Cannon Constructors North Inc
- Based in
- South San Francisco
- On San Francisco permits
- Jan 2000 to Dec 2020
- Last 24 months
- 0 permits filed
621 permits since 2000: 499 completed, 40 never finaled, 82 expired or cancelled.
Of the 40 never-finaled permits, 1 is 5 to 10 years old, 39 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 621.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 18, 2020 | Never finaled issued Feb 2021, no final | 50 Lansing St | to renew building permit application no(s)201108243104. demolish and remove existing wood form work/shoring @ north end of building, adjacent to 15 guy place, in order to comply with notice of violation # 200926808 and 201190414. all work complete.Details
to renew building permit application no(s)201108243104. demolish and remove existing wood form work/shoring @ north end of building, adjacent to 15 guy place, in order to comply with notice of violation # 200926808 and 201190414. all work complete. | |
| Nov 14, 2019 | Completed final sign-off Jan 2020 | 112 07th St | replace columns at canopy due to taxi damage. in-kind repair per dbi correction notice dated 11/3/19.Details
replace columns at canopy due to taxi damage. in-kind repair per dbi correction notice dated 11/3/19. | $1,500 |
| Nov 13, 2019 | Completed final sign-off Jun 2021 | 1532 Harrison St | revision pa# 2016-0725-3262s: modify a guardrail detail relating to a specific guardrail at the bridge seismic joint. this affects a total of 28 guardrail extensionsDetails
revision pa# 2016-0725-3262s: modify a guardrail detail relating to a specific guardrail at the bridge seismic joint. this affects a total of 28 guardrail extensions | |
| Jul 16, 2019 | Expired or cancelled withdrawn Aug 2020 | 1532 Harrison St | revision to s2 (arch/mep) of pa #2016-0725-3262 s. change roof deck occupancy from a-3 to r-2 accessory.Details
revision to s2 (arch/mep) of pa #2016-0725-3262 s. change roof deck occupancy from a-3 to r-2 accessory. | |
| Jun 24, 2019 | Completed final sign-off Dec 2021 | 1532 Harrison St | revision to s3(stromwater) for pa 2016-07-25-3262s. adjust the sewer piping to meet all the inverts at the street. maher exempted-approval from dph attached.Details
revision to s3(stromwater) for pa 2016-07-25-3262s. adjust the sewer piping to meet all the inverts at the street. maher exempted-approval from dph attached. | $18,500 |
| Nov 16, 2018 | Completed final sign-off Apr 2020 | 2153 15th St | revision to appln #201803194005. increase depth of shoring.Details
revision to appln #201803194005. increase depth of shoring. | |
| Nov 16, 2018 | Completed final sign-off Apr 2020 | 2222 Market St | shoring revision to appln #201803194011.Details
shoring revision to appln #201803194011. | |
| Nov 16, 2018 | Completed final sign-off Apr 2020 | 2161 15th St | shoring revision to appln #201803194008Details
shoring revision to appln #201803194008 | |
| Oct 24, 2018 | Completed final sign-off Dec 2021 | 625 02nd St | 4th fl ti: selective demo (e) non-load bearing walls, lighting, etc; construct (n) partitions, ceiling, etc; mep/srpinkler will be design build under sep submittal. building is fully sprinklered.Details
4th fl ti: selective demo (e) non-load bearing walls, lighting, etc; construct (n) partitions, ceiling, etc; mep/srpinkler will be design build under sep submittal. building is fully sprinklered. | $600,000 |
| Aug 31, 2018 | Completed final sign-off Mar 2021 | 1532 Harrison St | revision to pa 2016-0725-3262 s1 for 10x10 slab opening at garden level reinforced concrete slab for tower crane ** maher: exempted - see attached approval from dph **Details
revision to pa 2016-0725-3262 s1 for 10x10 slab opening at garden level reinforced concrete slab for tower crane ** maher: exempted - see attached approval from dph ** | $10,000 |
| May 16, 2018 | Completed final sign-off Jun 2021 | 1532 Harrison St | tower crane foundation for new construction. ref pa# 2016/07/25/3262-s. ** maher: exempted - approval from dph attached. **Details
tower crane foundation for new construction. ref pa# 2016/07/25/3262-s. ** maher: exempted - approval from dph attached. ** | $8,100 |
| Mar 19, 2018 | Completed final sign-off Apr 2020 | 2161 15th St | temporary shoring system to accommodate foundation construction for pa 2017-0331-2940, 2240 market stDetails
