| Sep 25, 2026 | In progress | 1 Market St | 7th fl - interior renovation of approx 4000 sq of level 7 amenity space at 1 market plaza. work includes a (n) updated tenant amenities including lounges & a study room | $568,000 | |
| Sep 10, 2026 | In progress | 55 Spear St | revision to pa #202512101423. remove one phone bootrh | ||
| Sep 3, 2026 | In progress | 1 Market St | 6/fl- soft demo of (e) non structural partitions, finishes, lighting celiings, millwork, and plumbing fixtures ab-17 | $512,352 | |
| Sep 2, 2026 | In progress | 1 Market St | 1st fl - interior renovation and fitout of approx. 26,480sf commercial kitchen, bar, grab-and-go, and seating areas. mep and kitchen/food service drawings under separate permit. no change of use. structural drawings included. | $3,760,160 | |
| Aug 31, 2026 | In progress | 55 Spear St | 37th floor partial ti. non structural partitions, ceilings, finishes+ associated mechanical + electrical. | $2,000,000 | |
| Aug 31, 2026 | In progress | 55 Spear St | Skyline Construction | 29th floor: non-structural partitions, ceiling, lighting & mep &mep. (e) convenience stair to be re-finish. | $3,646,268 |
| Aug 31, 2026 | In progress | 55 Spear St | Skyline Construction | 8/fl- ti to include paint, finishes, and (n) phone booths | $200,000 |
| Aug 31, 2026 | In progress | 55 Spear St | Skyline Construction | 9/fl- ti to include paint, finishes, and (n) phone booths | $200,000 |
| Aug 31, 2026 | In progress | 55 Spear St | Skyline Construction | 10/fl- ti to include paint, finishes, and (n) phone booths | $150,000 |
| Aug 25, 2026 | In progress | 55 Spear St | 7th fl: demo of (e) non-structural partitions, doors and frames, finishes, ceilings, lighting and plumbing fixtures. ductwork, hvac and electrical to be pulled back to source and plumbing to be capped. construction of new non-structural partitions, finishes, ceiling,lighting and plumbing fix | $450,000 | |
| Aug 18, 2026 | In progress | 55 Spear St | Dpr Construction A | demolition of 5th and 6th floor communicating stair to intermediary landing, floor infill at openning and restroom upgrades. no hvac or electrical modifications. | $350,000 |
| Aug 17, 2026 | In progress | 55 Spear St | Source Planning And Construction Inc | 18th floor: revision to bpa: 202606032408 room 18-009/ pantry and finishes to single sex rr was deferred. adressing architectural set and corresponding meps for this review. | $37,488 |
| Aug 3, 2026 | In progress | 55 Spear St | Gci, Inc | 37th floor: interior non-structural demolition only. ab017 | $91,700 |
| Jul 29, 2026 | In progress | 55 Spear St | Bcci Construction Company | administrative permit w/o plans to document pa # 202603046914 being performed on block 3713 & lot 007 | |
| Jul 22, 2026 | In progress | 55 Spear St | Skyline Construction | l30-l31 demo (e) slab for (n) opening for interconnecting stair between l30 & l31 (n) finishes, structural, platform landing | $715,000 |
| Jul 15, 2026 | In progress | 1 Market St | 1st fl: interior oly tenant improvement to construct new fitness center. mep deferred. | $1,363,200 | |
| Jul 10, 2026 | In progress | 1 Market St | Field Construction Inc. | to obtain final inspection for work approved under pa# 202410243673. all work is complete. | |
| Jul 9, 2026 | In progress | 1 Market St | Gci, Inc | 28th floor: electrical-new power, lighting and signal. ref pa #202604149423. | $27,000 |
| Jun 29, 2026 | In progress | 55 Spear St | Source Planning And Construction Inc | 17th fl structural for high density files. ref 202606032446 | |
| Jun 25, 2026 | In progress | 55 Spear St | Skyline Construction | 29th floor: interior non-structural demolition on the 29th floor. ab017 | $45,000 |
| Jun 24, 2026 | In progress | 1 Market St | Field Construction Inc. | 25th fl - deferred electrical under pa 202604149378 includes new lighting & branch circuiting; new power & signal & branch circuiting to existing panel | $150,000 |
| Jun 9, 2026 | In progress | 1 Market St | Gci, Inc | 28th fl - mechanical demo of mech systems: install 2 novo vav boxes , new fsd's reference: 202604149423 | $15,000 |
| Jun 3, 2026 | In progress | 55 Spear St | Source Planning And Construction Inc | 18f t.i: demo done under permit. new partitons & doors, ceilings, lights, el distribution. mep included. including structural work. n unisex accessible toilet. see coversheet for cope. deffered submittal: fire alarm, fire sprinklers, network anchor + health review at pantry. | $3,279,000 |
| Jun 3, 2026 | In progress | 1 Market St | Field Construction Inc. | 28th floor: demolition of 27th and 28th floor communicating stair to intermidiary landing and floor infill at opening in an existing unoccupied space. no hvac or electrical modifications. | $150,000 |
| Jun 3, 2026 | In progress | 55 Spear St | Source Planning And Construction Inc | spear street tower, 17th flr: t.i. selected demo of remaining soffite and partitions, primary demo under 202603137532. new construction will consist of new partitions and doors, ceilings, light fixtures and electrical distribution. meps. | $2,199 |
| May 19, 2026 | Completed | 55 Spear St | Source Planning And Construction Inc | 16th fl: mechanical & electrical for 202604169572(aka one market plaza spear tower) | $150,000 |
| May 14, 2026 | In progress | 1 Market St | Field Construction Inc. | 25/f: ref# 202604149378 - mech: demo all mech system. install 2 (n) vav boxes to supplort ventilation and temp controls. | $50,000 |
