Block 0313, lot 017
120 Stockton St
- City’s use
- Commercial Office
- Built
- 1974
- Stories
- 7
- Units
- 1
- Building
- 263,640 sq ft
- Lot
- 31,440 sq ft
- Zoning
- C3R
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
142 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 28, 2026 | In progress issued Sep 2026 | 120 Stockton St | Bobcomm Llc Dba Pacific Das Llc. | replacing existing amplifier to meet current sfdt standards.Details
replacing existing amplifier to meet current sfdt standards. | $20,000 |
| Jul 29, 2026 | In progress filed Jul 2026, not yet issued | 100 Stockton St | 1st and 3rd floor - tenant improvement at ground and 3rd floors including demo and construction of interior partitions and doors, electrical, hvac and plumbing.Details
1st and 3rd floor - tenant improvement at ground and 3rd floors including demo and construction of interior partitions and doors, electrical, hvac and plumbing. | $14,150,000 | |
| Jul 27, 2026 | In progress filed Jul 2026, not yet issued | 120 Stockton St | 1st floor ti: renovation of an (e) white box retail space with an overall area of approx 1121sqft. work includes, new non load bearing partition, new finishes, new ceiling and lights throught, new furniture, and fixtures, new mpe work and fixtures.Details
1st floor ti: renovation of an (e) white box retail space with an overall area of approx 1121sqft. work includes, new non load bearing partition, new finishes, new ceiling and lights throught, new furniture, and fixtures, new mpe work and fixtures. | $750,000 | |
| Jul 23, 2026 | In progress filed Jul 2026, not yet issued | 120 Stockton St | 1/f: interior t.i to expand an (e) m group - ground floor tenant space into portion of the adjacent space, resulting in a single combined tenant space of approx 5582 sqft. the adjacent space is under the same brand/ownership and filed in a seperate permit app. work includes nonloading partitions,...Details
1/f: interior t.i to expand an (e) m group - ground floor tenant space into portion of the adjacent space, resulting in a single combined tenant space of approx 5582 sqft. the adjacent space is under the same brand/ownership and filed in a seperate permit app. work includes nonloading partitions,... | $1,250,000 | |
| May 21, 2026 | In progress issued Jul 2026 | 100 Stockton St | Novo Construction Inc | shoring and demo. levels 1-3 interior.Details
shoring and demo. levels 1-3 interior. | $173,545 |
| Apr 30, 2026 | In progress issued Jul 2026 | 100 Stockton St | core and shell construction of a ground level elevator lobby, addition of a pair of passenger elevators to serve future 3rd floor building tenant.Details
core and shell construction of a ground level elevator lobby, addition of a pair of passenger elevators to serve future 3rd floor building tenant. | $1,200,000 | |
| Dec 31, 2025 | In progress issued Jan 2026 | 40 Ofarrell St | Corporate Sign Systems | sign type r-2 tenant identify blade sign "convene". fabricate and install (1) internally illuminated secondary blade sing (double face). coneecting to power source (by others) with dedicated 20 amp circuit, photo cell and timer per plan.Details
sign type r-2 tenant identify blade sign "convene". fabricate and install (1) internally illuminated secondary blade sing (double face). coneecting to power source (by others) with dedicated 20 amp circuit, photo cell and timer per plan. | $2,775 |
| Aug 16, 2024 | Completed final sign-off Aug 2024 | 120 Stockton St | Plant Construction Co, Lp | to obtain final inspection for work approved under pa#: 2018.0820.7773, 2018.1128.6842 and 2019.0226.3805. all work is complete.Details
to obtain final inspection for work approved under pa#: 2018.0820.7773, 2018.1128.6842 and 2019.0226.3805. all work is complete. | |
| Aug 16, 2024 | Completed final sign-off Aug 2024 | 120 Stockton St | Plant Construction Co, Lp | to obtain final inspection for work approved under 202112275035 and 202112285097.Details
to obtain final inspection for work approved under 202112275035 and 202112285097. | |
| Aug 16, 2024 | In progress issued Aug 2024 | 120 Stockton St | Plant Construction Co, Lp | to obtain final inspection for work approved under pa#: 2021.0408.8200, 2021.0528.1299 and 2021.0917.8644 all work is complete.Details
to obtain final inspection for work approved under pa#: 2021.0408.8200, 2021.0528.1299 and 2021.0917.8644 all work is complete. | |
| May 23, 2024 | In progress issued May 2024 | 100 Stockton St | Priority Architectural Graphics Dba Prio | 4 evacuation plan maps floor 1, 6, 8, 7Details
4 evacuation plan maps floor 1, 6, 8, 7 | $1,800 |
| Oct 26, 2023 | Completed final sign-off Nov 2023 | 120 Stockton St | Pribuss Engineering Inc | mofidy sprinkler head locations to accommodate new ceiling/partition layout for (e) restaurant @ basement, 1/f & 8/f, as built rev: total upright sprinklers: 59. ref bpa#202301270867 & 202309227175Details
mofidy sprinkler head locations to accommodate new ceiling/partition layout for (e) restaurant @ basement, 1/f & 8/f, as built rev: total upright sprinklers: 59. ref bpa#202301270867 & 202309227175 | |
| Oct 16, 2023 | In progress issued Oct 2023 | 100 Stockton St | Corporate Sign Systems | 4-5/f: as-builts to pa# 202309126405, revised mapsDetails
4-5/f: as-builts to pa# 202309126405, revised maps | |
| Sep 22, 2023 | Completed final sign-off Oct 2023 | 120 Stockton St | Pribuss Engineering Inc | revision to pa# 202301270867, modify sprinkler head location to accommodate new ceiling and partition layout for existing restaurant space on 8th flr. total added uprights 57. total plugged pendents 36.Details
revision to pa# 202301270867, modify sprinkler head location to accommodate new ceiling and partition layout for existing restaurant space on 8th flr. total added uprights 57. total plugged pendents 36. | $29,298 |
| Sep 12, 2023 | Completed final sign-off Nov 2023 | 100 Stockton St | Corporate Sign Systems | level 4 & 5: new evacuation maps.Details
level 4 & 5: new evacuation maps. | $2,000 |
| Sep 11, 2023 | Completed final sign-off Feb 2024 | 100 Stockton St | Golden Gate Sign Company Inc. | install electric wall projecting double faced sign chotto matte (sign b)Details
install electric wall projecting double faced sign chotto matte (sign b) | $5,000 |
