Craig Laws
- Listed as
- authorized agent-others, engineer
- Firm
- Laws & Associates, Inc.
- Based in
- Burlingame
- On San Francisco permits
- Oct 2004 to Nov 2024
64 permits since 2000 (engineer on 63 permits, authorized agent-others on 1 permit): 49 completed, 3 in progress, 11 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 4, 2024 | In progress issued Mar 2025 | 38 Hotaling Pl | Aidan Collins & Sons Inc | 1st & basement fl ti partial demo of (e) 1st fl plate for new openings. remove 2 existing stairs and replace with (n) accessible stairs. add (n) accessible bathroom, storage & mech storgae in the basement. add (n) wet bar & kitchen at 1st fl. remodel (e) bathroom at 1st flDetails
1st & basement fl ti partial demo of (e) 1st fl plate for new openings. remove 2 existing stairs and replace with (n) accessible stairs. add (n) accessible bathroom, storage & mech storgae in the basement. add (n) wet bar & kitchen at 1st fl. remodel (e) bathroom at 1st fl | $122,000 |
| May 10, 2024 | In progress issued Jul 2024 | 1 Yacht Rd | Singular Builders | remodel (e) member bar. new electrical, plumbing, and lighting. new built-in furnishings and fixtures at bar area. new service equipment in drinks prep area.Details
remodel (e) member bar. new electrical, plumbing, and lighting. new built-in furnishings and fixtures at bar area. new service equipment in drinks prep area. | $750,000 |
| Apr 25, 2024 | In progress filed Apr 2024, not yet issued | 38 Hotaling Pl | Aidan Collins & Sons Inc | the replacement of 3 gas electric with 3 new vrf heat pump units including duct work and control, addition of 3 outside air fans and controls to serve the 3 new vrf heat pump unitsDetails
the replacement of 3 gas electric with 3 new vrf heat pump units including duct work and control, addition of 3 outside air fans and controls to serve the 3 new vrf heat pump units | $75,000 |
| Apr 6, 2023 | Never finaled issued May 2023, no final | 659 Merchant St | Northern Sun Associates | deferred mechanical plumbing for non-structural interior tenant improvement of an existing vacant building reference permit 202210073960.Details
deferred mechanical plumbing for non-structural interior tenant improvement of an existing vacant building reference permit 202210073960. | |
| Apr 28, 2022 | Never finaled issued Apr 2022, no final | 455 Market St | R M I Mechanical Contractors | ste 1460: add 2 vav boxes. add 1 transfer fan. new ductwork. new heating piping, control work, and air balance. bldg pa# 202201286899.Details
ste 1460: add 2 vav boxes. add 1 transfer fan. new ductwork. new heating piping, control work, and air balance. bldg pa# 202201286899. | $40,000 |
| Feb 4, 2022 | Never finaled issued Aug 2022, no final | 215 King St | Abco Mechanical Contr Inc **See Notes** | install hvac split systemsDetails
install hvac split systems | $264,450 |
| Oct 28, 2021 | Completed final sign-off Nov 2021 | 455 Market St | R M I Mechanical Contractors | suite# 1900. add 5 vav terminal units iwth controls, add 1 transfer fan for it room, new ductwork, add & relocate thermostates & air balance.Details
suite# 1900. add 5 vav terminal units iwth controls, add 1 transfer fan for it room, new ductwork, add & relocate thermostates & air balance. | $90,000 |
| Jul 26, 2021 | Completed final sign-off Aug 2022 | 434 Jackson St | R M I Mechanical Contractors | add one roof air conditining unit & thermostate, add 1 exhaust fan, add supply & return air grilles, new ductwok, and air balance.Details
add one roof air conditining unit & thermostate, add 1 exhaust fan, add supply & return air grilles, new ductwok, and air balance. | $25,000 |
| Jan 21, 2021 | Completed final sign-off Aug 2022 | 235 Montgomery St | R.M.R. Construction Company | suite 1201: title 24 compliance to ref pa201903266209. maher n/aDetails
suite 1201: title 24 compliance to ref pa201903266209. maher n/a | $18,000 |
| Jan 21, 2021 | Completed final sign-off Aug 2021 | 150 California St | Team Commercial Construction Inc. | install split system heat pump. install new ductwork and fan coil unit, new fire smoke damper, new cpi control panel, new duct smoke detector for fsd. ref pa 202010015683.Details