| May 1, 2026 | In progress | 1 Market St | Field Construction Inc. | ev charging station - basement level garage. electrical and structural. | $300,000 |
| Apr 28, 2026 | In progress | 55 Spear St | Metropolitan Electrical Construction | floor 13b, fire only work to add two 2-way comm stations on floor 13b (stewart tower) at the passsenger and freight elevator lobbies. no permit app#: since no remodel work being done. | $12,008 |
| Apr 23, 2026 | In progress | 55 Spear St | Skyline Construction | level 31 ti new non structural partitions, mep, finishes. demo under 202604018733. no exterior or structural work. | $8,250,000 |
| Apr 23, 2026 | In progress | 55 Spear St | Skyline Construction | 30th fl - ti (n) non-structural partitions, mep, finishes. demo under pa 202604018733. no exterior or structural work | $9,052,500 |
| Apr 16, 2026 | In progress | 1 Market St | floors: 31st to 43rd: installation of a 6 inch cold water riser between 31st-43rd story steel framed office tower | $26,000 | |
| Apr 16, 2026 | In progress | 55 Spear St | 4th floor tenant improvement, demolition of existing non-partitions, doors, frames, finishes, ceilings, lighting and plumbing fixtures. ductwork, hvac and electrical to be pulled back to source and plumbing to be capped at source. construction of new non-structural partitions, finishes, ceiling, | $1,500,000 | |
| Apr 16, 2026 | In progress | 55 Spear St | 4th flr - demo of (e) non-structural partitions, doors & frames, finishes, ceilings, lighting and plumbing fixtures; ductwork, hvac and electrical to be pulled back to source and plumbing to be capped @ source. construction of (n) non-structural partitions finishes, ceiling, lighting and plumbing | $1,500,000 | |
| Apr 16, 2026 | Completed | 55 Spear St | Source Planning And Construction Inc | 16/fl- demolition of existing non structural partitions, doors, and frames, finishes, ceilings, lighting, plumbing fixtures. duct work havac and elec to be pulled back to source and plumbing to be caped at source. construction of new non strurctural partitions, finishes, ceiling, lighting,plumbing | $1,000,000 |
| Apr 14, 2026 | In progress | 55 Spear St | Field Construction Inc. | 25/f: demolition of (e) non-structural partitions, doors & grames, finishes, ceilings, lighting and plumbing fixtures. ductwork, hvac & electrical to be pulled back to source. and plumbing to be capped at source. construction of new non-structural partitions, | $1,000,000 |
| Apr 14, 2026 | In progress | 55 Spear St | Gci, Inc | 28th fl - demo of (e) non-structural partitions, doors & frames, finishes, ceilings, lighting and plumbing fixtures; ductwork, hvac and electrical to be pulled back to source and plumbing to be apped @ source. construction of (n) non-structural partitions finishes, ceiling, lighting and plumbing | $1,000,000 |
| Apr 8, 2026 | In progress | 1 Market St | Otte North America Inc | exterior building maintanence unit replacement of existing. scope includes installation of anchor points on the roods of two office towers at spear and tower steuart. | $449,000 |
| Apr 1, 2026 | In progress | 1 Market St | Field Construction Inc. | level 7: electrical - power, lighting and signal (ref bpa: 2025.0114.8331) | $10,000 |
| Apr 1, 2026 | In progress | 55 Spear St | Skyline Construction | floors 30 & 31: demo only, non-structural partitions, ceiling,finished, mep, ab-17 | $382,005 |
| Mar 17, 2026 | Completed | 1 Market St | Dpr Construction A | 15th floor: mech - demo mech systems, removal perimeter induction units vav boxes. relocate (2) vav boxes new fire smoke damper. electrical - fire smoke damage electrical. | $20,000 |
| Mar 13, 2026 | In progress | 1 Market St | Source Planning And Construction Inc | 18th fl - selective interior demo only (ab-017) ref fire 26-158 | $70,000 |
| Mar 13, 2026 | In progress | 1 Market St | Source Planning And Construction Inc | 17th fl - selective interior demo only (ab-017) ref 26-158 | $70,000 |
| Mar 9, 2026 | In progress | 1 Market St | Field Construction Inc. | 29th & 30th fl: revision to pa #2025-1215-1798. stair demo and infill at 30th fl only | |
| Jan 28, 2026 | Completed | 1 Market St | Gci, Inc | 37th/f spec suite- electrical new power & signal. new 2022 title 24 lighting & controls.ref 2025 0618 8952 | $15,000 |
| Jan 23, 2026 | In progress | 1 Market St | Golden Gate Fire Protection Inc | 7th fl - add 7 pendent sprinklers on the roof deck ref pa 202501148331 | $2,000 |
| Jan 22, 2026 | Expired or cancelled | 1 Market St | 13th/f: revision to previously approved pa# 202510238018 based on recently approved t.i. pa# 202512111539 in the same space on the same fl. demo restrooms, remove corridors from scope | $500,000 | |
| Jan 22, 2026 | Completed | 1 Market St | Gci, Inc | 37th/f- corridor/ restrooms & lobby: new power & signal devices throughout the space. new 2022 title 24 lighting & controls. ref# 202505144642. | $15,000 |
| Dec 23, 2025 | In progress | 55 Spear St | Swinerton Builders | 36th fl - minor ti to accomodate a new focus room and trade desk space. new wall power | $800,000 |
| Dec 18, 2025 | In progress | 1 Market St | Clune Construction Company L P | 13th fl - hvac ti project unit the (e) base bldg hvac system; modification to the air distribution system in the tenant space to suit arc renov including install of vav boxes and fan powered terminal for tenant needs. no new fire smoke dampers. ref pa 202512111539 | $300,000 |
| Dec 15, 2025 | Completed | 1 Market St | Dpr Construction A | 15th floor. demolition of (e) non-structural partitions, doors, frame, finishes. mep deferred for ceiling, light and plumbing fixtures in as existing unoccupied space. ab-017 applies | $150,000 |
