2016 | Completed final sign-off May 2024 | 1210 Lombard St | remodel all interior. excavate to add basement. rear addition, (e) lightwell reconfiguration, add (n) lightwell @ 2nd/3rd floor, add garden room @ basement level, convert a portion of (e) building @ second level to (n) garage.Details
remodel all interior. excavate to add basement. rear addition, (e) lightwell reconfiguration, add (n) lightwell @ 2nd/3rd floor, add garden room @ basement level, convert a portion of (e) building @ second level to (n) garage. | $900,000 |
| Apr 18, 2016 | Completed final sign-off Oct 2017 | 3551 Scott St | revision to #201402108218. add elevator. reconfigure previously approved baths, closet accordingly. remove previously approved powder room. install tiled 1-hr roof terrace w/ glass railing at front of building over 3rd story. per eg-01 info sheeet. per cac 1004s exc.1Details
revision to #201402108218. add elevator. reconfigure previously approved baths, closet accordingly. remove previously approved powder room. install tiled 1-hr roof terrace w/ glass railing at front of building over 3rd story. per eg-01 info sheeet. per cac 1004s exc.1 | $50,000 |
| Apr 7, 2016 | Completed final sign-off Jan 2019 | 1436 Jefferson St | full remodel of interior.claim area behind garage as part of lower unit.unit 1=2 stories/unit 2=2 stories @top.reconfigure 2 kitchens & 7 1/2 baths.addition @western lightwell against blindwall @neighbor(not visible).enclose entry stair & move garage door forward(w/in envelope). remove ext.stair;Details
full remodel of interior.claim area behind garage as part of lower unit.unit 1=2 stories/unit 2=2 stories @top.reconfigure 2 kitchens & 7 1/2 baths.addition @western lightwell against blindwall @neighbor(not visible).enclose entry stair & move garage door forward(w/in envelope). remove ext.stair; | $750,000 |
| Mar 2, 2016 | Completed final sign-off Jan 2019 | 1436 Jefferson St | foundation replace at garage level maher naDetails
foundation replace at garage level maher na | $60,000 |
| Dec 14, 2015 | Never finaled issued Feb 2017, no final | 1848 Green St | demolish (e) garageDetails
demolish (e) garage | $10,000 |
| Sep 16, 2015 | Completed final sign-off Mar 2016 | 2065 Larkin St | revision to pa#201508073662, add bathroom @ (e) study under stairs, remove non bearing wall between kitchen & dining, remove partitions @ end of hall near kitchen, add plywood & straps @ western wall in (e) bathroom, add lighting, outlets, switches at reconfigured spaces.Details
revision to pa#201508073662, add bathroom @ (e) study under stairs, remove non bearing wall between kitchen & dining, remove partitions @ end of hall near kitchen, add plywood & straps @ western wall in (e) bathroom, add lighting, outlets, switches at reconfigured spaces. | $12,000 |
| Jun 24, 2015 | Completed final sign-off Mar 2017 | 157 28th Av | replace kitchen in-kind. replace 4 bathrooms in-kind new flooring throughout. new appliances & fixtures. kitchen 15' x 20', baths (4) 5' x 8'.Details
replace kitchen in-kind. replace 4 bathrooms in-kind new flooring throughout. new appliances & fixtures. kitchen 15' x 20', baths (4) 5' x 8'. | $30,000 |
| May 29, 2015 | Completed final sign-off Mar 2017 | 1365 Union St | replace foundation, expand at western lightwell, add roof deck, remodel, reconfigure all interior. redistribute unit behind garage at gr level. upper unit is 2/f, 3/f and roof deck levels - maher ordinance extended #155-13 not requiredDetails
replace foundation, expand at western lightwell, add roof deck, remodel, reconfigure all interior. redistribute unit behind garage at gr level. upper unit is 2/f, 3/f and roof deck levels - maher ordinance extended #155-13 not required | $800,000 |
| Apr 2, 2015 | Completed final sign-off Jun 2016 | 44 Mallorca Wy | facade remodel bay window. n/a for the maherDetails
facade remodel bay window. n/a for the maher | $50,000 |
| Mar 31, 2015 | Completed final sign-off Mar 2017 | 1365 Union St | exploratory work - remove squares of plaster to determine direction and size of framing, vent and drain locations.Details
exploratory work - remove squares of plaster to determine direction and size of framing, vent and drain locations. | $1,000 |
| Feb 26, 2015 | Never finaled issued Nov 2016, no final | 2328 North Point St | add 13'-2"x 25'x 1-story @ rear. add 1-story on top. alter shape of western lightwell @ ground & enlarge eastern lightwell. roof deck over 15' front setback over 3rd story. roof deck on top of (n) story. internal reconfiguration.Details
add 13'-2"x 25'x 1-story @ rear. add 1-story on top. alter shape of western lightwell @ ground & enlarge eastern lightwell. roof deck over 15' front setback over 3rd story. roof deck on top of (n) story. internal reconfiguration. | $750,000 |
| Dec 10, 2014 | Completed final sign-off Jan 2021 | 1848 Green St | hor. & vert/addition to(e)2 units bld. demo(e)garage in rear yard.newDetails
hor. & vert/addition to(e)2 units bld. demo(e)garage in rear yard.new | $1,825,080 |
