Block 0200, lot 014
440 Davis Ct
- City’s use
- Multi-Family Residential
- Built
- 1966
- Stories
- 22
- Units
- 460
- Rooms
- 420 bathrooms
- Lot
- 94,529 sq ft
- Zoning
- RC4
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 17, 2026 | In progress issued Sep 2026 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit# 2117: rehabilitate existing kitchen and bathroom. install washer & dryer. no removal of structural walls.Details
unit# 2117: rehabilitate existing kitchen and bathroom. install washer & dryer. no removal of structural walls. | $60,000 |
| Sep 2, 2026 | In progress filed Sep 2026, not yet issued | 440 Davis Ct | General Air Technology | install (n) mini split ac system at elevator equipment room. evaporative coils to be installed in the equipment room and condenser to be installed on the roof of the exterior of the building. connect power circuit to equipment and provide condensate drains from the evaporative coils to drain at roofDetails
install (n) mini split ac system at elevator equipment room. evaporative coils to be installed in the equipment room and condenser to be installed on the roof of the exterior of the building. connect power circuit to equipment and provide condensate drains from the evaporative coils to drain at roof | $40,000 |
| Aug 27, 2026 | In progress issued Aug 2026 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 2015- remodel kitchen and bathroom. no removal of structrual walls. no (n) penetrations into (e) concrete elements. install washer and dryerDetails
unit 2015- remodel kitchen and bathroom. no removal of structrual walls. no (n) penetrations into (e) concrete elements. install washer and dryer | $60,000 |
| Aug 27, 2026 | In progress issued Aug 2026 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 1701- kitchen and bathroom remodel in kind like for likeDetails
unit 1701- kitchen and bathroom remodel in kind like for like | $70,000 |
| Aug 27, 2026 | In progress issued Aug 2026 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 512- kitchen and bathroom remodel in kind like for likeDetails
unit 512- kitchen and bathroom remodel in kind like for like | $70,000 |
| Aug 3, 2026 | Completed final sign-off Sep 2026 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit#2211: 1 kitchen and 1 bathroom remodel in kind like for like.Details
unit#2211: 1 kitchen and 1 bathroom remodel in kind like for like. | $40,000 |
| Jul 20, 2026 | Completed final sign-off Sep 2026 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 1601- remodel (e) kitchen and bathroom. no removal of structural walls. install washer and dryer. kitchen approximately 107sf, bathroom approximately, 42sf.Details
unit 1601- remodel (e) kitchen and bathroom. no removal of structural walls. install washer and dryer. kitchen approximately 107sf, bathroom approximately, 42sf. | $60,000 |
| Jul 16, 2026 | Completed final sign-off Aug 2026 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 2212: 1 kitchen and 2 bathroom remodels in kind like for like. no change to floor layout. no change to wall layout. no structural work.Details
unit 2212: 1 kitchen and 2 bathroom remodels in kind like for like. no change to floor layout. no change to wall layout. no structural work. | $60,000 |
| Jul 14, 2026 | In progress issued Jul 2026 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #1807: (1) kitchen, (1) bathroom remodel in kind, like for like. kitchen approximately 95sf, bathroom approximately 35sf.Details
unit #1807: (1) kitchen, (1) bathroom remodel in kind, like for like. kitchen approximately 95sf, bathroom approximately 35sf. | $60,000 |
| Jul 7, 2026 | Completed final sign-off Aug 2026 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 1807- remodel (e) kitchen and bathroom. no removal of structural walls. install washer and dryerDetails
unit 1807- remodel (e) kitchen and bathroom. no removal of structural walls. install washer and dryer | $60,000 |
| Jul 7, 2026 | Completed final sign-off Aug 2026 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 1410: rehabilitate existing kitchen and bathrom. no removal of structural walls. install washer and dryer.Details
unit 1410: rehabilitate existing kitchen and bathrom. no removal of structural walls. install washer and dryer. | $60,000 |
| Jun 23, 2026 | Completed final sign-off Jul 2026 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 2108: one kitchen and one bathroom remodel in-kind; like for like.Details
unit 2108: one kitchen and one bathroom remodel in-kind; like for like. | $60,000 |
| Jun 11, 2026 | Completed final sign-off Jul 2026 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit#: 413: rehabilitate existing kitchen and bathroom. install washer and dryer. no removal of structural walls. no new penetration into exisiting concrete elements.Details
unit#: 413: rehabilitate existing kitchen and bathroom. install washer and dryer. no removal of structural walls. no new penetration into exisiting concrete elements. | $60,000 |
| May 19, 2026 | Completed final sign-off Jul 2026 | 440 Davis Ct | Giampolini & Co Dba Giampolini/Courtney | survery concrete patching and crack repairs at exterior walls and balconies. patching will be compelted at different levels of to exterior building elevationDetails
survery concrete patching and crack repairs at exterior walls and balconies. patching will be compelted at different levels of to exterior building elevation | $32,366 |
| May 14, 2026 | Completed final sign-off Jul 2026 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit#1708: rehabitate existing kitchen and bathroom. install washer and dryer. no removal of structural walls.Details
unit#1708: rehabitate existing kitchen and bathroom. install washer and dryer. no removal of structural walls. | $60,000 |
| May 14, 2026 | Completed final sign-off Jul 2026 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit#: 2107: rehabiliate existing kitchen and bathroom install washer and dryer. no remoral of structural walls.Details
unit#: 2107: rehabiliate existing kitchen and bathroom install washer and dryer. no remoral of structural walls. | $60,000 |
| May 14, 2026 | Completed final sign-off Jul 2026 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit#: 1408: one kitchen one bathroom remodel in kind. like and like.Details
unit#: 1408: one kitchen one bathroom remodel in kind. like and like. | $60,000 |
| May 7, 2026 | Completed final sign-off Jun 2026 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #521: rehabilitate (e) kitchen and bathroom install washer and dryer, no removal of structural walls. no new penetratrion into (e) concrete elementsDetails
unit #521: rehabilitate (e) kitchen and bathroom install washer and dryer, no removal of structural walls. no new penetratrion into (e) concrete elements | $60,000 |
| May 7, 2026 | Completed final sign-off Jul 2026 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #501: rehabilitate (e) kitchen and bathroom install washer and dryer, no removal of structural walls. no new penetratrion into (e) concrete elementsDetails