temporary shoring system to accommodate foundation construction for pa 2017-0331-2940, 2240 market st | $75,000 |
| Mar 19, 2018 | Completed final sign-off Apr 2020 | 2153 15th St | temporary shoring system to accommodate foundation construction for pa 2017-0331-2940, 2240 market stDetails
temporary shoring system to accommodate foundation construction for pa 2017-0331-2940, 2240 market st | $75,000 |
| Mar 19, 2018 | Completed final sign-off Apr 2020 | 2222 Market St | temporary shoring system to accommodate foundation construction for pa 2017-0331-2940, 2240 market stDetails
temporary shoring system to accommodate foundation construction for pa 2017-0331-2940, 2240 market st | $75,000 |
| Mar 19, 2018 | Completed final sign-off Apr 2020 | 2240 Market St | temporary shoring system to accommodate foundation construction for pa 2017-0331-2940,Details
temporary shoring system to accommodate foundation construction for pa 2017-0331-2940, | $180,000 |
| Oct 11, 2017 | Completed final sign-off Sep 2020 | 302 Silver Av | tower crane foundation permitDetails
tower crane foundation permit | $25,000 |
| Sep 11, 2017 | Completed final sign-off Nov 2019 | 815 Tennessee St | addition of the mechanical fire/smoke alarm operation matrix to the mechanical drawing. ref pa 2014-0505-4911 s2Details
addition of the mechanical fire/smoke alarm operation matrix to the mechanical drawing. ref pa 2014-0505-4911 s2 | $1,000 |
| Jul 28, 2017 | Completed final sign-off Nov 2019 | 815 Tennessee St | to further comply with correction notice & report #2 dated 6/29/2017 rev. to s2 (arch/mep) new bldg pa#201405054911: add draft stop in joist space on sheet a9.00 detail 3. n/a ordinance #155-13Details
to further comply with correction notice & report #2 dated 6/29/2017 rev. to s2 (arch/mep) new bldg pa#201405054911: add draft stop in joist space on sheet a9.00 detail 3. n/a ordinance #155-13 | |
| Jul 26, 2017 | Completed final sign-off May 2018 | 815 Tennessee St | comply with notice and report 2 dated 6/29/17. revision to s2 arch/mep ref 201405054911, clarify drywall installtion sheet a1.10.01 to match drywall installation on sheet a9 per field ins reqDetails
comply with notice and report 2 dated 6/29/17. revision to s2 arch/mep ref 201405054911, clarify drywall installtion sheet a1.10.01 to match drywall installation on sheet a9 per field ins req | |
| Jul 19, 2017 | Completed final sign-off Jun 2018 | 1256 Market St | 2nd flr: full flr t.i. for single tenant. scope of work includes new partitions, ceilings, finishes, and lighting. structural scope of work limited to bracing & anchoring of new partions, suspension of new ceilings & anchoring of wall mounted equipment to extg perimeter brick walls.Details
2nd flr: full flr t.i. for single tenant. scope of work includes new partitions, ceilings, finishes, and lighting. structural scope of work limited to bracing & anchoring of new partions, suspension of new ceilings & anchoring of wall mounted equipment to extg perimeter brick walls. | $650,000 |
| Jun 7, 2017 | Completed final sign-off Nov 2019 | 815 Tennessee St | to comply w/correction notice & report #1 dated 5/25/17. additional fire proofing details to the previously approved #201705307838. these details are for the structural beams & columns in the 1st fl plate w/2 conditions: beams in a wall & beams in a ceiling assemblyDetails
to comply w/correction notice & report #1 dated 5/25/17. additional fire proofing details to the previously approved #201705307838. these details are for the structural beams & columns in the 1st fl plate w/2 conditions: beams in a wall & beams in a ceiling assembly | |
| Jun 2, 2017 | Completed final sign-off Apr 2021 | 1532 Harrison St | shoring & tieback for new construction at 1532 harrison st p/a#201607253262-s. maher exempt.Details
shoring & tieback for new construction at 1532 harrison st p/a#201607253262-s. maher exempt. | $600,000 |
| Jun 2, 2017 | Completed final sign-off Mar 2021 | 1532 Harrison St | demolition of on site parking lot, installation of steel soldier beams of shoring to allow for excavation of future basement. excavation of basement to a depth of approx 22 ft. below current grade. finish grading of basement excalvation for future concrete installation. maher exempt.Details
