- Jan 2000 to Sep 2026
673 permits since 2000 (contractor on 672 permits, authorized agent-others on 3 permits): 455 completed, 72 in progress, 97 never finaled, 49 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 673.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 22, 2026 | In progress filed Sep 2026, not yet issued | 809 Montgomery St | Plant Construction Co, Lp | deferred metal stair permit associated with pa# 202607155078,shop drawings for exterior structural steel staircase (stair 4&5) stairs 4/5 runs from the finished grade to level 1, level 2b, and level 3 of 809 montgomeryDetails
deferred metal stair permit associated with pa# 202607155078,shop drawings for exterior structural steel staircase (stair 4&5) stairs 4/5 runs from the finished grade to level 1, level 2b, and level 3 of 809 montgomery | |
| Aug 17, 2026 | In progress issued Aug 2026 | 845 Montgomery St | Plant Construction Co, Lp | revision to bpa: 202511199948, 202504295422 and 202511179791 - to update foundation of exterior stair 4-5Details
revision to bpa: 202511199948, 202504295422 and 202511179791 - to update foundation of exterior stair 4-5 | |
| Aug 17, 2026 | In progress issued Aug 2026 | 100 Columbus Av | Plant Construction Co, Lp | revision to bpa: 202511179791 - to update foundation of exterior stair 4-5Details
revision to bpa: 202511179791 - to update foundation of exterior stair 4-5 | |
| Jul 21, 2026 | In progress issued Jul 2026 | 2095 Jerrold Av | Plant Construction Co, Lp | maintain the existing paving(via grind & repaving with crete seal), restripe, and install new ornamental fencing with rolling gate and two egress doors.Details
maintain the existing paving(via grind & repaving with crete seal), restripe, and install new ornamental fencing with rolling gate and two egress doors. | $120,000 |
| Jul 15, 2026 | In progress issued Aug 2026 | 809 Montgomery St | Plant Construction Co, Lp | revision to bpa#202511199948, 202504295422 & #202511179791. to update foundation of exterior stair 4-5, west of 809 building.Details
revision to bpa#202511199948, 202504295422 & #202511179791. to update foundation of exterior stair 4-5, west of 809 building. | |
| Jul 15, 2026 | In progress issued Aug 2026 | 559 Pacific Av | Plant Construction Co, Lp | all work in 559 pacifc ave: new interior partitions, new interior finishes, new electrical, minor structural work.Details
all work in 559 pacifc ave: new interior partitions, new interior finishes, new electrical, minor structural work. | $1,996,842 |
| Jul 13, 2026 | In progress filed Jul 2026, not yet issued | 800 Chestnut St | Plant Construction Co, Lp | deferred frp permit, seismic retrofit under bpa# 202508132954Details
deferred frp permit, seismic retrofit under bpa# 202508132954 | $90,000 |
| Jun 26, 2026 | In progress issued Jul 2026 | 557 Pacific Av | Plant Construction Co, Lp | interior soft demo for unit 559 pacific ave. to include core and shell upgrades to restroom fixtures replaced in kind.Details
interior soft demo for unit 559 pacific ave. to include core and shell upgrades to restroom fixtures replaced in kind. | $82,071 |
| Jun 16, 2026 | In progress issued Aug 2026 | 1840 Sutter St | Plant Construction Co, Lp | this a revision to an active permit # 202412096390 to record a field condition change as approved by filed inspector david l araiza. (1) restroom to remain as gender neutral & (1) designated as standard.Details
this a revision to an active permit # 202412096390 to record a field condition change as approved by filed inspector david l araiza. (1) restroom to remain as gender neutral & (1) designated as standard. | |
| Jun 16, 2026 | In progress issued Jul 2026 | 809 Montgomery St | Plant Construction Co, Lp | to obtain final inspection for work approved under pa# 202406114238. all work is complete.Details
to obtain final inspection for work approved under pa# 202406114238. all work is complete. | |
| Jun 15, 2026 | In progress filed Jun 2026, not yet issued | 100 Columbus Av | Plant Construction Co, Lp | revision to pa# 2024-0205-5285, 2024-1001-2038; provide commercial kitchen at level 1 and utility(scullery) room at basement.Details
revision to pa# 2024-0205-5285, 2024-1001-2038; provide commercial kitchen at level 1 and utility(scullery) room at basement. | |
| Jun 12, 2026 | In progress issued Jun 2026 | 350 Masonic Av | Plant Construction Co, Lp | remodel existing roof-top play area that includes the removal and replacement of an existing play structure, restriping of a play court, minor structural strengthing of roof framing members beneath the play structure, and resurfacing/re-roofing.Details
remodel existing roof-top play area that includes the removal and replacement of an existing play structure, restriping of a play court, minor structural strengthing of roof framing members beneath the play structure, and resurfacing/re-roofing. | $300,000 |
| Jun 4, 2026 | In progress issued Oct 2026 | 800 Chestnut St | Plant Construction Co, Lp | revision to bpa# 202508132954, update concrete wall alignment at gridline c. revise collector callouts. remove grade beam extension beyond level 1 retaining walls. other misc. structural details per plans due to field conditions.Details
