Block 0056, lot 007
1789 Montgomery St
- City’s use
- Commercial Misc
- Lot
- 26,054 sq ft
- Zoning
- C2
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
85 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 17, 2026 | Completed final sign-off Jul 2026 | 55 Francisco St | Apex Site Solutions Inc | to obtain final inspection for work approved under pa# 201509308450. all work is complete.Details
to obtain final inspection for work approved under pa# 201509308450. all work is complete. | |
| May 20, 2025 | Completed final sign-off May 2025 | 55 Francisco St | Bilcor Inc | suite#: 330. install (6) ceiling mount horn strobe. install (5) ceiling mount strobe. ref#: 202503242881.Details
suite#: 330. install (6) ceiling mount horn strobe. install (5) ceiling mount strobe. ref#: 202503242881. | $7,326 |
| May 15, 2025 | Completed final sign-off Jun 2025 | 55 Francisco St | Mcclure Electric Inc | ste 330 - deferred electrical permit for 55 francisco ste 330 office ti. ref pa 202503242881Details
ste 330 - deferred electrical permit for 55 francisco ste 330 office ti. ref pa 202503242881 | $41,910 |
| May 7, 2025 | Completed final sign-off May 2025 | 55 Francisco St | Golden Gate Fire Protection Inc | suite 330: relocate 2 pendent sprinklers on the 3rd floor. ref#: 202503242881Details
suite 330: relocate 2 pendent sprinklers on the 3rd floor. ref#: 202503242881 | $500 |
| Mar 24, 2025 | Completed final sign-off Jun 2025 | 55 Francisco St | Hp Build | project consists of minimal demo of (e) partitions, doors associated power/data floor finishes construction of (n) partitions, doors, power data, minimal relocation/new lighting, millwork, sink(s) toiet and finishes, mep, life safety and sprinkler system modifications are to be under seperate andDetails
project consists of minimal demo of (e) partitions, doors associated power/data floor finishes construction of (n) partitions, doors, power data, minimal relocation/new lighting, millwork, sink(s) toiet and finishes, mep, life safety and sprinkler system modifications are to be under seperate and | $480,000 |
| Jan 21, 2025 | In progress issued Jan 2025 | 55 Francisco St | Peacock Construction | 7/fl- convert (e) office space to common corridor electrical room. minor demo of non structrual partitions. minor consturction of (n) partitions. mech and electrical deferredDetails
7/fl- convert (e) office space to common corridor electrical room. minor demo of non structrual partitions. minor consturction of (n) partitions. mech and electrical deferred | $50,000 |
| Nov 4, 2024 | Completed final sign-off Dec 2024 | 55 Francisco St | Lusardi Construction Co | 3/fl suite 300- ti includes (n) flooring, millwork, replace (e) sinks, add convenience power and data outlets.Details
3/fl suite 300- ti includes (n) flooring, millwork, replace (e) sinks, add convenience power and data outlets. | $199,209 |
| Dec 12, 2023 | In progress issued Jan 2024 | 55 Francisco St | Modus Rex Llc | dish revision to 202207279373. revise fiber poc to zayo, revise antenna screen attachment detail. install new 15 amp receptacle, no change to rf report, no visual change. remove batteries from scope of workDetails
dish revision to 202207279373. revise fiber poc to zayo, revise antenna screen attachment detail. install new 15 amp receptacle, no change to rf report, no visual change. remove batteries from scope of work | |
| Oct 27, 2023 | In progress issued Oct 2023 | 55 Francisco St | Anderson, Rowe & Buckley, Inc. | 6th fl - existing fire sprinkler system - tenant improvements relocate 7 pendents & 4 uprights, remove 2 pendents, add 4 uprights sprinklers & plug out net ref pa 2023-0921-7075Details
6th fl - existing fire sprinkler system - tenant improvements relocate 7 pendents & 4 uprights, remove 2 pendents, add 4 uprights sprinklers & plug out net ref pa 2023-0921-7075 | $11,000 |
| Oct 24, 2023 | Completed final sign-off Dec 2023 | 55 Francisco St | Bilcor Inc | install 7-ceiling mount strobes & 3-ceiling mount horn strobes, ref bpa#202309217075Details
install 7-ceiling mount strobes & 3-ceiling mount horn strobes, ref bpa#202309217075 | $6,600 |