unit #501: rehabilitate (e) kitchen and bathroom install washer and dryer, no removal of structural walls. no new penetratrion into (e) concrete elements | $60,000 |
| May 7, 2026 | Completed final sign-off Jul 2026 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #305: rehabilitate (e) kitchen and bathroom install washer and dryer, no removal of structural walls.no new penetratrion into (e) concrete elementsDetails
unit #305: rehabilitate (e) kitchen and bathroom install washer and dryer, no removal of structural walls.no new penetratrion into (e) concrete elements | $60,000 |
| Apr 21, 2026 | Completed final sign-off May 2026 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 1211: one kitchen one bathroom remodel in kind. like for like.Details
unit 1211: one kitchen one bathroom remodel in kind. like for like. | $60,000 |
| Apr 14, 2026 | Completed final sign-off Jun 2026 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #320: one kitchen and one bathroom remodel in-kind, like for like.Details
unit #320: one kitchen and one bathroom remodel in-kind, like for like. | $60,000 |
| Apr 10, 2026 | In progress issued Sep 2026 | 440 Davis Ct | City Building Inc. | level 1, tenant improvment includes interior refinishes of e residential tower main lobby. no change in use occupancy, occ load or egrees. replace in kind new front entry doors. new floor covering and wall finishes. all new or revised meps and life safety work will be design build,submitted separateDetails
level 1, tenant improvment includes interior refinishes of e residential tower main lobby. no change in use occupancy, occ load or egrees. replace in kind new front entry doors. new floor covering and wall finishes. all new or revised meps and life safety work will be design build,submitted separate | $154,000 |
| Apr 2, 2026 | Completed final sign-off Jun 2026 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | #809:rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer.Details
#809:rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer. | $60,000 |
| Mar 23, 2026 | In progress issued Mar 2026 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | revision 202602176002-unit 1406: remodel (e) kitchen and bathroom. no removal of structrual walls. install washer and dryer.Details
revision 202602176002-unit 1406: remodel (e) kitchen and bathroom. no removal of structrual walls. install washer and dryer. | |
| Mar 17, 2026 | Expired or cancelled cancelled Jul 2026 | 460 Davis Ct | Giampolini & Co Dba Giampolini/Courtney | prep and repaint portions of exterior facade to match existing. non-structural maintenance. no change to openings, materials, or structural elements.Details
prep and repaint portions of exterior facade to match existing. non-structural maintenance. no change to openings, materials, or structural elements. | $140,000 |
| Mar 5, 2026 | Completed final sign-off Apr 2026 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 812: one kitchen and bathroom remodel in kind.Details
unit 812: one kitchen and bathroom remodel in kind. | $60,000 |
| Feb 17, 2026 | Completed final sign-off May 2026 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #1406: one kitchen, one bathroom. remodel in kind like for like.Details
unit #1406: one kitchen, one bathroom. remodel in kind like for like. | $60,000 |
| Feb 10, 2026 | Completed final sign-off Apr 2026 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit#: 2114: rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer and dryers.Details
unit#: 2114: rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer and dryers. | $60,000 |
| Feb 5, 2026 | Completed final sign-off Apr 2026 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #42 - rehabilitate existing 1st floor kitchen and 2nd floor bathroom, relocate washer and elec dryer from 1st to 2nd floor of unit. no removal of structural walls.Details
unit #42 - rehabilitate existing 1st floor kitchen and 2nd floor bathroom, relocate washer and elec dryer from 1st to 2nd floor of unit. no removal of structural walls. | $60,000 |
| Feb 5, 2026 | Completed final sign-off Mar 2026 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit: 401. one bathroom, one kitchen remodel in kind. like for likeDetails
unit: 401. one bathroom, one kitchen remodel in kind. like for like | $60,000 |
| Feb 5, 2026 | Completed final sign-off Apr 2026 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit#: 403; rehabitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer.Details
unit#: 403; rehabitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer. | $60,000 |
| Jan 29, 2026 | Completed final sign-off Mar 2026 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit#1221: one kitchen, one bathroom remodel in kind, like for likeDetails
unit#1221: one kitchen, one bathroom remodel in kind, like for like | $60,000 |
| Jan 26, 2026 | Completed final sign-off Mar 2026 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #1508 - one kitchen, one bathroom remodel in kind, like for like.Details
unit #1508 - one kitchen, one bathroom remodel in kind, like for like. | $60,000 |
| Jan 13, 2026 | Completed final sign-off Apr 2026 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #619: rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer & dryerDetails
unit #619: rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer & dryer | $60,000 |
| Jan 13, 2026 | Completed final sign-off Apr 2026 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #1913: rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer & dryerDetails
unit #1913: rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer & dryer | $60,000 |
| Dec 18, 2025 | Completed final sign-off Jun 2026 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 321; revision to pa 202508213582 and 202511149653 to add washer and dryer to scopeDetails
unit 321; revision to pa 202508213582 and 202511149653 to add washer and dryer to scope | $10,000 |
| Dec 18, 2025 | In progress filed Dec 2025, not yet issued | 440 Davis Ct | Michael & Sons Construction Inc | unit 303: remove drywall as needed to expose shower p-trap for unit 404. remove and replace p-trap w/new. patch drywall and paint. unit 404: snake kitchen & vanity sinks. repair leak by dishwasher. work per his 2025-47152.Details
unit 303: remove drywall as needed to expose shower p-trap for unit 404. remove and replace p-trap w/new. patch drywall and paint. unit 404: snake kitchen & vanity sinks. repair leak by dishwasher. work per his 2025-47152. | $3,700 |
| Dec 11, 2025 | Completed final sign-off Mar 2026 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 322; one kitchen, one bathroom remodel in kind like for like.Details
unit 322; one kitchen, one bathroom remodel in kind like for like. | $60,000 |
| Dec 10, 2025 | Completed final sign-off Jan 2026 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 2005- remodel (e) kitchen and bathroom . no removal of sturctural walls.Details
unit 2005- remodel (e) kitchen and bathroom . no removal of sturctural walls. | $60,000 |
