Block 3713, lot 007
55 Spear St
- City’s use
- Commercial Office
- Built
- 1979
- Stories
- 43
- Building
- 1,534,312 sq ft
- Lot
- 113,198 sq ft
- Zoning
- C3O
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 23, 2026 | In progress filed Oct 2026, not yet issued | 1 Market St | 1 market plaza aka 55 spear st 6/f: full floor office t.i. on the 6th floor. including construction of open offices, meeting rooms and break rooms. structural includes anchoring of phone booths and partial height walls.Details
1 market plaza aka 55 spear st 6/f: full floor office t.i. on the 6th floor. including construction of open offices, meeting rooms and break rooms. structural includes anchoring of phone booths and partial height walls. | $7,997,440 | |
| Oct 21, 2026 | In progress issued Oct 2026 | 55 Spear St | Source Planning And Construction Inc | b1: demolition of (e) non-structural partitions. doors & frame, finishes, ceiling, lighting & plumbing fixtures. construction of new non-structural partitions, finishes, ceiling, lighting & plumbing fixtures. scope includes restrooms & locker room upgrades.Details
b1: demolition of (e) non-structural partitions. doors & frame, finishes, ceiling, lighting & plumbing fixtures. construction of new non-structural partitions, finishes, ceiling, lighting & plumbing fixtures. scope includes restrooms & locker room upgrades. | $650,000 |
| Oct 21, 2026 | In progress issued Oct 2026 | 55 Spear St | Source Planning And Construction Inc | grd fl: plumbing fixtures. new mail room and bike roomDetails
grd fl: plumbing fixtures. new mail room and bike room | $800,000 |
| Oct 8, 2026 | In progress issued Oct 2026 | 55 Spear St | Skyline Construction | levels 8,9, and 10 revision to 202608317423, 202608317425 202608317426 for revised phone booth location, additon/relocation of existing power and furniture layoutDetails
levels 8,9, and 10 revision to 202608317423, 202608317425 202608317426 for revised phone booth location, additon/relocation of existing power and furniture layout | |
| Oct 7, 2026 | In progress issued Oct 2026 | 55 Spear St | Skyline Construction | 28th ti non structural partitions, ceilings, lighting and associated mepDetails
28th ti non structural partitions, ceilings, lighting and associated mep | $1,800,000 |
| Sep 25, 2026 | In progress filed Sep 2026, not yet issued | 1 Market St | 7th fl - interior renovation of approx 4000 sq of level 7 amenity space at 1 market plaza. work includes a (n) updated tenant amenities including lounges & a study roomDetails
7th fl - interior renovation of approx 4000 sq of level 7 amenity space at 1 market plaza. work includes a (n) updated tenant amenities including lounges & a study room | $568,000 | |
| Sep 10, 2026 | In progress filed Sep 2026, not yet issued | 55 Spear St | revision to pa #202512101423. remove one phone bootrh | ||
| Sep 3, 2026 | Expired or cancelled suspend Nov 2026 | 1 Market St | Hathaway Dinwiddie Co. | 6/fl- soft demo of (e) non structural partitions, finishes, lighting celiings, millwork, and plumbing fixtures ab-17Details
6/fl- soft demo of (e) non structural partitions, finishes, lighting celiings, millwork, and plumbing fixtures ab-17 | $512,352 |
| Sep 2, 2026 | In progress filed Sep 2026, not yet issued | 1 Market St | 1st fl - interior renovation and fitout of approx. 26,480sf commercial kitchen, bar, grab-and-go, and seating areas. mep and kitchen/food service drawings under separate permit. no change of use. structural drawings included.Details
1st fl - interior renovation and fitout of approx. 26,480sf commercial kitchen, bar, grab-and-go, and seating areas. mep and kitchen/food service drawings under separate permit. no change of use. structural drawings included. | $3,760,160 | |
| Aug 31, 2026 | In progress issued Sep 2026 | 55 Spear St | Skyline Construction | 8/fl- ti to include paint, finishes, and (n) phone boothsDetails
8/fl- ti to include paint, finishes, and (n) phone booths | $200,000 |
| Aug 31, 2026 | In progress issued Oct 2026 | 55 Spear St | Skyline Construction | 29th floor: non-structural partitions, ceiling, lighting & mep &mep. (e) convenience stair to be re-finish.Details
29th floor: non-structural partitions, ceiling, lighting & mep &mep. (e) convenience stair to be re-finish. | $3,646,268 |
| Aug 31, 2026 | In progress issued Sep 2026 | 55 Spear St | Skyline Construction | 10/fl- ti to include paint, finishes, and (n) phone boothsDetails
10/fl- ti to include paint, finishes, and (n) phone booths | $150,000 |
| Aug 31, 2026 | In progress issued Oct 2026 | 55 Spear St | Gci, Inc | 37th floor partial ti. non structural partitions, ceilings, finishes+ associated mechanical + electrical.Details
37th floor partial ti. non structural partitions, ceilings, finishes+ associated mechanical + electrical. | $2,000,000 |
| Aug 31, 2026 | In progress issued Sep 2026 | 55 Spear St | Skyline Construction | 9/fl- ti to include paint, finishes, and (n) phone boothsDetails
9/fl- ti to include paint, finishes, and (n) phone booths | $200,000 |
| Aug 25, 2026 | In progress issued Nov 2026 | 55 Spear St | Field Construction Inc. | 7th fl: demo of (e) non-structural partitions, doors and frames, finishes, ceilings, lighting and plumbing fixtures. ductwork, hvac and electrical to be pulled back to source and plumbing to be capped. construction of new non-structural partitions, finishes, ceiling,lighting and plumbing fixDetails
7th fl: demo of (e) non-structural partitions, doors and frames, finishes, ceilings, lighting and plumbing fixtures. ductwork, hvac and electrical to be pulled back to source and plumbing to be capped. construction of new non-structural partitions, finishes, ceiling,lighting and plumbing fix | $450,000 |
| Aug 18, 2026 | In progress issued Sep 2026 | 55 Spear St | Dpr Construction A | demolition of 5th and 6th floor communicating stair to intermediary landing, floor infill at openning and restroom upgrades. no hvac or electrical modifications.Details
demolition of 5th and 6th floor communicating stair to intermediary landing, floor infill at openning and restroom upgrades. no hvac or electrical modifications. | $350,000 |
| Aug 17, 2026 | In progress issued Sep 2026 | 55 Spear St | Source Planning And Construction Inc | 18th floor: revision to bpa: 202606032408 room 18-009/ pantry and finishes to single sex rr was deferred. adressing architectural set and corresponding meps for this review.Details
18th floor: revision to bpa: 202606032408 room 18-009/ pantry and finishes to single sex rr was deferred. adressing architectural set and corresponding meps for this review. | $37,488 |
| Aug 3, 2026 | In progress issued Aug 2026 | 55 Spear St | Gci, Inc | 37th floor: interior non-structural demolition only. ab017Details
37th floor: interior non-structural demolition only. ab017 | $91,700 |
| Jul 29, 2026 | In progress issued Aug 2026 | 55 Spear St | Bcci Construction Company | administrative permit w/o plans to document pa # 202603046914 being performed on block 3713 & lot 007Details
administrative permit w/o plans to document pa # 202603046914 being performed on block 3713 & lot 007 | |
| Jul 22, 2026 | In progress issued Aug 2026 | 55 Spear St | Skyline Construction | l30-l31 demo (e) slab for (n) opening for interconnecting stair between l30 & l31 (n) finishes, structural, platform landingDetails
l30-l31 demo (e) slab for (n) opening for interconnecting stair between l30 & l31 (n) finishes, structural, platform landing | $715,000 |
| Jul 15, 2026 | In progress filed Jul 2026, not yet issued | 1 Market St | 1st fl: interior oly tenant improvement to construct new fitness center. mep deferred.Details
1st fl: interior oly tenant improvement to construct new fitness center. mep deferred. | $1,363,200 | |
| Jul 10, 2026 | Completed final sign-off Oct 2026 | 1 Market St | Field Construction Inc. | to obtain final inspection for work approved under pa# 202410243673. all work is complete.Details
to obtain final inspection for work approved under pa# 202410243673. all work is complete. | |
| Jul 9, 2026 | In progress issued Jul 2026 | 1 Market St | Gci, Inc | 28th floor: electrical-new power, lighting and signal. ref pa #202604149423.Details
28th floor: electrical-new power, lighting and signal. ref pa #202604149423. | $27,000 |
| Jun 29, 2026 | In progress issued Jun 2026 | 55 Spear St | Source Planning And Construction Inc | 17th fl structural for high density files. ref 202606032446Details
17th fl structural for high density files. ref 202606032446 | |
| Jun 25, 2026 | In progress issued Jul 2026 | 55 Spear St | Skyline Construction | 29th floor: interior non-structural demolition on the 29th floor. ab017Details
29th floor: interior non-structural demolition on the 29th floor. ab017 | $45,000 |
| Jun 24, 2026 | In progress issued Jul 2026 | 1 Market St | Field Construction Inc. | 25th fl - deferred electrical under pa 202604149378 includes new lighting & branch circuiting; new power & signal & branch circuiting to existing panelDetails
25th fl - deferred electrical under pa 202604149378 includes new lighting & branch circuiting; new power & signal & branch circuiting to existing panel | $150,000 |
| Jun 9, 2026 | In progress issued Aug 2026 | 1 Market St | Gci, Inc | 28th fl - mechanical demo of mech systems: install 2 novo vav boxes , new fsd's reference: 202604149423Details
28th fl - mechanical demo of mech systems: install 2 novo vav boxes , new fsd's reference: 202604149423 | $15,000 |
| Jun 3, 2026 | In progress issued Jun 2026 | 55 Spear St | Source Planning And Construction Inc | spear street tower, 17th flr: t.i. selected demo of remaining soffite and partitions, primary demo under 202603137532. new construction will consist of new partitions and doors, ceilings, light fixtures and electrical distribution. meps.Details
spear street tower, 17th flr: t.i. selected demo of remaining soffite and partitions, primary demo under 202603137532. new construction will consist of new partitions and doors, ceilings, light fixtures and electrical distribution. meps. | $2,199 |