| Sep 11, 2023 | Completed final sign-off Feb 2024 | 100 Stockton St | Golden Gate Sign Company Inc. | install electric wall single faced sign chotto matte (sign a)Details
install electric wall single faced sign chotto matte (sign a) | $5,000 |
| Aug 15, 2023 | Completed final sign-off Oct 2023 | 100 Stockton St | Sabah International Incorporated | tenant improvement scope: a fire alarm system tenant improvement is taking place @ the 1st,4th & 5th floor levels.1st floor is small and doe snot effect the (e)desing.Details
tenant improvement scope: a fire alarm system tenant improvement is taking place @ the 1st,4th & 5th floor levels.1st floor is small and doe snot effect the (e)desing. | $67,200 |
| Aug 15, 2023 | Completed final sign-off Sep 2023 | 120 Stockton St | Aaa Restaurant Fire Control/Dba Aaa Fire | furnish and install one (1) ansual r-102 fire suppression system in the main kitchen area on the 5 fl. ref 202212218887.Details
furnish and install one (1) ansual r-102 fire suppression system in the main kitchen area on the 5 fl. ref 202212218887. | $12,000 |
| Jul 20, 2023 | Completed final sign-off Oct 2024 | 120 Stockton St | Skyline Construction | 4th & 5th/f: dph review for micro kitchen, ref pa# 202211237089. provide equipment & equipment schedule. re-arrange cabinetry & appliances location. for catering service.Details
4th & 5th/f: dph review for micro kitchen, ref pa# 202211237089. provide equipment & equipment schedule. re-arrange cabinetry & appliances location. for catering service. | $5,000 |
| May 12, 2023 | Completed final sign-off Oct 2024 | 120 Stockton St | Skyline Construction | mep deferred pa# 202211237089. 4th & 5th fl exhaust fans.Details
mep deferred pa# 202211237089. 4th & 5th fl exhaust fans. | $326,880 |
| May 12, 2023 | Completed final sign-off Feb 2025 | 120 Stockton St | Skyline Construction | 5/f kitchen: deferred mep pa# 2022-1221-8887, flrs 4 & 5Details
5/f kitchen: deferred mep pa# 2022-1221-8887, flrs 4 & 5 | $326,880 |
| May 12, 2023 | Completed final sign-off Oct 2024 | 120 Stockton St | Skyline Construction | deferred mep 1st, 4th, 5th fl. ref 202211096227Details
deferred mep 1st, 4th, 5th fl. ref 202211096227 | $326,880 |
| May 8, 2023 | Never finaled issued May 2023, no final | 120 Stockton St | Golden Gate Fire Protection Inc | fire sprinklers relocate 106 penden sprinklers and relocate 55 uprights on 4th fl. relocate 131 pend sprink and 49 uprighs and 3 dry pendents 5th fl. relocate 4 pendent sprinklers relocate 2 uprights 1st fl lobby. add new fire hose cabinets ea fl. 202304075312, 202211096222 lobby. 202211237089 andDetails
fire sprinklers relocate 106 penden sprinklers and relocate 55 uprights on 4th fl. relocate 131 pend sprink and 49 uprighs and 3 dry pendents 5th fl. relocate 4 pendent sprinklers relocate 2 uprights 1st fl lobby. add new fire hose cabinets ea fl. 202304075312, 202211096222 lobby. 202211237089 and | $189,200 |
| May 8, 2023 | Completed final sign-off Apr 2024 | 100 Stockton St | Sabah International Incorporated | 1/f, 6/f, 7/f & 8/f: t.i., no changes to smoke control sequence or smoke control, provide/install new remote annunciator per plans, adjust (e) devices due to new ceiling height. ref bpa#202212168520 (aka 120 stockton street)Details
1/f, 6/f, 7/f & 8/f: t.i., no changes to smoke control sequence or smoke control, provide/install new remote annunciator per plans, adjust (e) devices due to new ceiling height. ref bpa#202212168520 (aka 120 stockton street) | $23,215 |
| Apr 12, 2023 | Never finaled issued Jun 2023, no final | 120 Stockton St | Skyline Construction, Corporate Sign Systems | electric dbl faced projecting wall sign "convene"Details
electric dbl faced projecting wall sign "convene" | $7,500 |
| Apr 12, 2023 | Never finaled issued Jun 2023, no final | 120 Stockton St | Skyline Construction, Corporate Sign Systems | electric transom portal sign "convene", projecting, single faceDetails
electric transom portal sign "convene", projecting, single face | $10,000 |
| Apr 7, 2023 | Completed final sign-off Oct 2024 | 120 Stockton St | Skyline Construction | revision to pa# 202211096227, reconfigure lobby layout including relocate furring partitions and reception desk no alterations to permitted accessible path of egress path.Details
revision to pa# 202211096227, reconfigure lobby layout including relocate furring partitions and reception desk no alterations to permitted accessible path of egress path. | |
| Mar 13, 2023 | Never finaled issued Mar 2023, no final | 100 Stockton St | per pa #201805048215 #201805048215s, add addresses 100, 110, 130 stockton st to apn 0313/017Details
per pa #201805048215 #201805048215s, add addresses 100, 110, 130 stockton st to apn 0313/017 | ||
| Mar 13, 2023 | Never finaled issued Mar 2023, no final | 30 Ofarrell St | per pa #201805048215 #201805048215s, add addresses 30, 40, 60, 70 ofarrell st to apn 0313/017Details
per pa #201805048215 #201805048215s, add addresses 30, 40, 60, 70 ofarrell st to apn 0313/017 | ||
| Mar 8, 2023 | Completed final sign-off Jan 2024 | 120 Stockton St | Sabah International Incorporated | tenant improvement, fire alarm system taking place at the level 1 which consist of creating (5) tenant spaceDetails
tenant improvement, fire alarm system taking place at the level 1 which consist of creating (5) tenant space | $35,000 |
| Feb 15, 2023 | Completed final sign-off Mar 2023 | 120 Stockton St | Pioneer Fire Inc. | convert (28) uprights to pendents add 3 pendents. ref pa 2022-1222-9002 & 202212168520Details
convert (28) uprights to pendents add 3 pendents. ref pa 2022-1222-9002 & 202212168520 | $6,200 |
| Feb 13, 2023 | Completed final sign-off Sep 2024 | 120 Stockton St | Calasia Construction Inc | suite #856. revision to pa# 202202168080. reduction in scope from originally approved ti permit. affected trades include ameps. no change in building square footage or height. no site work on this permit.Details
suite #856. revision to pa# 202202168080. reduction in scope from originally approved ti permit. affected trades include ameps. no change in building square footage or height. no site work on this permit. | |
| Feb 10, 2023 | Completed final sign-off Oct 2023 | 120 Stockton St | Edison Fire Extinguisher Company Inc | installation of new ul300 tank hood and fire suppression systemDetails