| Dec 4, 2025 | Completed final sign-off Jan 2026 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 1806: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit 1806: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Dec 4, 2025 | Completed final sign-off Jan 2026 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 2221: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit 2221: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Dec 2, 2025 | Completed final sign-off Jan 2026 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit#: 614. rehabilitate existing kitchen and bathroom. no removal of structrual walls.Details
unit#: 614. rehabilitate existing kitchen and bathroom. no removal of structrual walls. | $60,000 |
| Nov 24, 2025 | In progress issued Nov 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #1920 - recommencement and completion of work approved under pa # 202405071528.Details
unit #1920 - recommencement and completion of work approved under pa # 202405071528. | $68,000 |
| Nov 24, 2025 | Completed final sign-off Jan 2026 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit#: 1416. rehabilitate existing kitchen and bathroom. no removal of structrual walls.Details
unit#: 1416. rehabilitate existing kitchen and bathroom. no removal of structrual walls. | $60,000 |
| Nov 24, 2025 | Completed final sign-off Jan 2026 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 906- remodel (e) ktichen and bathroom. no removal of structural wallsDetails
unit 906- remodel (e) ktichen and bathroom. no removal of structural walls | $60,000 |
| Nov 18, 2025 | Completed final sign-off Jan 2026 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 1718: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit 1718: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Nov 14, 2025 | Completed final sign-off Jun 2026 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #321: revision to pa# 202508213582, to add smoke damaged repairs. reframe walls and drop ceiling.Details
unit #321: revision to pa# 202508213582, to add smoke damaged repairs. reframe walls and drop ceiling. | $50,000 |
| Nov 12, 2025 | In progress filed Nov 2025, not yet issued | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 321- remodel (e) ktichen and bathroom . no removal of sturctural walls.Details
unit 321- remodel (e) ktichen and bathroom . no removal of sturctural walls. | $60,000 |
| Nov 12, 2025 | Completed final sign-off Jan 2026 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 918- remodel (e) ktichen and bathroom . no removal of sturctural walls.Details
unit 918- remodel (e) ktichen and bathroom . no removal of sturctural walls. | $60,000 |
| Nov 12, 2025 | Completed final sign-off Jan 2026 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 708- remodel (e) ktichen and bathroom . no removal of sturctural walls.Details
unit 708- remodel (e) ktichen and bathroom . no removal of sturctural walls. | $60,000 |
| Sep 11, 2025 | Completed final sign-off Oct 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #1709: rehabilitate (e) kitchen and bathroom no removal of structural walls install washer and dryerDetails
unit #1709: rehabilitate (e) kitchen and bathroom no removal of structural walls install washer and dryer | $60,000 |
| Sep 11, 2025 | Completed final sign-off Nov 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #308: rehabilitate (e) kitchen and bathroom no removal of structural walls install washer and dryerDetails
unit #308: rehabilitate (e) kitchen and bathroom no removal of structural walls install washer and dryer | $60,000 |
| Sep 10, 2025 | Completed final sign-off Dec 2025 | 440 Davis Ct | Central Roofing Co. | re roofing: no torch down.Details
re roofing: no torch down. | $370,000 |
| Sep 9, 2025 | Completed final sign-off Oct 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 410: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit 410: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Sep 9, 2025 | Completed final sign-off Oct 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 2115: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit 2115: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Aug 26, 2025 | Completed final sign-off Oct 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #318: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit #318: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Aug 21, 2025 | Completed final sign-off Jun 2026 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #321: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit #321: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Aug 21, 2025 | Completed final sign-off Oct 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #1511: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit #1511: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Aug 7, 2025 | Completed final sign-off Sep 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #806: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit #806: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Aug 7, 2025 | Completed final sign-off Oct 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #705: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit #705: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Jul 29, 2025 | Completed final sign-off Sep 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit # 1114: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit # 1114: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Jul 29, 2025 | Completed final sign-off Sep 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit # 301: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit # 301: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Jul 15, 2025 | Completed final sign-off Sep 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #921: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit #921: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Jul 10, 2025 | Completed final sign-off Sep 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #2013: rehabilitate existing kitchen and bathroom in kind. demo existing closet. no removal of structural walls.Details
unit #2013: rehabilitate existing kitchen and bathroom in kind. demo existing closet. no removal of structural walls. | $60,000 |
| Jul 8, 2025 | Completed final sign-off Aug 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 2021: rehabilitate existing kichen and bathroom. no removal of structural walls.Details
unit 2021: rehabilitate existing kichen and bathroom. no removal of structural walls. | $60,000 |
| Jul 1, 2025 | Completed final sign-off Aug 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #1217: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit #1217: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Jul 1, 2025 | Completed final sign-off Aug 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #1505: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit #1505: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Jun 3, 2025 | Completed final sign-off Aug 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | # 502: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