install split system heat pump. install new ductwork and fan coil unit, new fire smoke damper, new cpi control panel, new duct smoke detector for fsd. ref pa 202010015683. | $28,404 |
| Dec 15, 2020 | Completed final sign-off Mar 2022 | 455 Market St | Rudolph Commercial Interiors Inc, Rci | ste #1900: modification of an existing tenant improvement. to include selective demo & construction of non-load bearing partitions, new ceiling grid & tile, new light fixtures & switching, new doors, frames, millwork, sink & finishes.Details
ste #1900: modification of an existing tenant improvement. to include selective demo & construction of non-load bearing partitions, new ceiling grid & tile, new light fixtures & switching, new doors, frames, millwork, sink & finishes. | $1,000,000 |
| Jun 26, 2020 | Never finaled issued Jul 2020, no final | 49 Stevenson St | R M I Mechanical Contractors | replace/add 12 vavs, add one exhaust fan, add one wshp, add one water pump, new ductwork, new water piping, temperature controls, and air balance. ref pa#202002134417Details
replace/add 12 vavs, add one exhaust fan, add one wshp, add one water pump, new ductwork, new water piping, temperature controls, and air balance. ref pa#202002134417 | $150,000 |
| Jan 15, 2020 | Completed final sign-off Jul 2021 | 455 Market St | R M I Mechanical Contractors | mech for suite 201 & 202 on 2nd fl: add 1 heat pump, add 3 transfer fans, add heat pump thermostat, relocate existing vav thermostats, new duct work, & air balanace. ref pa #201901241114.Details
mech for suite 201 & 202 on 2nd fl: add 1 heat pump, add 3 transfer fans, add heat pump thermostat, relocate existing vav thermostats, new duct work, & air balanace. ref pa #201901241114. | $60,000 |
| Jan 15, 2020 | Completed final sign-off Jul 2021 | 455 Market St | R M I Mechanical Contractors | mech for suite 300 on 3rd fl: add 1 heat pump, 4 vav boxes, add 2 fire smoke dampers, add 1 heat pump thermostat, add 4 vav thermostats. rleocate existing vav thermostats, new ductwork, & air balance. ref pa #201901241116.Details
mech for suite 300 on 3rd fl: add 1 heat pump, 4 vav boxes, add 2 fire smoke dampers, add 1 heat pump thermostat, add 4 vav thermostats. rleocate existing vav thermostats, new ductwork, & air balance. ref pa #201901241116. | $150,000 |
| Nov 22, 2019 | Completed final sign-off Feb 2020 | 555 Montgomery St | R M I Mechanical Contractors | 11th fl - add 10 vav boxes with controls, add 1 fire smoke damper, new ductwork, and air balanceDetails
11th fl - add 10 vav boxes with controls, add 1 fire smoke damper, new ductwork, and air balance | $90,000 |
| Nov 12, 2019 | Completed final sign-off Nov 2019 | 100 Montgomery St | Daniel Larratt Plumbing Inc | rep pa# 201909101144; compressed gas process pipping installationDetails
rep pa# 201909101144; compressed gas process pipping installation | |
| Oct 28, 2019 | Completed final sign-off Mar 2020 | 160 Pine St | Rudolph Commercial Interiors Inc, Rci | ste 350 - modification of existing hvac systems. new power and data for work station & offices. new break room. new lighting & controls ref pa 2019-0905-0689Details
ste 350 - modification of existing hvac systems. new power and data for work station & offices. new break room. new lighting & controls ref pa 2019-0905-0689 | $451,202 |
| Oct 10, 2019 | Completed final sign-off Sep 2020 | 555 Montgomery St | R M I Mechanical Contractors | 16th flr - add 1 vav box, add 6 fire smoke dampers, new and relocated thermostats, new ductwork and air balance. ref pa 2019-0717-6142.Details
16th flr - add 1 vav box, add 6 fire smoke dampers, new and relocated thermostats, new ductwork and air balance. ref pa 2019-0717-6142. | $50,000 |
| Sep 13, 2018 | Completed final sign-off Dec 2018 | 580 California St | Richlen Construction | 4th floor: add 2 vav's with controls. adjust existing hvac system to match new architectural layout. air balance. ref pa 2018-0716-4662Details
4th floor: add 2 vav's with controls. adjust existing hvac system to match new architectural layout. air balance. ref pa 2018-0716-4662 | $12,000 |
| Aug 10, 2018 | Completed final sign-off Jan 2019 | 560 Davis St | Marchetti Group | suite 200: south sideref pa 2018-0504-8227 modification of (e) hvac systems to match new architectural layout. replacement of 28 vav boxes with (n) vav boxes & ddc controls. air balance. electrical work alsoDetails