| Sep 21, 2023 | Completed final sign-off Jan 2024 | 55 Francisco St | Dpr Construction A | 6/f: single flr tenant remodel on flr 6 to include restroom upgrades, huddle rooms, telephone rooms, meeting rooms and lunch room. scope includes new ceilings finishes, mep, lfs fire alarm & sprinklers under separate permit.Details
6/f: single flr tenant remodel on flr 6 to include restroom upgrades, huddle rooms, telephone rooms, meeting rooms and lunch room. scope includes new ceilings finishes, mep, lfs fire alarm & sprinklers under separate permit. | $1,178,072 |
| Aug 11, 2023 | Completed final sign-off Sep 2023 | 55 Francisco St | Bilcor Inc | voluntary install 3 monitor modules in existing fire alarm system.Details
voluntary install 3 monitor modules in existing fire alarm system. | $1,998 |
| Nov 21, 2022 | Completed final sign-off Feb 2023 | 55 Francisco St | Statewide Roofing Inc. | reroofingDetails
reroofing | $381,168 |
| Nov 18, 2022 | Never finaled issued Nov 2022, no final | 55 Francisco St | Ayoob & Peery Plumbing Co Inc | 5/f: fire sprinkler. relocate (6) sprinklers per t.i. and change out (1). ref permit 202209092196Details
5/f: fire sprinkler. relocate (6) sprinklers per t.i. and change out (1). ref permit 202209092196 | $1,800 |
| Nov 9, 2022 | Completed final sign-off Jan 2023 | 55 Francisco St | Ayoob & Peery Plumbing Co Inc | 6th fl. add (1) and elocate (4) fire sprinklers per t.i. ref pa# 2021-0426-9325Details
6th fl. add (1) and elocate (4) fire sprinklers per t.i. ref pa# 2021-0426-9325 | $2,650 |
| Nov 4, 2022 | Completed final sign-off Dec 2022 | 55 Francisco St | Ayoob & Peery Plumbing Co Inc | 7th fl: relocate (4) fire sprinklers per ti. ref 202104269325.Details
7th fl: relocate (4) fire sprinklers per ti. ref 202104269325. | $2,100 |
| Sep 9, 2022 | Completed final sign-off Jun 2023 | 55 Francisco St | Swinerton Builders | mechanical only work to floors 5,6,7. demo fan coils and connect duct risers to ductwork distribution systems to be servied by hav under 202203291063Details
mechanical only work to floors 5,6,7. demo fan coils and connect duct risers to ductwork distribution systems to be servied by hav under 202203291063 | $45,000 |
| Jul 27, 2022 | Completed final sign-off Feb 2024 | 55 Francisco St | Modus Rex Llc | dish wireless: install 3(n) antennas, 3 (n) screws, 6(n) rrus, 1(n) equipment platform, 2(n) batteries.Details
dish wireless: install 3(n) antennas, 3 (n) screws, 6(n) rrus, 1(n) equipment platform, 2(n) batteries. | $115,000 |
| Jun 21, 2022 | Completed final sign-off Sep 2022 | 55 Francisco St | Bilcor Inc | 7/f, ste 790: install 2 ceiling mount speakers strobes, ref 2021 0426 9325Details
7/f, ste 790: install 2 ceiling mount speakers strobes, ref 2021 0426 9325 | $1,320 |
| Apr 25, 2022 | Completed final sign-off Jun 2022 | 55 Francisco St | Ayoob & Peery Plumbing Co Inc | 7th fl, suite 790: relocate 11 sprinkler heads per ti, plug 7 outlets. ref pa# 202104269325. job #22-632Details
7th fl, suite 790: relocate 11 sprinkler heads per ti, plug 7 outlets. ref pa# 202104269325. job #22-632 | $2,475 |
| Apr 22, 2022 | Completed final sign-off Oct 2022 | 55 Francisco St | Swinerton Builders | ste 790: mechanical & electrical drawings. arch drawings under pa# 202104269325. includes new air distribution & lighting throughout the space based on new layout.Details
ste 790: mechanical & electrical drawings. arch drawings under pa# 202104269325. includes new air distribution & lighting throughout the space based on new layout. | $65,000 |
| Apr 12, 2022 | Completed final sign-off Oct 2023 | 55 Francisco St | Metropolitan Electrical Construction | att - remove & replace 4 (e) antennas w/4 (n) antennas; install 6 (n) counters, 2 (n) rectifier, 1 (n) battery rack & 12 (n) batteriesDetails
att - remove & replace 4 (e) antennas w/4 (n) antennas; install 6 (n) counters, 2 (n) rectifier, 1 (n) battery rack & 12 (n) batteries | $42,000 |
| Mar 29, 2022 | Completed final sign-off Jul 2023 | 55 Francisco St | Swinerton Builders | installation of structural steel support the new ahu that is being installed on the roof.Details
installation of structural steel support the new ahu that is being installed on the roof. | $105,000 |
| Feb 25, 2022 | Completed final sign-off Mar 2022 | 55 Francisco St | Bilcor Inc | #330: fire life safety: install 1 ceiling mount horn-strobe and 1 wall mount horn-strobe. arch ref pa# 202104239275. mech pa# 202112204715.Details