# 502: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Apr 30, 2025 | Completed final sign-off Jul 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 1522: rehabilitate e) kitchen & bathroom. no removal of structural wallsDetails
unit 1522: rehabilitate e) kitchen & bathroom. no removal of structural walls | $60,000 |
| Apr 15, 2025 | Completed final sign-off Jul 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #802 rehabilitate existing kitchen and bathroom. no removal of structural wallsDetails
unit #802 rehabilitate existing kitchen and bathroom. no removal of structural walls | $60,000 |
| Apr 15, 2025 | Completed final sign-off Jul 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #407 rehabilitate existing kitchen and bathroom. no removal of structural wallsDetails
unit #407 rehabilitate existing kitchen and bathroom. no removal of structural walls | $60,000 |
| Apr 10, 2025 | Completed final sign-off Oct 2025 | 440 Davis Ct | Lynn Safety Inc. | installing rooftop equipment for exterior building maintenance eg cleaning windows or any required safety tie offDetails
installing rooftop equipment for exterior building maintenance eg cleaning windows or any required safety tie off | $22,803 |
| Apr 8, 2025 | Completed final sign-off Jun 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 1110: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit 1110: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Apr 8, 2025 | Completed final sign-off Jun 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 801: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit 801: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Mar 24, 2025 | Completed final sign-off Apr 2025 | 440 Davis Ct | Ati Restoration Llc | unit #1118: to obtain final inspection for work approved under pa#:2021.0616.2600 all work is complete.Details
unit #1118: to obtain final inspection for work approved under pa#:2021.0616.2600 all work is complete. | |
| Mar 18, 2025 | Completed final sign-off May 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 1312- rehab (e) kitchen and bathroom. no removal of sturcural walls.Details
unit 1312- rehab (e) kitchen and bathroom. no removal of sturcural walls. | $60,000 |
| Mar 13, 2025 | In progress issued Mar 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #1609 rehabilitate (e) kitchen and bathroom. no removal of structural walls. install washer & dryerDetails
unit #1609 rehabilitate (e) kitchen and bathroom. no removal of structural walls. install washer & dryer | $60,000 |
| Mar 13, 2025 | Completed final sign-off May 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #1304 rehabilitate (e) kitchen and bathroom. no removal of structural wallsDetails
unit #1304 rehabilitate (e) kitchen and bathroom. no removal of structural walls | $60,000 |
| Mar 4, 2025 | Completed final sign-off May 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | 16/fl: unit#1617 rehabilitate existing kitchen and bathroom. no removal of walls. install washer and dryer.Details
16/fl: unit#1617 rehabilitate existing kitchen and bathroom. no removal of walls. install washer and dryer. | $60,000 |
| Mar 4, 2025 | Completed final sign-off May 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | 15/fl: unit#1509 rehabilitate existing kitchen and bathroom. no removal of walls. install washer and dryer.Details
15/fl: unit#1509 rehabilitate existing kitchen and bathroom. no removal of walls. install washer and dryer. | $60,000 |
| Feb 27, 2025 | Completed final sign-off Apr 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 703: rehabilitate e) kitchen & bathroom. no removal of walls. no exterior workDetails
unit 703: rehabilitate e) kitchen & bathroom. no removal of walls. no exterior work | $60,000 |
| Feb 27, 2025 | Completed final sign-off Apr 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 1405: rehabilitate e) kitchen & bathroom. no removal of walls. no exterior workDetails
unit 1405: rehabilitate e) kitchen & bathroom. no removal of walls. no exterior work | $60,000 |
| Feb 18, 2025 | Completed final sign-off Mar 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | 5th/fl(unit#517): rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer.Details
5th/fl(unit#517): rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer. | $60,000 |
| Feb 18, 2025 | Completed final sign-off Mar 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | 19/fl(unit#1916):revision to pa#2025-0109-8004 add washer and dryerDetails
19/fl(unit#1916):revision to pa#2025-0109-8004 add washer and dryer | |
| Feb 18, 2025 | Completed final sign-off Mar 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | 05th/fl(unit#516):revision to pa#2025-0109-8001 add washer and dryerDetails
05th/fl(unit#516):revision to pa#2025-0109-8001 add washer and dryer | |
| Feb 13, 2025 | Completed final sign-off Apr 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #1004 rehabilitate (e) kitchen and bathroom no removal of structural wallsDetails
unit #1004 rehabilitate (e) kitchen and bathroom no removal of structural walls | $60,000 |
| Feb 13, 2025 | Completed final sign-off May 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #51 rehabilitate (e) kitchen and bathroom no removal of structural walls. replace (e) washer & dryerDetails
unit #51 rehabilitate (e) kitchen and bathroom no removal of structural walls. replace (e) washer & dryer | $60,000 |
| Jan 28, 2025 | Completed final sign-off Mar 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #1017 rehabilitate (e) kitchen and bathroom, no removal of structural walls. install washer & dryerDetails
unit #1017 rehabilitate (e) kitchen and bathroom, no removal of structural walls. install washer & dryer | $60,000 |
| Jan 28, 2025 | Completed final sign-off Mar 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #2017: rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer.Details
unit #2017: rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer. | $60,000 |
| Jan 28, 2025 | Completed final sign-off Mar 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #303: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit #303: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Jan 28, 2025 | Completed final sign-off Apr 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 520: rehabilitate existing kitchen and bath. no removal of structural walls. install washer and dryer.Details
unit 520: rehabilitate existing kitchen and bath. no removal of structural walls. install washer and dryer. | $60,000 |
| Jan 23, 2025 | Completed final sign-off Mar 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 607: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit 607: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Jan 23, 2025 | Completed final sign-off Mar 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 2110: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit 2110: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Jan 9, 2025 | Completed final sign-off Mar 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 1916 - rehabilitate existing kitchen and bathroom. no removal of structural wallsDetails
