David Rossi
- Listed as
- engineer
- On San Francisco permits
- Dec 2021 to Sep 2026
6 permits since 2000 (engineer on 6 permits): 3 completed, 2 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 16, 2026 | In progress issued Sep 2026 | 255 California St | Novo Construction Inc | floor reinforcement and anchorage details for atm safe and cash recycler.Details
floor reinforcement and anchorage details for atm safe and cash recycler. | $10,000 |
| Mar 24, 2026 | In progress issued Mar 2026 | 255 California St | Novo Construction Inc | 11/f suite 1100: interior tenant improvement. installation of (4) new furniture pods. structural anchoring and reinforcement.Details
11/f suite 1100: interior tenant improvement. installation of (4) new furniture pods. structural anchoring and reinforcement. | $15,000 |
| Sep 3, 2025 | Completed final sign-off Aug 2026 | 55 Spear St | Novo Construction Inc | 19th floor:revision to pa #202503172361 to revise phone room 1935, pantry 1976 and conference 1911 and 1910 doors. misc. revisions throughout 19th floor.Details
19th floor:revision to pa #202503172361 to revise phone room 1935, pantry 1976 and conference 1911 and 1910 doors. misc. revisions throughout 19th floor. | |
| Jun 4, 2024 | Completed final sign-off Aug 2024 | 1360 43rd Av | Icosa Design Llc | public art piece which consists of printer artwork of 3form panels mounted to powdercoated aluminum frame will be attached to structural plates on the side of the builidng via a rough terrain scissor lift. the artwork is 48'-9 3/4x8' and structural review and calculations were performed by a licenseDetails
public art piece which consists of printer artwork of 3form panels mounted to powdercoated aluminum frame will be attached to structural plates on the side of the builidng via a rough terrain scissor lift. the artwork is 48'-9 3/4x8' and structural review and calculations were performed by a license | $252,679 |
| Jul 7, 2022 | Completed final sign-off Oct 2022 | 460 Ellis St | Pacific Weathershield | installing a unistrut racking to facilitate 2 heat pumps at roof. is located at central light well not visible from the public right of way.install 4 new water tanks and one electic water heater in basement.Details
installing a unistrut racking to facilitate 2 heat pumps at roof. is located at central light well not visible from the public right of way.install 4 new water tanks and one electic water heater in basement. | $13,398 |
| Dec 28, 2021 | Never finaled issued Mar 2022, no final | 120 Stockton St | Novo Construction Inc | construction of on structural partitions, new acoustical grid and tile and gyp board ceilings. new finishes throughout at basement, 1, and 2. rev. to 202008101490 & 201805048215Details
construction of on structural partitions, new acoustical grid and tile and gyp board ceilings. new finishes throughout at basement, 1, and 2. rev. to 202008101490 & 201805048215 | $1,460,000 |