#330: fire life safety: install 1 ceiling mount horn-strobe and 1 wall mount horn-strobe. arch ref pa# 202104239275. mech pa# 202112204715. | $1,320 |
| Jan 7, 2022 | Completed final sign-off Jan 2022 | 55 Francisco St | Golden Gate Fire Protection Inc | fire sprinklers; relocate 50 pendent sprinklers on the 3rd fl sute, 330 ref pa 2021-0423-9275Details
fire sprinklers; relocate 50 pendent sprinklers on the 3rd fl sute, 330 ref pa 2021-0423-9275 | $25,000 |
| Dec 20, 2021 | Completed final sign-off Feb 2023 | 55 Francisco St | Peacock Construction | #330: hvac modifications. power lighting and signal. ref app#202104239275Details
#330: hvac modifications. power lighting and signal. ref app#202104239275 | $100,000 |
| Oct 28, 2021 | Completed final sign-off Mar 2022 | 55 Francisco St | Thomas Swan Sign Co Inc | parking structure entrance exterior entry: install 1 non-illuminated double faced projecting blade sign "[parking symbol] waterfront plaza"Details
parking structure entrance exterior entry: install 1 non-illuminated double faced projecting blade sign "[parking symbol] waterfront plaza" | $6,000 |
| Apr 26, 2021 | Completed final sign-off Oct 2022 | 55 Francisco St | Swinerton Builders | ste #790: minimal demolition of (e) partitions, millwork, associated power /data, floor finishes & lighting. construction of office glass fronts, doors, power/data, lighting & finishes. mep, life safety, sprinklers are to be under separate permits.Details
ste #790: minimal demolition of (e) partitions, millwork, associated power /data, floor finishes & lighting. construction of office glass fronts, doors, power/data, lighting & finishes. mep, life safety, sprinklers are to be under separate permits. | $198,000 |
| Apr 23, 2021 | Expired or cancelled cancelled Jan 2026 | 55 Francisco St | suite 300, 3/f: minimal demolition of (e) partitions, millwork and associated power/data, floor finishes and lighting. construction of new partitions, doors, power/data, lighting and finishes. mep, life safety and sprinkler system modifications are to be under separate and deferred permits.Details
suite 300, 3/f: minimal demolition of (e) partitions, millwork and associated power/data, floor finishes and lighting. construction of new partitions, doors, power/data, lighting and finishes. mep, life safety and sprinkler system modifications are to be under separate and deferred permits. | $503,908 | |
| Apr 23, 2021 | Completed final sign-off Feb 2023 | 55 Francisco St | Peacock Construction | suite 330, 3/f: existing interior walls & glazing to remain w/ exception of minor demo of partitions & associted power/data,finishes, lighting & ceiling tile.minor constructoin of (n) non-structural partitions, finishes & lighting.mep,l/s & f/s mods are under sep & deferred permits.Details
suite 330, 3/f: existing interior walls & glazing to remain w/ exception of minor demo of partitions & associted power/data,finishes, lighting & ceiling tile.minor constructoin of (n) non-structural partitions, finishes & lighting.mep,l/s & f/s mods are under sep & deferred permits. | $320,000 |
| Aug 22, 2020 | Completed final sign-off Sep 2021 | 55 Francisco St | Metropolitan Electrical Construction | at&t proposes to modify and existing facility as follows:· move existing mw frp box· expand existing frp box at gamma sector· remove and replace 5 existing antennas· remove and replace 6 existing rru's· all other related equipment being placed in existing cabinetsDetails
at&t proposes to modify and existing facility as follows:· move existing mw frp box· expand existing frp box at gamma sector· remove and replace 5 existing antennas· remove and replace 6 existing rru's· all other related equipment being placed in existing cabinets | $37,000 |
| Dec 19, 2019 | Completed final sign-off Feb 2020 | 55 Francisco St | Ayoob & Peery Plumbing Co Inc | 4th floor:as built. ref app#201907166057Details
4th floor:as built. ref app#201907166057 | |
| Dec 18, 2019 | Completed final sign-off Feb 2020 | 55 Francisco St | Bilcor Inc | fire alarm ti. install 15 ceiling mount strobes, 22 ceiling mount horn strobes, 3 control relays. ref 201910235287Details
