Back to bathroom remodel contractors
Adamas Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2013 to Feb 2026
- Last 24 months
- 1 permit filed
37 permits since 2000: 28 completed, 8 never finaled, 1 expired or cancelled.
Of the 8 never-finaled permits, 5 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 7 completed. Typically 99 days from filing to permit and 440 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 14, 2017 | Completed final sign-off Nov 2021 | 2742 Baker St | internal remodel of (2) units & rear yard excavation. lightwell infill @ both sides. (4) full baths (1) power (2) kitchens (1) roof deck (no penthouse) (1) skylight. rear addition @ ground level under area of (e) lower deckDetails
internal remodel of (2) units & rear yard excavation. lightwell infill @ both sides. (4) full baths (1) power (2) kitchens (1) roof deck (no penthouse) (1) skylight. rear addition @ ground level under area of (e) lower deck | $1,000,000 |
| Apr 18, 2016 | Completed final sign-off Oct 2017 | 3551 Scott St | revision to #201402108218. add elevator. reconfigure previously approved baths, closet accordingly. remove previously approved powder room. install tiled 1-hr roof terrace w/ glass railing at front of building over 3rd story. per eg-01 info sheeet. per cac 1004s exc.1Details
revision to #201402108218. add elevator. reconfigure previously approved baths, closet accordingly. remove previously approved powder room. install tiled 1-hr roof terrace w/ glass railing at front of building over 3rd story. per eg-01 info sheeet. per cac 1004s exc.1 | $50,000 |
| Apr 7, 2016 | Completed final sign-off Jan 2019 | 1436 Jefferson St | full remodel of interior.claim area behind garage as part of lower unit.unit 1=2 stories/unit 2=2 stories @top.reconfigure 2 kitchens & 7 1/2 baths.addition @western lightwell against blindwall @neighbor(not visible).enclose entry stair & move garage door forward(w/in envelope). remove ext.stair;Details
full remodel of interior.claim area behind garage as part of lower unit.unit 1=2 stories/unit 2=2 stories @top.reconfigure 2 kitchens & 7 1/2 baths.addition @western lightwell against blindwall @neighbor(not visible).enclose entry stair & move garage door forward(w/in envelope). remove ext.stair; | $750,000 |
| Sep 16, 2015 | Completed final sign-off Mar 2016 | 2065 Larkin St | revision to pa#201508073662, add bathroom @ (e) study under stairs, remove non bearing wall between kitchen & dining, remove partitions @ end of hall near kitchen, add plywood & straps @ western wall in (e) bathroom, add lighting, outlets, switches at reconfigured spaces.Details
revision to pa#201508073662, add bathroom @ (e) study under stairs, remove non bearing wall between kitchen & dining, remove partitions @ end of hall near kitchen, add plywood & straps @ western wall in (e) bathroom, add lighting, outlets, switches at reconfigured spaces. | $12,000 |
| Jun 24, 2015 | Completed final sign-off Mar 2017 | 157 28th Av | replace kitchen in-kind. replace 4 bathrooms in-kind new flooring throughout. new appliances & fixtures. kitchen 15' x 20', baths (4) 5' x 8'.Details
replace kitchen in-kind. replace 4 bathrooms in-kind new flooring throughout. new appliances & fixtures. kitchen 15' x 20', baths (4) 5' x 8'. | $30,000 |
| Sep 11, 2014 | Completed final sign-off May 2015 | 1670 Greenwich St | revision to appl #2013.0702.0984 to continue elevator to 4th floor & to reconfig bed, bath, closets, skylights, windows accordingly. one fire-rated window @ 4th level west. switch from tub to shower @ 3rd level hall bath.Details
revision to appl #2013.0702.0984 to continue elevator to 4th floor & to reconfig bed, bath, closets, skylights, windows accordingly. one fire-rated window @ 4th level west. switch from tub to shower @ 3rd level hall bath. | $10,000 |
| Jul 2, 2013 | Completed final sign-off May 2015 | 1670 Greenwich St | redistribute unit to back of garage. merge upper stories to one unit. add story. new roof deck on top. addition @ rear with terace on top. new hvac plumbing, elect, windows, doors, skylights. excavate @ lower level for higher ceilings. infill western lightwell. 2 kitchens. 5 1/2 baths. fire placeDetails
redistribute unit to back of garage. merge upper stories to one unit. add story. new roof deck on top. addition @ rear with terace on top. new hvac plumbing, elect, windows, doors, skylights. excavate @ lower level for higher ceilings. infill western lightwell. 2 kitchens. 5 1/2 baths. fire place | $400,000 |