suite 200: south sideref pa 2018-0504-8227 modification of (e) hvac systems to match new architectural layout. replacement of 28 vav boxes with (n) vav boxes & ddc controls. air balance. electrical work also | $350,000 |
| Aug 10, 2018 | Never finaled issued Aug 2018, no final | 560 Davis St | Marchetti Group | suite 200: ref pa 2017-1219-6919 provided new lighting & branch circuiting to existing panel. maintained some of the (e) power & signal outlets and provided additional (n) power branch circuiting & raceway systems. provided ca-t24 compliance forms.Details
suite 200: ref pa 2017-1219-6919 provided new lighting & branch circuiting to existing panel. maintained some of the (e) power & signal outlets and provided additional (n) power branch circuiting & raceway systems. provided ca-t24 compliance forms. | |
| Aug 10, 2018 | Completed final sign-off Jan 2019 | 560 Davis St | Marchetti Group | suite 200: ref pa 2018-0330-5082 modification of (e) hvac systems to match new architectural layout. replacement of 24 vav boxes witn (n) vav boxes & ddc controls. air balanceDetails
suite 200: ref pa 2018-0330-5082 modification of (e) hvac systems to match new architectural layout. replacement of 24 vav boxes witn (n) vav boxes & ddc controls. air balance | $350,000 |
| Jul 17, 2018 | Never finaled issued Jan 2019, no final | 455 Market St | Rudolph Commercial Interiors Inc, Rci | basement/lower level parking: addition of (1) heat pump/(1) exhaust fan/(1) outside air supply fan. no structural changes. maher n/a.Details
basement/lower level parking: addition of (1) heat pump/(1) exhaust fan/(1) outside air supply fan. no structural changes. maher n/a. | $76,836 |
| Apr 6, 2018 | Never finaled issued Apr 2018, no final | 235 Pine St | Bevilacqua & Sons | ste 1200 - modification of existing hvac systems to match new architectural layout. the addition of 2 new vav boxes with controls. air balance. ref pa 2018-0302-2706Details
ste 1200 - modification of existing hvac systems to match new architectural layout. the addition of 2 new vav boxes with controls. air balance. ref pa 2018-0302-2706 | $20,000 |
| Mar 8, 2018 | Completed final sign-off Mar 2018 | 44 Montgomery St | R M I Mechanical Contractors | add 1 supply diffuser, replace 1 exhaust fan, relocate 1 return air grille, relocate 1 thermostat and air balance; n/a maherDetails
add 1 supply diffuser, replace 1 exhaust fan, relocate 1 return air grille, relocate 1 thermostat and air balance; n/a maher | $6,000 |
| Jan 26, 2018 | Completed final sign-off Apr 2018 | 180 Montgomery St | Bevilacqua & Sons | ste. #700: layout. air balance. ref pa 2017-1226-7365. maher n/aDetails
ste. #700: layout. air balance. ref pa 2017-1226-7365. maher n/a | $10,600 |
| Dec 19, 2017 | Completed final sign-off Jun 2018 | 1045 Sansome St | Tulley Mechanical, Inc | suite #300 -installing new heating & ventilation system with ducting. revision to 201712065627Details
suite #300 -installing new heating & ventilation system with ducting. revision to 201712065627 | $110,000 |
| Dec 4, 2017 | Completed final sign-off Jan 2018 | 455 Market St | Peacock Construction | ground floor - t-24 mechanical for work under pa #201708255970. n/a maher ordinanceDetails
ground floor - t-24 mechanical for work under pa #201708255970. n/a maher ordinance | $14,000 |
| Nov 14, 2017 | Completed final sign-off Feb 2018 | 180 Montgomery St | Bevilacqua & Sons | 21st floor suite 2190 - the extent of the mechanical work for this project includes: the modification of existing hvac system to match new architectural layout. the addition of four vav boxes with controls,air balance. ref pa #201710121120.Details
21st floor suite 2190 - the extent of the mechanical work for this project includes: the modification of existing hvac system to match new architectural layout. the addition of four vav boxes with controls,air balance. ref pa #201710121120. | $41,900 |
| Oct 30, 2017 | Completed final sign-off Jan 2018 | 33 New Montgomery St | Peacock Construction | 15/f, 17/f- t-24 mechanical for work under pa#201708084175, add 3 vav boxes on 15/f, redistribute air per new layout. n/a ordinance #155-13Details
