5 permits since 2000 (engineer on 5 permits): 2 completed, 3 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 20, 2025 | Completed final sign-off Nov 2025 | 555 California St | Matrix Hg Inc | basement - installation of a new cooling coil in (e) air handler; installation of 3 (n) condensing units, each; installation of 6 (n) exv's for cus & coils; install refrigerant pipe for cu/exv/coils; pour concrete pads for condensing unitsDetails
basement - installation of a new cooling coil in (e) air handler; installation of 3 (n) condensing units, each; installation of 6 (n) exv's for cus & coils; install refrigerant pipe for cu/exv/coils; pour concrete pads for condensing units | $103,000 |
| Apr 29, 2022 | Never finaled issued May 2022, no final | 2620 Jones St | Dimension Construction Inc | removal of small doghouse covering an existing vent opening in the courtyard on ground level. install temporary shoring. install rebar & pour new concrete infill into (e) hole measuring 32"x68"x12.5". application of color epoxy to match finishes.Details
removal of small doghouse covering an existing vent opening in the courtyard on ground level. install temporary shoring. install rebar & pour new concrete infill into (e) hole measuring 32"x68"x12.5". application of color epoxy to match finishes. | $7,305 |
| Oct 14, 2021 | Completed final sign-off Jun 2022 | 3850 17th St | Build Group Inc. | deferred mep submittal for seismic attachments for original pa 202006018035.Details
deferred mep submittal for seismic attachments for original pa 202006018035. | $50,000 |
| Sep 17, 2021 | Never finaled issued Sep 2021, no final | 120 Stockton St | Plant Construction Co, Lp | revision to pa 2018-0504-8215 s12 fuel oil/generator to include clarification to wall rating to match ab2.07 & elimination of curb & (1) floor leak sensor @ generator room, due to second containment @ belly tankDetails
revision to pa 2018-0504-8215 s12 fuel oil/generator to include clarification to wall rating to match ab2.07 & elimination of curb & (1) floor leak sensor @ generator room, due to second containment @ belly tank | |
| Mar 25, 2021 | Never finaled issued Aug 2021, no final | 550 Kearny St | Acco Engineered Systems Inc. Dba Acco En | direct replacement of 1 cooling tower located on roof & 2 pumps in the penthouse.Details
direct replacement of 1 cooling tower located on roof & 2 pumps in the penthouse. | $450,000 |