| Jun 3, 2026 | In progress issued Jun 2026 | 55 Spear St | Source Planning And Construction Inc | 18f t.i: demo done under permit. new partitons & doors, ceilings, lights, el distribution. mep included. including structural work. n unisex accessible toilet. see coversheet for cope. deffered submittal: fire alarm, fire sprinklers, network anchor + health review at pantry.Details
18f t.i: demo done under permit. new partitons & doors, ceilings, lights, el distribution. mep included. including structural work. n unisex accessible toilet. see coversheet for cope. deffered submittal: fire alarm, fire sprinklers, network anchor + health review at pantry. | $3,279,000 |
| Jun 3, 2026 | In progress issued Aug 2026 | 1 Market St | Field Construction Inc. | 28th floor: demolition of 27th and 28th floor communicating stair to intermidiary landing and floor infill at opening in an existing unoccupied space. no hvac or electrical modifications.Details
28th floor: demolition of 27th and 28th floor communicating stair to intermidiary landing and floor infill at opening in an existing unoccupied space. no hvac or electrical modifications. | $150,000 |
| May 19, 2026 | Completed final sign-off Sep 2026 | 55 Spear St | Source Planning And Construction Inc | 16th fl: mechanical & electrical for 202604169572(aka one market plaza spear tower)Details
16th fl: mechanical & electrical for 202604169572(aka one market plaza spear tower) | $150,000 |
| May 14, 2026 | In progress issued Jun 2026 | 1 Market St | Field Construction Inc. | 25/f: ref# 202604149378 - mech: demo all mech system. install 2 (n) vav boxes to supplort ventilation and temp controls.Details
25/f: ref# 202604149378 - mech: demo all mech system. install 2 (n) vav boxes to supplort ventilation and temp controls. | $50,000 |
| May 1, 2026 | In progress filed May 2026, not yet issued | 1 Market St | Field Construction Inc. | ev charging station - basement level garage. restriping and add 4 ev charging stations. electrical and structural.Details
ev charging station - basement level garage. restriping and add 4 ev charging stations. electrical and structural. | $300,000 |
| Apr 28, 2026 | Completed final sign-off Oct 2026 | 55 Spear St | Metropolitan Electrical Construction | floor 13b, fire only work to add two 2-way comm stations on floor 13b (stewart tower) at the passsenger and freight elevator lobbies. no permit app#: since no remodel work being done.Details
floor 13b, fire only work to add two 2-way comm stations on floor 13b (stewart tower) at the passsenger and freight elevator lobbies. no permit app#: since no remodel work being done. | $12,008 |
| Apr 23, 2026 | In progress issued Jul 2026 | 55 Spear St | Skyline Construction | level 31 ti new non structural partitions, mep, finishes. demo under 202604018733. no exterior or structural work.Details
level 31 ti new non structural partitions, mep, finishes. demo under 202604018733. no exterior or structural work. | $8,250,000 |
| Apr 23, 2026 | In progress issued Jun 2026 | 55 Spear St | Skyline Construction | 30th fl - ti (n) non-structural partitions, mep, finishes. demo under pa 202604018733. no exterior or structural workDetails
30th fl - ti (n) non-structural partitions, mep, finishes. demo under pa 202604018733. no exterior or structural work | $9,052,500 |
| Apr 16, 2026 | Completed final sign-off Sep 2026 | 55 Spear St | Source Planning And Construction Inc | 16/fl- demolition of existing non structural partitions, doors, and frames, finishes, ceilings, lighting, plumbing fixtures. duct work havac and elec to be pulled back to source and plumbing to be caped at source. construction of new non strurctural partitions, finishes, ceiling, lighting,plumbingDetails
16/fl- demolition of existing non structural partitions, doors, and frames, finishes, ceilings, lighting, plumbing fixtures. duct work havac and elec to be pulled back to source and plumbing to be caped at source. construction of new non strurctural partitions, finishes, ceiling, lighting,plumbing | $1,000,000 |
| Apr 16, 2026 | In progress filed Apr 2026, not yet issued | 55 Spear St | 4th floor tenant improvement, demolition of existing non-partitions, doors, frames, finishes, ceilings, lighting and plumbing fixtures. ductwork, hvac and electrical to be pulled back to source and plumbing to be capped at source. construction of new non-structural partitions, finishes, ceiling,Details
4th floor tenant improvement, demolition of existing non-partitions, doors, frames, finishes, ceilings, lighting and plumbing fixtures. ductwork, hvac and electrical to be pulled back to source and plumbing to be capped at source. construction of new non-structural partitions, finishes, ceiling, | $1,500,000 | |
| Apr 16, 2026 | In progress filed Apr 2026, not yet issued | 55 Spear St | 4th flr - demo of (e) non-structural partitions, doors & frames, finishes, ceilings, lighting and plumbing fixtures; ductwork, hvac and electrical to be pulled back to source and plumbing to be capped @ source. construction of (n) non-structural partitions finishes, ceiling, lighting and plumbingDetails
4th flr - demo of (e) non-structural partitions, doors & frames, finishes, ceilings, lighting and plumbing fixtures; ductwork, hvac and electrical to be pulled back to source and plumbing to be capped @ source. construction of (n) non-structural partitions finishes, ceiling, lighting and plumbing | $1,500,000 | |
| Apr 16, 2026 | In progress filed Apr 2026, not yet issued | 1 Market St | floors: 31st to 43rd: installation of a 6 inch cold water riser between 31st-43rd story steel framed office towerDetails
floors: 31st to 43rd: installation of a 6 inch cold water riser between 31st-43rd story steel framed office tower | $26,000 | |
| Apr 14, 2026 | In progress issued Apr 2026 | 55 Spear St | Gci, Inc | 28th fl - demo of (e) non-structural partitions, doors & frames, finishes, ceilings, lighting and plumbing fixtures; ductwork, hvac and electrical to be pulled back to source and plumbing to be apped @ source. construction of (n) non-structural partitions finishes, ceiling, lighting and plumbingDetails
28th fl - demo of (e) non-structural partitions, doors & frames, finishes, ceilings, lighting and plumbing fixtures; ductwork, hvac and electrical to be pulled back to source and plumbing to be apped @ source. construction of (n) non-structural partitions finishes, ceiling, lighting and plumbing | $1,000,000 |
| Apr 14, 2026 | In progress issued Apr 2026 | 55 Spear St | Field Construction Inc. | 25/f: demolition of (e) non-structural partitions, doors & grames, finishes, ceilings, lighting and plumbing fixtures. ductwork, hvac & electrical to be pulled back to source. and plumbing to be capped at source. construction of new non-structural partitions,Details
25/f: demolition of (e) non-structural partitions, doors & grames, finishes, ceilings, lighting and plumbing fixtures. ductwork, hvac & electrical to be pulled back to source. and plumbing to be capped at source. construction of new non-structural partitions, | $1,000,000 |
| Apr 8, 2026 | In progress issued Jun 2026 | 1 Market St | Otte North America Inc | exterior building maintanence unit replacement of existing. scope includes installation of anchor points on the roods of two office towers at spear and tower steuart.Details
exterior building maintanence unit replacement of existing. scope includes installation of anchor points on the roods of two office towers at spear and tower steuart. | $449,000 |
| Apr 1, 2026 | In progress issued Apr 2026 | 55 Spear St | Skyline Construction | floors 30 & 31: demo only, non-structural partitions, ceiling,finished, mep, ab-17Details
floors 30 & 31: demo only, non-structural partitions, ceiling,finished, mep, ab-17 | $382,005 |
| Apr 1, 2026 | In progress issued Apr 2026 | 1 Market St | Field Construction Inc. | level 7: electrical - power, lighting and signal (ref bpa: 2025.0114.8331)Details
level 7: electrical - power, lighting and signal (ref bpa: 2025.0114.8331) | $10,000 |
| Mar 17, 2026 | Completed final sign-off May 2026 | 1 Market St | Dpr Construction A | 15th floor: mech - demo mech systems, removal perimeter induction units vav boxes. relocate (2) vav boxes new fire smoke damper. electrical - fire smoke damage electrical.Details
15th floor: mech - demo mech systems, removal perimeter induction units vav boxes. relocate (2) vav boxes new fire smoke damper. electrical - fire smoke damage electrical. | $20,000 |
| Mar 13, 2026 | In progress issued Mar 2026 | 1 Market St | Source Planning And Construction Inc | 17th fl - selective interior demo only (ab-017) ref 26-158Details
17th fl - selective interior demo only (ab-017) ref 26-158 | $70,000 |
| Mar 13, 2026 | In progress issued Mar 2026 | 1 Market St | Source Planning And Construction Inc | 18th fl - selective interior demo only (ab-017) ref fire 26-158Details
18th fl - selective interior demo only (ab-017) ref fire 26-158 | $70,000 |
| Mar 9, 2026 | In progress issued Aug 2026 | 1 Market St | Field Construction Inc. | 29th & 30th fl: revision to pa #2025-1215-1798. stair demo and infill at 30th fl onlyDetails
29th & 30th fl: revision to pa #2025-1215-1798. stair demo and infill at 30th fl only | |
| Jan 28, 2026 | Completed final sign-off Jun 2026 | 1 Market St | Gci, Inc | 37th/f spec suite- electrical new power & signal. new 2022 title 24 lighting & controls.ref 2025 0618 8952Details
37th/f spec suite- electrical new power & signal. new 2022 title 24 lighting & controls.ref 2025 0618 8952 | $15,000 |
| Jan 23, 2026 | Completed final sign-off Oct 2026 | 1 Market St | Golden Gate Fire Protection Inc | 7th fl - add 7 pendent sprinklers on the roof deck ref pa 202501148331Details
7th fl - add 7 pendent sprinklers on the roof deck ref pa 202501148331 | $2,000 |
| Jan 22, 2026 | Completed final sign-off Jun 2026 | 1 Market St | Gci, Inc | 37th/f- corridor/ restrooms & lobby: new power & signal devices throughout the space. new 2022 title 24 lighting & controls. ref# 202505144642.Details