unit 1916 - rehabilitate existing kitchen and bathroom. no removal of structural walls | $60,000 |
| Jan 9, 2025 | Completed final sign-off Mar 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 516 - rehabilitate existing kitchen and bathroom. no removal of structural wallsDetails
unit 516 - rehabilitate existing kitchen and bathroom. no removal of structural walls | $60,000 |
| Jan 9, 2025 | Completed final sign-off Feb 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 1713 revision to pa 202410314124 to add washer & dryerDetails
unit 1713 revision to pa 202410314124 to add washer & dryer | $5,000 |
| Jan 7, 2025 | Completed final sign-off Mar 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #811: rehabilitate (e) kitchen and bathroom no removal of structural wallsDetails
unit #811: rehabilitate (e) kitchen and bathroom no removal of structural walls | $60,000 |
| Nov 26, 2024 | Completed final sign-off Feb 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #510: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit #510: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Nov 7, 2024 | In progress issued Nov 2024 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit#: 815; rehabilitate existing kitchen and bathroom; no removal of structural walls.Details
unit#: 815; rehabilitate existing kitchen and bathroom; no removal of structural walls. | $60,000 |
| Nov 7, 2024 | Completed final sign-off Jun 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit#: 1403; rehabilitate existing kitchen and bathroom; no removal of structural walls.Details
unit#: 1403; rehabilitate existing kitchen and bathroom; no removal of structural walls. | $60,000 |
| Nov 4, 2024 | Completed final sign-off Mar 2025 | 460 Davis Ct | Trip Hazard Llc Dba Trip Hazard Landscap | non- structural concrete flatworko in multiple areas (30 total) ranging in size from 5-60 sqft all in common areas. serving residential areas onlyDetails
non- structural concrete flatworko in multiple areas (30 total) ranging in size from 5-60 sqft all in common areas. serving residential areas only | $50,000 |
| Oct 31, 2024 | Completed final sign-off Feb 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 1713: rehabilitate existing kitchen and bathroom. no removal of structural walls. to comply with nov# 202067171Details
unit 1713: rehabilitate existing kitchen and bathroom. no removal of structural walls. to comply with nov# 202067171 | $60,000 |
| Oct 31, 2024 | Completed final sign-off Jan 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 2201: rehabilitate existing kitchen and bathroom. no removal of structural walls. to comply with nov# 202067171Details
unit 2201: rehabilitate existing kitchen and bathroom. no removal of structural walls. to comply with nov# 202067171 | $60,000 |
| Oct 29, 2024 | Completed final sign-off Jun 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #1621: rehabilitate (e) kitchen and bathroom no removal of structural walls.Details
unit #1621: rehabilitate (e) kitchen and bathroom no removal of structural walls. | $60,000 |
| Oct 29, 2024 | Completed final sign-off Jun 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit# 421: rehabilitate (e) kitchen and bathroom no removal of structural walls.Details
unit# 421: rehabilitate (e) kitchen and bathroom no removal of structural walls. | $60,000 |
| Oct 17, 2024 | Completed final sign-off Nov 2024 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | rev 202410032226- unit 1512-install w&d unitDetails
rev 202410032226- unit 1512-install w&d unit | $60,000 |
| Oct 17, 2024 | Completed final sign-off Jan 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 514-rehabilitate (e) kitchen and bathroom, no removal of structural wallsDetails
unit 514-rehabilitate (e) kitchen and bathroom, no removal of structural walls | $60,000 |
| Oct 3, 2024 | Completed final sign-off Dec 2024 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit # 1606: rehabilitate kitchen and bathroom no removal of structural wallsDetails
unit # 1606: rehabilitate kitchen and bathroom no removal of structural walls | $60,000 |
| Oct 3, 2024 | Completed final sign-off Dec 2024 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #902: rehabilitate kitchen and bathroom no removal of structural wallsDetails
unit #902: rehabilitate kitchen and bathroom no removal of structural walls | $60,000 |
| Oct 3, 2024 | Completed final sign-off Dec 2024 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 1413, rehabitate existing kitchen and bathroom. no removal of structural walls.Details
unit 1413, rehabitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Oct 3, 2024 | Completed final sign-off Nov 2024 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 1512, rehabitate existing kitchen and bathroom. no removal of structural walls.Details
unit 1512, rehabitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Oct 1, 2024 | Completed final sign-off Nov 2024 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 315: ininstall washer and dryer revision to pa 202409100395Details
unit 315: ininstall washer and dryer revision to pa 202409100395 | $60,000 |
| Sep 16, 2024 | In progress issued Sep 2024 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 1518- rehabilitate (e) kitchen and bathroom . no removal of structural wallsDetails
unit 1518- rehabilitate (e) kitchen and bathroom . no removal of structural walls | $60,000 |
| Sep 16, 2024 | Completed final sign-off Dec 2024 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 707- rehabilitate (e) kitchen and bathroom. no removal of structrual walls.Details
unit 707- rehabilitate (e) kitchen and bathroom. no removal of structrual walls. | $60,000 |
| Sep 16, 2024 | Completed final sign-off Dec 2024 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 1706- rehabilitate (e) kitchen and bathroom. no removal of structrual walls.Details
unit 1706- rehabilitate (e) kitchen and bathroom. no removal of structrual walls. | $60,000 |
| Sep 16, 2024 | In progress issued Sep 2024 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #1905: rehab (e) kitchen and bathroom. no removal of structural walls.Details
unit #1905: rehab (e) kitchen and bathroom. no removal of structural walls. | $50,000 |
| Sep 11, 2024 | Completed final sign-off Oct 2024 | 460 Davis Ct | Newcap Roofing Inc | reroofingDetails
reroofing | $15,000 |
| Sep 11, 2024 | Completed final sign-off Dec 2025 | 440 Davis Ct | G Legarte Construction | replace existing fencing, repair rellises slats (all work in kind)Details
replace existing fencing, repair rellises slats (all work in kind) | $175,000 |
| Sep 10, 2024 | Completed final sign-off Nov 2024 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #315: rehabilitate existing kitchen and bathroom. no removal of structural wallsDetails
unit #315: rehabilitate existing kitchen and bathroom. no removal of structural walls | $50,000 |
| Sep 10, 2024 | Completed final sign-off Nov 2024 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #1322 rehabilitate (e) kitchen and bathroom, no removal of structural wallsDetails