revision to bpa# 202508132954, update concrete wall alignment at gridline c. revise collector callouts. remove grade beam extension beyond level 1 retaining walls. other misc. structural details per plans due to field conditions. | |
| May 27, 2026 | Completed final sign-off Aug 2026 | 340 Post St | Plant Construction Co, Lp | revision to pa# 202603127491: in response to district inspector comments - no change to scope. updated general notes and clarification for floor layout.Details
revision to pa# 202603127491: in response to district inspector comments - no change to scope. updated general notes and clarification for floor layout. | |
| May 22, 2026 | In progress issued May 2026 | 1098 Valencia St | Plant Construction Co, Lp | selective interior demo of non-structural elements only. project subject to ab-017Details
selective interior demo of non-structural elements only. project subject to ab-017 | $100,458 |
| Mar 18, 2026 | In progress filed Mar 2026, not yet issued | 1901 Jerrold Av | Plant Construction Co, Lp | demo (e) type vb 1 story marketDetails
demo (e) type vb 1 story market | $150,000 |
| Mar 18, 2026 | Completed final sign-off Jun 2026 | 0 Situs To Be Assigned | Plant Construction Co, Lp | demo (e) parking lotDetails
demo (e) parking lot | $10,000 |
| Mar 12, 2026 | Completed final sign-off Aug 2026 | 340 Post St | Plant Construction Co, Lp | t.i. selective demo, repair, restorative work throughout interior. exterior work: at facade, 1) remove sign & patch, 2) repair (1) window sash, 3) clean & paint storefront & facade, 4) install ada push buttonsDetails
t.i. selective demo, repair, restorative work throughout interior. exterior work: at facade, 1) remove sign & patch, 2) repair (1) window sash, 3) clean & paint storefront & facade, 4) install ada push buttons | $712,000 |
| Mar 2, 2026 | In progress issued Mar 2026 | 2390 Bush St | Plant Construction Co, Lp | voluntary barrier removal to 1 bathroom on basement lvl, relocate lav, mep upgradeDetails
voluntary barrier removal to 1 bathroom on basement lvl, relocate lav, mep upgrade | $10,000 |
| Jan 15, 2026 | In progress issued Apr 2026 | 350 Masonic Av | Plant Construction Co, Lp | revision to bpa#202405011192. interior renovation of corridors on ground floor, 1/f & 2/f restrooms. refrence permit#202506309738.Details
revision to bpa#202405011192. interior renovation of corridors on ground floor, 1/f & 2/f restrooms. refrence permit#202506309738. | $300,000 |
| Jan 14, 2026 | In progress issued Feb 2026 | 2270 Mckinnon Av | Plant Construction Co, Lp | tower crane and crane foundation: installation of tower crane model potain mdt 219 j10. reference to new building site permit application #202211076023 s.Details
tower crane and crane foundation: installation of tower crane model potain mdt 219 j10. reference to new building site permit application #202211076023 s. | $25,000 |
| Jan 14, 2026 | In progress issued Aug 2026 | 535 Pacific Av | Plant Construction Co, Lp | ext envelope,door and enclosure improvements.replace (3) main entrance doors, aluminum, steel fire-rated windows. replace (2) (e) skylights and add (1) new skylight, new shaft enclosure adj to stair enclosure at roof . retrofit (4) ext balconies, including installation of (n) metal guardrails.Details
ext envelope,door and enclosure improvements.replace (3) main entrance doors, aluminum, steel fire-rated windows. replace (2) (e) skylights and add (1) new skylight, new shaft enclosure adj to stair enclosure at roof . retrofit (4) ext balconies, including installation of (n) metal guardrails. | $100,000 |
| Jan 6, 2026 | In progress issued Sep 2026 | 800 Chestnut St | Plant Construction Co, Lp | change use from art college-artist studios. ext facade restoration @ (clay/brown bldg & residential bldg) and accessibility improvements, interior nonstructural improvements and limited new ext openings. repurposing of studio & admin space. add 2 residential dwelling units. seismic under sep permit.Details
change use from art college-artist studios. ext facade restoration @ (clay/brown bldg & residential bldg) and accessibility improvements, interior nonstructural improvements and limited new ext openings. repurposing of studio & admin space. add 2 residential dwelling units. seismic under sep permit. | $15,000,000 |
| Dec 23, 2025 | In progress filed Dec 2025, not yet issued | 535 Pacific Av | Plant Construction Co, Lp | level 2: interior tenant improvement includes new partitions, doors, ceilings, and finishes. mep deferred.Details
level 2: interior tenant improvement includes new partitions, doors, ceilings, and finishes. mep deferred. | $1,360,000 |
| Dec 23, 2025 | In progress filed Dec 2025, not yet issued | 535 Pacific Av | Plant Construction Co, Lp | level 1: interior tenant improvement includes new partitions, doors, ceilings, and finishes. mep deferred.Details
level 1: interior tenant improvement includes new partitions, doors, ceilings, and finishes. mep deferred. | $1,320,000 |
| Dec 23, 2025 | In progress filed Dec 2025, not yet issued | 535 Pacific Av | Plant Construction Co, Lp | basement level: interior tenant improvement includes new partitions, doors, ceilings, and finishes.Details
basement level: interior tenant improvement includes new partitions, doors, ceilings, and finishes. | $1,340,000 |