| Dec 15, 2025 | In progress | 1 Market St | Field Construction Inc. | 29th and 30th floors: demolition of 29th and 30th floor internal communicating stair to intermediary landing and floor infill at opening in an existing unoccupied space. | $150,000 |
| Dec 12, 2025 | Completed | 1 Market St | Gci, Inc | 37th fl - signage for fire extinguisher, exit route, room signage | $2,000 |
| Dec 11, 2025 | In progress | 1 Market St | Clune Construction Company L P | 13th/f t.i. minor demo of non structural elements, construction of new 23 offices, 13 meeting rooms, break & reception area. new finishes, ceilings, lights. ref 202510238018 | $1,880,900 |
| Dec 11, 2025 | Completed | 1 Market St | Anderson, Rowe & Buckley, Inc. | fire sprinkler demo t.i. relocate 90. total 90. ref t.i. pa #202510288303. | $46,350 |
| Dec 9, 2025 | Completed | 1 Market St | Gci, Inc | 37th fl: evacuation signage | $2,000 |
| Dec 5, 2025 | In progress | 55 Spear St | Specialized Graphics Inc | 4 evac maps on the 19/f | $2,000 |
| Dec 2, 2025 | In progress | 55 Spear St | Siemens Industry, Inc. | floor 37a/38a: fire only work for the "simpson thatcher" remodels on floors 37a and 38a. additions are 7 smoke detectors, 5 modules, 54 speakers, 52 speaker/strobes, 17 strobe, and the relocation of 3 smoke detectors. ref permit 202506058045. | $113,660 |
| Nov 19, 2025 | Completed | 1 Market St | Pioneer Fire Inc. | 13th/fl: relocate 4 concealed pendants, add 2 concealed pendants ref 202510238018 | $3,200 |
| Nov 13, 2025 | Completed | 55 Spear St | Siemens Industry, Inc. | 37a - fire only work for the corridor areas; additions are 7 smoke detectors and 7 speakers/s well as relocation of 5 smoke detecotrs ref pa 202505146425 | $15,370 |
| Nov 13, 2025 | Completed | 55 Spear St | Siemens Industry, Inc. | 37a - fire work only for the spec suite; additions are speaker/strobes and 9 strobes. ref pa 202506188952 | $19,045 |
| Nov 7, 2025 | Completed | 55 Spear St | Siemens Industry, Inc. | fire only work to add 8 strobes for the phone booth installation on floor 8b under ref#: 202510026579 | $4,968 |
| Oct 30, 2025 | Completed | 55 Spear St | Gci, Inc | 37/f: deferred structural submittal to pa# 202506058045. full accessibility provided per pa 202506058045. | $15,000 |
| Oct 28, 2025 | In progress | 1 Market St | demolition of existing non structural partitions, doors, and frames, finishes, ceilings, lighting, plumbing fixtures. duct work havac and elec to be pulled back to source and plumbing to be caped at source. construction of new non strurctural partitions, finishes, ceiling, lighting,plumbing fixtures | $550,000 | |
| Oct 28, 2025 | In progress | 1 Market St | Pioneer Fire Inc. | 8th/fl: add 8 concealed pendents in phone booths | $2,000 |
| Oct 23, 2025 | Completed | 1 Market St | Gci, Inc | 13/fl- demo of (e) non structural partitions, doors, and frames, finishes ceilings, lighting and plumbing fixtures. ductwork, hvac, and electrical to be pulled back to source and plumbing to be capped at source. construction of (n) non structural partitions, finishes, ceiling, lighting and plumbing | $750,000 |
| Oct 2, 2025 | Completed | 1 Market St | Gci, Inc | 8/f - steuart tower: install phone booths at specified open office areas. requesting existing focus rooms to provide requivalent faciliation for accessibility. | $55,000 |
| Sep 18, 2025 | Completed | 1 Market St | Gci, Inc | 37th fl - ref pa 202506188952 partial remodel of level 37 new offices, meeting rooms & conference rooms, replacement of (e) perimeter chilled water, interior zones will be replaced w/new cooling only vav | $350,000 |
| Sep 3, 2025 | Completed | 55 Spear St | Novo Construction Inc | 19th floor:revision to pa #202503172361 to revise phone room 1935, pantry 1976 and conference 1911 and 1910 doors. misc. revisions throughout 19th floor. | |
| Aug 28, 2025 | Completed | 55 Spear St | Gci, Inc | 37 and 38/fl-revision 202506058045 for mechanical design | |
| Aug 25, 2025 | In progress | 55 Spear St | Ayoob & Peery Plumbing Co Inc | 19th fl - record as built for 202507231385 fire; updated drawings for adjusted piping paln and final sprinkler head posisitons. ref pa 202503172361 | |
| Aug 21, 2025 | In progress | 1 Market St | Pioneer Fire Inc. | 37th floor. relocate (11) pendents and (1) upright convert (43) pendents and (7) uprights. add (1) pendent, remove (5) pendents, (2) uprights. ref#: 202506188952 | $17,500 |
| Aug 8, 2025 | Completed | 55 Spear St | Pioneer Fire Inc. | 37th & 38th fl ref pa #2025-0605-8045. remove 25 pendant sprinklers, relocate 50 pendant sprinklers, relocate 40 concealed sprinklers, convert 80 upright to pendent sprinklers, convert 23 upright sprinklers to concealed. add 8 pendant sprinklers. | $27,500 |
| Aug 7, 2025 | Completed | 55 Spear St | Siemens Industry, Inc. | fire only for the partial-floor remodel on floor 19a done under ref pa#: 202503172361; 1 speaker; 1 speaker/strobe and 2 strobes are added, as well as the relocation of 14 speaker/strobes. | $16,650 |
| Jul 31, 2025 | Completed | 55 Spear St | Siemens Industry, Inc. | floor 35a, fire only work for the tenant stairwell construction on floor 35a done under pa#: 202505096158; no devices are required to be added, only relocation sequence reprogramming. | |
| Jul 30, 2025 | Completed | 1 Market St | Pioneer Fire Inc. | 37th flr, relocate (12) pendents (8) concealed sprinkler head, remove (3) pendents. gc t.i. #202505146425 | $5,750 |