unit #1322 rehabilitate (e) kitchen and bathroom, no removal of structural walls | $50,000 |
| Sep 10, 2024 | Completed final sign-off Nov 2024 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #416: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit #416: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $50,000 |
| Sep 10, 2024 | Completed final sign-off Nov 2024 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit # 1915 rehabilitate (e) kitchen and bathroom, no removal of structural wallsDetails
unit # 1915 rehabilitate (e) kitchen and bathroom, no removal of structural walls | $50,000 |
| Jul 5, 2024 | Completed final sign-off Jun 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 907: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit 907: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $50,000 |
| Jun 17, 2024 | Completed final sign-off Oct 2024 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit # 1814: rehab (3) kitchen and bathroom. no removal of structural walls.Details
unit # 1814: rehab (3) kitchen and bathroom. no removal of structural walls. | $50,000 |
| Jun 17, 2024 | Completed final sign-off Oct 2024 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit# 2105: rehab (e) kitchen and bathroom. no removal of structural walls.Details
unit# 2105: rehab (e) kitchen and bathroom. no removal of structural walls. | $50,000 |
| May 28, 2024 | Completed final sign-off Nov 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 313 rehabilitate e kitchen and bath. no removal of structural walls.Details
unit 313 rehabilitate e kitchen and bath. no removal of structural walls. | $50,000 |
| May 28, 2024 | Completed final sign-off Nov 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 1019 rehabilitate e kitchen and bath. no removal of structural walls.Details
unit 1019 rehabilitate e kitchen and bath. no removal of structural walls. | $50,000 |
| May 16, 2024 | Completed final sign-off Nov 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #1003 rehabilitate existing kitchen and bathroom. no removal of structural wallsDetails
unit #1003 rehabilitate existing kitchen and bathroom. no removal of structural walls | $50,000 |
| May 16, 2024 | Completed final sign-off Aug 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #1603 rehabilitate existing kitchen and bathroom. no removal of structural wallsDetails
unit #1603 rehabilitate existing kitchen and bathroom. no removal of structural walls | $50,000 |
| May 7, 2024 | In progress issued May 2024 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 1920: rehabilitate existing kitchen and bath. no removal of structural walls.Details
unit 1920: rehabilitate existing kitchen and bath. no removal of structural walls. | $50,000 |
| May 7, 2024 | Completed final sign-off Oct 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 1218. rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit 1218. rehabilitate existing kitchen and bathroom. no removal of structural walls. | $50,000 |
| May 7, 2024 | Completed final sign-off Oct 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit# 2214 rehabilitate (e) kitchen and bathroom, no removal of structural wallsDetails
unit# 2214 rehabilitate (e) kitchen and bathroom, no removal of structural walls | $50,000 |
| May 7, 2024 | Completed final sign-off Oct 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit# 2217 rehabilitate (e) kitchen and bathroom, no removal of structural wallsDetails
unit# 2217 rehabilitate (e) kitchen and bathroom, no removal of structural walls | $50,000 |
| Apr 26, 2024 | In progress issued May 2024 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit# 1903 rehabilitate (e) kitchen and bathroom, no removal of structural wallsDetails
unit# 1903 rehabilitate (e) kitchen and bathroom, no removal of structural walls | $50,000 |
| Apr 26, 2024 | Completed final sign-off Oct 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #1117 rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit #1117 rehabilitate existing kitchen and bathroom. no removal of structural walls. | $50,000 |
| Apr 26, 2024 | In progress issued May 2024 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #519 rehabilitate (e) kitchen and bathroom, no removal of structural wallsDetails
unit #519 rehabilitate (e) kitchen and bathroom, no removal of structural walls | $50,000 |
| Apr 26, 2024 | In progress issued May 2024 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #1503: rehabilitate existing bathroom and kitchen. no removal of structural wallsDetails
unit #1503: rehabilitate existing bathroom and kitchen. no removal of structural walls | $50,000 |
| Apr 22, 2024 | Completed final sign-off Oct 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 810- remodel (e) kitchen and bathroom. no removal of strutural walls.Details
unit 810- remodel (e) kitchen and bathroom. no removal of strutural walls. | $50,000 |
| Apr 22, 2024 | In progress issued Apr 2024 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 304- remodel (e) kitchen and bathroom.Details
unit 304- remodel (e) kitchen and bathroom. | $50,000 |
| Apr 22, 2024 | In progress issued Apr 2024 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 1619- remodel (e) kitchen and bathroom. no removal of structural walls.Details
unit 1619- remodel (e) kitchen and bathroom. no removal of structural walls. | $50,000 |
| Apr 15, 2024 | Completed final sign-off Aug 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit#503 rehabilitate (e) kitchen and bathroom, no removal of structural wallsDetails
unit#503 rehabilitate (e) kitchen and bathroom, no removal of structural walls | $50,000 |
| Apr 15, 2024 | Completed final sign-off Aug 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #720 rehabilitate (e) kitchen and bathroom, no removal of structural wallsDetails
unit #720 rehabilitate (e) kitchen and bathroom, no removal of structural walls | $50,000 |
| Apr 5, 2024 | Completed final sign-off Aug 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #1318 rehabilitate (e) kitchen and bathroom, no removal of structural wallsDetails
unit #1318 rehabilitate (e) kitchen and bathroom, no removal of structural walls | $50,000 |
| Apr 5, 2024 | In progress issued Apr 2024 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #2108: rehabilitate (e) kitchen and bathroom no removal of structural wallsDetails
unit #2108: rehabilitate (e) kitchen and bathroom no removal of structural walls | $50,000 |
| Apr 5, 2024 | Completed final sign-off Aug 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #1816: rehabilitate (e) kitchen and bathroom no removal of structural wallsDetails
unit #1816: rehabilitate (e) kitchen and bathroom no removal of structural walls | $50,000 |
| Apr 5, 2024 | Completed final sign-off Aug 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #1721 rehabilitate (e) kitchen and bathroom, no removal of structural wallsDetails
unit #1721 rehabilitate (e) kitchen and bathroom, no removal of structural walls | $50,000 |