| Dec 19, 2025 | In progress issued Jun 2026 | 1283 Delaware St | Plant Construction Co, Lp | priority project(block 9)potrero power station development agreement.scope includes partial demolition of interior concrete floor and partial demolition of concrete header above existing door. structural retrofit including new foundation piles, a new mat slab and a new interior reinforcement wall.Details
priority project(block 9)potrero power station development agreement.scope includes partial demolition of interior concrete floor and partial demolition of concrete header above existing door. structural retrofit including new foundation piles, a new mat slab and a new interior reinforcement wall. | $1,500,000 |
| Dec 17, 2025 | In progress filed Dec 2025, not yet issued | 250 Laguna Honda Bl | Plant Construction Co, Lp | to erect 8 stories, no basement, type i-a, 172 residential units, office, assembly and parking building. (r-2,b,a-3,s-2)Details
to erect 8 stories, no basement, type i-a, 172 residential units, office, assembly and parking building. (r-2,b,a-3,s-2) | $100,000,000 |
| Dec 12, 2025 | Completed final sign-off Aug 2026 | 312 Mason St | Plant Construction Co, Lp | cornice maintenance, including steel trussed, wood framing, and brick walls. no visible change to the exterior of the building.Details
cornice maintenance, including steel trussed, wood framing, and brick walls. no visible change to the exterior of the building. | $75,000 |
| Dec 2, 2025 | In progress issued Jan 2026 | 845 Montgomery St | Plant Construction Co, Lp | to memorialize the location and portion of the exterior egress stair serving 809-831 montgomery street within the subject parcel boundary.Details
to memorialize the location and portion of the exterior egress stair serving 809-831 montgomery street within the subject parcel boundary. | |
| Dec 2, 2025 | In progress issued Jan 2026 | 100 Columbus Av | Plant Construction Co, Lp | to memorialize the location and portion of the exterior egress stair serving. 809-831 montgomery street within the subject parcel boundary.Details
to memorialize the location and portion of the exterior egress stair serving. 809-831 montgomery street within the subject parcel boundary. | |
| Nov 25, 2025 | In progress issued Dec 2025 | 100 Columbus Av | Plant Construction Co, Lp | provide structural foundation at the utility yard. revise architectural details to match structural foundation. ref permit 202402055285.Details
provide structural foundation at the utility yard. revise architectural details to match structural foundation. ref permit 202402055285. | |
| Oct 15, 2025 | Completed final sign-off Jan 2026 | 1000 California St | Plant Construction Co, Lp | administrative revision permit 202503172391 to cover sheet g-0.00 to show no mechanical work. added e0.0, e0.1, e0.2, e0.3, e0.4, and e1.0Details
administrative revision permit 202503172391 to cover sheet g-0.00 to show no mechanical work. added e0.0, e0.1, e0.2, e0.3, e0.4, and e1.0 | |
| Oct 7, 2025 | In progress issued Jan 2026 | 831 Montgomery St | Plant Construction Co, Lp | deferred skylight permit associated with #202309126365 & 202309126368: shop drawing for skylight located at the roof level of 831 montgomery st.Details
deferred skylight permit associated with #202309126365 & 202309126368: shop drawing for skylight located at the roof level of 831 montgomery st. | |
| Oct 7, 2025 | In progress issued Mar 2026 | 800 Chestnut St | Plant Construction Co, Lp | seismic upgrade to existing building. space to remain vacant per ab017. future accessibility to be restored under separate permit. no cfc until alteration permit restoring required ada features has been completed.Details
seismic upgrade to existing building. space to remain vacant per ab017. future accessibility to be restored under separate permit. no cfc until alteration permit restoring required ada features has been completed. | $5,000,000 |
| Oct 3, 2025 | Completed final sign-off Jul 2026 | 2 Lake St | Plant Construction Co, Lp | to obtain cfc memorializing accurate building type for the temple house building (3a) and courtyard building is (1a) as shown and approved in 202202097657 s2 arch mep addendum plans. this corrects the type of construction for the existing temple house bldg noted on the site permit.Details
to obtain cfc memorializing accurate building type for the temple house building (3a) and courtyard building is (1a) as shown and approved in 202202097657 s2 arch mep addendum plans. this corrects the type of construction for the existing temple house bldg noted on the site permit. | |
| Sep 29, 2025 | In progress filed Sep 2025, not yet issued | 530 Jackson St | Plant Construction Co, Lp | rev to pa# 2024-0613-4401 including cleaning and painting of (e) brick and stucco along with removal of abandoned cablingDetails
rev to pa# 2024-0613-4401 including cleaning and painting of (e) brick and stucco along with removal of abandoned cabling | |
| Sep 5, 2025 | In progress issued Feb 2026 | 535 Pacific Av | Plant Construction Co, Lp | bldg structural upgrade to meet 2022 code, include adding steel braces,interior shear walls. strengthening roof diaphragm & steel beams. lowering a section of bldg's basement level to improve accessibility. bldg core restroom upgrade.Details
bldg structural upgrade to meet 2022 code, include adding steel braces,interior shear walls. strengthening roof diaphragm & steel beams. lowering a section of bldg's basement level to improve accessibility. bldg core restroom upgrade. | $15,000,000 |