| Jul 23, 2025 | In progress | 55 Spear St | Ayoob & Peery Plumbing Co Inc | 19/flr: ad (20), relocate (50) fire sprinkler. job#: 25-647. ref#: 202503172361. | $43,477 |
| Jul 16, 2025 | Expired or cancelled | 1 Market St | Pioneer Fire Inc. | 17th floor spear tower: relocate(18) pendents, relocate(5) semi recessed, relocate(5) concaled pendents | $7,000 |
| Jul 10, 2025 | In progress | 55 Spear St | Siemens Industry, Inc. | fire only work to relocate 4 sprinklers/strobes in the unoccupied areas created with the floor 7a demolition. ref permit app#202506249311. | $3,844 |
| Jul 7, 2025 | Completed | 1 Market St | Dpr Construction A | 33rd-35th floors: guardrail at stair. ref pa#202501228840 | $20,000 |
| Jun 24, 2025 | Completed | 1 Market St | M C S Construction Services | 7/f -demolition of non structural partitions,ceiling, lighting, finishes, and any associated mechanical, plumbing, and electrical. per ab-17, space will rema8in unoccupied. permit for construction and related acessible features will be required prior to reoccupancy. ab-017 applies | $9,000 |
| Jun 18, 2025 | Completed | 1 Market St | Gci, Inc | construction of new non structural partitions, doors and glazing, ceiling, lighting, millwork, plumbing fixtures, equip and finishes. scope includes reception, break area, meeting roos, offices and open office area. no exterior work in the scope. all work to be on 37th fl. mep deferred. | $1,800,000 |
| Jun 6, 2025 | In progress | 1 Market St | Anderson, Rowe & Buckley, Inc. | 7th floor. existing fire sprinkler system demo, relocate 36 fire sprinklers | $9,000 |
| Jun 5, 2025 | Completed | 55 Spear St | Gci, Inc | 37&38/fl- ref 202505227124- ti (n) non structural partitions, ceilings, finishes, and mep | $5,650,000 |
| Jun 4, 2025 | In progress | 1 Market St | Anderson, Rowe & Buckley, Inc. | exising fire sprinkler system - tenant improvements. 6 added and 3 relocated sprinkler on 33rd flr. 6 added and 3 relocated sprinkler on 34th flr. no work on 35th flr. ref#: 202501228840 | $8,400 |
| May 22, 2025 | In progress | 1 Market St | Gci, Inc | 17/f of spear tower. demol of existing non structural partitions, door, finishes, ceilings lighting and plumbing fixtures. construction of new non structural partitons, doors, finishes, ceiling, lighting, millwork and plumbing fixturs. corridor upgrades, elevator lobby. mep deferred. | $850,000 |
| May 22, 2025 | Completed | 55 Spear St | Gci, Inc | 38 and partial 37/fl- partial soft demo of 37th floor and all 38th floor for non structural work only for ab017. ti permit to come. | $190,000 |
| May 16, 2025 | Completed | 55 Spear St | Anderson, Rowe & Buckley, Inc. | as built-proper lot from 006 to 007 ref 202504285377 | |
| May 14, 2025 | Completed | 1 Market St | Gci, Inc | 37th fl: demo of (e) non strucutral partitions, doors & frames, finishes, ceiling, lighting & plumbing fixtures. construction of new non structural partitions, finishes, ceiling, lighting, millwork & plumbing fixtures. scope includes new rated corridor, elevator lobby and restroom upgrades. | $1,028,899 |
| May 9, 2025 | Completed | 55 Spear St | Dpr Construction A | for adminstrative purposes only. change of address from 1 market st to 55 spear st for pa #2025-0122-8840 (b/l 3713/007) | |
| May 7, 2025 | Completed | 1 Market St | M C S Construction Services | 12th deferred mechanical and electrical work tenant improvement project under architectural building pa 202412237318. no exterior work | $400,000 |
| Apr 28, 2025 | Completed | 55 Spear St | Dpr Construction A | for administrative purposes only, change of address from 1 market st to 55 spear st for pa# 202412166922 (revision to 202410102710, b/l 3713/007, 1 market st) & 202410102710 (t.i. for 35th level, b/l 3713/006, 1 market st) | |
| Apr 24, 2025 | Completed | 1 Market St | Siemens Industry, Inc. | 26thb - fire only work demolition project done under pa 202411215523 7 existing speaker/strobes are relocated | $6,730 |
| Apr 24, 2025 | Completed | 1 Market St | Siemens Industry, Inc. | 12b - fire only workfor the warburg pincus remodel. ref pa 202412237318. additions are 15 speakers/strobes, add 3 strobes | $21,480 |
| Apr 18, 2025 | In progress | 1 Market St | Skyline Construction | 25th fl: demolition of existing door and non structural partition in suite 2525. to demise suite from adjacent suite 2500 and combine with suite 2550. patch and repair existing ceiling and finishes as needed to match existing. demo of existing combination drinking fountain and bottle filler. | $13,190 |
| Apr 16, 2025 | Completed | 1 Market St | M C S Construction Services | 26th floor. new light fixtures at 26th floor space. interior work only. deferred electrical permit under main architectural bldg pa#: 202411215523 and 202503132220 | $23,950 |
| Mar 17, 2025 | Completed | 55 Spear St | Novo Construction Inc | interior tenant improvement on the 19th fl of approx 8000 sq ft. mech,ele, plumbing and structural included | $925,000 |
| Mar 13, 2025 | Completed | 1 Market St | revision 202411215523- admin to change scope of work to modify verbiage to state no break room in current scope | ||
| Jan 22, 2025 | Completed | 1 Market St | Dpr Construction A | interior ti of (n) communicating stair between levels 34 & 35 & (e) communicating stair between levels 33 & 34. new stair construction to include slab demo as well as finishes, lighting & fire safety. | $150,000 |
| Jan 21, 2025 | Completed | 1 Market St | Anderson, Rowe & Buckley, Inc. | 23rd & 24th flrs - admistrative permit - correct lot number only. fire pa#202209233043. | |