fire alarm ti. install 15 ceiling mount strobes, 22 ceiling mount horn strobes, 3 control relays. ref 201910235287 | $27,060 |
| Jul 16, 2019 | Completed final sign-off Feb 2020 | 55 Francisco St | Ayoob & Peery Plumbing Co Inc | 4th flr. add 6, relocate 60, change=out 133 and plug 17 sprinklers to conform w/ (n) wall / ceiling layout of tenant improvement. job # 19685Details
4th flr. add 6, relocate 60, change=out 133 and plug 17 sprinklers to conform w/ (n) wall / ceiling layout of tenant improvement. job # 19685 | $46,575 |
| May 14, 2019 | Never finaled issued Jun 2019, no final | 55 Francisco St | Swinerton Builders | new work consists of new partitions, doors, frames, hardware, millwork, power/data, new finishe throughout, new ceiling & lighting to meet title 24. space is currently unoccupied. mep/fire/life safety under sep permit maher naDetails
new work consists of new partitions, doors, frames, hardware, millwork, power/data, new finishe throughout, new ceiling & lighting to meet title 24. space is currently unoccupied. mep/fire/life safety under sep permit maher na | $851,000 |
| Mar 29, 2019 | Never finaled filed Mar 2019, never issued | 55 Francisco St | street spaceDetails
street space | ||
| Jan 31, 2019 | Never finaled issued May 2019, no final | 55 Francisco St | Swinerton Builders | voluntary structural upgrade for the (e) office building.the work is specific to the 4th floor & roof of the 4th floor annex bldg. ** maher: n/a **Details
voluntary structural upgrade for the (e) office building.the work is specific to the 4th floor & roof of the 4th floor annex bldg. ** maher: n/a ** | $45,000 |
| Nov 19, 2018 | Completed final sign-off Jan 2019 | 55 Francisco St | Skyline Construction | rev to pa# 201808207777; building is now fully sprinklered, will be using 1/3 diagonal umbrella 201811095494, meps included for project(1st fl.)Details
rev to pa# 201808207777; building is now fully sprinklered, will be using 1/3 diagonal umbrella 201811095494, meps included for project(1st fl.) | $338,000 |
| Nov 9, 2018 | Never finaled issued Nov 2018, no final | 55 Francisco St | Ayoob & Peery Plumbing Co Inc | administratvie permit to verify full sprinkler coverage of building per nfpa 13. pa 2018-1105-4997 and 2018-1019-3637Details
administratvie permit to verify full sprinkler coverage of building per nfpa 13. pa 2018-1105-4997 and 2018-1019-3637 | |
| Nov 5, 2018 | Completed final sign-off Nov 2018 | 55 Francisco St | Ayoob & Peery Plumbing Co Inc | sprinkler permit to corr deficiencies note in holmes fire preven survey dated 9/19/2018 to complete full bld sprinkler system per nfpa 13r and with ref to admin bulletin ab-105 dated 21st nov 2012. add ten(10), relocate 3 and change out 40 sprinkler heads. maher na as builts to 201810193637Details
sprinkler permit to corr deficiencies note in holmes fire preven survey dated 9/19/2018 to complete full bld sprinkler system per nfpa 13r and with ref to admin bulletin ab-105 dated 21st nov 2012. add ten(10), relocate 3 and change out 40 sprinkler heads. maher na as builts to 201810193637 | |
| Oct 26, 2018 | Completed final sign-off Dec 2018 | 55 Francisco St | Bilcor Inc | 1st fl fire alarm ti: install 9 ceiling mount strobe, install 11 ceiling mount horn-strobes, install 9 duct detectors, install 9 control relay modules.Details
1st fl fire alarm ti: install 9 ceiling mount strobe, install 11 ceiling mount horn-strobes, install 9 duct detectors, install 9 control relay modules. | $23,800 |
| Oct 22, 2018 | Completed final sign-off Feb 2019 | 55 Francisco St | Golden Gate Fire Protection Inc | 1st fl l- fire sprinklers; relocate 59 upright sprinklers on the 1st fl and relocate 64 pendent sprinklers. ref. 201808207777Details
1st fl l- fire sprinklers; relocate 59 upright sprinklers on the 1st fl and relocate 64 pendent sprinklers. ref. 201808207777 | $64,575 |
| Oct 19, 2018 | Completed final sign-off Nov 2018 | 55 Francisco St | Ayoob & Peery Plumbing Co Inc | add and relocate fire sprinklers to correct deficiencies as noted in draft holmes fire's 9/24/2018 fire spinkler survey report to complete full building sprinklers per nfpa 13r with reference to ab 105. maher n/a documentation to confirm building is full sprinkler will be done under separate applDetails