| Sep 3, 2025 | In progress issued Jan 2026 | 809 Montgomery St | Plant Construction Co, Lp | fire alarm system associated with pa#202309126365 & 202309126368 at 809-831 montgomery stDetails
fire alarm system associated with pa#202309126365 & 202309126368 at 809-831 montgomery st | $20,000 |
| Aug 21, 2025 | Completed final sign-off Aug 2025 | 2 Lake St | Plant Construction Co, Lp | administrative permit to document ab-005 equivalency associated with pre-school occupancy and exiting from the 4th story. ref. permit #202202097657Details
administrative permit to document ab-005 equivalency associated with pre-school occupancy and exiting from the 4th story. ref. permit #202202097657 | |
| Jul 31, 2025 | Completed final sign-off Sep 2026 | 535 Pacific Av | Plant Construction Co, Lp | demolition of an interior finsihes, partitions, doors, equipment and fixtures under ab017 across basement to 4th floor.Details
demolition of an interior finsihes, partitions, doors, equipment and fixtures under ab017 across basement to 4th floor. | $190,000 |
| Jul 23, 2025 | Completed final sign-off Sep 2025 | 2 Lake St | Plant Construction Co, Lp | restoration of the e) lake st exteior archDetails
restoration of the e) lake st exteior arch | $10,000 |
| Jul 22, 2025 | In progress issued Sep 2025 | 809 Montgomery St | Plant Construction Co, Lp | deferred skylight permit associated with #202309126365 & 202309126368: shop drawing for skylight located at the roof level of 809 montgomery st.Details
deferred skylight permit associated with #202309126365 & 202309126368: shop drawing for skylight located at the roof level of 809 montgomery st. | |
| Jun 20, 2025 | In progress issued Jul 2025 | 800 Chestnut St | Plant Construction Co, Lp | soft demo of a vacant building per ab-017 including the removal of nonstructural partitions, fixtures, finishes and capping of mep for future buildout.Details
soft demo of a vacant building per ab-017 including the removal of nonstructural partitions, fixtures, finishes and capping of mep for future buildout. | $868,581 |
| Jun 13, 2025 | In progress issued Jun 2025 | 2 Lake St | Plant Construction Co, Lp | fabricate and install evacuation signage for basement through level 4.Details
fabricate and install evacuation signage for basement through level 4. | |
| May 15, 2025 | In progress issued Jan 2026 | 809 Montgomery St | Plant Construction Co, Lp | rev to 2023-004055ca & pa# 202309126368 & pa# 202309126365. to address dbi correction notice for substandard concrete & deteriorated rebar. ref pa# 202407196897. new work includes montgomery st. storefront revisions & misc. interior & minor exterior changes, equip. screening, roof terrace trellisDetails
rev to 2023-004055ca & pa# 202309126368 & pa# 202309126365. to address dbi correction notice for substandard concrete & deteriorated rebar. ref pa# 202407196897. new work includes montgomery st. storefront revisions & misc. interior & minor exterior changes, equip. screening, roof terrace trellis | $5,000 |
| Mar 17, 2025 | Completed final sign-off Jan 2026 | 1000 California St | Plant Construction Co, Lp | remodel of (e) service bar room inclusive of (n) bar diewall and bar top (n) backbar top, (n) equipment (n) revised millwork for display flooring repairs and utility connections relocationDetails
remodel of (e) service bar room inclusive of (n) bar diewall and bar top (n) backbar top, (n) equipment (n) revised millwork for display flooring repairs and utility connections relocation | $65,000 |
| Mar 5, 2025 | Completed final sign-off Oct 2025 | 2230 Jerrold Av | Plant Construction Co, Lp | construction of an emergency generator to support the meals on wheels, sf production and support center. site work includes structural slab, electrical conduits to and from the building and an emergency generator. the emergency generator will be enclosed by a pre-fabricated enclosure.Details
construction of an emergency generator to support the meals on wheels, sf production and support center. site work includes structural slab, electrical conduits to and from the building and an emergency generator. the emergency generator will be enclosed by a pre-fabricated enclosure. | $1,400,000 |
| Feb 27, 2025 | Completed final sign-off Dec 2025 | 2 Lake St | Plant Construction Co, Lp | installation of exterior building lighting at the temple house facade on lake st & the sanctuary facade facing the interior courtyardDetails
installation of exterior building lighting at the temple house facade on lake st & the sanctuary facade facing the interior courtyard | $15,000 |
| Feb 11, 2025 | Completed final sign-off Aug 2026 | 312 Mason St | Plant Construction Co, Lp | removal and abatement of (e) paint on sheet metal and repair on repaint. masonry facade repair. repair (e) wood/metal windows in kind. work is facing street and in the public right of way.Details
removal and abatement of (e) paint on sheet metal and repair on repaint. masonry facade repair. repair (e) wood/metal windows in kind. work is facing street and in the public right of way. | $2,000,000 |
| Jan 31, 2025 | Completed final sign-off Oct 2025 | 2 Lake St | Plant Construction Co, Lp | deferred food service permit#: 202202097657 add2;Details
deferred food service permit#: 202202097657 add2; | |