demolition of on site parking lot, installation of steel soldier beams of shoring to allow for excavation of future basement. excavation of basement to a depth of approx 22 ft. below current grade. finish grading of basement excalvation for future concrete installation. maher exempt. | $600,000 |
| May 30, 2017 | Completed final sign-off Apr 2018 | 815 Tennessee St | to comply with correction notice & report #1 dated 5/25/17. revision to s2 (arch/mep) ref pa 2014-0505-4911. amended details 2 & 3 on sheet a9.20 to show fire proofing method on frame beams & postsDetails
to comply with correction notice & report #1 dated 5/25/17. revision to s2 (arch/mep) ref pa 2014-0505-4911. amended details 2 & 3 on sheet a9.20 to show fire proofing method on frame beams & posts | |
| May 11, 2017 | Completed final sign-off Jun 2020 | 302 Silver Av | temporary shoring. ref p/a#201603152080.Details
temporary shoring. ref p/a#201603152080. | $250,000 |
| May 5, 2017 | Completed final sign-off Jun 2020 | 302 Silver Av | dmolish 3 stories mix use res'd & commercial.Details
dmolish 3 stories mix use res'd & commercial. | $100,000 |
| Mar 31, 2017 | Completed final sign-off Sep 2024 | 2240 Market St | priority permit processing. change of use from funural home to apartment & retail. vertical & horizontal addition to existing. 5-story, 44 dwelling units with commercial over basement garage building. assigned to fpe sagiv 3.9.21, lt. deenDetails
priority permit processing. change of use from funural home to apartment & retail. vertical & horizontal addition to existing. 5-story, 44 dwelling units with commercial over basement garage building. assigned to fpe sagiv 3.9.21, lt. deen | $20,000,000 |
| Jan 4, 2017 | Completed final sign-off Apr 2018 | 815 Tennessee St | revision to addendum 1 (sgtructural) app #201405054911; deletion of elevator 2/associated changes, deletion of stoops, flip of elevator 1 and stair 1Details
revision to addendum 1 (sgtructural) app #201405054911; deletion of elevator 2/associated changes, deletion of stoops, flip of elevator 1 and stair 1 | $100,000 |
| Jul 25, 2016 | Completed final sign-off Jul 2022 | 1532 Harrison St | to erect 7 stories, 1 basement, type i-b, 136 residential units and commercial building (r-2,m,s-2). maher exempted.Details
to erect 7 stories, 1 basement, type i-b, 136 residential units and commercial building (r-2,m,s-2). maher exempted. | $32,000,000 |
| Jul 7, 2016 | Completed final sign-off Feb 2017 | 135 Townsend St | 1st floor - revision to bathrooms- see app. 201510169929. exterior changes under separate permit, no storage above 12 ft. n/a maher ord. 155-13Details
1st floor - revision to bathrooms- see app. 201510169929. exterior changes under separate permit, no storage above 12 ft. n/a maher ord. 155-13 | $20,000 |
| Jul 7, 2016 | Completed final sign-off Mar 2017 | 135 Townsend St | general equipment and installation per application 201510169929(arch);201605046471(plumb),1st flr revision to bathrooms only. n/a maher ord. 155-13Details
general equipment and installation per application 201510169929(arch);201605046471(plumb),1st flr revision to bathrooms only. n/a maher ord. 155-13 | $20,000 |
| May 9, 2016 | Completed final sign-off Mar 2017 | 135 Townsend St | deferred electrical installation per permit application 2015-1016-9929; maher n/aDetails
deferred electrical installation per permit application 2015-1016-9929; maher n/a | $302,000 |
| May 4, 2016 | Completed final sign-off Mar 2017 | 135 Townsend St | all floors: general plumbing equipment & installation per pa #2015-1016-9929. n/a maher ordinanceDetails
all floors: general plumbing equipment & installation per pa #2015-1016-9929. n/a maher ordinance | $123,000 |
| May 4, 2016 | Completed final sign-off May 2016 | 135 Townsend St | demo of existing under fire service to 139 townsend st and install temporary revised fire service to 139 townsend per nfpa 13 and 24. ref appl 2015/10/16/9929. compliance with maher ordinance 155-13 not required.Details
demo of existing under fire service to 139 townsend st and install temporary revised fire service to 139 townsend per nfpa 13 and 24. ref appl 2015/10/16/9929. compliance with maher ordinance 155-13 not required. | $9,600 |
| Apr 26, 2016 | Completed final sign-off Mar 2017 | 135 Townsend St | all floors: mechanical equipment and installation per application #2015-1016-9929. n/a for maher. 16 fsds. fire alarm deferred.Details
all floors: mechanical equipment and installation per application #2015-1016-9929. n/a for maher. 16 fsds. fire alarm deferred. | $323,000 |