add and relocate fire sprinklers to correct deficiencies as noted in draft holmes fire's 9/24/2018 fire spinkler survey report to complete full building sprinklers per nfpa 13r with reference to ab 105. maher n/a documentation to confirm building is full sprinkler will be done under separate appl | $10,000 |
| Aug 20, 2018 | Completed final sign-off Jan 2019 | 55 Francisco St | Skyline Construction | 1st floor: t.i. includes demo of non-structural partitions and bldg new non structural partitions, mep, life safety, and sprinklers under permit. bldg is not fully sprinklered. n/a for maherDetails
1st floor: t.i. includes demo of non-structural partitions and bldg new non structural partitions, mep, life safety, and sprinklers under permit. bldg is not fully sprinklered. n/a for maher | $653,000 |
| Aug 15, 2018 | Completed final sign-off Sep 2018 | 55 Francisco St | Pioneer Fire Inc. | 3rd flr, suite 350. relocate (7) pendants. fire sprinklersDetails
3rd flr, suite 350. relocate (7) pendants. fire sprinklers | $8,000 |
| Jul 11, 2018 | Never finaled issued Jul 2018, no final | 55 Francisco St | Novo Construction Inc | mep for tenant improvement, new vav boxes, new exhaust fan and ductwork. new lighting and controls. receptacles for office, conference & break room. ref pa 2018-0514-8976. n/a for maher.Details
mep for tenant improvement, new vav boxes, new exhaust fan and ductwork. new lighting and controls. receptacles for office, conference & break room. ref pa 2018-0514-8976. n/a for maher. | $30,000 |
| May 14, 2018 | Never finaled issued May 2018, no final | 55 Francisco St | Novo Construction Inc | 3/f suite 350: ti to include new partitions, doors, frames & hardware, millwork, new ceiling & finishesDetails
3/f suite 350: ti to include new partitions, doors, frames & hardware, millwork, new ceiling & finishes | $350,000 |
| May 9, 2018 | Completed final sign-off Jul 2018 | 55 Francisco St | Bilcor Inc | demo (2) horn-strobes, demo (1) strobe, remove and reinstall (2) horn-strobes, ref ti 2018-0130-9905Details
demo (2) horn-strobes, demo (1) strobe, remove and reinstall (2) horn-strobes, ref ti 2018-0130-9905 | $1,000 |
| Feb 28, 2018 | Never finaled issued Mar 2018, no final | 55 Francisco St | Ayoob & Peery Plumbing Co Inc | modification due to persistant corrosion and failure issues: relocate 58 and add 1 sprinklerDetails
modification due to persistant corrosion and failure issues: relocate 58 and add 1 sprinkler | $13,575 |
| Jan 30, 2018 | Completed final sign-off Oct 2018 | 55 Francisco St | Novo Construction Inc | exterior ground flr windows (4) at south facade - not visible from street. new structural support at window openings and wall stregtherning at (e) wall, new mech bld env t-24. fire/life/safety under sep permit. maher naDetails
exterior ground flr windows (4) at south facade - not visible from street. new structural support at window openings and wall stregtherning at (e) wall, new mech bld env t-24. fire/life/safety under sep permit. maher na | $100,000 |
| Dec 12, 2017 | Completed final sign-off Aug 2018 | 55 Francisco St | Novo Construction Inc | project consists of new exterior awning and store bought planters, maher naDetails
project consists of new exterior awning and store bought planters, maher na | $40,000 |
| Aug 21, 2017 | Completed final sign-off Sep 2017 | 55 Francisco St | Pioneer Fire Inc. | 3rd floor suite 380: relocate 14 pendents, 5 uprights and remove 4 pendents. ref #2017-0425-4861. maher naDetails
3rd floor suite 380: relocate 14 pendents, 5 uprights and remove 4 pendents. ref #2017-0425-4861. maher na | $15,464 |
| Jun 27, 2017 | Completed final sign-off Oct 2017 | 55 Francisco St | Novo Construction Inc | #380- mechanical work for ti at suite 380, ref pa 2017-0425-4861Details
#380- mechanical work for ti at suite 380, ref pa 2017-0425-4861 | $6,000 |
| Jun 6, 2017 | Completed final sign-off Oct 2017 | 55 Francisco St | Novo Construction Inc | suite 380 - electrical work for ti. ref pa 2017-0425-4861Details
suite 380 - electrical work for ti. ref pa 2017-0425-4861 | $8,000 |