37th/f- corridor/ restrooms & lobby: new power & signal devices throughout the space. new 2022 title 24 lighting & controls. ref# 202505144642. | $15,000 |
| Jan 22, 2026 | Expired or cancelled withdrawn Jul 2026 | 1 Market St | 13th/f: revision to previously approved pa# 202510238018 based on recently approved t.i. pa# 202512111539 in the same space on the same fl. demo restrooms, remove corridors from scopeDetails
13th/f: revision to previously approved pa# 202510238018 based on recently approved t.i. pa# 202512111539 in the same space on the same fl. demo restrooms, remove corridors from scope | $500,000 | |
| Dec 23, 2025 | In progress issued May 2026 | 55 Spear St | Swinerton Builders | 36th fl - minor ti to accomodate a new focus room and trade desk space. new wall powerDetails
36th fl - minor ti to accomodate a new focus room and trade desk space. new wall power | $800,000 |
| Dec 18, 2025 | In progress issued Jan 2026 | 1 Market St | Clune Construction Company L P | 13th fl - hvac ti project unit the (e) base bldg hvac system; modification to the air distribution system in the tenant space to suit arc renov including install of vav boxes and fan powered terminal for tenant needs. no new fire smoke dampers. ref pa 202512111539Details
13th fl - hvac ti project unit the (e) base bldg hvac system; modification to the air distribution system in the tenant space to suit arc renov including install of vav boxes and fan powered terminal for tenant needs. no new fire smoke dampers. ref pa 202512111539 | $300,000 |
| Dec 15, 2025 | In progress issued Feb 2026 | 1 Market St | Field Construction Inc. | 29th and 30th floors: demolition of 29th and 30th floor internal communicating stair to intermediary landing and floor infill at opening in an existing unoccupied space.Details
29th and 30th floors: demolition of 29th and 30th floor internal communicating stair to intermediary landing and floor infill at opening in an existing unoccupied space. | $150,000 |
| Dec 15, 2025 | Completed final sign-off May 2026 | 1 Market St | Dpr Construction A | 15th floor. demolition of (e) non-structural partitions, doors, frame, finishes. mep deferred for ceiling, light and plumbing fixtures in as existing unoccupied space. ab-017 appliesDetails
15th floor. demolition of (e) non-structural partitions, doors, frame, finishes. mep deferred for ceiling, light and plumbing fixtures in as existing unoccupied space. ab-017 applies | $150,000 |
| Dec 12, 2025 | Completed final sign-off Jun 2026 | 1 Market St | Gci, Inc | 37th fl - signage for fire extinguisher, exit route, room signageDetails
37th fl - signage for fire extinguisher, exit route, room signage | $2,000 |
| Dec 11, 2025 | In progress issued Jan 2026 | 1 Market St | Clune Construction Company L P | 13th/f t.i. minor demo of non structural elements, construction of new 23 offices, 13 meeting rooms, break & reception area. new finishes, ceilings, lights. ref 202510238018Details
13th/f t.i. minor demo of non structural elements, construction of new 23 offices, 13 meeting rooms, break & reception area. new finishes, ceilings, lights. ref 202510238018 | $1,880,900 |
| Dec 11, 2025 | Completed final sign-off Mar 2026 | 1 Market St | Anderson, Rowe & Buckley, Inc. | fire sprinkler demo t.i. relocate 90. total 90. ref t.i. pa #202510288303.Details
fire sprinkler demo t.i. relocate 90. total 90. ref t.i. pa #202510288303. | $46,350 |
| Dec 9, 2025 | Completed final sign-off Jun 2026 | 1 Market St | Gci, Inc | 37th fl: evacuation signageDetails
37th fl: evacuation signage | $2,000 |
| Dec 5, 2025 | In progress issued Dec 2025 | 55 Spear St | Specialized Graphics Inc | 4 evac maps on the 19/f | $2,000 |
| Dec 2, 2025 | In progress issued Dec 2025 | 55 Spear St | Siemens Industry, Inc. | floor 37a/38a: fire only work for the "simpson thatcher" remodels on floors 37a and 38a. additions are 7 smoke detectors, 5 modules, 54 speakers, 52 speaker/strobes, 17 strobe, and the relocation of 3 smoke detectors. ref permit 202506058045.Details
floor 37a/38a: fire only work for the "simpson thatcher" remodels on floors 37a and 38a. additions are 7 smoke detectors, 5 modules, 54 speakers, 52 speaker/strobes, 17 strobe, and the relocation of 3 smoke detectors. ref permit 202506058045. | $113,660 |
| Nov 19, 2025 | Completed final sign-off Apr 2026 | 1 Market St | Pioneer Fire Inc. | 13th/fl: relocate 4 concealed pendants, add 2 concealed pendants ref 202510238018Details
13th/fl: relocate 4 concealed pendants, add 2 concealed pendants ref 202510238018 | $3,200 |
| Nov 13, 2025 | Completed final sign-off Dec 2025 | 55 Spear St | Siemens Industry, Inc. | 37a - fire work only for the spec suite; additions are speaker/strobes and 9 strobes. ref pa 202506188952Details
37a - fire work only for the spec suite; additions are speaker/strobes and 9 strobes. ref pa 202506188952 | $19,045 |
| Nov 13, 2025 | Completed final sign-off Dec 2025 | 55 Spear St | Siemens Industry, Inc. | 37a - fire only work for the corridor areas; additions are 7 smoke detectors and 7 speakers/s well as relocation of 5 smoke detecotrs ref pa 202505146425Details
37a - fire only work for the corridor areas; additions are 7 smoke detectors and 7 speakers/s well as relocation of 5 smoke detecotrs ref pa 202505146425 | $15,370 |
| Nov 7, 2025 | Completed final sign-off Nov 2025 | 55 Spear St | Siemens Industry, Inc. | fire only work to add 8 strobes for the phone booth installation on floor 8b under ref#: 202510026579Details
fire only work to add 8 strobes for the phone booth installation on floor 8b under ref#: 202510026579 | $4,968 |
| Oct 30, 2025 | Completed final sign-off Jun 2026 | 55 Spear St | Gci, Inc | 37/f: deferred structural submittal to pa# 202506058045. full accessibility provided per pa 202506058045.Details
37/f: deferred structural submittal to pa# 202506058045. full accessibility provided per pa 202506058045. | $15,000 |
| Oct 28, 2025 | In progress issued Oct 2025 | 1 Market St | Pioneer Fire Inc. | 8th/fl: add 8 concealed pendents in phone boothsDetails
8th/fl: add 8 concealed pendents in phone booths | $2,000 |
| Oct 28, 2025 | In progress filed Oct 2025, not yet issued | 1 Market St | demolition of existing non structural partitions, doors, and frames, finishes, ceilings, lighting, plumbing fixtures. duct work havac and elec to be pulled back to source and plumbing to be caped at source. construction of new non strurctural partitions, finishes, ceiling, lighting,plumbing fixturesDetails
demolition of existing non structural partitions, doors, and frames, finishes, ceilings, lighting, plumbing fixtures. duct work havac and elec to be pulled back to source and plumbing to be caped at source. construction of new non strurctural partitions, finishes, ceiling, lighting,plumbing fixtures | $550,000 | |
| Oct 23, 2025 | Completed final sign-off Aug 2026 | 1 Market St | Gci, Inc | 13/fl- demo of (e) non structural partitions, doors, and frames, finishes ceilings, lighting and plumbing fixtures. ductwork, hvac, and electrical to be pulled back to source and plumbing to be capped at source. construction of (n) non structural partitions, finishes, ceiling, lighting and plumbingDetails
13/fl- demo of (e) non structural partitions, doors, and frames, finishes ceilings, lighting and plumbing fixtures. ductwork, hvac, and electrical to be pulled back to source and plumbing to be capped at source. construction of (n) non structural partitions, finishes, ceiling, lighting and plumbing | $750,000 |
| Oct 2, 2025 | Completed final sign-off Jan 2026 | 1 Market St | Gci, Inc | 8/f - steuart tower: install phone booths at specified open office areas. requesting existing focus rooms to provide requivalent faciliation for accessibility.Details
8/f - steuart tower: install phone booths at specified open office areas. requesting existing focus rooms to provide requivalent faciliation for accessibility. | $55,000 |
| Sep 18, 2025 | Completed final sign-off Jun 2026 | 1 Market St | Gci, Inc | 37th fl - ref pa 202506188952 partial remodel of level 37 new offices, meeting rooms & conference rooms, replacement of (e) perimeter chilled water, interior zones will be replaced w/new cooling only vavDetails
37th fl - ref pa 202506188952 partial remodel of level 37 new offices, meeting rooms & conference rooms, replacement of (e) perimeter chilled water, interior zones will be replaced w/new cooling only vav | $350,000 |
| Sep 3, 2025 | Completed final sign-off Aug 2026 | 55 Spear St | Novo Construction Inc | 19th floor:revision to pa #202503172361 to revise phone room 1935, pantry 1976 and conference 1911 and 1910 doors. misc. revisions throughout 19th floor.Details
19th floor:revision to pa #202503172361 to revise phone room 1935, pantry 1976 and conference 1911 and 1910 doors. misc. revisions throughout 19th floor. | |
| Aug 28, 2025 | Completed final sign-off Jun 2026 | 55 Spear St | Gci, Inc | 37 and 38/fl-revision 202506058045 for mechanical designDetails
37 and 38/fl-revision 202506058045 for mechanical design | |
| Aug 25, 2025 | In progress issued Aug 2025 | 55 Spear St | Ayoob & Peery Plumbing Co Inc | 19th fl - record as built for 202507231385 fire; updated drawings for adjusted piping paln and final sprinkler head posisitons. ref pa 202503172361Details
19th fl - record as built for 202507231385 fire; updated drawings for adjusted piping paln and final sprinkler head posisitons. ref pa 202503172361 | |
| Aug 21, 2025 | In progress issued Aug 2025 | 1 Market St | Pioneer Fire Inc. | 37th floor. relocate (11) pendents and (1) upright convert (43) pendents and (7) uprights. add (1) pendent, remove (5) pendents, (2) uprights. ref#: 202506188952Details
37th floor. relocate (11) pendents and (1) upright convert (43) pendents and (7) uprights. add (1) pendent, remove (5) pendents, (2) uprights. ref#: 202506188952 | $17,500 |
| Aug 8, 2025 | Completed final sign-off Nov 2025 | 55 Spear St | Pioneer Fire Inc. | 37th & 38th fl ref pa #2025-0605-8045. remove 25 pendant sprinklers, relocate 50 pendant sprinklers, relocate 40 concealed sprinklers, convert 80 upright to pendent sprinklers, convert 23 upright sprinklers to concealed. add 8 pendant sprinklers.Details