| Apr 3, 2024 | Completed final sign-off Aug 2025 | 460 Davis Ct | Commercial Fire Protection Llc | voluntary upgrade of (e) fire alarm system, initiating devices,modules,amplifilers.phase 5 and phase 10 from sffd approved plan of action dated 11/20/2023 as shown on plans on sheet fa-21 to 23.all (e) notification appliances to remain as installed.Details
voluntary upgrade of (e) fire alarm system, initiating devices,modules,amplifilers.phase 5 and phase 10 from sffd approved plan of action dated 11/20/2023 as shown on plans on sheet fa-21 to 23.all (e) notification appliances to remain as installed. | $80,000 |
| Mar 26, 2024 | In progress issued Mar 2024 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #916: rehabilitate (e) kitchen and bathroom no removal of structural wallsDetails
unit #916: rehabilitate (e) kitchen and bathroom no removal of structural walls | $50,000 |
| Mar 21, 2024 | Completed final sign-off Aug 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #1022 - rehabilitate existing kitchen and bathroom; no removal of structural wallsDetails
unit #1022 - rehabilitate existing kitchen and bathroom; no removal of structural walls | $50,000 |
| Mar 21, 2024 | Completed final sign-off Aug 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 1613 rehabilitate existing kitchen and bath. no remomval of structural walls.Details
unit 1613 rehabilitate existing kitchen and bath. no remomval of structural walls. | $50,000 |
| Mar 21, 2024 | Completed final sign-off Aug 2025 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 1121 rehabilitate existing kitchen and bath. no remomveal of structural walls.Details
unit 1121 rehabilitate existing kitchen and bath. no remomveal of structural walls. | $50,000 |
| Mar 21, 2024 | In progress issued Mar 2024 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #2003 rehabilitate (e) kitchen and bathroom, no removal of structural wallsDetails
unit #2003 rehabilitate (e) kitchen and bathroom, no removal of structural walls | $50,000 |
| Mar 1, 2024 | Completed final sign-off May 2024 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 1907 - rehabilitate existing kitchen and bathroom; no removal of structural wallsDetails
unit 1907 - rehabilitate existing kitchen and bathroom; no removal of structural walls | $50,000 |
| Feb 23, 2024 | Completed final sign-off Feb 2024 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 50 revision to 202401093640. change location of the washer dryer, change location of kitchen appliances, change location of master bath lavetory and second lavetory. remove linen closet & open master bath showerDetails
unit 50 revision to 202401093640. change location of the washer dryer, change location of kitchen appliances, change location of master bath lavetory and second lavetory. remove linen closet & open master bath shower | $15,000 |
| Feb 2, 2024 | Completed final sign-off Apr 2024 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit# 1519; rehabilitate (e) kitchen and bathroom, no removal of structural wallsDetails
unit# 1519; rehabilitate (e) kitchen and bathroom, no removal of structural walls | $50,000 |
| Feb 2, 2024 | Completed final sign-off Apr 2024 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit# 622; rehabilitate (e) kitchen and bathroom, no removal of structural wallsDetails
unit# 622; rehabilitate (e) kitchen and bathroom, no removal of structural walls | $50,000 |
| Jan 30, 2024 | Completed final sign-off Apr 2024 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #1506: rehabilitate (e) kitchen and bathroom. no removal of structural walls.Details
unit #1506: rehabilitate (e) kitchen and bathroom. no removal of structural walls. | $50,000 |
| Jan 30, 2024 | Completed final sign-off Apr 2024 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #2019, 20th floor: rehabilitate existing kitchen and bathroom. no removal of structural wallsDetails
unit #2019, 20th floor: rehabilitate existing kitchen and bathroom. no removal of structural walls | $50,000 |
| Jan 30, 2024 | Completed final sign-off Apr 2024 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 2006 floor 20- rehabilitate existing kitchen and bathroom. no removal of structural wallsDetails
unit 2006 floor 20- rehabilitate existing kitchen and bathroom. no removal of structural walls | $50,000 |
| Jan 30, 2024 | Completed final sign-off Apr 2024 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit# 0613: rehabilitate (e) kitchen and bathroom. no removal of structural walls.Details
unit# 0613: rehabilitate (e) kitchen and bathroom. no removal of structural walls. | $50,000 |
| Jan 16, 2024 | Completed final sign-off Mar 2024 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 1313: rehabilitate (e) kitchen and bathroom. no removal of structrual walls.Details
unit 1313: rehabilitate (e) kitchen and bathroom. no removal of structrual walls. | $50,000 |
| Jan 9, 2024 | Completed final sign-off Feb 2024 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit th# 50: revision to permit 202311090526. revise master bathroom layout. add to scope window and door replacement.Details
unit th# 50: revision to permit 202311090526. revise master bathroom layout. add to scope window and door replacement. | $40,000 |
| Dec 26, 2023 | Completed final sign-off Mar 2024 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit # 1119: rehabilitate (e) kitchen and bathroom, no removal of structural wallsDetails
unit # 1119: rehabilitate (e) kitchen and bathroom, no removal of structural walls | $50,000 |
| Dec 26, 2023 | Completed final sign-off May 2024 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit # 912: rehabilitate (e) kitchen and bathroom, no removal of structural wallsDetails
unit # 912: rehabilitate (e) kitchen and bathroom, no removal of structural walls | $50,000 |
| Dec 26, 2023 | Completed final sign-off Mar 2024 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #2106: rehabilitate (e) kitchen and bathroom. no removal of structural walls.Details
unit #2106: rehabilitate (e) kitchen and bathroom. no removal of structural walls. | $50,000 |
| Dec 26, 2023 | In progress filed Dec 2023, not yet issued | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | rehabilitate (e) kitchen and bathroom, no removal of structural wallsDetails
rehabilitate (e) kitchen and bathroom, no removal of structural walls | $50,000 |
| Dec 26, 2023 | Completed final sign-off Mar 2024 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #1922: rehabilitate (e) kitchen and bathroom, no removal of structural wallsDetails
unit #1922: rehabilitate (e) kitchen and bathroom, no removal of structural walls | $50,000 |
| Dec 1, 2023 | In progress filed Dec 2023, not yet issued | 440 Davis Ct | Plant Construction Co, Lp | replacement of existing guardrail with a new 8'-0" tall security fence and gate at the east and west ends of the plaza level. existing light poles to be retained.Details
replacement of existing guardrail with a new 8'-0" tall security fence and gate at the east and west ends of the plaza level. existing light poles to be retained. | $150,000 |