| Apr 25, 2017 | Completed final sign-off Oct 2017 | 55 Francisco St | Novo Construction Inc | #380- project consists of demo of existijg walls, ceiling and millwork. new work consistes of new ceiling height partitions, doors, frames hardware. new millwork, power/data, finishes throughout. new ceiling and lighting to meet title 24 req. space is currently unoccupied. n/a ordinance #155-13Details
#380- project consists of demo of existijg walls, ceiling and millwork. new work consistes of new ceiling height partitions, doors, frames hardware. new millwork, power/data, finishes throughout. new ceiling and lighting to meet title 24 req. space is currently unoccupied. n/a ordinance #155-13 | $288,644 |
| Aug 26, 2016 | Completed final sign-off Nov 2016 | 55 Francisco St | H C I Systems Inc | hci systems hsall install 7 new notification appliances 5th fl tenant space. all new notificiation appliances shall be tied into existing power supply. all strobes synchronized. ref 201607051492Details
hci systems hsall install 7 new notification appliances 5th fl tenant space. all new notificiation appliances shall be tied into existing power supply. all strobes synchronized. ref 201607051492 | $5,000 |
| Aug 9, 2016 | Completed final sign-off May 2019 | 55 Francisco St | Metropolitan Electrical Construction | att modification install (3) new antennas, r&r (e) 7 with (n) 7 antennas, install 2 new frp screens, install 3 new rrus 32b66, remove 3 existing rrus 11 with 3 new rrsu 32, install 6 new rrus at parapetDetails
att modification install (3) new antennas, r&r (e) 7 with (n) 7 antennas, install 2 new frp screens, install 3 new rrus 32b66, remove 3 existing rrus 11 with 3 new rrsu 32, install 6 new rrus at parapet | $61,000 |
| Jul 5, 2016 | Never finaled issued Jul 2016, no final | 55 Francisco St | Adam Lewis Construction Company | selective ti on 5th floor witn new non-bearing partitions & new millwork. no exterior work. maher na arch only - all else deferred submittal (mep, fire)Details
selective ti on 5th floor witn new non-bearing partitions & new millwork. no exterior work. maher na arch only - all else deferred submittal (mep, fire) | $116,400 |
| May 10, 2016 | Never finaled issued May 2016, no final | 55 Francisco St | 6th floor - 4 evacuation plan. n/a maher ordinanceDetails
6th floor - 4 evacuation plan. n/a maher ordinance | $1,800 | |
| Apr 25, 2016 | Never finaled issued Apr 2016, no final | 55 Francisco St | 8th floor - (4) evacuation plans. n/a maher ordinanceDetails
8th floor - (4) evacuation plans. n/a maher ordinance | $1,600 | |
| Mar 21, 2016 | Completed final sign-off May 2016 | 55 Francisco St | Golden Gate Fire Protection Inc | fire sprinkler only. upgrade system for the real real. 6th and 8th fl. 6th relocate 219 pendent/uprt add 10 plug off 8 heads, 8th: relocate 19 heads add 2 headsDetails
fire sprinkler only. upgrade system for the real real. 6th and 8th fl. 6th relocate 219 pendent/uprt add 10 plug off 8 heads, 8th: relocate 19 heads add 2 heads | $124,500 |
| Mar 2, 2016 | Completed final sign-off Jul 2016 | 55 Francisco St | Skyline Construction | mechanical and electrical work for ti ref 201602028592Details
mechanical and electrical work for ti ref 201602028592 | $40,000 |
| Feb 2, 2016 | Completed final sign-off Jul 2016 | 55 Francisco St | Skyline Construction | 6th & 8th floor: ti - includes demo of non structural partitions and building (n) non structural partitiona. all (n) or revised meps/fire/life safety work will be under sep permit. maher naDetails
6th & 8th floor: ti - includes demo of non structural partitions and building (n) non structural partitiona. all (n) or revised meps/fire/life safety work will be under sep permit. maher na | $1,607,683 |
| Jan 19, 2016 | Completed final sign-off Apr 2016 | 55 Francisco St | Teamwrkx Inc. | 7th flr: barrier removal project for restroom ada (disabled access) and new finishes/fixtures; maher n/aDetails
7th flr: barrier removal project for restroom ada (disabled access) and new finishes/fixtures; maher n/a | $137,000 |
| Jan 19, 2016 | Completed final sign-off Apr 2016 | 55 Francisco St | Teamwrkx Inc. | 6th flr: barrier removal. project for restroom. ada upgrades (disabled access upgrades) and (n) finishes/fixtures.; maher n/aDetails