37th & 38th fl ref pa #2025-0605-8045. remove 25 pendant sprinklers, relocate 50 pendant sprinklers, relocate 40 concealed sprinklers, convert 80 upright to pendent sprinklers, convert 23 upright sprinklers to concealed. add 8 pendant sprinklers. | $27,500 |
| Aug 7, 2025 | Completed final sign-off Mar 2026 | 55 Spear St | Siemens Industry, Inc. | fire only for the partial-floor remodel on floor 19a done under ref pa#: 202503172361; 1 speaker; 1 speaker/strobe and 2 strobes are added, as well as the relocation of 14 speaker/strobes.Details
fire only for the partial-floor remodel on floor 19a done under ref pa#: 202503172361; 1 speaker; 1 speaker/strobe and 2 strobes are added, as well as the relocation of 14 speaker/strobes. | $16,650 |
| Jul 31, 2025 | Completed final sign-off Aug 2025 | 55 Spear St | Siemens Industry, Inc. | floor 35a, fire only work for the tenant stairwell construction on floor 35a done under pa#: 202505096158; no devices are required to be added, only relocation sequence reprogramming.Details
floor 35a, fire only work for the tenant stairwell construction on floor 35a done under pa#: 202505096158; no devices are required to be added, only relocation sequence reprogramming. | |
| Jul 30, 2025 | Completed final sign-off Nov 2025 | 1 Market St | Pioneer Fire Inc. | 37th flr, relocate (12) pendents (8) concealed sprinkler head, remove (3) pendents. gc t.i. #202505146425Details
37th flr, relocate (12) pendents (8) concealed sprinkler head, remove (3) pendents. gc t.i. #202505146425 | $5,750 |
| Jul 23, 2025 | In progress issued Jul 2025 | 55 Spear St | Ayoob & Peery Plumbing Co Inc | 19/flr: ad (20), relocate (50) fire sprinkler. job#: 25-647. ref#: 202503172361.Details
19/flr: ad (20), relocate (50) fire sprinkler. job#: 25-647. ref#: 202503172361. | $43,477 |
| Jul 16, 2025 | Expired or cancelled cancelled Oct 2025 | 1 Market St | Pioneer Fire Inc. | 17th floor spear tower: relocate(18) pendents, relocate(5) semi recessed, relocate(5) concaled pendentsDetails
17th floor spear tower: relocate(18) pendents, relocate(5) semi recessed, relocate(5) concaled pendents | $7,000 |
| Jul 10, 2025 | In progress issued Jul 2025 | 55 Spear St | Siemens Industry, Inc. | fire only work to relocate 4 sprinklers/strobes in the unoccupied areas created with the floor 7a demolition. ref permit app#202506249311.Details
fire only work to relocate 4 sprinklers/strobes in the unoccupied areas created with the floor 7a demolition. ref permit app#202506249311. | $3,844 |
| Jul 7, 2025 | Completed final sign-off Oct 2025 | 1 Market St | Dpr Construction A | 33rd-35th floors: guardrail at stair. ref pa#202501228840Details
33rd-35th floors: guardrail at stair. ref pa#202501228840 | $20,000 |
| Jun 24, 2025 | Completed final sign-off Jul 2025 | 1 Market St | M C S Construction Services | 7/f -demolition of non structural partitions,ceiling, lighting, finishes, and any associated mechanical, plumbing, and electrical. per ab-17, space will rema8in unoccupied. permit for construction and related acessible features will be required prior to reoccupancy. ab-017 appliesDetails
7/f -demolition of non structural partitions,ceiling, lighting, finishes, and any associated mechanical, plumbing, and electrical. per ab-17, space will rema8in unoccupied. permit for construction and related acessible features will be required prior to reoccupancy. ab-017 applies | $9,000 |
| Jun 18, 2025 | Completed final sign-off Jun 2026 | 1 Market St | Gci, Inc | construction of new non structural partitions, doors and glazing, ceiling, lighting, millwork, plumbing fixtures, equip and finishes. scope includes reception, break area, meeting roos, offices and open office area. no exterior work in the scope. all work to be on 37th fl. mep deferred.Details
construction of new non structural partitions, doors and glazing, ceiling, lighting, millwork, plumbing fixtures, equip and finishes. scope includes reception, break area, meeting roos, offices and open office area. no exterior work in the scope. all work to be on 37th fl. mep deferred. | $1,800,000 |
| Jun 6, 2025 | In progress issued Jun 2025 | 1 Market St | Anderson, Rowe & Buckley, Inc. | 7th floor. existing fire sprinkler system demo, relocate 36 fire sprinklersDetails
7th floor. existing fire sprinkler system demo, relocate 36 fire sprinklers | $9,000 |
| Jun 5, 2025 | Completed final sign-off Jun 2026 | 55 Spear St | Gci, Inc | 37&38/fl- ref 202505227124- ti (n) non structural partitions, ceilings, finishes, and mepDetails
37&38/fl- ref 202505227124- ti (n) non structural partitions, ceilings, finishes, and mep | $5,650,000 |
| Jun 4, 2025 | In progress issued Jun 2025 | 1 Market St | Anderson, Rowe & Buckley, Inc. | exising fire sprinkler system - tenant improvements. 6 added and 3 relocated sprinkler on 33rd flr. 6 added and 3 relocated sprinkler on 34th flr. no work on 35th flr. ref#: 202501228840Details
exising fire sprinkler system - tenant improvements. 6 added and 3 relocated sprinkler on 33rd flr. 6 added and 3 relocated sprinkler on 34th flr. no work on 35th flr. ref#: 202501228840 | $8,400 |
| May 22, 2025 | Completed final sign-off Jun 2026 | 55 Spear St | Gci, Inc | 38 and partial 37/fl- partial soft demo of 37th floor and all 38th floor for non structural work only for ab017. ti permit to come.Details
38 and partial 37/fl- partial soft demo of 37th floor and all 38th floor for non structural work only for ab017. ti permit to come. | $190,000 |
| May 22, 2025 | In progress issued Jul 2025 | 1 Market St | Gci, Inc | 17/f of spear tower. demol of existing non structural partitions, door, finishes, ceilings lighting and plumbing fixtures. construction of new non structural partitons, doors, finishes, ceiling, lighting, millwork and plumbing fixturs. corridor upgrades, elevator lobby. mep deferred.Details
17/f of spear tower. demol of existing non structural partitions, door, finishes, ceilings lighting and plumbing fixtures. construction of new non structural partitons, doors, finishes, ceiling, lighting, millwork and plumbing fixturs. corridor upgrades, elevator lobby. mep deferred. | $850,000 |
| May 16, 2025 | Completed final sign-off May 2025 | 55 Spear St | Anderson, Rowe & Buckley, Inc. | as built-proper lot from 006 to 007 ref 202504285377Details
as built-proper lot from 006 to 007 ref 202504285377 | |
| May 14, 2025 | Completed final sign-off Jun 2026 | 1 Market St | Gci, Inc | 37th fl: demo of (e) non strucutral partitions, doors & frames, finishes, ceiling, lighting & plumbing fixtures. construction of new non structural partitions, finishes, ceiling, lighting, millwork & plumbing fixtures. scope includes new rated corridor, elevator lobby and restroom upgrades.Details
37th fl: demo of (e) non strucutral partitions, doors & frames, finishes, ceiling, lighting & plumbing fixtures. construction of new non structural partitions, finishes, ceiling, lighting, millwork & plumbing fixtures. scope includes new rated corridor, elevator lobby and restroom upgrades. | $1,028,899 |
| May 9, 2025 | Completed final sign-off Oct 2025 | 55 Spear St | Dpr Construction A | for adminstrative purposes only. change of address from 1 market st to 55 spear st for pa #2025-0122-8840 (b/l 3713/007)Details
for adminstrative purposes only. change of address from 1 market st to 55 spear st for pa #2025-0122-8840 (b/l 3713/007) | |
| May 7, 2025 | Completed final sign-off Oct 2025 | 1 Market St | M C S Construction Services | 12th deferred mechanical and electrical work tenant improvement project under architectural building pa 202412237318. no exterior workDetails
12th deferred mechanical and electrical work tenant improvement project under architectural building pa 202412237318. no exterior work | $400,000 |
| Apr 28, 2025 | Completed final sign-off Oct 2025 | 55 Spear St | Dpr Construction A | for administrative purposes only, change of address from 1 market st to 55 spear st for pa# 202412166922 (revision to 202410102710, b/l 3713/007, 1 market st) & 202410102710 (t.i. for 35th level, b/l 3713/006, 1 market st)Details
for administrative purposes only, change of address from 1 market st to 55 spear st for pa# 202412166922 (revision to 202410102710, b/l 3713/007, 1 market st) & 202410102710 (t.i. for 35th level, b/l 3713/006, 1 market st) | |
| Apr 24, 2025 | Completed final sign-off Jun 2025 | 1 Market St | Siemens Industry, Inc. | 26thb - fire only work demolition project done under pa 202411215523 7 existing speaker/strobes are relocatedDetails
26thb - fire only work demolition project done under pa 202411215523 7 existing speaker/strobes are relocated | $6,730 |
| Apr 24, 2025 | Completed final sign-off May 2025 | 1 Market St | Siemens Industry, Inc. | 12b - fire only workfor the warburg pincus remodel. ref pa 202412237318. additions are 15 speakers/strobes, add 3 strobesDetails
12b - fire only workfor the warburg pincus remodel. ref pa 202412237318. additions are 15 speakers/strobes, add 3 strobes | $21,480 |
| Apr 18, 2025 | In progress issued May 2025 | 1 Market St | Skyline Construction | 25th fl: demolition of existing door and non structural partition in suite 2525. to demise suite from adjacent suite 2500 and combine with suite 2550. patch and repair existing ceiling and finishes as needed to match existing. demo of existing combination drinking fountain and bottle filler.Details
25th fl: demolition of existing door and non structural partition in suite 2525. to demise suite from adjacent suite 2500 and combine with suite 2550. patch and repair existing ceiling and finishes as needed to match existing. demo of existing combination drinking fountain and bottle filler. | $13,190 |
| Apr 16, 2025 | Completed final sign-off Aug 2025 | 1 Market St | M C S Construction Services | 26th floor. new light fixtures at 26th floor space. interior work only. deferred electrical permit under main architectural bldg pa#: 202411215523 and 202503132220Details