installation of new ul300 tank hood and fire suppression system | $6,600 |
| Feb 2, 2023 | Completed final sign-off Oct 2023 | 120 Stockton St | Sabah International Incorporated | a fire alarm system tenant improvement is taking place in the basement first and 8th floor levels, basement and 1st floor areas are smallDetails
a fire alarm system tenant improvement is taking place in the basement first and 8th floor levels, basement and 1st floor areas are small | $62,260 |
| Jan 27, 2023 | Completed final sign-off Oct 2023 | 120 Stockton St | Pribuss Engineering Inc | modify sprinkler head locations to accomodate new ceiling and partition layout for existing restaurant space on basement, 1/f, 8/f. total sprinker 105Details
modify sprinkler head locations to accomodate new ceiling and partition layout for existing restaurant space on basement, 1/f, 8/f. total sprinker 105 | $53,970 |
| Jan 26, 2023 | Expired or cancelled withdrawn Oct 2023 | 120 Stockton St | Pioneer Fire Inc. | relocate system shut off valve, alarm valve & drain system closer to newly installed access panel on 1st floor. coring through 1st floor to basement level to connect level one drain pupe to main drain.Details
relocate system shut off valve, alarm valve & drain system closer to newly installed access panel on 1st floor. coring through 1st floor to basement level to connect level one drain pupe to main drain. | $16,046 |
| Dec 22, 2022 | Never finaled issued Feb 2023, no final | 120 Stockton St | Novo Construction Inc | ground flr: ti mechanical, electrical and plumbing, ref # 202208241210Details
ground flr: ti mechanical, electrical and plumbing, ref # 202208241210 | $195,000 |
| Dec 21, 2022 | Completed final sign-off Sep 2023 | 120 Stockton St | Skyline Construction | 4/f & 5/f: buildout of support pantry & service kitchen, partitions, ceilings, fixtures, finishes, kitchen equipment. ref bpa#202211237089 for convene t.i. mep deferred.Details
4/f & 5/f: buildout of support pantry & service kitchen, partitions, ceilings, fixtures, finishes, kitchen equipment. ref bpa#202211237089 for convene t.i. mep deferred. | $250,000 |
| Dec 16, 2022 | Never finaled issued Jan 2023, no final | 120 Stockton St | Novo Construction Inc | lobby/6/7/8-f: t.i., demo of doors, new nonstructural elements; lobby: new security desk, furry walls, ceiling, electrical, mechanical; 6&7/f: elevatory lobby/restroom upgrades; 7&8/f: new office amenity, new ceiling finishes, furring walls, breakroom. structural trellis on exterior deckDetails
lobby/6/7/8-f: t.i., demo of doors, new nonstructural elements; lobby: new security desk, furry walls, ceiling, electrical, mechanical; 6&7/f: elevatory lobby/restroom upgrades; 7&8/f: new office amenity, new ceiling finishes, furring walls, breakroom. structural trellis on exterior deck | $450,000 |
| Nov 23, 2022 | Completed final sign-off Feb 2025 | 120 Stockton St | Skyline Construction | 4th & 5th fl: interior tenant improvement includes new non-load bearing partitions, ceilings, work, finishes, and casework. installation of horizontal exit assembly. "change of use at 4/f-5/f to assembly occupancy and general entertainment use per planning code."Details
4th & 5th fl: interior tenant improvement includes new non-load bearing partitions, ceilings, work, finishes, and casework. installation of horizontal exit assembly. "change of use at 4/f-5/f to assembly occupancy and general entertainment use per planning code." | $2,000,000 |
| Nov 22, 2022 | Completed final sign-off Feb 2023 | 120 Stockton St | Pioneer Fire Inc. | 1st flr - add (4) pendent sprinkler heads and (14) uprights total (18) heads. gcti #202208241210.Details
1st flr - add (4) pendent sprinkler heads and (14) uprights total (18) heads. gcti #202208241210. | $2,700 |
| Nov 9, 2022 | Completed final sign-off Feb 2025 | 120 Stockton St | Skyline Construction | tenant improvement in a vacant core & shell bldg. work area include g/f lobby serving tenant spaceon level 4 & 5. restrooms & idf rooms in tenant space. installation of non-bearing partitions, ceiling finishes fixtures & casework.Details
tenant improvement in a vacant core & shell bldg. work area include g/f lobby serving tenant spaceon level 4 & 5. restrooms & idf rooms in tenant space. installation of non-bearing partitions, ceiling finishes fixtures & casework. | $150,000 |
| Sep 1, 2022 | Never finaled issued Sep 2022, no final | 120 Stockton St | Priority Architectural Graphics Dba Prio | all floores: 57 evacuation plan maps.Details
all floores: 57 evacuation plan maps. | $24,225 |
| Aug 26, 2022 | Expired or cancelled cancelled Jan 2026 | 120 Stockton St | type 1 kitchenhood associated with ti pa#202202168080Details
type 1 kitchenhood associated with ti pa#202202168080 | $25,000 | |
| Aug 24, 2022 | Never finaled issued Sep 2022, no final | 120 Stockton St | Novo Construction Inc | g/f: tenant improvement. construction of new non-structural partitions, new acoustical ceilings (restroom only) and new wall finishes (restroom, janitor's closet, drinking fountains surround only)Details
g/f: tenant improvement. construction of new non-structural partitions, new acoustical ceilings (restroom only) and new wall finishes (restroom, janitor's closet, drinking fountains surround only) | $1,272,550 |
| Aug 11, 2022 | Never finaled issued Jan 2023, no final | 120 Stockton St | Novo Construction Inc | revision to pa202204212700; to add additional ductwork on basement level; ref 202112285092. maher n/a.Details
revision to pa202204212700; to add additional ductwork on basement level; ref 202112285092. maher n/a. | $5,000 |
| Jul 21, 2022 | Never finaled issued Aug 2022, no final | 120 Stockton St | Novo Construction Inc | placement of concrete & ramps only for a future tenant improvement. new concrete slabs to be placed above (e) concrete installed under bpa#202008101490 in preperation of future t.i. no demo of (e) concrete. temp guard will provided btw future t.i. along ramps, and where change in elev exceeded 6".Details
placement of concrete & ramps only for a future tenant improvement. new concrete slabs to be placed above (e) concrete installed under bpa#202008101490 in preperation of future t.i. no demo of (e) concrete. temp guard will provided btw future t.i. along ramps, and where change in elev exceeded 6". | $1,200,000 |