6th flr: barrier removal. project for restroom. ada upgrades (disabled access upgrades) and (n) finishes/fixtures.; maher n/a | $137,000 |
| Jan 13, 2016 | Completed final sign-off Jan 2016 | 55 Francisco St | H C I Systems Inc | 1st floor suite 150 - install (4) new nac devices + relcoate (1) nac device. all devices are being added to an existing fire alarm system. n/a maher ordinanceDetails
1st floor suite 150 - install (4) new nac devices + relcoate (1) nac device. all devices are being added to an existing fire alarm system. n/a maher ordinance | $5,000 |
| Sep 30, 2015 | Completed final sign-off Jul 2026 | 55 Francisco St | Triton Tower Inc | at&t modification to (e) telecom facility: install (3) (n) rrus-32 units, install (3) (n) dc-6 surge suppressors, install (n) 2" innerduct, r/r (e) (e) antennas with (3) (n) antennas, paint to match bldg. r/r (e) dul with 92) (n) dus-41 inside (e) 19" rack, remove all unused coax cables. n/a maher.Details
at&t modification to (e) telecom facility: install (3) (n) rrus-32 units, install (3) (n) dc-6 surge suppressors, install (n) 2" innerduct, r/r (e) (e) antennas with (3) (n) antennas, paint to match bldg. r/r (e) dul with 92) (n) dus-41 inside (e) 19" rack, remove all unused coax cables. n/a maher. | $15,500 |
| Sep 16, 2015 | Completed final sign-off Feb 2016 | 55 Francisco St | Kell Mechanical Heating And Air Condi | 1st floor: revision to approved permit 2015-07-17-1837; 5 new supply registersDetails
1st floor: revision to approved permit 2015-07-17-1837; 5 new supply registers | $2,500 |
| Jul 23, 2015 | Completed final sign-off Jan 2016 | 55 Francisco St | H C I Systems Inc | on 1st floor - fire alarm ti add new device to existing fire alarm system in new ti space. 10 horn/strobes, 1 strobe, 7 duct detectors, 1 bpsDetails
on 1st floor - fire alarm ti add new device to existing fire alarm system in new ti space. 10 horn/strobes, 1 strobe, 7 duct detectors, 1 bps | $11,470 |
| Jul 9, 2015 | Never finaled issued Jul 2015, no final | 55 Francisco St | Evergreen Premier Construction Inc. | suite 100 - install new electrical outlets & led light fixtures, title 24 calculation. ref #201506048157. n/a maher ordinanceDetails
suite 100 - install new electrical outlets & led light fixtures, title 24 calculation. ref #201506048157. n/a maher ordinance | $100,000 |
| Jul 1, 2015 | Completed final sign-off Jan 2016 | 55 Francisco St | Sure Fire Protection | add 26 ssp and relocate 2 (e) ssp, relocate 8 ssu, add 6 ssu. use new mech tee off main for new ssp. t.i. pa#201506048157. n/a ordinance #155-13Details
add 26 ssp and relocate 2 (e) ssp, relocate 8 ssu, add 6 ssu. use new mech tee off main for new ssp. t.i. pa#201506048157. n/a ordinance #155-13 | $21,981 |
| Jun 4, 2015 | Completed final sign-off Feb 2016 | 55 Francisco St | Teamwrkx Inc. | new ceiling height partitions, power/data, millwork, doors, frames, hardware and finishes throughout. new ada showers in scope as well. n/a for maher.Details
new ceiling height partitions, power/data, millwork, doors, frames, hardware and finishes throughout. new ada showers in scope as well. n/a for maher. | $279,504 |
| Jul 1, 2014 | Completed final sign-off Oct 2014 | 55 Francisco St | Westower Communications | removal of antennas, coax, cable tray & radio equipment for nextel. n/a ordinance #155-13.Details
removal of antennas, coax, cable tray & radio equipment for nextel. n/a ordinance #155-13. | $10,000 |
| Mar 7, 2014 | Completed final sign-off May 2014 | 55 Francisco St | H C I Systems Inc | 1/f: add 1 new monitor module to the existing fire alarm system to monitor the leak detection system. compliance with ordinance no 155-13 not required.Details
1/f: add 1 new monitor module to the existing fire alarm system to monitor the leak detection system. compliance with ordinance no 155-13 not required. | $6,800 |
| Dec 2, 2013 | Completed final sign-off Feb 2014 | 55 Francisco St | Cannon Constructors North Inc | 2nd floor:modifications to hvac system per new tenant layout. ref app# 201307031115 & 201310028269Details
2nd floor:modifications to hvac system per new tenant layout. ref app# 201307031115 & 201310028269 | $65,376 |