| Apr 11, 2016 | Completed final sign-off Jun 2016 | 135 Townsend St | 2 new floor openings for tenant stair ref 201510169929 rev 2Details
2 new floor openings for tenant stair ref 201510169929 rev 2 | $3,000 |
| Mar 15, 2016 | Completed final sign-off Feb 2021 | 302 Silver Av | to erect 5 stories, 2 basement, residential care for the elderly building.Details
to erect 5 stories, 2 basement, residential care for the elderly building. | $67,000,000 |
| Feb 12, 2016 | Never finaled issued Feb 2016, no final | 450 Hayes St | revision to 2013-0626-0573s3, relocation of rated wall in basement mechanical plumbing room, equipment. maher naDetails
revision to 2013-0626-0573s3, relocation of rated wall in basement mechanical plumbing room, equipment. maher na | $1,000 |
| Feb 5, 2016 | Never finaled issued Feb 2016, no final | 450 Hayes St | revision to app#201306260573(s3)(architect/mep). relocate fsd in trash room basement level. n/a for maher.Details
revision to app#201306260573(s3)(architect/mep). relocate fsd in trash room basement level. n/a for maher. | $1,000 |
| Feb 1, 2016 | Completed final sign-off Apr 2018 | 724 20th St | soil nail shoring wall for (n) construction at 815 tennessee. (ref pa #201405054911-s)Details
soil nail shoring wall for (n) construction at 815 tennessee. (ref pa #201405054911-s) | $55,000 |
| Feb 1, 2016 | Completed final sign-off Nov 2019 | 815 Tennessee St | shoring & excavation for (n) construction. ref pa #201405054911-2.Details
shoring & excavation for (n) construction. ref pa #201405054911-2. | $750,000 |
| Jan 12, 2016 | Completed final sign-off Nov 2016 | 5830 03rd St | repair water damage at 5/f units per corrction notece. replacement in kind insulation , dry wall at ceilings, soffits and misc. interior finishes. (ref pa 201310048539)Details
repair water damage at 5/f units per corrction notece. replacement in kind insulation , dry wall at ceilings, soffits and misc. interior finishes. (ref pa 201310048539) | $500,000 |
| Jan 8, 2016 | Completed final sign-off Mar 2017 | 135 Townsend St | change of use to office occupancy and exterior improvement. work includes installation of new g/f storefront, reh of the upper floor windows, a new roof deck and new elevator/stairs penthouse, interior work under pa# 2015/10/16/9929. ** maher: n/a **Details
change of use to office occupancy and exterior improvement. work includes installation of new g/f storefront, reh of the upper floor windows, a new roof deck and new elevator/stairs penthouse, interior work under pa# 2015/10/16/9929. ** maher: n/a ** | $750,000 |
| Oct 16, 2015 | Completed final sign-off Mar 2017 | 135 Townsend St | seismic strengthening of existing bldg, install new stairs, elevator, restrooms & utilities. no change of use, no exterior changes, stair & elevator penthouses under separate permit. n/a maher ordinanceDetails
seismic strengthening of existing bldg, install new stairs, elevator, restrooms & utilities. no change of use, no exterior changes, stair & elevator penthouses under separate permit. n/a maher ordinance | $1,500,000 |
| Aug 26, 2015 | Completed final sign-off Feb 2017 | 135 Townsend St | remove (e) non structural, non bearing partition walls. maher na. life safety deferred, if required.Details
remove (e) non structural, non bearing partition walls. maher na. life safety deferred, if required. | $250,000 |
| May 11, 2015 | Completed final sign-off Oct 2016 | 400 Grove St | 6-inch underground fire service only. to complete piping from 8-inch city water main to property line. ref. overhead spklr. app# 2013.0314.2213/s-4 n/a for maher.Details
6-inch underground fire service only. to complete piping from 8-inch city water main to property line. ref. overhead spklr. app# 2013.0314.2213/s-4 n/a for maher. | $10,000 |
| Mar 4, 2015 | Completed final sign-off Nov 2016 | 450 Hayes St | tower crane installation. foundation under seperate permit 2013 0626 0573 s1/r1 maher - not req'dDetails
tower crane installation. foundation under seperate permit 2013 0626 0573 s1/r1 maher - not req'd | $20,000 |
| Jan 26, 2015 | Completed final sign-off Mar 2015 | 1 Bush St | addition of lighting fixures in offices on the 17th and 18th fl. 52 offices total. no other workDetails
addition of lighting fixures in offices on the 17th and 18th fl. 52 offices total. no other work | $3,000 |