26th floor. new light fixtures at 26th floor space. interior work only. deferred electrical permit under main architectural bldg pa#: 202411215523 and 202503132220 | $23,950 |
| Mar 17, 2025 | Completed final sign-off Aug 2026 | 55 Spear St | Novo Construction Inc | interior tenant improvement on the 19th fl of approx 8000 sq ft. mech,ele, plumbing and structural includedDetails
interior tenant improvement on the 19th fl of approx 8000 sq ft. mech,ele, plumbing and structural included | $925,000 |
| Mar 13, 2025 | Completed final sign-off Aug 2025 | 1 Market St | revision 202411215523- admin to change scope of work to modify verbiage to state no break room in current scopeDetails
revision 202411215523- admin to change scope of work to modify verbiage to state no break room in current scope | ||
| Jan 22, 2025 | Completed final sign-off Oct 2025 | 1 Market St | Dpr Construction A | interior ti of (n) communicating stair between levels 34 & 35 & (e) communicating stair between levels 33 & 34. new stair construction to include slab demo as well as finishes, lighting & fire safety.Details
interior ti of (n) communicating stair between levels 34 & 35 & (e) communicating stair between levels 33 & 34. new stair construction to include slab demo as well as finishes, lighting & fire safety. | $150,000 |
| Jan 21, 2025 | Completed final sign-off Jan 2025 | 1 Market St | Anderson, Rowe & Buckley, Inc. | 1st flr - admistrative permit - correct lot number only. fire pa#202304206077 r1. fire sprinkler systemDetails
1st flr - admistrative permit - correct lot number only. fire pa#202304206077 r1. fire sprinkler system | |
| Jan 21, 2025 | Completed final sign-off Jan 2025 | 1 Market St | Anderson, Rowe & Buckley, Inc. | 23rd & 24th flrs - admistrative permit - correct lot number only. fire pa#202209233043.Details
23rd & 24th flrs - admistrative permit - correct lot number only. fire pa#202209233043. | |
| Jan 14, 2025 | In progress issued Jun 2025 | 1 Market St | Field Construction Inc. | level 7-terrace: renovation of the level 7 existing northeast & southwest terrace connected to an existing building. the work will include nw constructions of pavilions, planters, and seating. the existing steuart street tower lobby finishes will also be renovated. mep & life safty under seperate.Details
level 7-terrace: renovation of the level 7 existing northeast & southwest terrace connected to an existing building. the work will include nw constructions of pavilions, planters, and seating. the existing steuart street tower lobby finishes will also be renovated. mep & life safty under seperate. | $8,000,000 |
| Jan 2, 2025 | Completed final sign-off May 2025 | 1 Market St | Pioneer Fire Inc. | 26th floor; convert (131) pendents to uprights, relocate (11) pendents, remove (7) pendents. architectural building permit#2024-11215523Details
26th floor; convert (131) pendents to uprights, relocate (11) pendents, remove (7) pendents. architectural building permit#2024-11215523 | $22,500 |
| Dec 23, 2024 | Completed final sign-off Oct 2025 | 1 Market St | M C S Construction Services | 12 floor; demolition of existing non-structural partitions, doors and frames, finishes, ceilings, lighting and millwork. ductwork, hvac and electrical to be pulled back to source. scope includes t.i. suite 1200. construction of new non-structural partitions, finishes, ceiling, plumbing fixtures,Details
12 floor; demolition of existing non-structural partitions, doors and frames, finishes, ceilings, lighting and millwork. ductwork, hvac and electrical to be pulled back to source. scope includes t.i. suite 1200. construction of new non-structural partitions, finishes, ceiling, plumbing fixtures, | $1,164,338 |
| Dec 17, 2024 | Completed final sign-off Apr 2025 | 1 Market St | Anderson, Rowe & Buckley, Inc. | b1, b2 as build 25 fewer fire sprinklers. existing fire sprinkler ref pa 202408219173Details
b1, b2 as build 25 fewer fire sprinklers. existing fire sprinkler ref pa 202408219173 | |
| Dec 16, 2024 | Completed final sign-off May 2025 | 1 Market St | Dpr Construction A | 35th fl revision to 202410102710 to include minor partition changes, corresponding mep and needed structural beam penetrationDetails
35th fl revision to 202410102710 to include minor partition changes, corresponding mep and needed structural beam penetration | $7,000 |
| Dec 10, 2024 | Expired or cancelled expired Oct 2026 | 1 Market St | Gci, Inc | 6th fl- demo of non structural partitions & construction of new rated demising partitions per previously discussed ab-005Details
6th fl- demo of non structural partitions & construction of new rated demising partitions per previously discussed ab-005 | $12,000 |
| Nov 21, 2024 | Completed final sign-off Aug 2025 | 1 Market St | M C S Construction Services | 26th flr.demo of e non structural partitions, doors, frames, finishes, ceilings,lighting plumbijng fixtures.ductwork,hvac & elec to be pulled back to source and plumbing to be capped at source. construction of new non structural partions, finishes, ceiling, lighting, plumbing fixtures.scope incld:Details
26th flr.demo of e non structural partitions, doors, frames, finishes, ceilings,lighting plumbijng fixtures.ductwork,hvac & elec to be pulled back to source and plumbing to be capped at source. construction of new non structural partions, finishes, ceiling, lighting, plumbing fixtures.scope incld: | $460,327 |
| Nov 12, 2024 | In progress issued Nov 2024 | 1 Market St | Siemens Industry, Inc. | basement - fire only work to add 4 speaker/strobes and relocate 2 smoke detectors for the basement levels s1 elevator lobbies/b1 restrooms. ref pa 202405232787Details
basement - fire only work to add 4 speaker/strobes and relocate 2 smoke detectors for the basement levels s1 elevator lobbies/b1 restrooms. ref pa 202405232787 | $4,565 |
| Oct 30, 2024 | Completed final sign-off Dec 2024 | 1 Market St | M C S Construction Services | b2/fl-ref 202405232787-deferred submision for ti electrical permitDetails
b2/fl-ref 202405232787-deferred submision for ti electrical permit | $5,000 |
| Oct 11, 2024 | Completed final sign-off Dec 2024 | 1 Market St | M C S Construction Services | deferred electrical permit for interior improvement project under pa # 202405222665/202409120646 b1 level.Details
deferred electrical permit for interior improvement project under pa # 202405222665/202409120646 b1 level. | $165,000 |
| Sep 12, 2024 | Completed final sign-off Dec 2024 | 1 Market St | M C S Construction Services | revision to 202405222665. remove ceiling in the parking garage.Details
revision to 202405222665. remove ceiling in the parking garage. | |
| Aug 21, 2024 | Completed final sign-off Jun 2025 | 1 Market St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler systems, tenant improvements. b1-23 added and 10 relocated sprinklers. b2- 4 relocated sprinklers. b1-remove 2 fire hose racksDetails
existing fire sprinkler systems, tenant improvements. b1-23 added and 10 relocated sprinklers. b2- 4 relocated sprinklers. b1-remove 2 fire hose racks | $24,000 |
| Aug 21, 2024 | Completed final sign-off Sep 2024 | 1 Market St | Golden Gate Fire Protection Inc | basement - raise and relocate sprinkler lines and fdc pipe for new bike racks. ref pa 202405232787Details
basement - raise and relocate sprinkler lines and fdc pipe for new bike racks. ref pa 202405232787 | $5,500 |
| Aug 2, 2024 | Completed final sign-off Aug 2024 | 1 Market St | Siemens Industry, Inc. | floor 12b/15b. fire only work for the corridor remodels on floors 12b and 15b; additions are 12 speaker/strobes and 1 strove, as well as the relocation of 4 smoke detectors and 2 pull stations. ref pa 202310279620 and 202310279621Details
floor 12b/15b. fire only work for the corridor remodels on floors 12b and 15b; additions are 12 speaker/strobes and 1 strove, as well as the relocation of 4 smoke detectors and 2 pull stations. ref pa 202310279620 and 202310279621 | $12,155 |
| Jul 18, 2024 | In progress issued Jul 2024 | 98 Mission St | Golden Gate Sign Company Inc. | revised attachment detail for entry canopy "b". ref permit 202402266505Details
revised attachment detail for entry canopy "b". ref permit 202402266505 | |
| May 23, 2024 | Completed final sign-off Dec 2024 | 1 Market St | M C S Construction Services | basement level: demolition of existing ramps, bike ramps, finishes, ceilings, and light fixtures. construction of new finishes, ceiling and light fixtures. no exterior work to occur.Details
basement level: demolition of existing ramps, bike ramps, finishes, ceilings, and light fixtures. construction of new finishes, ceiling and light fixtures. no exterior work to occur. | $300,000 |
| May 22, 2024 | Completed final sign-off Dec 2024 | 1 Market St | M C S Construction Services | demo of the valet booth in an existing valet parking garage. refresh of existing elevator lobby to the parking garage. finish and lighting upgrade in accessbiel restrooms. new scope of work includes new valet booth, accessible passanger drop off and loading zone, finishes, ceiling, lighting and millDetails
demo of the valet booth in an existing valet parking garage. refresh of existing elevator lobby to the parking garage. finish and lighting upgrade in accessbiel restrooms. new scope of work includes new valet booth, accessible passanger drop off and loading zone, finishes, ceiling, lighting and mill | $700,000 |
| May 16, 2024 | Completed final sign-off Jun 2024 | 1 Market St | Pioneer Fire Inc. | ti 202310279621-12/fl - fire only to relocate (16) pendentsDetails
ti 202310279621-12/fl - fire only to relocate (16) pendents | $2,400 |
| May 16, 2024 | In progress issued May 2024 | 1 Market St | Pioneer Fire Inc. | ti 202310279620-15/fl - fire only to relocate (22) pendentsDetails
ti 202310279620-15/fl - fire only to relocate (22) pendents | $3,300 |
| May 9, 2024 | Completed final sign-off Apr 2025 | 1 Market St | Field Construction Inc. | 15th fl - lighting & power. ref permit 202310279620Details
15th fl - lighting & power. ref permit 202310279620 | $55,000 |