| Jun 24, 2022 | Completed final sign-off Jul 2022 | 120 Stockton St | Sabah International Incorporated | basement, l1,l2: t.i.: no changes to smoke control, no elevator work. new audible & visual - 3 strobes, 3 speakers, 5 smoke detectors. ref pa202112285092Details
basement, l1,l2: t.i.: no changes to smoke control, no elevator work. new audible & visual - 3 strobes, 3 speakers, 5 smoke detectors. ref pa202112285092 | $32,190 |
| Apr 25, 2022 | Completed final sign-off Jun 2022 | 120 Stockton St | Pioneer Fire Inc. | (basement, 1st & 2nd fl) relocate & add sprinklers due to new space. 14 pendents, 2 uprights. ref pa# 202112285092.Details
(basement, 1st & 2nd fl) relocate & add sprinklers due to new space. 14 pendents, 2 uprights. ref pa# 202112285092. | $8,000 |
| Apr 21, 2022 | Never finaled issued Jun 2022, no final | 120 Stockton St | Novo Construction Inc | mep: basement, 1st, and 2nd floor: tennant improvement ref pa#202112285092 to include new ductwork, new power and data for work stations and offices, new power for breakroom. new lighting and controls.Details
mep: basement, 1st, and 2nd floor: tennant improvement ref pa#202112285092 to include new ductwork, new power and data for work stations and offices, new power for breakroom. new lighting and controls. | $120,000 |
| Feb 16, 2022 | Completed final sign-off Sep 2024 | 120 Stockton St | Sunshine Comm'l Constr. Inc., Calasia Construction Inc | interior tenant suite 856 fit out & change of occupancy for(n) restaurant.t.i. improvement within an existing 8 stories shell bldg,scope to include:interior partitions,kitchen equipment,retrooms,mech,elec & plu system improvements as required for a full t.i. build out.no site work in this scope.Details
interior tenant suite 856 fit out & change of occupancy for(n) restaurant.t.i. improvement within an existing 8 stories shell bldg,scope to include:interior partitions,kitchen equipment,retrooms,mech,elec & plu system improvements as required for a full t.i. build out.no site work in this scope. | $6,250,000 |
| Dec 28, 2021 | Never finaled issued Mar 2022, no final | 120 Stockton St | Novo Construction Inc | construction of on structural partitions, new acoustical grid and tile and gyp board ceilings. new finishes throughout at basement, 1, and 2. rev. to 202008101490 & 201805048215Details
construction of on structural partitions, new acoustical grid and tile and gyp board ceilings. new finishes throughout at basement, 1, and 2. rev. to 202008101490 & 201805048215 | $1,460,000 |
| Dec 28, 2021 | Expired or cancelled expired Aug 2024 | 120 Stockton St | Plant Construction Co, Lp | revision to addendum 3 of 201805045215 and 202008101490. limited to a revised fan damper matrix on sheet m801Details
revision to addendum 3 of 201805045215 and 202008101490. limited to a revised fan damper matrix on sheet m801 | |
| Dec 27, 2021 | Expired or cancelled expired Aug 2024 | 120 Stockton St | Plant Construction Co, Lp | storm water control plans for pa# 201805048215 & pa# 202008101490. for pid review only.Details
storm water control plans for pa# 201805048215 & pa# 202008101490. for pid review only. | |
| Dec 22, 2021 | Completed final sign-off Aug 2024 | 120 Stockton St | Plant Construction Co, Lp | revision to pa# 2018-0504-8215 addendum #8 update elevator matrixDetails
revision to pa# 2018-0504-8215 addendum #8 update elevator matrix | |
| Dec 15, 2021 | Completed final sign-off Mar 2023 | 120 Stockton St | Sabah International Incorporated | revision to permit 201805048215-s8 two way communication only. change from rath 2400-808nspm call stations to rath 2400-808nsp call stations.Details
revision to permit 201805048215-s8 two way communication only. change from rath 2400-808nspm call stations to rath 2400-808nsp call stations. | |
| Dec 2, 2021 | Expired or cancelled cancelled Jan 2026 | 120 Stockton St | suite 856: upgrades include structural reinforcement for future roof opening, future skylight, future landscap aeras and future boulder fixtures.Details
suite 856: upgrades include structural reinforcement for future roof opening, future skylight, future landscap aeras and future boulder fixtures. | $175,000 | |
| Sep 17, 2021 | Never finaled issued Sep 2021, no final | 120 Stockton St | Plant Construction Co, Lp | revision to pa 2018-0504-8215 s12 fuel oil/generator to include clarification to wall rating to match ab2.07 & elimination of curb & (1) floor leak sensor @ generator room, due to second containment @ belly tankDetails
revision to pa 2018-0504-8215 s12 fuel oil/generator to include clarification to wall rating to match ab2.07 & elimination of curb & (1) floor leak sensor @ generator room, due to second containment @ belly tank | |
| May 28, 2021 | Never finaled issued Sep 2021, no final | 120 Stockton St | Plant Construction Co, Lp | partial replacement of (e) pg&e vault lid due to upgraded lift out panel & sizing as well as associated demolition & structural upgrades. refer to the site permit 201805048215Details
partial replacement of (e) pg&e vault lid due to upgraded lift out panel & sizing as well as associated demolition & structural upgrades. refer to the site permit 201805048215 | $60,000 |
| Apr 8, 2021 | Never finaled issued Jan 2022, no final | 120 Stockton St | Plant Construction Co, Lp | addition of a scissor lift in the loading dock and (2) hour rated glazing on the north facade, level 6 & 7. revision to pa#201805048215 & #202008101490(arch) / #202008131716(str).Details
addition of a scissor lift in the loading dock and (2) hour rated glazing on the north facade, level 6 & 7. revision to pa#201805048215 & #202008101490(arch) / #202008131716(str). | $50,000 |
| Aug 13, 2020 | Never finaled issued Feb 2021, no final | 120 Stockton St | Plant Construction Co, Lp | revisions to bpa# 201805048215 addenda 2 structural - superstructure include the following: 1) new passenger elevator servicing levels 1-5. 2) mep shaft updates at the northwest mechanical room. 3) revised dead and live loading at levels 2-5.Details
revisions to bpa# 201805048215 addenda 2 structural - superstructure include the following: 1) new passenger elevator servicing levels 1-5. 2) mep shaft updates at the northwest mechanical room. 3) revised dead and live loading at levels 2-5. | $250,000 |