| Dec 15, 2014 | Completed final sign-off Mar 2016 | 543 Howard St | title 24- lighting for tenant improvement to pa# 201409055601. title 24- mechanical.Details
title 24- lighting for tenant improvement to pa# 201409055601. title 24- mechanical. | $273,535 |
| Dec 8, 2014 | Completed final sign-off Jan 2016 | 5830 03rd St | tower crane erection for new building under p/a# 201310048539.Details
tower crane erection for new building under p/a# 201310048539. | $70,000 |
| Nov 13, 2014 | Completed final sign-off Feb 2015 | 625 02nd St | 4th flr: t.i. demo of a portion (non-structural) leaving the ceiling grid as is. demo door and infilling the wall creating one room. maher n/a. a non ab-060 room (ign room)Details
4th flr: t.i. demo of a portion (non-structural) leaving the ceiling grid as is. demo door and infilling the wall creating one room. maher n/a. a non ab-060 room (ign room) | $16,217 |
| Oct 17, 2014 | Completed final sign-off Mar 2016 | 543 Howard St | modify existing mechanical (hvac) ductwork for new t.i. layout per 2014.0702.0395. lighting and title 24 plan. maher n/a.Details
modify existing mechanical (hvac) ductwork for new t.i. layout per 2014.0702.0395. lighting and title 24 plan. maher n/a. | $47,000 |
| Sep 25, 2014 | Completed final sign-off Jan 2015 | 8 Octavia St | to add new door and wall to create electrical riser room. provide sign service area.Details
to add new door and wall to create electrical riser room. provide sign service area. | $1,500 |
| Sep 5, 2014 | Completed final sign-off Mar 2016 | 543 Howard St | interior office remodel, tenant improvement. new/relocated partitions, doors, finishes, lighting, power and hvac distribution. remodel of (e) bathrooms to replace finishes and make ada compliant.Details
interior office remodel, tenant improvement. new/relocated partitions, doors, finishes, lighting, power and hvac distribution. remodel of (e) bathrooms to replace finishes and make ada compliant. | $800,000 |
| Aug 29, 2014 | Completed final sign-off Nov 2016 | 424 Hayes St | revision to temp shoring approved appl #201403261776 - increase depth of soldier piles by 12 inches.Details
revision to temp shoring approved appl #201403261776 - increase depth of soldier piles by 12 inches. | $5,000 |
| Aug 29, 2014 | Completed final sign-off Nov 2016 | 367 Ivy St | revision to temp shoring approved appl #201403261780 increase depth of soldier piles by 12 inches. n/a maher ordinanceDetails
revision to temp shoring approved appl #201403261780 increase depth of soldier piles by 12 inches. n/a maher ordinance | $5,000 |
| Aug 28, 2014 | Completed final sign-off Nov 2016 | 450 Hayes St | rev. to temp. shoring permit 201403361779- increase depth of solders piles by 12"; add tiebacksDetails
rev. to temp. shoring permit 201403361779- increase depth of solders piles by 12"; add tiebacks | $5,000 |
| Jul 23, 2014 | Completed final sign-off Aug 2014 | 843 Jamestown Av | bldg 2 rev. to pa#9924075s & 201110146787, as built, no work to be performed, not visable from street, elimination of non egress balconies.Details
bldg 2 rev. to pa#9924075s & 201110146787, as built, no work to be performed, not visable from street, elimination of non egress balconies. | |
| Jul 23, 2014 | Completed final sign-off Aug 2014 | 871 Jamestown Av | bldg 6- rev. to pa#9924082s & 201203206499, as built, no work to be performed, not visable from street, elimination of non egress balconies.Details
bldg 6- rev. to pa#9924082s & 201203206499, as built, no work to be performed, not visable from street, elimination of non egress balconies. | |
| Jul 23, 2014 | Completed final sign-off Aug 2014 | 849 Jamestown Av | bldg 3- rev. to pa#9924078s & 201110146790, as built, no work to be performed, not visable from street, elimination of non egress balconies.Details
bldg 3- rev. to pa#9924078s & 201110146790, as built, no work to be performed, not visable from street, elimination of non egress balconies. | |
| Jul 23, 2014 | Completed final sign-off Aug 2014 | 877 Jamestown Av | bldg 7- rev. to pa#9924076s & 201203206497, as built, no work to be performed, not visable from street, elimination of non egress balconies.Details
bldg 7- rev. to pa#9924076s & 201203206497, as built, no work to be performed, not visable from street, elimination of non egress balconies. | |