| May 9, 2024 | Completed final sign-off Apr 2025 | 1 Market St | Field Construction Inc. | 12/f: lighting and power. ref pa# 202310279621Details
12/f: lighting and power. ref pa# 202310279621 | $75,000 |
| Mar 25, 2024 | In progress issued Mar 2024 | 55 Spear St | per historical record, add address 55 spear st to apn 3713/007.Details
per historical record, add address 55 spear st to apn 3713/007. | ||
| Mar 18, 2024 | Completed final sign-off Apr 2024 | 1 Market St | Golden Gate Fire Protection Inc | relocate 98 upright sprinklers on the 35/f.Details
relocate 98 upright sprinklers on the 35/f. | $24,115 |
| Mar 7, 2024 | Completed final sign-off Jul 2024 | 1 Market St | Skyline Construction | revision to 202207208907. revised to t-24 inspection forms to have special inspection requirement abrogatedDetails
revision to 202207208907. revised to t-24 inspection forms to have special inspection requirement abrogated | |
| Feb 29, 2024 | Completed final sign-off May 2024 | 1 Market St | Hitt Contracting Inc. | 35/f: interior demo to existinng office space. demo space to include demo of non load bearing partitions, ceiings, millwork and finishes, fire and life safety to remain operational during course of construction. modification to mech and plumbing systems shall allow existing base bldg infrasturre toDetails
35/f: interior demo to existinng office space. demo space to include demo of non load bearing partitions, ceiings, millwork and finishes, fire and life safety to remain operational during course of construction. modification to mech and plumbing systems shall allow existing base bldg infrasturre to | $50,000 |
| Feb 26, 2024 | In progress issued Apr 2024 | 98 Mission St | Golden Gate Sign Company Inc. | entry canopy/awning for sign support bDetails
entry canopy/awning for sign support b | $15,000 |
| Feb 26, 2024 | In progress issued Apr 2024 | 98 Mission St | Golden Gate Sign Company Inc. | erect electric projecting single face sign a (stk)Details
erect electric projecting single face sign a (stk) | $10,000 |
| Feb 26, 2024 | In progress issued Apr 2024 | 98 Mission St | Golden Gate Sign Company Inc. | erect electric single face wall sign sign c (stk)Details
erect electric single face wall sign sign c (stk) | $10,000 |
| Feb 26, 2024 | In progress issued Apr 2024 | 98 Mission St | Golden Gate Sign Company Inc. | erect electric projecting double face sign e1 & e2 (stk steak house)Details
erect electric projecting double face sign e1 & e2 (stk steak house) | $20,000 |
| Jan 16, 2024 | Completed final sign-off Feb 2024 | 1 Market St | Siemens Industry, Inc. | 25b/f: fire only work,for the restrooms remodel, 2 speaker/strobes are added. ref pa# 202310068155.Details
25b/f: fire only work,for the restrooms remodel, 2 speaker/strobes are added. ref pa# 202310068155. | $1,922 |
| Dec 6, 2023 | In progress issued Dec 2023 | 1 Market St | Field Construction Inc. | electrical power & lighting ref to 202310068155Details
electrical power & lighting ref to 202310068155 | $75,000 |
| Nov 15, 2023 | Never finaled issued Nov 2023, no final | 1 Market St | O C Mc Donald Co Inc | 3rd/f: remove an (e) water sourced heat pump (24000 btu) replace w/ 1 (36000 btu) water sourced heat pumpDetails
3rd/f: remove an (e) water sourced heat pump (24000 btu) replace w/ 1 (36000 btu) water sourced heat pump | $74,000 |
| Nov 13, 2023 | Completed final sign-off Nov 2023 | 1 Market St | Siemens Industry, Inc. | fire alarm work for the parnassus remodel on flr 16b, addition of 6 smoke detectors, 2 modules, 1 strobe power supply, 30 speaker/strobes, 12 strobes and the relocation of 2 smoke detector. ref permit 202305016775Details
fire alarm work for the parnassus remodel on flr 16b, addition of 6 smoke detectors, 2 modules, 1 strobe power supply, 30 speaker/strobes, 12 strobes and the relocation of 2 smoke detector. ref permit 202305016775 | $47,980 |
| Oct 27, 2023 | Completed final sign-off Apr 2025 | 1 Market St | Field Construction Inc. | 12th fl, steuart tower - demo of (e) non-structural partitions, doors & frmaes, finishes, ceiling, lighting and plumbing fixtures; construction of new non-structural partitions, finishes, ceiling lighting; scope includes corridor and elevator lobby upgrades. no exterior work to occur.Details
12th fl, steuart tower - demo of (e) non-structural partitions, doors & frmaes, finishes, ceiling, lighting and plumbing fixtures; construction of new non-structural partitions, finishes, ceiling lighting; scope includes corridor and elevator lobby upgrades. no exterior work to occur. | $225,000 |
| Oct 27, 2023 | Completed final sign-off Apr 2025 | 1 Market St | Field Construction Inc. | 15th fl, steuart tower - demo of (e) non-structural partitions, doors & frmaes, finishes, ceiling, lighting and plumbing fixtures; construction of new non-structural partitions, finishes, ceiling lighting and plumbing fixtures; scope includes restroom accessibility upgrades, corridor and elevator.Details
15th fl, steuart tower - demo of (e) non-structural partitions, doors & frmaes, finishes, ceiling, lighting and plumbing fixtures; construction of new non-structural partitions, finishes, ceiling lighting and plumbing fixtures; scope includes restroom accessibility upgrades, corridor and elevator. | $225,000 |
| Oct 10, 2023 | In progress issued Nov 2023 | 1 Market St | Skyline Construction | revision to 202207208954 (deferred mep for 202207118174).Details
revision to 202207208954 (deferred mep for 202207118174). | |
| Oct 6, 2023 | Completed final sign-off Mar 2024 | 1 Market St | Field Construction Inc. | demolition of (e) non-structural restroom partitions, doors & frames, finishes, ceiling, lighting and plumbing fixtures. construction of new resroom non-structural partions, finishes, ceiling, lighting and plumbing fixtures. scope includes restroom, drinking fountain accessibility upgrades. noDetails
demolition of (e) non-structural restroom partitions, doors & frames, finishes, ceiling, lighting and plumbing fixtures. construction of new resroom non-structural partions, finishes, ceiling, lighting and plumbing fixtures. scope includes restroom, drinking fountain accessibility upgrades. no | $163,000 |
| Sep 20, 2023 | Completed final sign-off Oct 2023 | 1 Market St | Anderson, Rowe & Buckley, Inc. | (e) fire sprinkler system tenant improvements - 9 sprinklersDetails
(e) fire sprinkler system tenant improvements - 9 sprinklers | $8,500 |
| Aug 25, 2023 | Completed final sign-off Apr 2024 | 1 Market St | Paganini Electric Corp(See Signatories) | install 2 life safety 2 way communication sytem call stations. add to existing system.Details
install 2 life safety 2 way communication sytem call stations. add to existing system. | $20,000 |
| Aug 10, 2023 | Completed final sign-off Jan 2024 | 1 Market St | Gci, Inc | 42/f: mechanical-revision to add new water source heat pump & associated ductwork, (2) new vav boxes, controls for new hvac, ref pa# 202201276745.Details
42/f: mechanical-revision to add new water source heat pump & associated ductwork, (2) new vav boxes, controls for new hvac, ref pa# 202201276745. | $180,000 |
| Aug 8, 2023 | Completed final sign-off Apr 2024 | 1 Market St | Skyline Construction, Clune Construction Company L P | 1/f: modification of (e) bank, no area or height work in scope, remove (e) exterior atms/night depository, restore windows to original condition. no change in use/occupancy/additional added building area.Details
1/f: modification of (e) bank, no area or height work in scope, remove (e) exterior atms/night depository, restore windows to original condition. no change in use/occupancy/additional added building area. | $120,000 |
| Aug 2, 2023 | Completed final sign-off Jun 2024 | 1 Market St | Novo Construction Inc | 17/f: revision to bpa#202212218864, phone booths in code plan w/required signage.Details
17/f: revision to bpa#202212218864, phone booths in code plan w/required signage. | $500 |
| Jul 26, 2023 | Completed final sign-off Apr 2024 | 1 Market St | Skyline Construction, Clune Construction Company L P | remove existing vault and furniture. partially remove wall that encloses the exiting vault. provide new wall to its existing location. ab-017 demo. tenant space to be wentDetails
remove existing vault and furniture. partially remove wall that encloses the exiting vault. provide new wall to its existing location. ab-017 demo. tenant space to be went | $30,000 |
| Jul 19, 2023 | Completed final sign-off Mar 2025 | 1 Market St | Skyline Construction | revision to 202207118174 alteration to (e) office buit out on 24th fl, change interior layout. no change in use or exterior, area remains bDetails
revision to 202207118174 alteration to (e) office buit out on 24th fl, change interior layout. no change in use or exterior, area remains b | |
| Jul 13, 2023 | Completed final sign-off Mar 2024 | 1 Market St | Gci, Inc | 16/f: mechanical-ductwork,new vav boxes, supplemental heat pump ddc controls upgrade, air balance, replace induction units; electrical- new lighting & branch circuiting to existing panel, new power and signal, title 24, ref pa# 202305016775.Details
16/f: mechanical-ductwork,new vav boxes, supplemental heat pump ddc controls upgrade, air balance, replace induction units; electrical- new lighting & branch circuiting to existing panel, new power and signal, title 24, ref pa# 202305016775. | $1,200,000 |
| Jul 6, 2023 | Never finaled issued Jul 2023, no final | 1 Market St | Siemens Industry, Inc. | fire only work for the fintness center on fl. 1 additons and 1 duct detector 1 module, 5 speaker/strobes, and 11 strobes, ref pa# 2023-0120-0509Details
fire only work for the fintness center on fl. 1 additons and 1 duct detector 1 module, 5 speaker/strobes, and 11 strobes, ref pa# 2023-0120-0509 | $14,915 |
| May 15, 2023 | Completed final sign-off Jun 2023 | 1 Market St | Siemens Industry, Inc. | 39a/f:fire only work for the "gic" remodel, additions are 5 smoke detectors, 3 modules, 1strobe power supply, 37 speaker/strobes, 25 strobes, as well as the relocation of 5 smoke detectors. ref pa# 202211307363Details