| Jan 21, 2025 | Completed | 1 Market St | Anderson, Rowe & Buckley, Inc. | 1st flr - admistrative permit - correct lot number only. fire pa#202304206077 r1. fire sprinkler system | |
| Jan 14, 2025 | In progress | 1 Market St | Field Construction Inc. | level 7-terrace: renovation of the level 7 existing northeast & southwest terrace connected to an existing building. the work will include nw constructions of pavilions, planters, and seating. the existing steuart street tower lobby finishes will also be renovated. mep & life safty under seperate. | $8,000,000 |
| Jan 2, 2025 | Completed | 1 Market St | Pioneer Fire Inc. | 26th floor; convert (131) pendents to uprights, relocate (11) pendents, remove (7) pendents. architectural building permit#2024-11215523 | $22,500 |
| Dec 23, 2024 | Completed | 1 Market St | M C S Construction Services | 12 floor; demolition of existing non-structural partitions, doors and frames, finishes, ceilings, lighting and millwork. ductwork, hvac and electrical to be pulled back to source. scope includes t.i. suite 1200. construction of new non-structural partitions, finishes, ceiling, plumbing fixtures, | $1,164,338 |
| Dec 17, 2024 | Completed | 1 Market St | Anderson, Rowe & Buckley, Inc. | b1, b2 as build 25 fewer fire sprinklers. existing fire sprinkler ref pa 202408219173 | |
| Dec 16, 2024 | Completed | 1 Market St | Dpr Construction A | 35th fl revision to 202410102710 to include minor partition changes, corresponding mep and needed structural beam penetration | $7,000 |
| Dec 10, 2024 | In progress | 1 Market St | Gci, Inc | 6th fl- demo of non structural partitions & construction of new rated demising partitions per previously discussed ab-005 | $12,000 |
| Nov 21, 2024 | Completed | 1 Market St | M C S Construction Services | 26th flr.demo of e non structural partitions, doors, frames, finishes, ceilings,lighting plumbijng fixtures.ductwork,hvac & elec to be pulled back to source and plumbing to be capped at source. construction of new non structural partions, finishes, ceiling, lighting, plumbing fixtures.scope incld: | $460,327 |
| Nov 12, 2024 | In progress | 1 Market St | Siemens Industry, Inc. | basement - fire only work to add 4 speaker/strobes and relocate 2 smoke detectors for the basement levels s1 elevator lobbies/b1 restrooms. ref pa 202405232787 | $4,565 |
| Oct 30, 2024 | Completed | 1 Market St | M C S Construction Services | b2/fl-ref 202405232787-deferred submision for ti electrical permit | $5,000 |
| Oct 11, 2024 | Completed | 1 Market St | M C S Construction Services | deferred electrical permit for interior improvement project under pa # 202405222665/202409120646 b1 level. | $165,000 |
| Sep 12, 2024 | Completed | 1 Market St | M C S Construction Services | revision to 202405222665. remove ceiling in the parking garage. | |
| Aug 21, 2024 | Completed | 1 Market St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler systems, tenant improvements. b1-23 added and 10 relocated sprinklers. b2- 4 relocated sprinklers. b1-remove 2 fire hose racks | $24,000 |
| Aug 21, 2024 | Completed | 1 Market St | Golden Gate Fire Protection Inc | basement - raise and relocate sprinkler lines and fdc pipe for new bike racks. ref pa 202405232787 | $5,500 |
| Aug 2, 2024 | Completed | 1 Market St | Siemens Industry, Inc. | floor 12b/15b. fire only work for the corridor remodels on floors 12b and 15b; additions are 12 speaker/strobes and 1 strove, as well as the relocation of 4 smoke detectors and 2 pull stations. ref pa 202310279620 and 202310279621 | $12,155 |
| Jul 18, 2024 | In progress | 98 Mission St | Golden Gate Sign Company Inc. | revised attachment detail for entry canopy "b". ref permit 202402266505 | |
| May 23, 2024 | Completed | 1 Market St | M C S Construction Services | basement level: demolition of existing ramps, bike ramps, finishes, ceilings, and light fixtures. construction of new finishes, ceiling and light fixtures. no exterior work to occur. | $300,000 |
| May 22, 2024 | Completed | 1 Market St | M C S Construction Services | demo of the valet booth in an existing valet parking garage. refresh of existing elevator lobby to the parking garage. finish and lighting upgrade in accessbiel restrooms. new scope of work includes new valet booth, accessible passanger drop off and loading zone, finishes, ceiling, lighting and mill | $700,000 |
| May 16, 2024 | In progress | 1 Market St | Pioneer Fire Inc. | ti 202310279620-15/fl - fire only to relocate (22) pendents | $3,300 |
| May 16, 2024 | Completed | 1 Market St | Pioneer Fire Inc. | ti 202310279621-12/fl - fire only to relocate (16) pendents | $2,400 |
| May 9, 2024 | Completed | 1 Market St | Field Construction Inc. | 15th fl - lighting & power. ref permit 202310279620 | $55,000 |
| May 9, 2024 | Completed | 1 Market St | Field Construction Inc. | 12/f: lighting and power. ref pa# 202310279621 | $75,000 |
| Mar 25, 2024 | In progress | 55 Spear St | per historical record, add address 55 spear st to apn 3713/007. | ||
| Mar 18, 2024 | Completed | 1 Market St | Golden Gate Fire Protection Inc | relocate 98 upright sprinklers on the 35/f. | $24,115 |
| Mar 7, 2024 | Completed | 1 Market St | Skyline Construction | revision to 202207208907. revised to t-24 inspection forms to have special inspection requirement abrogated | |