| Jul 23, 2014 | Completed final sign-off Aug 2014 | 841 Jamestown Av | bldg 10- rev. to pa#9924080s & 201110146791, as built, no work to be performed, not visable from street, elimination of non egress balconies. window replacement in kind, maximum u-factor 0.40Details
bldg 10- rev. to pa#9924080s & 201110146791, as built, no work to be performed, not visable from street, elimination of non egress balconies. window replacement in kind, maximum u-factor 0.40 | |
| Jul 23, 2014 | Completed final sign-off Aug 2014 | 833 Jamestown Av | bldg 1- rev. to pa#201203206490 & 200103235127, as built, no work to be performed, not visable from street, elimination of non egress balconies.Details
bldg 1- rev. to pa#201203206490 & 200103235127, as built, no work to be performed, not visable from street, elimination of non egress balconies. | |
| Jul 11, 2014 | Completed final sign-off Nov 2014 | 543 Howard St | 4th flr: tenant improvement, mechanical hvac change for new layout, application #201404113026Details
4th flr: tenant improvement, mechanical hvac change for new layout, application #201404113026 | $96,000 |
| Jul 2, 2014 | Completed final sign-off Mar 2016 | 543 Howard St | t.i. on first and mezzanine floor. reconfigure existing office space to create new offices and new finishes, new accessible toile and showers, and new break room cabinets. mep, lighting and sprinkler under separate permit. maher n/a.Details
t.i. on first and mezzanine floor. reconfigure existing office space to create new offices and new finishes, new accessible toile and showers, and new break room cabinets. mep, lighting and sprinkler under separate permit. maher n/a. | $250,000 |
| Jun 30, 2014 | Completed final sign-off Dec 2014 | 543 Howard St | electrical for tenant improvement permit# 2014-0411-3026.Details
electrical for tenant improvement permit# 2014-0411-3026. | $175,000 |
| Jun 2, 2014 | Completed final sign-off Jan 2015 | 333 Bush St | tenant imrpovement to a hair salon, replace plumbing fixtures, lighting with new, new flooring & paint. lighting + t-24 included this permit.Details
tenant imrpovement to a hair salon, replace plumbing fixtures, lighting with new, new flooring & paint. lighting + t-24 included this permit. | $62,000 |
| May 5, 2014 | Completed final sign-off Nov 2019 | 815 Tennessee St | retention of partial corner facade of (e) building to be incorporated as a free standing wall fronting the proposed new construction pa# 2014/05/05/4911's'. per sf planning case# 2013.0220u. *** maher: compliance with ordinance no# 155-13 not required **Details
retention of partial corner facade of (e) building to be incorporated as a free standing wall fronting the proposed new construction pa# 2014/05/05/4911's'. per sf planning case# 2013.0220u. *** maher: compliance with ordinance no# 155-13 not required ** | $150,000 |
| May 5, 2014 | Completed final sign-off Nov 2019 | 815 Tennessee St | to erect 5 stories, 1 basement, 69 units residential with parking building. ** maher: compliance with ordinance no# 155-13 not required **Details
to erect 5 stories, 1 basement, 69 units residential with parking building. ** maher: compliance with ordinance no# 155-13 not required ** | $21,000,000 |
| Apr 11, 2014 | Completed final sign-off Dec 2014 | 543 Howard St | 4th floor interior office tenant improvment build-out. no structural, new lights, ducting & finishes.Details
4th floor interior office tenant improvment build-out. no structural, new lights, ducting & finishes. | $400,000 |
| Mar 26, 2014 | Completed final sign-off Nov 2016 | 430 Hayes St | temporary shoring to accomodate new construciton at 450 hayes st (201306260573)Details
temporary shoring to accomodate new construciton at 450 hayes st (201306260573) | $32,000 |
| Mar 26, 2014 | Completed final sign-off Nov 2016 | 424 Hayes St | temporary shoring to accommodate new construciton at 450 hayes st (201306260573)Details
temporary shoring to accommodate new construciton at 450 hayes st (201306260573) | $5,800 |
| Mar 26, 2014 | Completed final sign-off Nov 2016 | 367 Ivy St | temporary shoring to accomodate new construciton at 450 hayes st (201306260573) n/a for the maher ordinance #155-13Details
temporary shoring to accomodate new construciton at 450 hayes st (201306260573) n/a for the maher ordinance #155-13 | $40,000 |
| Mar 26, 2014 | Completed final sign-off Nov 2016 | 450 Hayes St | temporary shoring to accomodate new construciton (201306260573 s)Details