15/f, 17/f- t-24 mechanical for work under pa#201708084175, add 3 vav boxes on 15/f, redistribute air per new layout. n/a ordinance #155-13 | $15,000 |
| Oct 27, 2017 | Completed final sign-off Mar 2018 | 90 New Montgomery St | Rylko Builders Inc. | suite 500: title 24 for mech & electrical for pa 2017-0918-8881. maher n/a.Details
suite 500: title 24 for mech & electrical for pa 2017-0918-8881. maher n/a. | $5,000 |
| Sep 5, 2017 | Completed final sign-off Apr 2018 | 1 Market St | Marchetti Group | ref pa 2017-0417-4154, mep work only; maher ord 155-13 naDetails
ref pa 2017-0417-4154, mep work only; maher ord 155-13 na | |
| Aug 18, 2017 | Completed final sign-off Sep 2017 | 235 Pine St | Bevilacqua & Sons | 18th floor suite 1850 -the modification of existing hvac systems to match new architectural layout. the addition of one vav box with ddc controls. air balance. ref pa #201707121663. n/a maher ordinanceDetails
18th floor suite 1850 -the modification of existing hvac systems to match new architectural layout. the addition of one vav box with ddc controls. air balance. ref pa #201707121663. n/a maher ordinance | $17,600 |
| Aug 18, 2017 | Completed final sign-off Dec 2017 | 300 Montgomery St | Bevilacqua & Sons | 10th floor suite 1050 -the modification of existing hvac systems to match new architectural layout. the addition of one vav box with controls. air balance. ref pa#201705307899. n/a maher ordinanceDetails
10th floor suite 1050 -the modification of existing hvac systems to match new architectural layout. the addition of one vav box with controls. air balance. ref pa#201705307899. n/a maher ordinance | $21,300 |
| Jul 27, 2017 | Completed final sign-off Nov 2017 | 235 Pine St | Bevilacqua & Sons | suite #1475: the modification of existing hvac systems to match new arch layout. the replacement of 5 vav boxes with (n) vav boxes + ddc controls. air balance. maher naDetails
suite #1475: the modification of existing hvac systems to match new arch layout. the replacement of 5 vav boxes with (n) vav boxes + ddc controls. air balance. maher na | $39,850 |
| Jul 11, 2017 | Completed final sign-off Aug 2017 | 235 Pine St | Tulley Mechanical, Inc | 12th floor suite 1250 - modification to existing hvac. ref #201706230205. n/a maher ordinanceDetails
12th floor suite 1250 - modification to existing hvac. ref #201706230205. n/a maher ordinance | $5,000 |
| Jun 27, 2017 | Completed final sign-off Oct 2017 | 55 Francisco St | Novo Construction Inc | #380- mechanical work for ti at suite 380, ref pa 2017-0425-4861Details
#380- mechanical work for ti at suite 380, ref pa 2017-0425-4861 | $6,000 |
| Dec 14, 2016 | Never finaled issued Dec 2016, no final | 101 California St | Source Planning And Construction Inc | 47th fl mech and elec for 201611021677Details
47th fl mech and elec for 201611021677 | $211,000 |
| Oct 19, 2016 | Completed final sign-off Feb 2017 | 595 Market St | Richlen Construction | mokdification of (e) hvac systems to match new architectural layout. addition of (2) exhaust fans with controls. air balancingDetails
mokdification of (e) hvac systems to match new architectural layout. addition of (2) exhaust fans with controls. air balancing | $15,000 |
| Aug 31, 2016 | Completed final sign-off May 2017 | 235 Pine St | Bevilacqua & Sons | 23/f lobby- mechanical for elevator lobby modifications. ref app#201608245912.Details
23/f lobby- mechanical for elevator lobby modifications. ref app#201608245912. | $3,000 |
| Aug 30, 2016 | Completed final sign-off Jun 2017 | 601 California St | Peacock Construction | 8th floor - t-24 electricla for work done under pa #201606301282 includes t-24 mechanical.Details
8th floor - t-24 electricla for work done under pa #201606301282 includes t-24 mechanical. | $87,000 |
| Jan 13, 2016 | Never finaled issued Jan 2016, no final | 501 02nd St | Gci, Inc | modification of extg hvac system to match new layout, one new vav box, four exhaust fans, one water heater. ref app#201311102240. n/a ordinance #155-13Details
modification of extg hvac system to match new layout, one new vav box, four exhaust fans, one water heater. ref app#201311102240. n/a ordinance #155-13 | $50,000 |