| Aug 10, 2020 | Never finaled issued Dec 2021, no final | 120 Stockton St | Plant Construction Co, Lp | revision to bpa #2018-0504-8215 s3 arch/mep. minor construction and lease driven changes, including the addition of an elevator and windows on north facade.Details
revision to bpa #2018-0504-8215 s3 arch/mep. minor construction and lease driven changes, including the addition of an elevator and windows on north facade. | $1,100,000 |
| Oct 11, 2019 | Never finaled issued Oct 2019, no final | 120 Stockton St | street spaceDetails
street space | ||
| Mar 29, 2019 | Never finaled issued Apr 2019, no final | 120 Stockton St | street space and metered parking.Details
street space and metered parking. | ||
| Feb 26, 2019 | Expired or cancelled expired Aug 2024 | 120 Stockton St | Plant Construction Co, Lp | new foundation & new opening in (e) floor slabs for installation of construction tower crane. ** comply maher ord 155-13**Details
new foundation & new opening in (e) floor slabs for installation of construction tower crane. ** comply maher ord 155-13** | $300,000 |
| Feb 22, 2019 | Never finaled issued Feb 2019, no final | 120 Stockton St | street spaceDetails
street space | ||
| Jan 9, 2019 | Never finaled issued Feb 2019, no final | 120 Stockton St | street spaceDetails
street space | ||
| Nov 28, 2018 | Expired or cancelled expired Aug 2024 | 120 Stockton St | Plant Construction Co, Lp | rooftop and basement slab demo.Details
rooftop and basement slab demo. | $1,000 |
| Aug 20, 2018 | Expired or cancelled expired Aug 2024 | 120 Stockton St | Plant Construction Co, Lp | proposed soft demo consists of the removal of all equipment, doors, partitions, furnishings, ceilings, and other non-concrete, non structural construction. ab017. construction under app#201805048215Details
proposed soft demo consists of the removal of all equipment, doors, partitions, furnishings, ceilings, and other non-concrete, non structural construction. ab017. construction under app#201805048215 | $100,000 |
| May 4, 2018 | Completed final sign-off Aug 2024 | 120 Stockton St | Pribuss Engineering Inc, Plant Construction Co, Lp | major alterations of an (e) building & includes the replacement of exterior wall & the addition of 4 roof amenity space. **comply w/ maher**Details
major alterations of an (e) building & includes the replacement of exterior wall & the addition of 4 roof amenity space. **comply w/ maher** | $80,000,000 |
| Mar 30, 2016 | Completed final sign-off May 2016 | 120 Stockton St | Pacific Auxiliary Fire Alarm | fire alarm adding 2 strobes and 1 horn/strobe to the (e) fire alarm system due to a ti on the 3rd floor. ref pa 2015-1218-5524. maher naDetails
fire alarm adding 2 strobes and 1 horn/strobe to the (e) fire alarm system due to a ti on the 3rd floor. ref pa 2015-1218-5524. maher na | $1,700 |
| Jan 20, 2016 | Never finaled issued Feb 2016, no final | 120 Stockton St | Build By Design | install 2 new circuits to new cash wrap. 1 new circuit to back of house. new floor fixtures in e space. no modifications to sprinklerDetails
install 2 new circuits to new cash wrap. 1 new circuit to back of house. new floor fixtures in e space. no modifications to sprinkler | $15,000 |
| Dec 18, 2015 | Completed final sign-off May 2016 | 120 Stockton St | Sachse Construction And Dev. | 34d fkiirl t.i. for hugo boss boutique in macy's men's store on 3rd floor. no exterior work. no mechanical work. lighting only. signage under separate permit. n/a maher ord. 155-13Details
34d fkiirl t.i. for hugo boss boutique in macy's men's store on 3rd floor. no exterior work. no mechanical work. lighting only. signage under separate permit. n/a maher ord. 155-13 | $142,000 |
| Sep 4, 2015 | Completed final sign-off Oct 2015 | 120 Stockton St | Trainor Commercial Construction Inc. | ground flr: minor ti for m. kors work includes (n) fixtures, finishes, elec recpetacles. no change to mep/fire/life safety. maher naDetails
ground flr: minor ti for m. kors work includes (n) fixtures, finishes, elec recpetacles. no change to mep/fire/life safety. maher na | $80,000 |
| Jan 23, 2015 | Completed final sign-off Feb 2015 | 120 Stockton St | Potter Fire Protection | relocate 13 fire sprinklers and install seismic end- of - line graces. ref #201501216281. n/a meher ordinanceDetails
relocate 13 fire sprinklers and install seismic end- of - line graces. ref #201501216281. n/a meher ordinance | $7,000 |
| Jan 21, 2015 | Completed final sign-off Jun 2015 | 120 Stockton St | Freeman Construction Company | 3/f: tenant improvement inc sportswear expansion. includes interior partitions, minor ceiling remodel, floor and wall finishes, fixutre. elec mech sep permit. compliance with maher ordinance no 155-13 not required.Details
3/f: tenant improvement inc sportswear expansion. includes interior partitions, minor ceiling remodel, floor and wall finishes, fixutre. elec mech sep permit. compliance with maher ordinance no 155-13 not required. | $59,585 |
| Nov 5, 2014 | Never finaled issued Nov 2014, no final | 120 Stockton St | Maguire Inc Dba Lahue And Associates | replace in kind the canopy taken down for mta. central sub way project. originally canopy was taken down under 201406168543. bldg required that we provide another permit to reattach (attchment detail).; maher n/aDetails
replace in kind the canopy taken down for mta. central sub way project. originally canopy was taken down under 201406168543. bldg required that we provide another permit to reattach (attchment detail).; maher n/a | |
| Aug 4, 2014 | Completed final sign-off Aug 2014 | 120 Stockton St | Potter Fire Protection | relocate 3 fire sprinklers. ref app#201406269584. n/a for the maher ordiance #155-13Details
relocate 3 fire sprinklers. ref app#201406269584. n/a for the maher ordiance #155-13 | $1,280 |
| Jun 26, 2014 | Completed final sign-off Dec 2014 | 120 Stockton St | West Coast Commercial Interiors | t.i. demo extg millwork and finishes. install new millwork flooring and finishes with associcated electrical. no ceiling lighting changes. no mechanical changes. all electrical, sprklr,fire alarm work is to be under separate permit. n/a for the maher ordinance #155-13Details