| Jan 8, 2025 | Completed final sign-off May 2025 | 36 Hoff St | Plant Construction Co, Lp | install new prefabricated steel stairs at west elevationDetails
install new prefabricated steel stairs at west elevation | $20,000 |
| Dec 13, 2024 | Completed final sign-off Mar 2025 | 831 Montgomery St | Plant Construction Co, Lp | revision to pa202309126368 & pa202309126365. reference pa202407196897: clarify rebar detailing and reinforcement at building cornersDetails
revision to pa202309126368 & pa202309126365. reference pa202407196897: clarify rebar detailing and reinforcement at building corners | |
| Dec 9, 2024 | In progress issued Jun 2025 | 1840 Sutter St | Plant Construction Co, Lp | interior tenant improvmemts to renovate exhibit, archives and rest roooms work includes upgrades to hvac, lighting and plumbing fixtures and finishes no exterior or structural work non load bearingDetails
interior tenant improvmemts to renovate exhibit, archives and rest roooms work includes upgrades to hvac, lighting and plumbing fixtures and finishes no exterior or structural work non load bearing | $1,875,000 |
| Oct 21, 2024 | In progress filed Oct 2024, not yet issued | 1610 Geary Bl | Plant Construction Co, Lp | japantown peace plaza ti of an (e) outdoor plaza over parking srtucture below: scope include demo(e) stair and installing (n) double staircase along geary blvd entrance. exterior work onlyDetails
japantown peace plaza ti of an (e) outdoor plaza over parking srtucture below: scope include demo(e) stair and installing (n) double staircase along geary blvd entrance. exterior work only | $1,000,000 |
| Oct 10, 2024 | In progress issued Dec 2025 | 100 Columbus Av | Plant Construction Co, Lp | revision to pa# 202402055285 & 202312273130, elimination of battery vault at utility garden area and addition of subterranean vault at pavillion basement level with associated changes to foundation and shoring.Details
revision to pa# 202402055285 & 202312273130, elimination of battery vault at utility garden area and addition of subterranean vault at pavillion basement level with associated changes to foundation and shoring. | |
| Oct 7, 2024 | In progress issued Nov 2024 | 100 Columbus Av | Plant Construction Co, Lp | memorialize easement configuration on 845 montgomery and 100 columbus to serve egress, fsd, and utility service for the 809 and 831 montgomery parcel. all ada and built elements are constructed under pa #202402055285. 809-831 montgomery bldg merger and ada elements constructed under 202309126368Details
memorialize easement configuration on 845 montgomery and 100 columbus to serve egress, fsd, and utility service for the 809 and 831 montgomery parcel. all ada and built elements are constructed under pa #202402055285. 809-831 montgomery bldg merger and ada elements constructed under 202309126368 | |
| Oct 2, 2024 | Completed final sign-off Apr 2025 | 222 02nd St | Plant Construction Co, Lp | 3rd fl - replacement of existing kitchen equipment in pot wash room. 20% ada restroom upgrades. no change in fixture quantities; occupant load calculations or path of travelDetails
3rd fl - replacement of existing kitchen equipment in pot wash room. 20% ada restroom upgrades. no change in fixture quantities; occupant load calculations or path of travel | $30,000 |
| Aug 20, 2024 | Completed final sign-off May 2025 | 36 Hoff St | Plant Construction Co, Lp | rev 202404250801 and ref 202407096026- exterior dry rot repair at south elevation (rear of property )Details
rev 202404250801 and ref 202407096026- exterior dry rot repair at south elevation (rear of property ) | $10,000 |
| Aug 16, 2024 | Completed final sign-off Aug 2024 | 120 Stockton St | Plant Construction Co, Lp | to obtain final inspection for work approved under pa#: 2018.0820.7773, 2018.1128.6842 and 2019.0226.3805. all work is complete.Details
to obtain final inspection for work approved under pa#: 2018.0820.7773, 2018.1128.6842 and 2019.0226.3805. all work is complete. | |
| Aug 16, 2024 | Completed final sign-off Aug 2024 | 120 Stockton St | Plant Construction Co, Lp | to obtain final inspection for work approved under 202112275035 and 202112285097.Details
to obtain final inspection for work approved under 202112275035 and 202112285097. | |
| Aug 16, 2024 | Completed final sign-off Mar 2025 | 3055 16th St | Plant Construction Co, Lp | revision to pa# 2022-1107-6021 100% affordable housing additional structural support required at the storefront. revised storefront, repair & finishes to match existing.Details
revision to pa# 2022-1107-6021 100% affordable housing additional structural support required at the storefront. revised storefront, repair & finishes to match existing. | $30,000 |
| Aug 16, 2024 | In progress issued Aug 2024 | 120 Stockton St | Plant Construction Co, Lp | to obtain final inspection for work approved under pa#: 2021.0408.8200, 2021.0528.1299 and 2021.0917.8644 all work is complete.Details
to obtain final inspection for work approved under pa#: 2021.0408.8200, 2021.0528.1299 and 2021.0917.8644 all work is complete. | |
| Aug 13, 2024 | Expired or cancelled withdrawn Sep 2024 | 2 Lake St | Plant Construction Co, Lp | revision to pa# 202202097657-s2. to include 2 new exterior light wells @ level 1. reduce level 2 court yard size. add planters & tree wells @ court yard / light wells. redesign level 1 office suite & associated mepf changes.Details