| Oct 7, 2014 | Completed final sign-off Feb 2015 | 339 14th Av | rebuild and extend extg deck. replace decking with trex. remove extg guardrail and install new trex railing. relocate stair. replace extg broken dining room. french doors with the same.Details
rebuild and extend extg deck. replace decking with trex. remove extg guardrail and install new trex railing. relocate stair. replace extg broken dining room. french doors with the same. | $12,000 |
| Sep 11, 2014 | Completed final sign-off May 2015 | 1670 Greenwich St | revision to appl #2013.0702.0984 to continue elevator to 4th floor & to reconfig bed, bath, closets, skylights, windows accordingly. one fire-rated window @ 4th level west. switch from tub to shower @ 3rd level hall bath.Details
revision to appl #2013.0702.0984 to continue elevator to 4th floor & to reconfig bed, bath, closets, skylights, windows accordingly. one fire-rated window @ 4th level west. switch from tub to shower @ 3rd level hall bath. | $10,000 |
| Jun 30, 2014 | Never finaled issued Jun 2014, no final | 2328 North Point St | exploratory work: remove (10) 24 squares of plaster to dtermine direction of framing, framing splices & sizes, locations of key vents & drains. patch all areas w/new drywall at close of determination.Details
exploratory work: remove (10) 24 squares of plaster to dtermine direction of framing, framing splices & sizes, locations of key vents & drains. patch all areas w/new drywall at close of determination. | $1,000 |
| Jun 27, 2014 | Completed final sign-off May 2015 | 1670 Greenwich St | revision to pa#201307020984-s1. structural work only, foundation depth on east & west of bldg were adjusted after field verification. new 2x6 studs size on 2nd & 3rd level. foundation to be install continuously instead of section, new joists & floor sheathing at part of 3/f as shown on plan.Details
revision to pa#201307020984-s1. structural work only, foundation depth on east & west of bldg were adjusted after field verification. new 2x6 studs size on 2nd & 3rd level. foundation to be install continuously instead of section, new joists & floor sheathing at part of 3/f as shown on plan. | |
| Jun 26, 2014 | Never finaled issued Jun 2014, no final | 4506 California St | exploratory work:remove (12) 24"x24"squares of plaster to determine direction of framing, framing splices, location of key vents & drains. work to be performed is related to future permit to remodel entire bldg. replace all drywall to restore fire ratings @ close of determination. patch all opening.Details
exploratory work:remove (12) 24"x24"squares of plaster to determine direction of framing, framing splices, location of key vents & drains. work to be performed is related to future permit to remodel entire bldg. replace all drywall to restore fire ratings @ close of determination. patch all opening. | $1,000 |
| Jun 26, 2014 | Completed final sign-off Jan 2021 | 1848 Green St | exploratory work:remove (12) 24"x24"squares of plaster to determine direction of framing, framing splices, location of key vents & drains. work to be performed is related to future permit to remodel entire bldg. replace all drywall to restore fire ratings @ close of determination. patch all opening.Details
exploratory work:remove (12) 24"x24"squares of plaster to determine direction of framing, framing splices, location of key vents & drains. work to be performed is related to future permit to remodel entire bldg. replace all drywall to restore fire ratings @ close of determination. patch all opening. | $1,000 |
| Jun 26, 2014 | Never finaled issued Jun 2014, no final | 3880 19th St | exploratory work:remove (12) 24"x24"squares of plaster to determine direction of framing, framing splices, location of key vents & drains. work to be performed is related to future permit to remodel entire bldg. replace all drywall to restore fire ratings @ close of determination. patch all opening.Details
exploratory work:remove (12) 24"x24"squares of plaster to determine direction of framing, framing splices, location of key vents & drains. work to be performed is related to future permit to remodel entire bldg. replace all drywall to restore fire ratings @ close of determination. patch all opening. | $2,400 |
| Jul 2, 2013 | Completed final sign-off May 2015 | 1670 Greenwich St | redistribute unit to back of garage. merge upper stories to one unit. add story. new roof deck on top. addition @ rear with terace on top. new hvac plumbing, elect, windows, doors, skylights. excavate @ lower level for higher ceilings. infill western lightwell. 2 kitchens. 5 1/2 baths. fire placeDetails
redistribute unit to back of garage. merge upper stories to one unit. add story. new roof deck on top. addition @ rear with terace on top. new hvac plumbing, elect, windows, doors, skylights. excavate @ lower level for higher ceilings. infill western lightwell. 2 kitchens. 5 1/2 baths. fire place | $400,000 |