t.i. demo extg millwork and finishes. install new millwork flooring and finishes with associcated electrical. no ceiling lighting changes. no mechanical changes. all electrical, sprklr,fire alarm work is to be under separate permit. n/a for the maher ordinance #155-13 | $15,000 |
| Jun 16, 2014 | Never finaled issued Jun 2014, no final | 120 Stockton St | Maguire Inc Dba Lahue And Associates | central subway project 2 of 3 canopies must be removed to accomodate equipment which will dig a constrn. emergency egress route from tunnel. awnings no.1 and no. 2 on o'farrell to be removed, stored. reinstalled in same or better condition under separate permit; compliance with ord 155-13 not req'dDetails
central subway project 2 of 3 canopies must be removed to accomodate equipment which will dig a constrn. emergency egress route from tunnel. awnings no.1 and no. 2 on o'farrell to be removed, stored. reinstalled in same or better condition under separate permit; compliance with ord 155-13 not req'd | $50,000 |
| May 7, 2014 | Never finaled issued May 2014, no final | 120 Stockton St | Marini Construction Inc | revision to pa # 2014-0304-9793 - change address from 170 ofarrell to 120 stockton space 428: t.i project for a michael kors vender shop inside macy's store. work to include elect., flooring, drywall, and structural signage reinforcement. n/a for the maher ordinance #155-13Details
revision to pa # 2014-0304-9793 - change address from 170 ofarrell to 120 stockton space 428: t.i project for a michael kors vender shop inside macy's store. work to include elect., flooring, drywall, and structural signage reinforcement. n/a for the maher ordinance #155-13 | $199,534 |
| Oct 24, 2013 | Never finaled issued Oct 2013, no final | 120 Stockton St | Potter Fire Protection | relocate 9 fire sprinklers on the 3rd fl. ref permit #201310159187Details
relocate 9 fire sprinklers on the 3rd fl. ref permit #201310159187 | $4,000 |
| Oct 15, 2013 | Completed final sign-off Nov 2013 | 120 Stockton St | Compass Construction | 3rd floor-tenant improvement of an (e) calvin klein area-new display shelving, display racks, new flooring, new partial ceiling soffit & associated electricalDetails
3rd floor-tenant improvement of an (e) calvin klein area-new display shelving, display racks, new flooring, new partial ceiling soffit & associated electrical | $75,000 |
| Sep 13, 2013 | Completed final sign-off Oct 2013 | 120 Stockton St | Granger Contracting Company Incorporated | remodel sales floor. add new cash wrapDetails
remodel sales floor. add new cash wrap | $38,000 |
| Jul 31, 2012 | Completed final sign-off Mar 2013 | 120 Stockton St | Pacific Auxiliary Fire Alarm | revision to 201206061979 due to field changes. add 7 devices and removing 2 sd.Details
revision to 201206061979 due to field changes. add 7 devices and removing 2 sd. | $3,000 |
| Jun 6, 2012 | Completed final sign-off Mar 2013 | 120 Stockton St | Pacific Auxiliary Fire Alarm | add 24 horn strobes, 6 strobes, 2 smoke detectors, 1 horn and 1 relay on the 7th flDetails
add 24 horn strobes, 6 strobes, 2 smoke detectors, 1 horn and 1 relay on the 7th fl | $19,000 |
| May 17, 2012 | Completed final sign-off May 2012 | 120 Stockton St | 6th floor-partial 10th storage rock instllation. t.i approved under pa# 2011-1104-8325. sprinkler revisions under separate application.Details
6th floor-partial 10th storage rock instllation. t.i approved under pa# 2011-1104-8325. sprinkler revisions under separate application. | $40,000 | |
| Mar 19, 2012 | Completed final sign-off Jan 2013 | 120 Stockton St | Big Joe California North Inc | install storage racks in basement level storage room. nfpa 13 owner's certificate included- sprinklera and fire alarm separate permit.Details
install storage racks in basement level storage room. nfpa 13 owner's certificate included- sprinklera and fire alarm separate permit. | $10,000 |
| Mar 12, 2012 | Completed final sign-off Jun 2012 | 120 Stockton St | Trainor Commercial Construction Inc. | interior non structural improvements to the 1st floor of extg macy's to install a new vender in a 550 sq ft. floor lease area.Details
interior non structural improvements to the 1st floor of extg macy's to install a new vender in a 550 sq ft. floor lease area. | $32,750 |
| Mar 6, 2012 | Completed final sign-off Mar 2012 | 120 Stockton St | Potter Fire Protection | relocate 21 plugs, 2 plugs, 5 sprinlkersDetails
relocate 21 plugs, 2 plugs, 5 sprinlkers | $12,000 |
| Feb 10, 2012 | Completed final sign-off Mar 2012 | 120 Stockton St | Big Joe California North Inc | install storage racks in storage room on the 6th floor. ti under 201111048325Details
install storage racks in storage room on the 6th floor. ti under 201111048325 | $20,000 |
| Jan 26, 2012 | Completed final sign-off Feb 2013 | 120 Stockton St | Trainor Commercial Construction Inc. | interior non structural tenant improvement to the 2nd and 3rd floors extg macy's men's retail work to include cabinet and shelving remodel and lighting. fire alarm and sprinkler under seperate permit.Details
interior non structural tenant improvement to the 2nd and 3rd floors extg macy's men's retail work to include cabinet and shelving remodel and lighting. fire alarm and sprinkler under seperate permit. | $32,794 |
| Jan 11, 2012 | Completed final sign-off May 2012 | 120 Stockton St | Potter Fire Protection | 1st floor:relocate 56, add 3, change 81 and plug 7 fire sprinklers.Details
1st floor:relocate 56, add 3, change 81 and plug 7 fire sprinklers. | $36,000 |
| Nov 15, 2011 | Expired or cancelled withdrawn Apr 2012 | 120 Stockton St | replace (e) exterior entrance doors at the two customer entrances. ti approved under pa #201111048325Details
replace (e) exterior entrance doors at the two customer entrances. ti approved under pa #201111048325 | $10,000 | |
| Nov 4, 2011 | Completed final sign-off Feb 2013 | 120 Stockton St | Trainor Commercial Construction Inc. | interior tenant improvement on the 1st and 6th floors. no exterior work this permit.Details
interior tenant improvement on the 1st and 6th floors. no exterior work this permit. | $257,560 |
| Oct 11, 2011 | Completed final sign-off Feb 2012 | 120 Stockton St | Big Joe California North Inc | macy's. install storage rack in storage rooms on the 4th floor. ti approved under pa# 2011.08.16.2547Details