| Oct 14, 2015 | Never finaled issued Oct 2015, no final | 2100 Fillmore St | Rudolph Commercial Interiors Inc, Rci | mechanical drawings in additon to 201508144302. addition of 2 split system hvac units, air balanace, new hvac systems. compliance with maher ordinance 155-13 not required.Details
mechanical drawings in additon to 201508144302. addition of 2 split system hvac units, air balanace, new hvac systems. compliance with maher ordinance 155-13 not required. | $42,530 |
| Sep 17, 2015 | Completed final sign-off Dec 2015 | 1 Post St | Sc Builders, Inc | 21st floor: mechanical and electrical for app#201507101233Details
21st floor: mechanical and electrical for app#201507101233 | $29,000 |
| Jan 27, 2015 | Completed final sign-off Jul 2015 | 301 Howard St | Peacock Construction | mechanical for work done under pa #2014.1210.3434. n/a maher ordinanceDetails
mechanical for work done under pa #2014.1210.3434. n/a maher ordinance | $105,000 |
| Aug 21, 2014 | Completed final sign-off Jan 2015 | 555 Montgomery St | Commercial Interior Builders Inc | 11th flr: mechanical work to include addition of one new vav box with new ductwork and diffusers to match new architectural layout. ref. permit 201408073230 for architectural work. maher n/aDetails
11th flr: mechanical work to include addition of one new vav box with new ductwork and diffusers to match new architectural layout. ref. permit 201408073230 for architectural work. maher n/a | $8,500 |
| Jun 5, 2014 | Completed final sign-off Jan 2015 | 555 Montgomery St | Commercial Interior Builders Inc | install new vav box per 2013 cbc and electrical code. ref. appl. 201404173483. maher ordinance n/a.Details
install new vav box per 2013 cbc and electrical code. ref. appl. 201404173483. maher ordinance n/a. | $10,455 |
| May 20, 2014 | Completed final sign-off Sep 2014 | 1 Market St | Gci, Inc | one new vav box, new exhaust fan, adjust existing mechanical to match new architectural system. new lighting. ref. pa#201402208954. n/a ordinance #155-13.Details
one new vav box, new exhaust fan, adjust existing mechanical to match new architectural system. new lighting. ref. pa#201402208954. n/a ordinance #155-13. | $15,000 |
| May 13, 2014 | Never finaled issued May 2014, no final | 180 Montgomery St | Hathaway Dinwiddie Co. | 17th floor -the addition of one vav box including ductwork and controls. adjust existing mechanical syatem to matching archtectural layout. air balance of mechanical systems. ref #2014.0320.1253Details
17th floor -the addition of one vav box including ductwork and controls. adjust existing mechanical syatem to matching archtectural layout. air balance of mechanical systems. ref #2014.0320.1253 | $45,000 |
| Mar 18, 2014 | Completed final sign-off Jan 2015 | 501 02nd St | Novo Construction Inc | mechanical and electrical wor for tenant improvement on the 7th fl ref 201402047749. compliance with ordinance #155-13 not requiredDetails
mechanical and electrical wor for tenant improvement on the 7th fl ref 201402047749. compliance with ordinance #155-13 not required | |
| Jan 23, 2014 | Completed final sign-off Mar 2014 | 601 California St | Peacock Construction Inc | mechanical and electrical revision for 201312063506Details
mechanical and electrical revision for 201312063506 | $30,000 |
| Jan 6, 2014 | Completed final sign-off Mar 2014 | 575 Market St | Dome Construction Corp | relocate existing supplies & returns, rezone (1) supply grill, relocate existing building sensors, demo (1) existing exhaust fan, install fire smoke damper. ref. to pa#201312113855Details
relocate existing supplies & returns, rezone (1) supply grill, relocate existing building sensors, demo (1) existing exhaust fan, install fire smoke damper. ref. to pa#201312113855 | $7,400 |
| May 2, 2012 | Completed final sign-off Sep 2012 | 1750 Taylor St | Innovative Mechanical Inc | unit #803-installation of air handler with ducting. also vent 2 bathrooms, exhaust fans & 1 kitchen exhaust. t.i. pa# 2012-0328-7077Details
unit #803-installation of air handler with ducting. also vent 2 bathrooms, exhaust fans & 1 kitchen exhaust. t.i. pa# 2012-0328-7077 | $35,000 |
| Jan 27, 2012 | Completed final sign-off Sep 2012 | 222 Kearny St | Richlen Construction | ti. 2nd & 4th floors - hvac modification for new walls life safety under sep permit. ref pa #201109013699.Details