temporary shoring to accomodate new construciton (201306260573 s) | $94,000 |
| Mar 24, 2014 | Never finaled issued May 2014, no final | 8 Octavia St | evacuation signs on all floors (1-8, roof) for new building. 23 total signsDetails
evacuation signs on all floors (1-8, roof) for new building. 23 total signs | $8,500 |
| Feb 3, 2014 | Completed final sign-off Nov 2014 | 2559 Van Ness Av | revision to addendum 1, foundation & super structure, ref approved pa# 2011/06/01/7181. ** maher: compliance with ordinance no# 155-13 not required **Details
revision to addendum 1, foundation & super structure, ref approved pa# 2011/06/01/7181. ** maher: compliance with ordinance no# 155-13 not required ** | |
| Dec 5, 2013 | Completed final sign-off Dec 2013 | 595 Market St | to obtain final inspection for work approved under pa 201203166193; all work is completeDetails
to obtain final inspection for work approved under pa 201203166193; all work is complete | |
| Dec 5, 2013 | Never finaled issued Dec 2013, no final | 595 Market St | ste #2700: to obtain final inspection for work approved under pa 201202134026; all work is completeDetails
ste #2700: to obtain final inspection for work approved under pa 201202134026; all work is complete | |
| Dec 2, 2013 | Completed final sign-off Feb 2014 | 55 Francisco St | 2nd floor:modifications to hvac system per new tenant layout. ref app# 201307031115 & 201310028269Details
2nd floor:modifications to hvac system per new tenant layout. ref app# 201307031115 & 201310028269 | $65,376 |
| Oct 29, 2013 | Completed final sign-off Dec 2013 | 595 Market St | #2150- oti title 24 drawings, ref. to pa# 201308134196Details
#2150- oti title 24 drawings, ref. to pa# 201308134196 | $65,000 |
| Oct 17, 2013 | Completed final sign-off Nov 2014 | 2559 Van Ness Av | tower crane erection permit. ref site permit #2011.0601.7181.Details
tower crane erection permit. ref site permit #2011.0601.7181. | $35,000 |
| Oct 17, 2013 | Never finaled issued Oct 2013, no final | 595 Market St | suite #2150:modification to hvac for new tenant layoutDetails
suite #2150:modification to hvac for new tenant layout | $62,000 |
| Oct 11, 2013 | Completed final sign-off Nov 2014 | 2559 Van Ness Av | revision to app#2011-0601-7181. revision to addendum #1:foundation super structure ammendment to the crane foundation. foundation to be reviewed separate (under crane permit).Details
revision to app#2011-0601-7181. revision to addendum #1:foundation super structure ammendment to the crane foundation. foundation to be reviewed separate (under crane permit). | $20,000 |
| Oct 10, 2013 | Expired or cancelled cancelled Jan 2026 | 2559 Van Ness Av | free standing tower crane foundationDetails
free standing tower crane foundation | $35,000 |
| Oct 9, 2013 | Never finaled issued Dec 2013, no final | 50 Lansing St | to construct a system for safety washing windows - exterior building maintenance system. equipment will fold away when not in used.Details
to construct a system for safety washing windows - exterior building maintenance system. equipment will fold away when not in used. | $20,000 |
| Oct 4, 2013 | Completed final sign-off Nov 2013 | 557 Howard St | revision to 201302281188. changes to structural detailsDetails
revision to 201302281188. changes to structural details | |
| Oct 4, 2013 | Completed final sign-off Nov 2016 | 5830 03rd St | to erect type v, 5 stories, 1 basement, 136 units residential & parking building. (maher) compliance with ordinance no. 155-13 not required.Details
to erect type v, 5 stories, 1 basement, 136 units residential & parking building. (maher) compliance with ordinance no. 155-13 not required. | $26,000,000 |
| Oct 2, 2013 | Never finaled issued Oct 2013, no final | 55 Francisco St | 2nd floor:revision to app#201307031115. adding scope taking over the rest of the floor, space on the floor. all hvac, electrical, plmg and life safty will be design build and submitted seperately.Details
2nd floor:revision to app#201307031115. adding scope taking over the rest of the floor, space on the floor. all hvac, electrical, plmg and life safty will be design build and submitted seperately. | $76,000 |
| Sep 17, 2013 | Completed final sign-off Dec 2013 | 595 Market St | 12th floor-hvac modifications for new tenant improvement. t.i. pa# 2013-0729-2995Details