| Feb 29, 2024 | Completed | 1 Market St | Hitt Contracting Inc. | 35/f: interior demo to existinng office space. demo space to include demo of non load bearing partitions, ceiings, millwork and finishes, fire and life safety to remain operational during course of construction. modification to mech and plumbing systems shall allow existing base bldg infrasturre to | $50,000 |
| Feb 26, 2024 | In progress | 98 Mission St | Golden Gate Sign Company Inc. | erect electric single face wall sign sign c (stk) | $10,000 |
| Feb 26, 2024 | In progress | 98 Mission St | Golden Gate Sign Company Inc. | erect electric projecting double face sign e1 & e2 (stk steak house) | $20,000 |
| Feb 26, 2024 | In progress | 98 Mission St | Golden Gate Sign Company Inc. | erect electric projecting single face sign a (stk) | $10,000 |
| Feb 26, 2024 | In progress | 98 Mission St | Golden Gate Sign Company Inc. | entry canopy/awning for sign support b | $15,000 |
| Jan 16, 2024 | Completed | 1 Market St | Siemens Industry, Inc. | 25b/f: fire only work,for the restrooms remodel, 2 speaker/strobes are added. ref pa# 202310068155. | $1,922 |
| Dec 6, 2023 | In progress | 1 Market St | Field Construction Inc. | electrical power & lighting ref to 202310068155 | $75,000 |
| Nov 15, 2023 | In progress | 1 Market St | O C Mc Donald Co Inc | 3rd/f: remove an (e) water sourced heat pump (24000 btu) replace w/ 1 (36000 btu) water sourced heat pump | $74,000 |
| Nov 13, 2023 | Completed | 1 Market St | Siemens Industry, Inc. | fire alarm work for the parnassus remodel on flr 16b, addition of 6 smoke detectors, 2 modules, 1 strobe power supply, 30 speaker/strobes, 12 strobes and the relocation of 2 smoke detector. ref permit 202305016775 | $47,980 |
| Oct 27, 2023 | Completed | 1 Market St | Field Construction Inc. | 12th fl, steuart tower - demo of (e) non-structural partitions, doors & frmaes, finishes, ceiling, lighting and plumbing fixtures; construction of new non-structural partitions, finishes, ceiling lighting; scope includes corridor and elevator lobby upgrades. no exterior work to occur. | $225,000 |
| Oct 27, 2023 | Completed | 1 Market St | Field Construction Inc. | 15th fl, steuart tower - demo of (e) non-structural partitions, doors & frmaes, finishes, ceiling, lighting and plumbing fixtures; construction of new non-structural partitions, finishes, ceiling lighting and plumbing fixtures; scope includes restroom accessibility upgrades, corridor and elevator. | $225,000 |
| Oct 10, 2023 | In progress | 1 Market St | Skyline Construction | revision to 202207208954 (deferred mep for 202207118174). | |
| Oct 6, 2023 | Completed | 1 Market St | Field Construction Inc. | demolition of (e) non-structural restroom partitions, doors & frames, finishes, ceiling, lighting and plumbing fixtures. construction of new resroom non-structural partions, finishes, ceiling, lighting and plumbing fixtures. scope includes restroom, drinking fountain accessibility upgrades. no | $163,000 |
| Sep 20, 2023 | Completed | 1 Market St | Anderson, Rowe & Buckley, Inc. | (e) fire sprinkler system tenant improvements - 9 sprinklers | $8,500 |
| Aug 25, 2023 | Completed | 1 Market St | Paganini Electric Corp(See Signatories) | install 2 life safety 2 way communication sytem call stations. add to existing system. | $20,000 |
| Aug 10, 2023 | Completed | 1 Market St | Gci, Inc | 42/f: mechanical-revision to add new water source heat pump & associated ductwork, (2) new vav boxes, controls for new hvac, ref pa# 202201276745. | $180,000 |
| Aug 8, 2023 | Completed | 1 Market St | Skyline Construction, Clune Construction Company L P | 1/f: modification of (e) bank, no area or height work in scope, remove (e) exterior atms/night depository, restore windows to original condition. no change in use/occupancy/additional added building area. | $120,000 |
| Aug 2, 2023 | Completed | 1 Market St | Novo Construction Inc | 17/f: revision to bpa#202212218864, phone booths in code plan w/required signage. | $500 |
| Jul 26, 2023 | Completed | 1 Market St | Skyline Construction, Clune Construction Company L P | remove existing vault and furniture. partially remove wall that encloses the exiting vault. provide new wall to its existing location. ab-017 demo. tenant space to be went | $30,000 |
| Jul 19, 2023 | Completed | 1 Market St | Skyline Construction | revision to 202207118174 alteration to (e) office buit out on 24th fl, change interior layout. no change in use or exterior, area remains b | |
| Jul 13, 2023 | Completed | 1 Market St | Gci, Inc | 16/f: mechanical-ductwork,new vav boxes, supplemental heat pump ddc controls upgrade, air balance, replace induction units; electrical- new lighting & branch circuiting to existing panel, new power and signal, title 24, ref pa# 202305016775. | $1,200,000 |
| Jul 6, 2023 | Never finaled | 1 Market St | Siemens Industry, Inc. | fire only work for the fintness center on fl. 1 additons and 1 duct detector 1 module, 5 speaker/strobes, and 11 strobes, ref pa# 2023-0120-0509 | $14,915 |
| May 15, 2023 | Completed | 1 Market St | Siemens Industry, Inc. | 39a/f:fire only work for the "gic" remodel, additions are 5 smoke detectors, 3 modules, 1strobe power supply, 37 speaker/strobes, 25 strobes, as well as the relocation of 5 smoke detectors. ref pa# 202211307363 | $62,660 |
| May 1, 2023 | Completed | 1 Market St | Gci, Inc | 16/f: commercial ti to include selective demo and construction of non structural partitions, ceilings, finishes, equipment. mep and fire sep permit | $4,800,000 |