| Nov 22, 2013 | Never finaled issued Nov 2013, no final | 55 Francisco St | Pioneer Fire Inc. | 2nd floor: relocate 2 uprights, replace 103 pendents with 103 uprights. t.i. pa# 201307031115Details
2nd floor: relocate 2 uprights, replace 103 pendents with 103 uprights. t.i. pa# 201307031115 | $4,557 |
| Nov 7, 2013 | Completed final sign-off Jul 2014 | 55 Francisco St | Western Allied Mechanical Inc. | remove & replace existing water cooled chiller, cooling tower + associated pumps wiht new higher efficiency, but same capacity units. install new refigerant monitoring system + ventilation system for chiller room.Details
remove & replace existing water cooled chiller, cooling tower + associated pumps wiht new higher efficiency, but same capacity units. install new refigerant monitoring system + ventilation system for chiller room. | $450,000 |
| Oct 28, 2013 | Completed final sign-off Mar 2014 | 55 Francisco St | Costrotta Construc Management Inc | modifications to (e) at & t unmanned telecommunication facility consisting of installing 3 new rrus-11'sDetails
modifications to (e) at & t unmanned telecommunication facility consisting of installing 3 new rrus-11's | $7,000 |
| Oct 2, 2013 | Never finaled issued Oct 2013, no final | 55 Francisco St | Cannon Constructors North Inc | 2nd floor:revision to app#201307031115. adding scope taking over the rest of the floor, space on the floor. all hvac, electrical, plmg and life safty will be design build and submitted seperately.Details
2nd floor:revision to app#201307031115. adding scope taking over the rest of the floor, space on the floor. all hvac, electrical, plmg and life safty will be design build and submitted seperately. | $76,000 |
| Aug 26, 2013 | Completed final sign-off Mar 2014 | 55 Francisco St | Costrotta Construc Management Inc | a modification to an extg at&t unmanned telecommunication facility consisting of adding 6, new 6 port isco filter in an extg 19"rack. no new batteries are proposed.Details
a modification to an extg at&t unmanned telecommunication facility consisting of adding 6, new 6 port isco filter in an extg 19"rack. no new batteries are proposed. | $5,800 |
| Aug 14, 2013 | Completed final sign-off Jan 2014 | 55 Francisco St | Pioneer Fire Inc. | 2nd floor-remodel/removal of (e) ceiling & replacing 103 pendents with 103 uprights tio provide upright coverageDetails
2nd floor-remodel/removal of (e) ceiling & replacing 103 pendents with 103 uprights tio provide upright coverage | $11,778 |
| Jul 3, 2013 | Never finaled issued Jul 2013, no final | 55 Francisco St | Cannon Constructors North Inc | 2nd floor: t.i. includes the demolishing of non structural. all new or revised hvac, electrical plmg and life safety work will be design build and submitted for permit seperatly. bldg is fully sprinklered.Details
2nd floor: t.i. includes the demolishing of non structural. all new or revised hvac, electrical plmg and life safety work will be design build and submitted for permit seperatly. bldg is fully sprinklered. | $240,000 |
| Jul 3, 2013 | Completed final sign-off Feb 2014 | 55 Francisco St | Cannon Constructors North Inc | 4th floor: t.i. includes the demolishing of non structural partitions and bldg new non-structural partitions. . all new or revised hvac, electrical, plmg, and life safety work will be design build and submitted for permit seperatly. bldg is fully sprinklered.Details
4th floor: t.i. includes the demolishing of non structural partitions and bldg new non-structural partitions. . all new or revised hvac, electrical, plmg, and life safety work will be design build and submitted for permit seperatly. bldg is fully sprinklered. | $150,000 |
| Jun 13, 2013 | Never finaled issued Jun 2013, no final | 55 Francisco St | Pioneer Fire Inc. | 5th floor-relocate or add 5 sprinklers to accomodate new build outDetails
5th floor-relocate or add 5 sprinklers to accomodate new build out | $4,993 |
| May 21, 2013 | Completed final sign-off Sep 2013 | 55 Francisco St | Cardea Bldg Dba Dimension Design Group | 5th floor-selective tenant improvement-relocate non load bearing partitions in 2 rooms & add new mill workDetails
5th floor-selective tenant improvement-relocate non load bearing partitions in 2 rooms & add new mill work | $15,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.