12th floor-hvac modifications for new tenant improvement. t.i. pa# 2013-0729-2995 | $24,300 |
| Aug 13, 2013 | Completed final sign-off Dec 2013 | 595 Market St | 21/f- interior t.i. including demolition, new partitions. new electrical and plumbing, new ceiling and lighting and related finishes. no structural work to be performed. fire & sprinkler under separate permit.Details
21/f- interior t.i. including demolition, new partitions. new electrical and plumbing, new ceiling and lighting and related finishes. no structural work to be performed. fire & sprinkler under separate permit. | $440,000 |
| Aug 1, 2013 | Completed final sign-off Dec 2013 | 595 Market St | interior t.i. including demolition, new partitions, plumbing and related finishes. no structural work to be performed. restroom remodel only.Details
interior t.i. including demolition, new partitions, plumbing and related finishes. no structural work to be performed. restroom remodel only. | $80,000 |
| Aug 1, 2013 | Completed final sign-off Apr 2014 | 595 Market St | interior t.i. including demolition, new partitions, new electrical, new plumbing, new ceiling, lighting and related finishes. no structural work to be performed.Details
interior t.i. including demolition, new partitions, new electrical, new plumbing, new ceiling, lighting and related finishes. no structural work to be performed. | $350,000 |
| Jul 29, 2013 | Completed final sign-off Dec 2013 | 595 Market St | 12th floor-interior tenant improvement including demolition & new partitions, new electrical & plumbing. new ceiling & lighting. related finishes.Details
12th floor-interior tenant improvement including demolition & new partitions, new electrical & plumbing. new ceiling & lighting. related finishes. | $290,000 |
| Jul 19, 2013 | Never finaled issued Jul 2013, no final | 8 Octavia St | tower crane operating permit.Details
tower crane operating permit. | $150,000 |
| Jul 19, 2013 | Never finaled issued Jul 2013, no final | 595 Market St | reconfigure hvac ductwork to new tenant office improvement. ref. to pa#201305096589Details
reconfigure hvac ductwork to new tenant office improvement. ref. to pa#201305096589 | $8,750 |
| Jul 16, 2013 | Completed final sign-off May 2015 | 428 Grove St | temporary shoring at adjacent property to accomodate new construction at 400 grove st.site permit#201303142213sDetails
temporary shoring at adjacent property to accomodate new construction at 400 grove st.site permit#201303142213s | $50,000 |
| Jul 16, 2013 | Completed final sign-off May 2015 | 400 Grove St | temporary shoring to accomodate new construction site permit#201303142213sDetails
temporary shoring to accomodate new construction site permit#201303142213s | $80,000 |
| Jul 3, 2013 | Never finaled issued Jul 2013, no final | 55 Francisco St | 2nd floor: t.i. includes the demolishing of non structural. all new or revised hvac, electrical plmg and life safety work will be design build and submitted for permit seperatly. bldg is fully sprinklered.Details
2nd floor: t.i. includes the demolishing of non structural. all new or revised hvac, electrical plmg and life safety work will be design build and submitted for permit seperatly. bldg is fully sprinklered. | $240,000 |
| Jul 3, 2013 | Completed final sign-off Feb 2014 | 55 Francisco St | 4th floor: t.i. includes the demolishing of non structural partitions and bldg new non-structural partitions. . all new or revised hvac, electrical, plmg, and life safety work will be design build and submitted for permit seperatly. bldg is fully sprinklered.Details
4th floor: t.i. includes the demolishing of non structural partitions and bldg new non-structural partitions. . all new or revised hvac, electrical, plmg, and life safety work will be design build and submitted for permit seperatly. bldg is fully sprinklered. | $150,000 |
| Jun 17, 2013 | Completed final sign-off Jan 2014 | 625 02nd St | 2nd floor suite 2000 - non-structural tenant improvement, close opening in demising betwee n suite 2000 & 2100, divide 1 room, add door, relocate 3 light fixtures (10% of total), add power & data outlets in suite 2000.Details
2nd floor suite 2000 - non-structural tenant improvement, close opening in demising betwee n suite 2000 & 2100, divide 1 room, add door, relocate 3 light fixtures (10% of total), add power & data outlets in suite 2000. | $15,000 |