| May 1, 2023 | Completed | 1 Market St | Siemens Industry, Inc. | 17b/f: addition of 7-smoke detectors, 2-modules, 1-strobe power supply, 34-speaker/strobes, 12-strobes, as well as the relocation of 6-smoke detectors and 1-duct detector, ref pa# 202211075982 | $52,584 |
| Apr 13, 2023 | Completed | 1 Market St | Skyline Construction | 39/f: revision to bpa#202211307363 for structural work associated w/proposed nana wall in lieu of modem fold wall | |
| Apr 11, 2023 | Completed | 1 Market St | Paganini Electric Corp(See Signatories) | 39th flr - furnish and install 2 fire life safety 2-way communication call stations. ref 201605258242. | $23,000 |
| Mar 22, 2023 | Completed | 1 Market St | Skyline Construction | deferred mep for issued pa# 2023-0120-0509 | $700,000 |
| Mar 16, 2023 | Completed | 1 Market St | Anderson, Rowe & Buckley, Inc. | 39/f: fire sprinkler only. ref fire permit 202302131842. remove all wet pipe and devices in computer/it room. fm 206 to be installed on separate permit (nic - to be protect by other) | |
| Mar 9, 2023 | Never finaled | 1 Market St | Siemens Industry, Inc. | fire only work to obtain a permit to document the specific fsd/fan unit smoke control sequence for floor 36a only. ref pa 2022-1018-4554 (mechanical) | |
| Feb 14, 2023 | Completed | 1 Market St | Intelligent Technologies & Services Inc | 39/flr computer room: supply & install a complete novec detection & control system, fire suppression system | $39,200 |
| Feb 13, 2023 | Completed | 1 Market St | Anderson, Rowe & Buckley, Inc. | 39/f: fire sprinkler only. relocate 149 pendents and add 14 pendents. relocate 9 uprights. remove/plug off 15 pendents, for gic on the 39/f. (spear tower) | $101,000 |
| Feb 10, 2023 | Completed | 1 Market St | Siemens Industry, Inc. | fire only work for the "citigroup" remodel on floor 40a; additons are 8 smoke detectores, 4 modules, 1 speaker, 39 speaker/strobes, and 20 strobes, as well as the relocation of 7 smoke detectors | $58,854 |
| Feb 2, 2023 | Never finaled | 1 Market St | Paganini Electric Corp(See Signatories) | add 2 way communication call station on the 17th fl | $22,500 |
| Feb 2, 2023 | Completed | 1 Market St | Paganini Electric Corp(See Signatories) | add 2 way communication cell stations on the 23rd fl | $21,262 |
| Feb 2, 2023 | Completed | 1 Market St | Paganini Electric Corp(See Signatories) | add 2 way communication station on the 24th fl | $21,262 |
| Jan 20, 2023 | Completed | 1 Market St | Skyline Construction | fitness center for building tenant, not for general public use, build out on level 1 new locker rooms and bathrooms to comply with d.a. checklist requirements, no change in use or exterior scope. no pool, spa & juice bar | $3,000,000 |
| Dec 30, 2022 | Completed | 1 Market St | Skyline Construction | 39/f: deferred mep permit for 202211307363. | |
| Dec 21, 2022 | Completed | 1 Market St | Novo Construction Inc | 17th/f: mech & electrical & plumbing for t.i. 202211075982 | $750,000 |
| Nov 30, 2022 | Completed | 1 Market St | Skyline Construction | 39/f: tenant improvement work includes non-structural interior partitions, doors, fixtures and finishes. mep deferred. annual assembly permits required for (2) expandable rooms. | $2,160,000 |
| Nov 8, 2022 | Completed | 1 Market St | Gci, Inc | mechanica install 2 water source heat pump, install 1 circulation pump, modify ductwork for e vavss. elec, power, lighting | $150,000 |
| Nov 7, 2022 | Completed | 1 Market St | Novo Construction Inc | 17/f: t.i., nonstructural demo, build-out of new reception area, open office, enclosed offices, & meeting rooms. mep under separate permit. | $900,000 |
| Oct 25, 2022 | Completed | 1 Market St | Golden Gate Fire Protection Inc | 40th fl: fire sprinkler ti. relocate 106 pendent sprinklers and 55 uprights. new 1.5" pre-action valve. ref pa# 202201266664 & 202204132112. | $84,525 |
| Oct 18, 2022 | Never finaled | 1 Market St | Gci, Inc | 36th fl: vrf & erv system shall operate in smoke control mode along w/ building supply & return air system. ref pa #202201316997 | $20,000 |
| Oct 5, 2022 | Completed | 1 Market St | Siemens Industry, Inc. | floor 36a: fire only for the "citigroup" remodel; addition are 3 smoke detectors, 1 module, 2 duct detectors, 1 strobe power supply, 1 speaker, 36 speaker/strobes, 24 strobes, as well as the relocation of 6 smoke detectors. ref pa#202201316997 | $43,200 |
| Sep 22, 2022 | Completed | 1 Market St | Siemens Industry, Inc. | fire only work or the "spec suite 1050" remodel on floor 10b; additon are 2 speaker/strobes and 1 strobe, ref pa# 2022-0307-9332 | $1,810 |
| Sep 14, 2022 | Never finaled | 1 Market St | Siemens Industry, Inc. | fire only work for citigroup remodel on 42/f: additions 3 smoke detectors, 2 modules, 1 strobe power supply, 1 speaker, 30 speaker/strobe, 20 strobes, as well as the relocation of 6 smoke detectors, ref 202201276745 | $28,200 |
| Sep 12, 2022 | Completed | 1 Market St | Siemens Industry, Inc. | fire only work for the "city group: remodel on floor 41a; additons are 3 smoke detectors, 2 modules, 14 speaker/strobes and 13 strobes, ref pa# 202111232986 | $18,750 |
| Sep 8, 2022 | Completed | 1 Market St | Field Construction Inc. | 10th fl: hvac modification and interior tenant mino lighting updates. t.i. arch work under separate permit. ref pa# 202208110346 | $199,000 |
| Aug 11, 2022 | Completed | 1 Market St | Field Construction Inc. | suite 1050: rev to pa202203079332 - layout changes. no structural work. | |
| Jul 28, 2022 | Never finaled | 98 Mission St | Golden Gate Sign Company Inc. | installation of (7) non illuminated blank painted panels to replace existing panels. 4'-5"x23'-7" ea. | $10,000 |