39a/f:fire only work for the "gic" remodel, additions are 5 smoke detectors, 3 modules, 1strobe power supply, 37 speaker/strobes, 25 strobes, as well as the relocation of 5 smoke detectors. ref pa# 202211307363 | $62,660 |
| May 1, 2023 | Completed final sign-off Mar 2024 | 1 Market St | Gci, Inc | 16/f: commercial ti to include selective demo and construction of non structural partitions, ceilings, finishes, equipment. mep and fire sep permitDetails
16/f: commercial ti to include selective demo and construction of non structural partitions, ceilings, finishes, equipment. mep and fire sep permit | $4,800,000 |
| May 1, 2023 | Completed final sign-off May 2023 | 1 Market St | Siemens Industry, Inc. | 17b/f: addition of 7-smoke detectors, 2-modules, 1-strobe power supply, 34-speaker/strobes, 12-strobes, as well as the relocation of 6-smoke detectors and 1-duct detector, ref pa# 202211075982Details
17b/f: addition of 7-smoke detectors, 2-modules, 1-strobe power supply, 34-speaker/strobes, 12-strobes, as well as the relocation of 6-smoke detectors and 1-duct detector, ref pa# 202211075982 | $52,584 |
| Apr 13, 2023 | Completed final sign-off Oct 2023 | 1 Market St | Skyline Construction | 39/f: revision to bpa#202211307363 for structural work associated w/proposed nana wall in lieu of modem fold wallDetails
39/f: revision to bpa#202211307363 for structural work associated w/proposed nana wall in lieu of modem fold wall | |
| Apr 11, 2023 | Completed final sign-off Jul 2023 | 1 Market St | Paganini Electric Corp(See Signatories) | 39th flr - furnish and install 2 fire life safety 2-way communication call stations. ref 201605258242.Details
39th flr - furnish and install 2 fire life safety 2-way communication call stations. ref 201605258242. | $23,000 |
| Mar 22, 2023 | Completed final sign-off Mar 2025 | 1 Market St | Skyline Construction | deferred mep for issued pa# 2023-0120-0509Details
deferred mep for issued pa# 2023-0120-0509 | $700,000 |
| Mar 16, 2023 | Completed final sign-off Apr 2023 | 1 Market St | Anderson, Rowe & Buckley, Inc. | 39/f: fire sprinkler only. ref fire permit 202302131842. remove all wet pipe and devices in computer/it room. fm 206 to be installed on separate permit (nic - to be protect by other)Details
39/f: fire sprinkler only. ref fire permit 202302131842. remove all wet pipe and devices in computer/it room. fm 206 to be installed on separate permit (nic - to be protect by other) | |
| Mar 9, 2023 | Never finaled issued Mar 2023, no final | 1 Market St | Siemens Industry, Inc. | fire only work to obtain a permit to document the specific fsd/fan unit smoke control sequence for floor 36a only. ref pa 2022-1018-4554 (mechanical)Details
fire only work to obtain a permit to document the specific fsd/fan unit smoke control sequence for floor 36a only. ref pa 2022-1018-4554 (mechanical) | |
| Feb 14, 2023 | Completed final sign-off Jun 2023 | 1 Market St | Intelligent Technologies & Services Inc | 39/flr computer room: supply & install a complete novec detection & control system, fire suppression systemDetails
39/flr computer room: supply & install a complete novec detection & control system, fire suppression system | $39,200 |
| Feb 13, 2023 | Completed final sign-off Jun 2023 | 1 Market St | Anderson, Rowe & Buckley, Inc. | 39/f: fire sprinkler only. relocate 149 pendents and add 14 pendents. relocate 9 uprights. remove/plug off 15 pendents, for gic on the 39/f. (spear tower)Details
39/f: fire sprinkler only. relocate 149 pendents and add 14 pendents. relocate 9 uprights. remove/plug off 15 pendents, for gic on the 39/f. (spear tower) | $101,000 |
| Feb 10, 2023 | Completed final sign-off Feb 2023 | 1 Market St | Siemens Industry, Inc. | fire only work for the "citigroup" remodel on floor 40a; additons are 8 smoke detectores, 4 modules, 1 speaker, 39 speaker/strobes, and 20 strobes, as well as the relocation of 7 smoke detectorsDetails
fire only work for the "citigroup" remodel on floor 40a; additons are 8 smoke detectores, 4 modules, 1 speaker, 39 speaker/strobes, and 20 strobes, as well as the relocation of 7 smoke detectors | $58,854 |
| Feb 2, 2023 | Completed final sign-off Aug 2023 | 1 Market St | Paganini Electric Corp(See Signatories) | add 2 way communication cell stations on the 23rd flDetails
add 2 way communication cell stations on the 23rd fl | $21,262 |
| Feb 2, 2023 | Never finaled issued Feb 2023, no final | 1 Market St | Paganini Electric Corp(See Signatories) | add 2 way communication call station on the 17th flDetails
add 2 way communication call station on the 17th fl | $22,500 |
| Feb 2, 2023 | Completed final sign-off Aug 2023 | 1 Market St | Paganini Electric Corp(See Signatories) | add 2 way communication station on the 24th flDetails
add 2 way communication station on the 24th fl | $21,262 |
| Jan 20, 2023 | Completed final sign-off Nov 2023 | 1 Market St | Skyline Construction | fitness center for building tenant, not for general public use, build out on level 1 new locker rooms and bathrooms to comply with d.a. checklist requirements, no change in use or exterior scope. no pool, spa & juice barDetails
fitness center for building tenant, not for general public use, build out on level 1 new locker rooms and bathrooms to comply with d.a. checklist requirements, no change in use or exterior scope. no pool, spa & juice bar | $3,000,000 |
| Dec 30, 2022 | Completed final sign-off Sep 2023 | 1 Market St | Skyline Construction | 39/f: deferred mep permit for 202211307363.Details
39/f: deferred mep permit for 202211307363. | |
| Dec 21, 2022 | Completed final sign-off Jun 2024 | 1 Market St | Novo Construction Inc | 17th/f: mech & electrical & plumbing for t.i. 202211075982Details
17th/f: mech & electrical & plumbing for t.i. 202211075982 | $750,000 |
| Nov 30, 2022 | Completed final sign-off Oct 2023 | 1 Market St | Skyline Construction | 39/f: tenant improvement work includes non-structural interior partitions, doors, fixtures and finishes. mep deferred. annual assembly permits required for (2) expandable rooms.Details
39/f: tenant improvement work includes non-structural interior partitions, doors, fixtures and finishes. mep deferred. annual assembly permits required for (2) expandable rooms. | $2,160,000 |
| Nov 8, 2022 | Completed final sign-off Dec 2022 | 1 Market St | Gci, Inc | mechanica install 2 water source heat pump, install 1 circulation pump, modify ductwork for e vavss. elec, power, lightingDetails
mechanica install 2 water source heat pump, install 1 circulation pump, modify ductwork for e vavss. elec, power, lighting | $150,000 |
| Nov 7, 2022 | Completed final sign-off Jun 2024 | 1 Market St | Novo Construction Inc | 17/f: t.i., nonstructural demo, build-out of new reception area, open office, enclosed offices, & meeting rooms. mep under separate permit.Details
17/f: t.i., nonstructural demo, build-out of new reception area, open office, enclosed offices, & meeting rooms. mep under separate permit. | $900,000 |
| Oct 25, 2022 | Completed final sign-off Jan 2023 | 1 Market St | Golden Gate Fire Protection Inc | 40th fl: fire sprinkler ti. relocate 106 pendent sprinklers and 55 uprights. new 1.5" pre-action valve. ref pa# 202201266664 & 202204132112.Details
40th fl: fire sprinkler ti. relocate 106 pendent sprinklers and 55 uprights. new 1.5" pre-action valve. ref pa# 202201266664 & 202204132112. | $84,525 |
| Oct 18, 2022 | Never finaled issued Dec 2022, no final | 1 Market St | Gci, Inc | 36th fl: vrf & erv system shall operate in smoke control mode along w/ building supply & return air system. ref pa #202201316997Details
36th fl: vrf & erv system shall operate in smoke control mode along w/ building supply & return air system. ref pa #202201316997 | $20,000 |
| Oct 5, 2022 | Completed final sign-off Oct 2022 | 1 Market St | Siemens Industry, Inc. | floor 36a: fire only for the "citigroup" remodel; addition are 3 smoke detectors, 1 module, 2 duct detectors, 1 strobe power supply, 1 speaker, 36 speaker/strobes, 24 strobes, as well as the relocation of 6 smoke detectors. ref pa#202201316997Details
floor 36a: fire only for the "citigroup" remodel; addition are 3 smoke detectors, 1 module, 2 duct detectors, 1 strobe power supply, 1 speaker, 36 speaker/strobes, 24 strobes, as well as the relocation of 6 smoke detectors. ref pa#202201316997 | $43,200 |
| Sep 22, 2022 | Completed final sign-off Sep 2022 | 1 Market St | Siemens Industry, Inc. | fire only work or the "spec suite 1050" remodel on floor 10b; additon are 2 speaker/strobes and 1 strobe, ref pa# 2022-0307-9332Details
fire only work or the "spec suite 1050" remodel on floor 10b; additon are 2 speaker/strobes and 1 strobe, ref pa# 2022-0307-9332 | $1,810 |
| Sep 14, 2022 | Never finaled issued Sep 2022, no final | 1 Market St | Siemens Industry, Inc. | fire only work for citigroup remodel on 42/f: additions 3 smoke detectors, 2 modules, 1 strobe power supply, 1 speaker, 30 speaker/strobe, 20 strobes, as well as the relocation of 6 smoke detectors, ref 202201276745Details
fire only work for citigroup remodel on 42/f: additions 3 smoke detectors, 2 modules, 1 strobe power supply, 1 speaker, 30 speaker/strobe, 20 strobes, as well as the relocation of 6 smoke detectors, ref 202201276745 | $28,200 |
| Sep 12, 2022 | Completed final sign-off Sep 2022 | 1 Market St | Siemens Industry, Inc. | fire only work for the "city group: remodel on floor 41a; additons are 3 smoke detectors, 2 modules, 14 speaker/strobes and 13 strobes, ref pa# 202111232986Details
fire only work for the "city group: remodel on floor 41a; additons are 3 smoke detectors, 2 modules, 14 speaker/strobes and 13 strobes, ref pa# 202111232986 | $18,750 |
| Sep 8, 2022 | Completed final sign-off Jun 2023 | 1 Market St | Field Construction Inc. | 10th fl: hvac modification and interior tenant mino lighting updates. t.i. arch work under separate permit. ref pa# 202208110346Details
10th fl: hvac modification and interior tenant mino lighting updates. t.i. arch work under separate permit. ref pa# 202208110346 | $199,000 |