revision to pa# 202202097657-s2. to include 2 new exterior light wells @ level 1. reduce level 2 court yard size. add planters & tree wells @ court yard / light wells. redesign level 1 office suite & associated mepf changes. | |
| Aug 12, 2024 | Completed final sign-off Jul 2025 | 1300 Van Ness Av | Plant Construction Co, Lp | revision to pa # 2024-0402-9189 update metal stud notes; kickers and work above ceiling has been elminated; non bearing wall stud sizes increased from 4" to 6" wide; box beams added to brace walls out of plane; steel post @ partial ht walls in restrooms eliminated non bearing stud walls detailsDetails
revision to pa # 2024-0402-9189 update metal stud notes; kickers and work above ceiling has been elminated; non bearing wall stud sizes increased from 4" to 6" wide; box beams added to brace walls out of plane; steel post @ partial ht walls in restrooms eliminated non bearing stud walls details | |
| Jul 25, 2024 | In progress issued Apr 2025 | 809 Montgomery St | Plant Construction Co, Lp | deferred mep & atrium smoke control system associated with pa #202309126365 & 202309126368 at 809-831 montgomery streetDetails
deferred mep & atrium smoke control system associated with pa #202309126365 & 202309126368 at 809-831 montgomery street | $1,000,000 |
| Jul 19, 2024 | Completed final sign-off Mar 2025 | 831 Montgomery St | Plant Construction Co, Lp | revision to 202309126368. due to discovery of cracked/substandard e) concrete wall conditions on site w/ inspector & contractor. replace portion of e) concrete wall along gridline 3.2 w/ new structural cmu wall. replace e) concrete wall along grideline 9 w/ new structural concrete wallDetails
revision to 202309126368. due to discovery of cracked/substandard e) concrete wall conditions on site w/ inspector & contractor. replace portion of e) concrete wall along gridline 3.2 w/ new structural cmu wall. replace e) concrete wall along grideline 9 w/ new structural concrete wall | $20,000 |
| Jul 11, 2024 | Completed final sign-off Dec 2025 | 1610 Geary Bl | Plant Construction Co, Lp | temporary pedestrian walkway. ref pa# 202212279207Details
temporary pedestrian walkway. ref pa# 202212279207 | |
| Jul 10, 2024 | In progress issued Sep 2024 | 831 Montgomery St | Plant Construction Co, Lp | deferred metal stair permit associated with pa# 202309126368. shop drawings for interior structural steel staircase (stair 6). located at 831 montgomery. stair 6 runs from level b to level 2a. p/c to determine construction valuation cost, dmj 07/01/2024;Details
deferred metal stair permit associated with pa# 202309126368. shop drawings for interior structural steel staircase (stair 6). located at 831 montgomery. stair 6 runs from level b to level 2a. p/c to determine construction valuation cost, dmj 07/01/2024; | |
| Jul 9, 2024 | Completed final sign-off Jun 2025 | 36 Hoff St | Plant Construction Co, Lp | revision to pa3 2024-0425-0801 dry rot repair at roof, exterior elevation north & middle elevation. selected stud replacement at north exterior non-bearing wall elvations, new roof guard rail attachment to roof, and misc. wood repairs at roof. all repairs are to be done in kind. privately funded.Details
revision to pa3 2024-0425-0801 dry rot repair at roof, exterior elevation north & middle elevation. selected stud replacement at north exterior non-bearing wall elvations, new roof guard rail attachment to roof, and misc. wood repairs at roof. all repairs are to be done in kind. privately funded. | $30,000 |
| Jul 9, 2024 | In progress issued Nov 2024 | 831 Montgomery St | Plant Construction Co, Lp | deferred fire sprinkler system associated with pa #202309126365 & 202309126368 at 809-831 montgomery streetDetails
deferred fire sprinkler system associated with pa #202309126365 & 202309126368 at 809-831 montgomery street | $50,000 |
| Jul 9, 2024 | In progress issued Apr 2025 | 831 Montgomery St | Plant Construction Co, Lp | deferred mep & atrium smoke control system associated with pa #202309126365 & 202309126368 at 809-831 montgomery streetDetails
deferred mep & atrium smoke control system associated with pa #202309126365 & 202309126368 at 809-831 montgomery street | $1,000,000 |
| Jul 8, 2024 | In progress issued Nov 2024 | 809 Montgomery St | Plant Construction Co, Lp | deferred fire sprinkler system associated with pa #202309126365 & 202309126368 at 809-831 montgomery streetDetails
deferred fire sprinkler system associated with pa #202309126365 & 202309126368 at 809-831 montgomery street | $100,000 |
| Jun 26, 2024 | Completed final sign-off Oct 2024 | 535 Pacific Av | Plant Construction Co, Lp | basement, 1st, 2nd, & 4th level demo only. no structural. ab 017Details
basement, 1st, 2nd, & 4th level demo only. no structural. ab 017 | $50,000 |
| Jun 13, 2024 | In progress issued Jul 2024 | 545 Pacific Av | Plant Construction Co, Lp | upgrade waterproofing system at (e) below grade buliding wall/foundation along the property line adajacent to 100 columbus aveDetails
upgrade waterproofing system at (e) below grade buliding wall/foundation along the property line adajacent to 100 columbus ave | $5,000 |
