John Ward
- License
- S6869
- Structural engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up S6869 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Mar 2024 to Aug 2024
3 permits since 2000 (engineer on 3 permits): 3 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Plant Construction Co, Lp (3)
- Architects
- David Masenten (3)
- Engineers
- Matthew Dehgani (2), Ray Juachon (2)
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 0
- Other or unknown 3
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 12, 2024 | Completed final sign-off Jul 2025 | 1300 Van Ness Av | Plant Construction Co, Lp | revision to pa # 2024-0402-9189 update metal stud notes; kickers and work above ceiling has been elminated; non bearing wall stud sizes increased from 4" to 6" wide; box beams added to brace walls out of plane; steel post @ partial ht walls in restrooms eliminated non bearing stud walls detailsDetails
revision to pa # 2024-0402-9189 update metal stud notes; kickers and work above ceiling has been elminated; non bearing wall stud sizes increased from 4" to 6" wide; box beams added to brace walls out of plane; steel post @ partial ht walls in restrooms eliminated non bearing stud walls details | |
| Apr 8, 2024 | Completed final sign-off Jul 2025 | 1300 Van Ness Av | Plant Construction Co, Lp | barrier removal on level 1 of regency ballroom in 2 single occupant all gender restrooms & improvement to e) women's & men's multifixture resroomDetails
barrier removal on level 1 of regency ballroom in 2 single occupant all gender restrooms & improvement to e) women's & men's multifixture resroom | $150,000 |
| Mar 18, 2024 | Completed final sign-off Jul 2025 | 1300 Van Ness Av | Plant Construction Co, Lp | improvements at the regency ballroom include modifications and upgrades to (e) hvac equipment and systems. work includes new roof top mounted units as well as access to the units.Details
improvements at the regency ballroom include modifications and upgrades to (e) hvac equipment and systems. work includes new roof top mounted units as well as access to the units. | $1,200,000 |