| Aug 11, 2022 | Completed final sign-off Jun 2023 | 1 Market St | Field Construction Inc. | suite 1050: rev to pa202203079332 - layout changes. no structural work.Details
suite 1050: rev to pa202203079332 - layout changes. no structural work. | |
| Jul 28, 2022 | Never finaled issued Aug 2022, no final | 98 Mission St | Golden Gate Sign Company Inc. | installation of (7) non illuminated blank painted panels to replace existing panels. 4'-5"x23'-7" ea.Details
installation of (7) non illuminated blank painted panels to replace existing panels. 4'-5"x23'-7" ea. | $10,000 |
| Jul 28, 2022 | Never finaled issued Aug 2022, no final | 98 Mission St | Golden Gate Sign Company Inc. | install (1) c4 illuminated logo sign, install (2) d/f internally illuminated blad sign. install (2) illuminated signs on interior. electrical permit only.Details
install (1) c4 illuminated logo sign, install (2) d/f internally illuminated blad sign. install (2) illuminated signs on interior. electrical permit only. | $5,000 |
| Jul 28, 2022 | Never finaled issued Aug 2022, no final | 98 Mission St | Golden Gate Sign Company Inc. | install (1) c4 illuminated logo sign, install (2) d/f internally illuminated blad sign. install (2) illuminated signs on interior. electrical permit only.Details
install (1) c4 illuminated logo sign, install (2) d/f internally illuminated blad sign. install (2) illuminated signs on interior. electrical permit only. | $20,000 |
| Jul 22, 2022 | Completed final sign-off Feb 2023 | 1 Market St | Paganini Electric Corp(See Signatories) | 40st/fl: install 2 2-way communication cell stationsDetails
40st/fl: install 2 2-way communication cell stations | $21,525 |
| Jul 22, 2022 | Completed final sign-off Oct 2022 | 1 Market St | Paganini Electric Corp(See Signatories) | 42nd/fl: install 2 2-way communication cell stationsDetails
42nd/fl: install 2 2-way communication cell stations | $21,525 |
| Jul 22, 2022 | Completed final sign-off Oct 2022 | 1 Market St | Paganini Electric Corp(See Signatories) | 36th/fl: install 2 2-way communication cell stationsDetails
36th/fl: install 2 2-way communication cell stations | $21,525 |
| Jul 20, 2022 | Completed final sign-off Jul 2024 | 1 Market St | Skyline Construction | mep for bpa#202207118174.Details
mep for bpa#202207118174. | |
| Jul 11, 2022 | Completed final sign-off Jul 2024 | 1 Market St | Skyline Construction | corporate office build-out on level 24: installation of a new 1 hour corridor between exit stair esntrances. demolition and remodel of extg core restrooms to comply with da checklist requirements.Details
corporate office build-out on level 24: installation of a new 1 hour corridor between exit stair esntrances. demolition and remodel of extg core restrooms to comply with da checklist requirements. | $4,000,000 |
| Jul 5, 2022 | Completed final sign-off Jul 2024 | 1 Market St | Skyline Construction | corporate office build out level 23. installation of new 1 hour corridor between exist stair entrances. demo and remodel existing core restrooms to comly with da checklist requirements. no change in use or exterior scope, area remains businessDetails
corporate office build out level 23. installation of new 1 hour corridor between exist stair entrances. demo and remodel existing core restrooms to comly with da checklist requirements. no change in use or exterior scope, area remains business | $10,000,000 |
| Jun 7, 2022 | Never finaled issued Jun 2022, no final | 1 Market St | fire sprinkler t.i. (8) relocated and (1) deleted pendent sprinkler heads re permit# 2022-0426-3002Details
fire sprinkler t.i. (8) relocated and (1) deleted pendent sprinkler heads re permit# 2022-0426-3002 | $2,000 | |
| Jun 6, 2022 | Completed final sign-off Dec 2022 | 1 Market St | Golden Gate Fire Protection Inc | 39th fl: fire sprinkler demo. 2 heads under stairs on 39th fl. add 2 upright sprinklers on the 39th fl. for stair infillDetails
39th fl: fire sprinkler demo. 2 heads under stairs on 39th fl. add 2 upright sprinklers on the 39th fl. for stair infill | $2,000 |
| May 31, 2022 | Never finaled issued Jun 2022, no final | 1 Market St | Golden Gate Fire Protection Inc | 41st fl - fire sprinklers - relocate 56 pendent sprinklers and relocate 21 uprights. ref pa 2021-1123-2986Details
41st fl - fire sprinklers - relocate 56 pendent sprinklers and relocate 21 uprights. ref pa 2021-1123-2986 | $40,425 |
| May 11, 2022 | Completed final sign-off Jul 2024 | 1 Market St | Skyline Construction | 23rd + 24th fl: demolition of an (e) connecting stair & slab infill betweeen 23rd & 24th fl. install (n) 1-hr corridor between exit stair entrances. modification to (e) core restrooms to comply with da checklist requirements. no change in use or exterior scope.Details
23rd + 24th fl: demolition of an (e) connecting stair & slab infill betweeen 23rd & 24th fl. install (n) 1-hr corridor between exit stair entrances. modification to (e) core restrooms to comply with da checklist requirements. no change in use or exterior scope. | $500,000 |
| May 10, 2022 | Completed final sign-off Jun 2023 | 1 Market St | Skyline Construction | 23/f-24/f: demo of interior non-bearing wall partitions, doors, light fixtures, flor finishes and plumbing fixtures. no change in use or exterior scope, the area remains business. maher n/a. ab-017 appliesDetails
23/f-24/f: demo of interior non-bearing wall partitions, doors, light fixtures, flor finishes and plumbing fixtures. no change in use or exterior scope, the area remains business. maher n/a. ab-017 applies | $128,000 |
| Apr 29, 2022 | Completed final sign-off Jul 2022 | 1 Market St | Golden Gate Fire Protection Inc | 36th fl: fire sprinklers - relocate 111 pendent sprinklers & relocate 80 uprights. ref pa# 202201316997Details
36th fl: fire sprinklers - relocate 111 pendent sprinklers & relocate 80 uprights. ref pa# 202201316997 | $90,250 |
| Apr 26, 2022 | Completed final sign-off Aug 2022 | 1 Market St | 10th fl fire sprinkler tenant improvement. 8 relocated and 2 deleted pendent heads. ref pa# 202203079332Details
10th fl fire sprinkler tenant improvement. 8 relocated and 2 deleted pendent heads. ref pa# 202203079332 | $4,150 | |
| Apr 14, 2022 | Completed final sign-off Jun 2022 | 1 Market St | Siemens Industry, Inc. | fl 10b: fire only work for the corridor/lobby remodel on fl 10b. 2 smoke detectors, 7 speaker/strobes, and 2 strobes are added, as well as the relocation of 6 smoke detectors. ref pa# 202110190764.Details
fl 10b: fire only work for the corridor/lobby remodel on fl 10b. 2 smoke detectors, 7 speaker/strobes, and 2 strobes are added, as well as the relocation of 6 smoke detectors. ref pa# 202110190764. | $8,700 |
| Apr 14, 2022 | Completed final sign-off Jun 2022 | 1 Market St | Siemens Industry, Inc. | fl 10b: fire only work for the state street capital remodel on fl 10b. 2 smoke detectors, 9 speaker/strobes, and 3 strobes are added, as well as the relocation of 2 smoke detectors & 1 speaker/strobe. ref pa# 202112104147Details
fl 10b: fire only work for the state street capital remodel on fl 10b. 2 smoke detectors, 9 speaker/strobes, and 3 strobes are added, as well as the relocation of 2 smoke detectors & 1 speaker/strobe. ref pa# 202112104147 | $9,250 |
| Apr 13, 2022 | Never finaled issued Apr 2022, no final | 1 Market St | Golden Gate Fire Protection Inc | 42nd fl: fire sprinklers. relocate 117 pendent sprinklers and relocate 57 uprights. new 1.5 pre-action. ref pa# 202201276745.Details
42nd fl: fire sprinklers. relocate 117 pendent sprinklers and relocate 57 uprights. new 1.5 pre-action. ref pa# 202201276745. | $91,350 |
| Mar 31, 2022 | Completed final sign-off Apr 2022 | 1 Market St | Golden Gate Fire Protection Inc | 10/f: fire sprinklers. relocate 56 pendent sprinklers. ref ti permit 202203079332.Details
10/f: fire sprinklers. relocate 56 pendent sprinklers. ref ti permit 202203079332. | $29,400 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Skyline Construction (27), Gci, Inc (25), Siemens Industry, Inc. (24), Field Construction Inc. (19), Anderson, Rowe & Buckley, Inc. (11), M C S Construction Services (10), Source Planning And Construction Inc (10), Golden Gate Fire Protection Inc (9), Pioneer Fire Inc. (9), Dpr Construction A (8), Golden Gate Sign Company Inc. (8), Paganini Electric Corp(See Signatories) (8), Novo Construction Inc (5), Clune Construction Company L P (4), Ayoob & Peery Plumbing Co Inc (2), Bcci Construction Company, Hathaway Dinwiddie Co., Hitt Contracting Inc., Intelligent Technologies & Services Inc, Metropolitan Electrical Construction, O C Mc Donald Co Inc, Otte North America Inc, Specialized Graphics Inc, Swinerton Builders
- Architects
- Eric Ibsen (32), Lida Hoe (8), Mark Walsh (7), Suwanty Mulia (6), David De Valeria (5), Stephani Kwan (3), Brent Allen (2), Jeffrey Schmierer (2), Justin Beadle (2), Katharine Dwyer (2), Michael Zelazek (2), Teresa K Emery (2), Candace Chan, Douglas Zucker, Forete Architecture, Guion Childress, Lawrence Smith, Levi Aburte, Pelli, Clarke & Pelli, Robert Lopez, Scott E Clement, Victoria Salgado, Yi-Tso Jeff Chen
- Engineers
- Edward Rivera (9), Wayne Gaw (7), Amit Wadhwa (4), Brett Sauers (4), Steven Shaeffer (4), Elisabeth M Allen (3), Jesus B Cabellon Jr (3), Alexander Joseph Pacheco (2), Andrew Lener (2), Bradley Hollub (2), Dean Macy (2), Edward Rivera (2), Joshua Mcmahan (2), Levi G. Abarte (2), Rudolfo P Bustos Iii (2), Susanna M. See (2), Aaron J. Strauch, Adam T. Hugo-Holman, Alan Charles Burr, Alan Robinson, Carlo Biscocho, David Rossi, David Rossi, Edward Robinson, Jeffrey Kersh, Jennifer Keeene, Jordan Weatherred, Nicole E Crone, Pablo Orozco, Sherry Chaumpluke, Shyam Kumar, Todd Frederick, Tony Jacob, Xiaobo Wong, Zack C Kardon
- Designers
- Ronald Demartini (8), Robert Buckley (5), Golden Gate Fire Protection (3), Pioneer Fire Inc. (3), R L H Fire Protection Inc (2), Mark Ruben Friedberg, Peter Mchugh
- Pmt consultant/expediters
- Alan Robinson
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.