| Jul 28, 2022 | Never finaled | 98 Mission St | Golden Gate Sign Company Inc. | install (1) c4 illuminated logo sign, install (2) d/f internally illuminated blad sign. install (2) illuminated signs on interior. electrical permit only. | $20,000 |
| Jul 28, 2022 | Never finaled | 98 Mission St | Golden Gate Sign Company Inc. | install (1) c4 illuminated logo sign, install (2) d/f internally illuminated blad sign. install (2) illuminated signs on interior. electrical permit only. | $5,000 |
| Jul 22, 2022 | Completed | 1 Market St | Paganini Electric Corp(See Signatories) | 40st/fl: install 2 2-way communication cell stations | $21,525 |
| Jul 22, 2022 | Completed | 1 Market St | Paganini Electric Corp(See Signatories) | 36th/fl: install 2 2-way communication cell stations | $21,525 |
| Jul 22, 2022 | Completed | 1 Market St | Paganini Electric Corp(See Signatories) | 42nd/fl: install 2 2-way communication cell stations | $21,525 |
| Jul 20, 2022 | Completed | 1 Market St | Skyline Construction | mep for bpa#202207118174. | |
| Jul 11, 2022 | Completed | 1 Market St | Skyline Construction | corporate office build-out on level 24: installation of a new 1 hour corridor between exit stair esntrances. demolition and remodel of extg core restrooms to comply with da checklist requirements. | $4,000,000 |
| Jul 5, 2022 | Completed | 1 Market St | Skyline Construction | corporate office build out level 23. installation of new 1 hour corridor between exist stair entrances. demo and remodel existing core restrooms to comly with da checklist requirements. no change in use or exterior scope, area remains business | $10,000,000 |
| Jun 7, 2022 | Never finaled | 1 Market St | R L H Fire Protection Inc | fire sprinkler t.i. (8) relocated and (1) deleted pendent sprinkler heads re permit# 2022-0426-3002 | $2,000 |
| Jun 6, 2022 | Completed | 1 Market St | Golden Gate Fire Protection Inc | 39th fl: fire sprinkler demo. 2 heads under stairs on 39th fl. add 2 upright sprinklers on the 39th fl. for stair infill | $2,000 |
| May 31, 2022 | Never finaled | 1 Market St | Golden Gate Fire Protection Inc | 41st fl - fire sprinklers - relocate 56 pendent sprinklers and relocate 21 uprights. ref pa 2021-1123-2986 | $40,425 |
| May 11, 2022 | Completed | 1 Market St | Skyline Construction | 23rd + 24th fl: demolition of an (e) connecting stair & slab infill betweeen 23rd & 24th fl. install (n) 1-hr corridor between exit stair entrances. modification to (e) core restrooms to comply with da checklist requirements. no change in use or exterior scope. | $500,000 |
| May 10, 2022 | Completed | 1 Market St | Skyline Construction | 23/f-24/f: demo of interior non-bearing wall partitions, doors, light fixtures, flor finishes and plumbing fixtures. no change in use or exterior scope, the area remains business. maher n/a. ab-017 applies | $128,000 |
| Apr 29, 2022 | Completed | 1 Market St | Golden Gate Fire Protection Inc | 36th fl: fire sprinklers - relocate 111 pendent sprinklers & relocate 80 uprights. ref pa# 202201316997 | $90,250 |
| Apr 26, 2022 | Completed | 1 Market St | R L H Fire Protection Inc | 10th fl fire sprinkler tenant improvement. 8 relocated and 2 deleted pendent heads. ref pa# 202203079332 | $4,150 |
| Apr 14, 2022 | Completed | 1 Market St | Siemens Industry, Inc. | fl 10b: fire only work for the corridor/lobby remodel on fl 10b. 2 smoke detectors, 7 speaker/strobes, and 2 strobes are added, as well as the relocation of 6 smoke detectors. ref pa# 202110190764. | $8,700 |
| Apr 14, 2022 | Completed | 1 Market St | Siemens Industry, Inc. | fl 10b: fire only work for the state street capital remodel on fl 10b. 2 smoke detectors, 9 speaker/strobes, and 3 strobes are added, as well as the relocation of 2 smoke detectors & 1 speaker/strobe. ref pa# 202112104147 | $9,250 |
| Apr 13, 2022 | Never finaled | 1 Market St | Golden Gate Fire Protection Inc | 42nd fl: fire sprinklers. relocate 117 pendent sprinklers and relocate 57 uprights. new 1.5 pre-action. ref pa# 202201276745. | $91,350 |
| Mar 31, 2022 | Completed | 1 Market St | Golden Gate Fire Protection Inc | 10/f: fire sprinklers. relocate 56 pendent sprinklers. ref ti permit 202203079332. | $29,400 |
| Mar 7, 2022 | Completed | 1 Market St | Field Construction Inc. | 10th fl: demolition of (e) non-structural partitions, doors & frames, gyp board ceiling, lighting, millwork & finishes. construction of (n) non-structural partitions, act ceiling, lighting, millwork & finishes. | $600,000 |
| Feb 1, 2022 | Completed | 1 Market St | Pioneer Fire Inc. | as-built fire sprinklers for pa 202111222851. maher n/a | |
| Jan 31, 2022 | Completed | 1 Market St | Gci, Inc | 36th floor: t.i. to include demo of non-structural partitions, lighting, power and data. construction of new non-load bearing partitions. new mep and structural work incl 6 new fsds. fire alarm and sprinkler under separate permits. | $2,615,022 |
| Jan 27, 2022 | Completed | 1 Market St | Gci, Inc | 42/f: tenant improvement to include demo of non structural partitions, lighting, power and data. new ceilings and lighting. new mep. new all gender restrooms and structural work. | $2,615,022 |
| Jan 26, 2022 | Completed | 1 Market St | Gci, Inc | 40th fl - interior ti, demo non-structural partition & lighting. new non-structural load bearing partitions, suspended ceilings & lighting, new mech throughout, new plumbing & break rooms; mother's room, new data cabling and av | $2,615,022 |