macy's. install storage rack in storage rooms on the 4th floor. ti approved under pa# 2011.08.16.2547 | $20,000 |
| Sep 30, 2011 | Completed final sign-off Mar 2012 | 120 Stockton St | Potter Fire Protection | 4th floor-relocate 34 & plug 19 fire sprinklers onlyDetails
4th floor-relocate 34 & plug 19 fire sprinklers only | $15,000 |
| Aug 16, 2011 | Completed final sign-off Feb 2012 | 120 Stockton St | Trainor Commercial Construction Inc. | 4th floor t.i. interior non-structural work of existing bldg, new partitions & lighting.Details
4th floor t.i. interior non-structural work of existing bldg, new partitions & lighting. | $178,449 |
| Aug 16, 2011 | Completed final sign-off Dec 2011 | 120 Stockton St | Big Joe California North Inc | revision to pa #201108011404 to show aisle width dimensions 5th floor at stock rooms/storage areas.Details
revision to pa #201108011404 to show aisle width dimensions 5th floor at stock rooms/storage areas. | $500 |
| Aug 12, 2011 | Completed final sign-off Feb 2013 | 120 Stockton St | Pacific Auxiliary Fire Alarm | voluntary upgrade of an existing fire alarm system. replace facp and all initiating devices and some notification appliances.Details
voluntary upgrade of an existing fire alarm system. replace facp and all initiating devices and some notification appliances. | $196,000 |
| Aug 4, 2011 | Completed final sign-off Sep 2011 | 120 Stockton St | Potter Fire Protection | relocated 255 fire sprinklers, plug 24 fire sprinklers on the 5th floor only- pipe schedule- new siesmic bracing-Details
relocated 255 fire sprinklers, plug 24 fire sprinklers on the 5th floor only- pipe schedule- new siesmic bracing- | $94,500 |
| Aug 1, 2011 | Completed final sign-off Dec 2011 | 120 Stockton St | Big Joe California North Inc | 5th floor-tenant improvement-storage racks only (6495 sf)Details
5th floor-tenant improvement-storage racks only (6495 sf) | $81,700 |
| Jun 22, 2011 | Completed final sign-off Feb 2013 | 120 Stockton St | Trainor Commercial Construction Inc. | interior non structural t i to lower level 14,000 sq ft half of floor. install partitions, new electrical floor outlets and light fixtures. extg restroom accessories will be upgraded for accessibilty.Details
interior non structural t i to lower level 14,000 sq ft half of floor. install partitions, new electrical floor outlets and light fixtures. extg restroom accessories will be upgraded for accessibilty. | $47,994 |
| May 20, 2011 | Completed final sign-off Dec 2011 | 120 Stockton St | Trainor Commercial Construction Inc. | 5th floor tenant improvement for retail sales area. life safety permits separate.Details
5th floor tenant improvement for retail sales area. life safety permits separate. | $243,944 |
| Apr 26, 2011 | Completed final sign-off Dec 2011 | 120 Stockton St | Trainor Commercial Construction Inc. | interior non-structural demo to (e) building 5th. flr. (per ab-017) structural slab under separate permitsDetails
interior non-structural demo to (e) building 5th. flr. (per ab-017) structural slab under separate permits | $80,000 |
| Nov 10, 2010 | Never finaled issued Nov 2010, no final | 50 Ofarrell St | Trainor Commercial Construction Inc. | macy's men store. remove an existing exterior canopy on south side of building, also required one lane of traffic is closed for equipment useDetails
macy's men store. remove an existing exterior canopy on south side of building, also required one lane of traffic is closed for equipment use | $16,000 |
| Oct 5, 2009 | Completed final sign-off Dec 2009 | 50 Ofarrell St | Trainor Commercial Construction Inc. | 7th fl - remove communicating opening on 7th floor and infill with 3hr rated constructionDetails
7th fl - remove communicating opening on 7th floor and infill with 3hr rated construction | $8,500 |
| Jun 24, 2009 | Completed final sign-off Jul 2009 | 120 Stockton St | to obtain final inspection for work approved under pa 200607035609; all work is completeDetails
to obtain final inspection for work approved under pa 200607035609; all work is complete | ||
| Jun 24, 2009 | Completed final sign-off Jul 2009 | 120 Stockton St | to obtain final inspection for work approved under pa 200608290879; all work is completeDetails
to obtain final inspection for work approved under pa 200608290879; all work is complete | ||
| Nov 7, 2007 | Never finaled issued Nov 2007, no final | 120 Stockton St | West Coast Commercial Interiors | renew pa# 200607035609 for final inspectionDetails
renew pa# 200607035609 for final inspection | |
| Jul 26, 2007 | Never finaled issued Jul 2007, no final | 50 Ofarrell St | street spaceDetails
street space | ||
| Aug 29, 2006 | Expired or cancelled expired Mar 2009 | 120 Stockton St | Potter Fire Protection | relocate 9 and plug 26 fire sprinklers on the 3rd floor onlyDetails
relocate 9 and plug 26 fire sprinklers on the 3rd floor only | $2,850 |
| Jul 3, 2006 | Completed final sign-off Mar 2007 | 120 Stockton St | demolition & construction of non structural interior partitions, ceilings & finishes. any mech. elec or plumbing work required as a result of this work is to be design/build under a separate permit.Details
demolition & construction of non structural interior partitions, ceilings & finishes. any mech. elec or plumbing work required as a result of this work is to be design/build under a separate permit. | $80,000 | |
| Jun 15, 2006 | Completed final sign-off Dec 2006 | 120 Stockton St | water fountain is non compliant. revision to app #200602074014Details
water fountain is non compliant. revision to app #200602074014 | ||
| Feb 7, 2006 | Completed final sign-off Dec 2006 | 120 Stockton St | demo & cnstruction of non structural partitions, door, millwork & finishes in an existing macy's dept store. all mechanical, elec or plumbing work to be performed under a separate permit, any alterations to existing sprinkler layout as a result of this scope of work to be performed under separateDetails
demo & cnstruction of non structural partitions, door, millwork & finishes in an existing macy's dept store. all mechanical, elec or plumbing work to be performed under a separate permit, any alterations to existing sprinkler layout as a result of this scope of work to be performed under separate | $70,000 | |
