Charles Bloszies
- Listed as
- architect
- Firm
- Charles Bloszies Architect
- Based in
- San Francisco
- On San Francisco permits
- Mar 2007 to Jun 2026
16 permits since 2000 (architect on 16 permits): 11 completed, 4 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 9, 2026 | Completed final sign-off Sep 2026 | 1275 Sacramento St | Truebeck Construction | revision 202602125853- revise floor finish in kitchen serving area. relocate kitchen mop sink, revise and remove select doors, show structrual exhaust hood and framing details, replace grease interceptor and add (n) water hot piping.Details
revision 202602125853- revise floor finish in kitchen serving area. relocate kitchen mop sink, revise and remove select doors, show structrual exhaust hood and framing details, replace grease interceptor and add (n) water hot piping. | |
| Feb 12, 2026 | Completed final sign-off Sep 2026 | 1275 Sacramento St | Truebeck Construction | renovation of commercial kitchen restrooms & entrance to the cafeteria space used by cathedral school for boys. new exit passageway & alteration to utilities serving the area to be renovatedDetails
renovation of commercial kitchen restrooms & entrance to the cafeteria space used by cathedral school for boys. new exit passageway & alteration to utilities serving the area to be renovated | $4,000,000 |
| Apr 5, 2022 | Completed final sign-off Sep 2024 | 1 Kearny St | Centric Construction Inc | this submittal revised pa#202102164724. changes consist of revised location for new mechanical riser and associated ductwork, revised structural design to accomodate new riser location, and new ceilings.Details
this submittal revised pa#202102164724. changes consist of revised location for new mechanical riser and associated ductwork, revised structural design to accomodate new riser location, and new ceilings. | |
| Aug 19, 2021 | Completed final sign-off Mar 2022 | 99 Missouri St | Oliver & Company Inc. | revision to pa 202008272734 and 202007069636 to update slab and foundation design based on field conditions, additional interior display shelves and new footing details for site lighting fixtures.Details
revision to pa 202008272734 and 202007069636 to update slab and foundation design based on field conditions, additional interior display shelves and new footing details for site lighting fixtures. | |
| Apr 6, 2021 | Completed final sign-off Jul 2021 | 460 Bryant St | modification to (e) restrooms as revision to approved permit 201208157486. remove (e) toilet partition. reinstall new. remove (e) non bearing wall and replace with new wall to provide minimum clearance in front of water closet.Details
modification to (e) restrooms as revision to approved permit 201208157486. remove (e) toilet partition. reinstall new. remove (e) non bearing wall and replace with new wall to provide minimum clearance in front of water closet. | $48,000 | |
| Apr 5, 2021 | Never finaled issued Jun 2021, no final | 4020 23rd St | Rod Heisler Construction | replacement of garage door, casings, and trim to increase garage door width and replacement of wood cladding on planters with metal facing. all work is non structural. (e) garage door header and supporting structure will remain unaltered.Details
replacement of garage door, casings, and trim to increase garage door width and replacement of wood cladding on planters with metal facing. all work is non structural. (e) garage door header and supporting structure will remain unaltered. | $35,000 |
| Apr 5, 2021 | Never finaled issued Jun 2021, no final | 4020 23rd St | Rod Heisler Construction | repair dryrot and painting on the exterior. replacement of deteriorating decking and railing at rear at 2 levels. all construction is (e). no new work proposed.Details
repair dryrot and painting on the exterior. replacement of deteriorating decking and railing at rear at 2 levels. all construction is (e). no new work proposed. | $75,000 |
| Jan 21, 2021 | Completed final sign-off May 2021 | 888 Post St | Skyline Capital Builders Llc | priority project: deferred submittal for revision to architectural addendum 2 & mep addendum 3 due to revisions to original site permit. original site permit and addendums all approved under pa# 2019-1223-0310. revision to original site permit approved under pa# 2020-1006-5970.Details
priority project: deferred submittal for revision to architectural addendum 2 & mep addendum 3 due to revisions to original site permit. original site permit and addendums all approved under pa# 2019-1223-0310. revision to original site permit approved under pa# 2020-1006-5970. | $25,000 |
| Nov 16, 2020 | Completed final sign-off Dec 2020 | 460 Bryant St | C C I Commercial Construction & Improv | revision to pa# 201905312137. switch door swing. modification to existing ground floor restrooms.Details
revision to pa# 201905312137. switch door swing. modification to existing ground floor restrooms. | |
| Mar 28, 2019 | Completed final sign-off Jul 2019 | 440 Turk St | Fisher Development Inc | deferred submittal for structural for extg. entry gate. referencing permit 201810304528. 4x4 mesh at rear deck fence. frtw sleepers in lieu of steel. n/a for maherDetails
deferred submittal for structural for extg. entry gate. referencing permit 201810304528. 4x4 mesh at rear deck fence. frtw sleepers in lieu of steel. n/a for maher | $10,000 |
| Sep 11, 2018 | Never finaled issued Sep 2018, no final | 360 Spear St | admin permit to memorialize pc motions 19515 and 19516,authorizing 49,992 gsf of office use to be flexibly configured at 3rd/4th fl.land use occup apprvd as internet exchange for reminder of bldg remains unchanged. permit to finalize planning approval of land use category and endable payment of assoDetails
admin permit to memorialize pc motions 19515 and 19516,authorizing 49,992 gsf of office use to be flexibly configured at 3rd/4th fl.land use occup apprvd as internet exchange for reminder of bldg remains unchanged. permit to finalize planning approval of land use category and endable payment of asso | ||
| Feb 23, 2018 | Never finaled issued Feb 2018, no final | 1 Kearny St | Novo Construction Inc | 10/f: divide 1 large office into 2 smaller offices. mech, elec, sprinkler & life safety under separate permitDetails
10/f: divide 1 large office into 2 smaller offices. mech, elec, sprinkler & life safety under separate permit | $22,000 |
| Jan 13, 2016 | Completed final sign-off Nov 2017 | 856 Market St | replace market street facade. exterior sign under separate permit ** maher: n/a **Details
replace market street facade. exterior sign under separate permit ** maher: n/a ** | $500,000 | |
| Jan 8, 2016 | Completed final sign-off Mar 2017 | 135 Townsend St | Cannon Constructors North Inc | change of use to office occupancy and exterior improvement. work includes installation of new g/f storefront, reh of the upper floor windows, a new roof deck and new elevator/stairs penthouse, interior work under pa# 2015/10/16/9929. ** maher: n/a **Details
change of use to office occupancy and exterior improvement. work includes installation of new g/f storefront, reh of the upper floor windows, a new roof deck and new elevator/stairs penthouse, interior work under pa# 2015/10/16/9929. ** maher: n/a ** | $750,000 |
| Oct 27, 2008 | Completed final sign-off Oct 2015 | 345 Brannan St | Swinerton Builders | erect an office, restaurant & parking 4 stories building.Details
erect an office, restaurant & parking 4 stories building. | $10,000,000 |
| Mar 2, 2007 | Expired or cancelled expired Apr 2009 | 660 Market St | interior non structural soft demo of basement levelDetails
interior non structural soft demo of basement level | $35,000 |