| Jun 13, 2024 | In progress issued Jul 2024 | 124 Columbus Av | Plant Construction Co, Lp | upgrade waterproofing system at (e) below grade buliding wall/foundation along the property line adajacent to 100 columbus ave. no interior workDetails
upgrade waterproofing system at (e) below grade buliding wall/foundation along the property line adajacent to 100 columbus ave. no interior work | $5,000 |
| Jun 13, 2024 | In progress issued Jul 2024 | 535 Pacific Av | Plant Construction Co, Lp | upgrade the waterproofing system at (e) below grade building wall/foundation along the property line adjacent to 100 columbus ave.Details
upgrade the waterproofing system at (e) below grade building wall/foundation along the property line adjacent to 100 columbus ave. | $5,000 |
| Jun 13, 2024 | In progress issued Jul 2024 | 150 Columbus Av | Plant Construction Co, Lp | upgrade waterproofing system at (e) below grade buliding wall/foundation along the property line adajacent to 100 columbus aveDetails
upgrade waterproofing system at (e) below grade buliding wall/foundation along the property line adajacent to 100 columbus ave | $5,000 |
| Jun 13, 2024 | In progress issued Aug 2024 | 100 Columbus Av | Plant Construction Co, Lp | upgrade waterproofing system at (e) below grade buliding wall/foundation along the property line adajacent to 124 columbus ave, 150 columbus, 530 jackson, 535 pacific, 545 pacific, 845 montgomery stDetails
upgrade waterproofing system at (e) below grade buliding wall/foundation along the property line adajacent to 124 columbus ave, 150 columbus, 530 jackson, 535 pacific, 545 pacific, 845 montgomery st | $25,000 |
| Jun 13, 2024 | In progress issued Jul 2024 | 845 Montgomery St | Plant Construction Co, Lp | upgrade waterproofing system at (e) below grade buliding wall/foundation along the property line adajacent to 100 columbus aveDetails
upgrade waterproofing system at (e) below grade buliding wall/foundation along the property line adajacent to 100 columbus ave | $5,000 |
| Jun 13, 2024 | In progress issued Jul 2024 | 530 Jackson St | Plant Construction Co, Lp | upgrade waterproofing system at (e) below grade buliding wall/foundation along the property line adajacent to 100 columbus aveDetails
upgrade waterproofing system at (e) below grade buliding wall/foundation along the property line adajacent to 100 columbus ave | $5,000 |
| Jun 11, 2024 | In progress issued Jul 2024 | 809 Montgomery St | Plant Construction Co, Lp | for plan review only to memorialize brick repointing and repair on north & south facades of historic building 809 montgomery st.Details
for plan review only to memorialize brick repointing and repair on north & south facades of historic building 809 montgomery st. | |
| May 22, 2024 | Completed final sign-off Aug 2024 | 2750 Jackson St | Plant Construction Co, Lp | in stall cnc machine & dust collector in rated enclosure.Details
in stall cnc machine & dust collector in rated enclosure. | $25,000 |
| May 16, 2024 | Completed final sign-off Jul 2025 | 1300 Van Ness Av | Plant Construction Co, Lp | basement level: new back of house spaces sewing event staff and performers to be installed in the annex space. new spaces include dressing rooms, group viewing rooms, and single occupant shower/restroom. work includes multi-stall public restrooms and upgrades to (e) single user restrooms. (e) lift @Details
basement level: new back of house spaces sewing event staff and performers to be installed in the annex space. new spaces include dressing rooms, group viewing rooms, and single occupant shower/restroom. work includes multi-stall public restrooms and upgrades to (e) single user restrooms. (e) lift @ | $1,529,279 |
| Apr 25, 2024 | Completed final sign-off May 2025 | 36 Hoff St | Plant Construction Co, Lp | in kind replacement of windows, sliding doors, and stucco at (3) south elevations of the building. scope includes (34) windows, (8) sliding doors as well as replacement of traffic coating at (4) patios and balconies. 17 windows, 4 sliding doors at south elevation (visible to street) will be aluminumDetails
in kind replacement of windows, sliding doors, and stucco at (3) south elevations of the building. scope includes (34) windows, (8) sliding doors as well as replacement of traffic coating at (4) patios and balconies. 17 windows, 4 sliding doors at south elevation (visible to street) will be aluminum | $320,000 |
| Apr 16, 2024 | In progress issued Apr 2024 | 3251 20th Av | Plant Construction Co, Lp | anchorage of fixed and mobile retail shelving units. shelving units are for storage of store merchandise and are not to be exposed to the general publicDetails
anchorage of fixed and mobile retail shelving units. shelving units are for storage of store merchandise and are not to be exposed to the general public | $25,500 |
| Apr 8, 2024 | Completed final sign-off Jul 2025 | 1300 Van Ness Av | Plant Construction Co, Lp | barrier removal on level 1 of regency ballroom in 2 single occupant all gender restrooms & improvement to e) women's & men's multifixture resroomDetails
barrier removal on level 1 of regency ballroom in 2 single occupant all gender restrooms & improvement to e) women's & men's multifixture resroom | $150,000 |
| Apr 8, 2024 | In progress filed Apr 2024, not yet issued | 270 Masonic Av | Plant Construction Co, Lp | mandatory seismic retrofit of existing building per sfbc section 503.11.1. to allow for future non structural alternations including partitions, ceilings, and mep upgrades for more than two thirds of the building. (e) bldg is currently unoccupied.Details
