Dustin M Moore
- Listed as
- architect
- Firm
- Strata Landscape Arch
- Based in
- San Francisco
- On San Francisco permits
- Jul 2013 to Nov 2025
9 permits since 2000 (architect on 9 permits): 5 completed, 1 in progress, 2 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 25, 2025 | In progress issued Nov 2025 | 490 Avila St | Aquascape | swimming pool remodel - new tile, plaster, cover, pool equipment and plumbing. shall comply with cf2r-plb-02-e.Details
swimming pool remodel - new tile, plaster, cover, pool equipment and plumbing. shall comply with cf2r-plb-02-e. | $72,000 |
| Jun 21, 2019 | Never finaled issued Jul 2019, no final | 120 27th Av | Bicardo Builders | revision to pa 2019-0213-2826 change in materialDetails
revision to pa 2019-0213-2826 change in material | |
| Feb 13, 2019 | Completed final sign-off Dec 2019 | 120 27th Av | Bicardo Builders | new front entry stairs. replace (e) terrazzo with concrete collaborative terrazza. color to be medium gray with bullnose detail.Details
new front entry stairs. replace (e) terrazzo with concrete collaborative terrazza. color to be medium gray with bullnose detail. | $60,000 |
| Jul 12, 2017 | Never finaled issued Aug 2017, no final | 3934 Washington St | Frank & Grossman Landscaping Contr Inc | new paving, outdoor kitchen, fire pit, planting, irrigation, low voltage lighting landscape work. maher n/aDetails
new paving, outdoor kitchen, fire pit, planting, irrigation, low voltage lighting landscape work. maher n/a | $75,000 |
| Jan 19, 2017 | Completed final sign-off Oct 2018 | 2846 Fillmore St | Frank & Grossman Landscaping Contr Inc | new steps, fence, paving, fountain feature, planting, irrigation, low voltage lighting, landscape scope maher naDetails
new steps, fence, paving, fountain feature, planting, irrigation, low voltage lighting, landscape scope maher na | $170,000 |
| Dec 7, 2016 | Expired or cancelled cancelled Jan 2026 | 2100 Jefferson St | Capomastro Group:Acalifornia Corp. | new wall, fence, stairs, planting, irrigation, low voltage lighting. landscape slope. maher not reqDetails
new wall, fence, stairs, planting, irrigation, low voltage lighting. landscape slope. maher not req | $52,500 |
| Jul 18, 2014 | Completed final sign-off Aug 2023 | 2750 Vallejo St | Aquascape | swimming pool remodel: add a new spa in deck area.Details
swimming pool remodel: add a new spa in deck area. | $45,000 |
| Mar 5, 2014 | Completed final sign-off Dec 2014 | 767 Rhode Island St | Rock And Rose Landscaping & Birkmyer | retaining walls below 3', (n) wood deck, stone paths, planting, low voltage lighting, fire pit. deck and retaining wall shall not exceed 36"Details
retaining walls below 3', (n) wood deck, stone paths, planting, low voltage lighting, fire pit. deck and retaining wall shall not exceed 36" | $65,000 |
| Jul 31, 2013 | Completed final sign-off Sep 2014 | 2601 Broadway | Rock And Rose Landscaping & Birkmyer | new retaining walls, stairs, handrails, planting, irrigation and lighting.Details
new retaining walls, stairs, handrails, planting, irrigation and lighting. | $50,000 |