| Jul 11, 2005 | Never finaled issued Jul 2005, no final | 120 Stockton St | Potter Fire Protection | relocate (3) and plug (1) fire sprinkler on the basement level onlyDetails
relocate (3) and plug (1) fire sprinkler on the basement level only | $850 |
| Jun 2, 2005 | Never finaled issued Jun 2005, no final | 120 Stockton St | Potter Fire Protection | relocate (26) and add (11) fire sprinklers on the 4th floorDetails
relocate (26) and add (11) fire sprinklers on the 4th floor | $7,500 |
| May 5, 2005 | Never finaled issued May 2005, no final | 120 Stockton St | demo,partitions,mill work,door,column wrap,new partition,mill work,column wrap,new carpet if needed.Details
demo,partitions,mill work,door,column wrap,new partition,mill work,column wrap,new carpet if needed. | $30,000 | |
| Apr 28, 2005 | Never finaled issued May 2005, no final | 120 Stockton St | Pacific Auxiliary Fire Alarm | add notification appliances to the fire alarm system in basement,2/f,4/f due to remodel of fittingDetails
add notification appliances to the fire alarm system in basement,2/f,4/f due to remodel of fitting | $31,500 |
| Mar 31, 2005 | Never finaled issued Mar 2005, no final | 120 Stockton St | Potter Fire Protection | relocate 12 fire sprinklers in basement,18 fire sprinklers on 2/f & 8 fire sprinklers on 4/f toDetails
relocate 12 fire sprinklers in basement,18 fire sprinklers on 2/f & 8 fire sprinklers on 4/f to | $7,500 |
| Feb 18, 2005 | Never finaled issued Feb 2005, no final | 120 Stockton St | tenant improvement of fitting rooms on lower level, 2nd floor & 3rd floor & 4th flrDetails
tenant improvement of fitting rooms on lower level, 2nd floor & 3rd floor & 4th flr | $75,000 | |
| Mar 10, 2004 | Completed final sign-off Aug 2004 | 120 Stockton St | Potter Fire Protection | add 14 fire sprinklers at the basement slab opening to rpovide a water curtain.Details
add 14 fire sprinklers at the basement slab opening to rpovide a water curtain. | $1,680 |
| Jul 16, 2003 | Expired or cancelled expired Aug 2011 | 50 Ofarrell St | Pacific Auxiliary Fire Alarm | adding to (e) fire alarm system due to remodel of basement and 1st floorDetails
adding to (e) fire alarm system due to remodel of basement and 1st floor | $27,000 |
| Jun 4, 2003 | Completed final sign-off Aug 2004 | 120 Stockton St | structural only- openings in slab. prv app 200304232956. ti is being done unders wep permit. titleDetails
structural only- openings in slab. prv app 200304232956. ti is being done unders wep permit. title | $100,000 | |
| Jun 3, 2003 | Completed final sign-off Aug 2004 | 120 Stockton St | Potter Fire Protection | fire sprinkler alterationpbasemnt 197 fire sprinkle,1st fl: 18 fire sprinkler,3rd fl 11 f/s relocateDetails
fire sprinkler alterationpbasemnt 197 fire sprinkle,1st fl: 18 fire sprinkler,3rd fl 11 f/s relocate | $24,000 |
| Apr 23, 2003 | Completed final sign-off Aug 2004 | 120 Stockton St | remodel basement,gr flr,alterations to sales floors, fitting rm partitions, fixtures, sales stationsDetails
remodel basement,gr flr,alterations to sales floors, fitting rm partitions, fixtures, sales stations | $300,000 | |
| Apr 23, 2003 | Completed final sign-off Jun 2003 | 120 Stockton St | demolition of non structural partitions. ceiling. flooring and finishes. t.i permit to followDetails
demolition of non structural partitions. ceiling. flooring and finishes. t.i permit to follow | $30,000 | |
| Apr 23, 2002 | Expired or cancelled expired Jan 2004 | 50 Ofarrell St | Cal-Air Inc | replace 1 a/c unit on roof. like for like 15 tonsDetails
replace 1 a/c unit on roof. like for like 15 tons | $23,489 |
| Oct 22, 2001 | Completed final sign-off Dec 2001 | 120 Stockton St | Potter Fire Protection | 3/fl. -correct address on appl#200108307245 work is in "kenneth cole"areaDetails
3/fl. -correct address on appl#200108307245 work is in "kenneth cole"area | $4,800 |
| Oct 12, 2001 | Completed final sign-off Jul 2002 | 120 Stockton St | minor remodel interior/ cabinetsDetails
minor remodel interior/ cabinets | $15,000 | |
| Sep 20, 2001 | Completed final sign-off Oct 2001 | 120 Stockton St | app 2001/09/06/7712 comm t.i. for new flooring, ceiling, wall finishes & returbishing , fitting roomDetails
app 2001/09/06/7712 comm t.i. for new flooring, ceiling, wall finishes & returbishing , fitting room | $72,000 | |
| Jun 15, 2001 | Expired or cancelled expired Jun 2003 | 120 Stockton St | retrail tenant improvementDetails
retrail tenant improvement | $120,000 | |
| Jun 12, 2001 | Expired or cancelled withdrawn Jul 2001 | 50 Ofarrell St | remove partition walls doors millwork finishes or fixtures provide fitting rooms and partitions perDetails
remove partition walls doors millwork finishes or fixtures provide fitting rooms and partitions per | $250,000 | |
| Sep 6, 2000 | Completed final sign-off Dec 2000 | 120 Stockton St | Potter Fire Protection | relocate 47 sprinklersDetails
relocate 47 sprinklers | $4,800 |
| Aug 24, 2000 | Expired or cancelled expired Feb 2001 | 120 Stockton St | Lakewood Const Specialtie | installation of hugo boss casework, new fitting rooms & lighting on 3rd fl onlyDetails
installation of hugo boss casework, new fitting rooms & lighting on 3rd fl only | $25,000 |
| Aug 22, 2000 | Expired or cancelled expired Mar 2002 | 120 Stockton St | new partitions in "perry ellis" area of 3rd fl @ macys mens. hc complies. no ceiling/lighting/hvac wDetails
new partitions in "perry ellis" area of 3rd fl @ macys mens. hc complies. no ceiling/lighting/hvac w | $15,000 | |
| Jul 27, 2000 | Completed final sign-off Jan 2001 | 120 Stockton St | add wall and door in sales area @ 3rd fl.Details
add wall and door in sales area @ 3rd fl. | $15,000 | |
| Jul 19, 2000 | Completed final sign-off Dec 2000 | 120 Stockton St | remodel space at macy'sDetails
remodel space at macy's | $65,000 | |
| Jul 14, 2000 | Completed final sign-off Dec 2000 | 120 Stockton St | interior non-structual demoDetails
interior non-structual demo | ||
| May 26, 2000 | Expired or cancelled expired Nov 2000 | 50 Ofarrell St | Pacific Auxiliary Fire Alarm | fire alarm addition to existing systemDetails
fire alarm addition to existing system | $8,174 |
| Apr 10, 2000 | Expired or cancelled expired Aug 2000 | 50 Ofarrell St | fire alarm modification.Details
fire alarm modification. | $1,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.