Block 3569, lot 088
36 Hoff St
- City’s use
- Multi-Family Residential
- Built
- 1986
- Stories
- 5
- Units
- 49
- Rooms
- 49 bedrooms, 49 bathrooms
- Building
- 29,000 sq ft
- Lot
- 7,750 sq ft
- Zoning
- NC3
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 8, 2025 | Completed final sign-off May 2025 | 36 Hoff St | Plant Construction Co, Lp | install new prefabricated steel stairs at west elevationDetails
install new prefabricated steel stairs at west elevation | $20,000 |
| Jan 6, 2025 | Completed final sign-off Feb 2025 | 36 Hoff St | B B J Electric, Inc | revision to pa# 202407317635: add 1 relay module for shunt trip, 1 heat detector inside elevator machine room, and add 1 monitor modules for ac shunt supervision.Details
revision to pa# 202407317635: add 1 relay module for shunt trip, 1 heat detector inside elevator machine room, and add 1 monitor modules for ac shunt supervision. | $2,520 |
| Dec 3, 2024 | Completed final sign-off Feb 2025 | 36 Hoff St | Pribuss Engineering Inc | demo & remove 9e) sprinkler head @ top & bottom of elevator shaft for elevator modernization process - 2 heads pluggedDetails
demo & remove 9e) sprinkler head @ top & bottom of elevator shaft for elevator modernization process - 2 heads plugged | $1,000 |
| Aug 20, 2024 | Completed final sign-off May 2025 | 36 Hoff St | Plant Construction Co, Lp | rev 202404250801 and ref 202407096026- exterior dry rot repair at south elevation (rear of property )Details
rev 202404250801 and ref 202407096026- exterior dry rot repair at south elevation (rear of property ) | $10,000 |
| Aug 7, 2024 | Completed final sign-off Feb 2025 | 36 Hoff St | B B J Electric, Inc | install new facu. combination sd & co detectors with lf sounder base in every bedroom & living room. meet sffc 1103.7.6.1Details
install new facu. combination sd & co detectors with lf sounder base in every bedroom & living room. meet sffc 1103.7.6.1 | $157,574 |
| Jul 16, 2024 | Completed final sign-off Jan 2025 | 36 Hoff St | Pribuss Engineering Inc | change out existing rusted pipe and fittings and sprinkler heads and replace with new galvanized pipe, painted fittings and sprinker on 2/flr garage.Details
change out existing rusted pipe and fittings and sprinkler heads and replace with new galvanized pipe, painted fittings and sprinker on 2/flr garage. | $43,200 |
| Jul 9, 2024 | Completed final sign-off Jun 2025 | 36 Hoff St | Plant Construction Co, Lp | revision to pa3 2024-0425-0801 dry rot repair at roof, exterior elevation north & middle elevation. selected stud replacement at north exterior non-bearing wall elvations, new roof guard rail attachment to roof, and misc. wood repairs at roof. all repairs are to be done in kind. privately funded.Details
revision to pa3 2024-0425-0801 dry rot repair at roof, exterior elevation north & middle elevation. selected stud replacement at north exterior non-bearing wall elvations, new roof guard rail attachment to roof, and misc. wood repairs at roof. all repairs are to be done in kind. privately funded. | $30,000 |
| May 15, 2024 | Completed final sign-off Apr 2025 | 36 Hoff St | The Lawson Roofing Co Inc. | reroofingDetails
reroofing | $600,000 |
| Apr 25, 2024 | Completed final sign-off May 2025 | 36 Hoff St | Plant Construction Co, Lp | in kind replacement of windows, sliding doors, and stucco at (3) south elevations of the building. scope includes (34) windows, (8) sliding doors as well as replacement of traffic coating at (4) patios and balconies. 17 windows, 4 sliding doors at south elevation (visible to street) will be aluminumDetails
in kind replacement of windows, sliding doors, and stucco at (3) south elevations of the building. scope includes (34) windows, (8) sliding doors as well as replacement of traffic coating at (4) patios and balconies. 17 windows, 4 sliding doors at south elevation (visible to street) will be aluminum | $320,000 |
| Jul 7, 2022 | Completed final sign-off Jul 2022 | 36 Hoff St | Puckett Construction | replace windows in kind. two windows are facing the streets. u-factor =0.30Details
replace windows in kind. two windows are facing the streets. u-factor =0.30 | $2,000 |
| Jul 17, 2015 | Never finaled issued Jul 2015, no final | 36 Hoff St | street space permitDetails
street space permit | ||
| Sep 19, 2003 | Completed final sign-off Nov 2003 | 36 Hoff St | Anderson Roofing & Sheet Metal | reroofingDetails
reroofing | $72,755 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Plant Construction Co, Lp (4), B B J Electric, Inc (2), Pribuss Engineering Inc (2), Anderson Roofing & Sheet Metal, Puckett Construction, The Lawson Roofing Co Inc.
- Engineers
- Jimmy Lau
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.