mandatory seismic retrofit of existing building per sfbc section 503.11.1. to allow for future non structural alternations including partitions, ceilings, and mep upgrades for more than two thirds of the building. (e) bldg is currently unoccupied. | $4,128,602 |
| Mar 26, 2024 | In progress issued Dec 2024 | 809 Montgomery St | Plant Construction Co, Lp | deferred metal stair permit associated with pa# 201904178238. shop drawings for structural steel staircase (stair 2 & 3) located at 809m.Details
deferred metal stair permit associated with pa# 201904178238. shop drawings for structural steel staircase (stair 2 & 3) located at 809m. | |
| Mar 18, 2024 | Completed final sign-off Jul 2025 | 1300 Van Ness Av | Plant Construction Co, Lp | improvements at the regency ballroom include modifications and upgrades to (e) hvac equipment and systems. work includes new roof top mounted units as well as access to the units.Details
improvements at the regency ballroom include modifications and upgrades to (e) hvac equipment and systems. work includes new roof top mounted units as well as access to the units. | $1,200,000 |
| Feb 5, 2024 | In progress issued Sep 2024 | 100 Columbus Av | Plant Construction Co, Lp | erect a one-story building plus basement, to include employee assembly room, kitchen, single-accomodation restrooms & support spaces. provide exterior enclosure around utility equipment. hardscape and landscape improvements and solar voltaic system on roof of 100 columbus st. under separate permits.Details
erect a one-story building plus basement, to include employee assembly room, kitchen, single-accomodation restrooms & support spaces. provide exterior enclosure around utility equipment. hardscape and landscape improvements and solar voltaic system on roof of 100 columbus st. under separate permits. | $2,100,000 |
| Jan 18, 2024 | In progress issued Feb 2024 | 831 Montgomery St | Plant Construction Co, Lp | 831 montgomery st foundation upgrades in preparation of building renovations.building merger with 809 montgomery st. under pa#202309126368 and pa#202309126365. shoring under pa#202311090542.Details
831 montgomery st foundation upgrades in preparation of building renovations.building merger with 809 montgomery st. under pa#202309126368 and pa#202309126365. shoring under pa#202311090542. | $100,000 |
| Dec 27, 2023 | Completed final sign-off Feb 2025 | 100 Columbus Av | Plant Construction Co, Lp | shoring for jackson square improvements. to perform alterations to the (e) surface parking lot to accommodate a one-story building + basement and add'l site improvements.Details
shoring for jackson square improvements. to perform alterations to the (e) surface parking lot to accommodate a one-story building + basement and add'l site improvements. | $75,000 |
| Dec 5, 2023 | In progress issued Dec 2023 | 270 Masonic Av | Plant Construction Co, Lp | the structural scope is an addition to the parking deck rehabilitation permit under 202309196898Details
the structural scope is an addition to the parking deck rehabilitation permit under 202309196898 | |
| Dec 5, 2023 | Completed final sign-off Jan 2026 | 755 Ashbury St | Plant Construction Co, Lp | renovate exterior play space and parking area, includes installation of play equipment.Details
renovate exterior play space and parking area, includes installation of play equipment. | $325,000 |
| Dec 1, 2023 | In progress filed Dec 2023, not yet issued | 440 Davis Ct | Plant Construction Co, Lp | replacement of existing guardrail with a new 8'-0" tall security fence and gate at the east and west ends of the plaza level. existing light poles to be retained.Details
replacement of existing guardrail with a new 8'-0" tall security fence and gate at the east and west ends of the plaza level. existing light poles to be retained. | $150,000 |
| Nov 21, 2023 | Completed final sign-off Dec 2024 | 550 Battery St | Plant Construction Co, Lp | voluntarily upgrade structurally to increase capacity of reinf conc transfer bms at lvl 3 in long. direction and reinf conc sw in transverse direction at lvl 3 to 6. str is not being brought into compliance w/ current code. the objective is collapse prevention at the 475-year eq per asce 41-17Details
voluntarily upgrade structurally to increase capacity of reinf conc transfer bms at lvl 3 in long. direction and reinf conc sw in transverse direction at lvl 3 to 6. str is not being brought into compliance w/ current code. the objective is collapse prevention at the 475-year eq per asce 41-17 | $5,000,000 |
| Nov 20, 2023 | In progress issued Dec 2023 | 2150 Fulton St | Plant Construction Co, Lp | mep associated w/ pa #202311070380Details
mep associated w/ pa #202311070380 | $55,000 |
| Nov 9, 2023 | Completed final sign-off Mar 2025 | 831 Montgomery St | Plant Construction Co, Lp | shoring associated with pa# 202309126365 & 202309126368.Details
shoring associated with pa# 202309126365 & 202309126368. | $150,000 |
| Nov 9, 2023 | In progress issued Jan 2024 | 843 Montgomery St | Plant Construction Co, Lp | underpipnning associated with pa# 202309126365 & 202309126368.Details
underpipnning associated with pa# 202309126365 & 202309126368. | $15,000 |