ti. 2nd & 4th floors - hvac modification for new walls life safety under sep permit. ref pa #201109013699. | $250,000 |
| Nov 17, 2010 | Completed final sign-off Jul 2011 | 501 02nd St | R.M.R. Construction Company | 2nd floor - for t.i. pa# 2010-1021-3498-mechanical permit for main permitDetails
2nd floor - for t.i. pa# 2010-1021-3498-mechanical permit for main permit | $31,000 |
| Aug 14, 2008 | Completed final sign-off Aug 2008 | 595 Market St | Turner Construction Co | mechanical work on the 9th floor. suite 950. reference arch.plans under pa# 2008.06.06.3811Details
mechanical work on the 9th floor. suite 950. reference arch.plans under pa# 2008.06.06.3811 | $62,000 |
| Jul 1, 2008 | Completed final sign-off Sep 2008 | 1 Market St | 1 -demolition of non-bearing partitions, doors, plumbing, electrical. 2 - new non-bearing partitions, doors, plumbing, electrical. no structural work or alterations to base building shell.Details
1 -demolition of non-bearing partitions, doors, plumbing, electrical. 2 - new non-bearing partitions, doors, plumbing, electrical. no structural work or alterations to base building shell. | $58,000 | |
| Jun 24, 2008 | Completed final sign-off Sep 2008 | 71 Stevenson St | Richlen Construction | ref. appl. 200805021178.relocate e)/install (n) lighs & reuse existing,new outlets for new layout. add 2 vav boxes,1 exhaust fan, 3 sfds, relocate supply air grilles including ductwork and controls as necessary.air balance of mechanical systems. fire sprinkler and life safety under separate permit.Details
ref. appl. 200805021178.relocate e)/install (n) lighs & reuse existing,new outlets for new layout. add 2 vav boxes,1 exhaust fan, 3 sfds, relocate supply air grilles including ductwork and controls as necessary.air balance of mechanical systems. fire sprinkler and life safety under separate permit. | $160,000 |
| Jun 24, 2008 | Completed final sign-off Sep 2008 | 71 Stevenson St | Richlen Construction | ref. arch.200805021175,install new lighting and reuse (e),provide new outlets for new layout,add 3 vav boxes,1 heat pump,3 fsds & relocate supply air grilles, including ductwork and controls,fire sprinklers & life safety under separate permit.Details
ref. arch.200805021175,install new lighting and reuse (e),provide new outlets for new layout,add 3 vav boxes,1 heat pump,3 fsds & relocate supply air grilles, including ductwork and controls,fire sprinklers & life safety under separate permit. | $160,000 |
| Feb 1, 2008 | Completed final sign-off May 2008 | 215 Fremont St | Richlen Construction | 1st flr: me & el design build for aim fitness sp, mech work: add (1) new heat pump incl ductwork & controls, add (1) new vav box incl ductwork & controls, relocate supply & return air grills incl req'd new ductwork. elec work: relocate lights fr (e) space & bldg stock.f.s.& l.s.under separate permitDetails
1st flr: me & el design build for aim fitness sp, mech work: add (1) new heat pump incl ductwork & controls, add (1) new vav box incl ductwork & controls, relocate supply & return air grills incl req'd new ductwork. elec work: relocate lights fr (e) space & bldg stock.f.s.& l.s.under separate permit | $60,000 |
| Aug 1, 2006 | Completed final sign-off Oct 2006 | 1 Post St | Robbins Construction Inc Dba Trevor D Ro | oti-2 9th/fl el-me, sp.Details
oti-2 9th/fl el-me, sp. | $21,700 |
| Mar 27, 2006 | Completed final sign-off Aug 2006 | 1 Post St | Robbins Construction Inc Dba Trevor D Ro | oti-2, 9th floor, el, me, sp . engineered drawings for hvac, fire sprinklers & title 24 lighting calcs. t.i. workDetails
oti-2, 9th floor, el, me, sp . engineered drawings for hvac, fire sprinklers & title 24 lighting calcs. t.i. work | $43,500 |
| Jun 7, 2005 | Completed final sign-off Dec 2005 | 333 Bush St | Skyline Construction | oti-2, 4th floor, el, me.Details
oti-2, 4th floor, el, me. | $50,000 |
| Oct 5, 2004 | Expired or cancelled expired Dec 2006 | 3221 Pierce St | 2/f- replace heating system including addition of air conditioning (hvac)for office spaceDetails
2/f- replace heating system including addition of air conditioning (hvac)for office space | $25,000 |