| Nov 30, 2023 | Completed final sign-off Feb 2024 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #1015: rehabilitate (e) kitchen and bathroom. no removal of structural walls.Details
unit #1015: rehabilitate (e) kitchen and bathroom. no removal of structural walls. | $60,000 |
| Nov 30, 2023 | Completed final sign-off Feb 2024 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #805: rehabilitate (e) kitchen and bathroom. no removal of structural walls.Details
unit #805: rehabilitate (e) kitchen and bathroom. no removal of structural walls. | $60,000 |
| Nov 30, 2023 | Completed final sign-off Feb 2024 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit# 2104: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit# 2104: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Nov 9, 2023 | In progress issued Nov 2023 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit#: th50: rehabitate existing kitchen and bathroom. repl/reloc washer/dryer. no removal walls.Details
unit#: th50: rehabitate existing kitchen and bathroom. repl/reloc washer/dryer. no removal walls. | $60,000 |
| Nov 1, 2023 | Completed final sign-off Dec 2023 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 1419: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit 1419: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Oct 25, 2023 | Completed final sign-off Sep 2025 | 440 Davis Ct | Commercial Fire Protection Llc | upgrade existing fire alarm devices to be replaced to include mannual pull stations and smoke detectors. existing bells to be replace with horn strobes. units to have 520 hz low feq audibles installed. fire alarm control panel shall be monitored with a stalink 4 v cell gsm sole path communicationDetails
upgrade existing fire alarm devices to be replaced to include mannual pull stations and smoke detectors. existing bells to be replace with horn strobes. units to have 520 hz low feq audibles installed. fire alarm control panel shall be monitored with a stalink 4 v cell gsm sole path communication | $180,000 |
| Oct 12, 2023 | Expired or cancelled cancelled Dec 2023 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #1810: rehab (e) kitchen & bathroom, no removal of strutural wallsDetails
unit #1810: rehab (e) kitchen & bathroom, no removal of strutural walls | $60,000 |
| Oct 12, 2023 | Completed final sign-off Dec 2023 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit #1421: rehab (e) kitchen & bathroom, no removal of strutural wallsDetails
unit #1421: rehab (e) kitchen & bathroom, no removal of strutural walls | $60,000 |
| Oct 6, 2023 | Completed final sign-off Feb 2024 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 1321: revision to 202308295489: remove one entry closet and one kitchen pantry.Details
unit 1321: revision to 202308295489: remove one entry closet and one kitchen pantry. | $5,000 |
| Oct 5, 2023 | Completed final sign-off Dec 2023 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit# 1016: rehabilitate (e) kitchen and bathroom. no removal of structural walls.Details
unit# 1016: rehabilitate (e) kitchen and bathroom. no removal of structural walls. | $70,000 |
| Oct 5, 2023 | Completed final sign-off Dec 2023 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit# 820: rehabilitate (e) kitchen and bathroom. no removal of structural walls.Details
unit# 820: rehabilitate (e) kitchen and bathroom. no removal of structural walls. | $70,000 |
| Oct 3, 2023 | Completed final sign-off Jan 2024 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit# 314: rehabilitate kitchen and bathroom. no removal of structural walls.Details
unit# 314: rehabilitate kitchen and bathroom. no removal of structural walls. | $70,000 |
| Oct 3, 2023 | Completed final sign-off Dec 2023 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 316: rehabilitate (e) kitchen and (e) bathroom. no removal of structural walls.Details
unit 316: rehabilitate (e) kitchen and (e) bathroom. no removal of structural walls. | $70,000 |
| Oct 3, 2023 | Completed final sign-off Dec 2023 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 2206: rehabilitate existing kitchen and bath. no removal of structural walls.Details
unit 2206: rehabilitate existing kitchen and bath. no removal of structural walls. | $70,000 |
| Sep 5, 2023 | Completed final sign-off Nov 2023 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit# 310: rehab (e) kitchen. rehab (e) bathroom. no removal of structural walls.Details
unit# 310: rehab (e) kitchen. rehab (e) bathroom. no removal of structural walls. | $40,000 |
| Sep 5, 2023 | Completed final sign-off Nov 2023 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit# 405: rehab (e) kitchen. rehab (e) bathroom. no removal of structural walls.Details
unit# 405: rehab (e) kitchen. rehab (e) bathroom. no removal of structural walls. | $69,000 |
| Sep 5, 2023 | Completed final sign-off Oct 2023 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 1417 rehabilitate existing kitchen; rehabilitate existing bathroom; no removal of structural wallsDetails
unit 1417 rehabilitate existing kitchen; rehabilitate existing bathroom; no removal of structural walls | $40,000 |
| Sep 1, 2023 | Completed final sign-off Oct 2023 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 1216: rehab (e) kitchem & bathroom. no removal of structural walls, address complaint 2023012509Details
unit 1216: rehab (e) kitchem & bathroom. no removal of structural walls, address complaint 2023012509 | $64,000 |
| Aug 29, 2023 | Never finaled issued Aug 2023, no final | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 1321 - rehabilitate (e) kitchen and bathroom; no removal of structural wallsDetails
unit 1321 - rehabilitate (e) kitchen and bathroom; no removal of structural walls | $40,000 |
| Aug 28, 2023 | Completed final sign-off Sep 2023 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 312: rev to pad 202307273104 to show furred wals along concrete wall ner living room. no exterior work. change of layout.Details
unit 312: rev to pad 202307273104 to show furred wals along concrete wall ner living room. no exterior work. change of layout. | $8,500 |
| Aug 28, 2023 | Completed final sign-off Nov 2023 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | townhouse #56: rehabilitate (e) kitchen and bathrooms, replace and relocate washer and dryer. no structural work is proposed.Details
townhouse #56: rehabilitate (e) kitchen and bathrooms, replace and relocate washer and dryer. no structural work is proposed. | $40,000 |
| Aug 24, 2023 | Completed final sign-off Sep 2023 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 411: revision to permit 202307283234 to show furred walls along concrete walls near kitchen, living area, bedrooms and balcony. no exterior work.Details
unit 411: revision to permit 202307283234 to show furred walls along concrete walls near kitchen, living area, bedrooms and balcony. no exterior work. | $8,500 |
| Aug 24, 2023 | Completed final sign-off Oct 2023 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 511: revision to permit 202307283238 to show furred walls along concrete walls near kitchen, living area, bedrooms and balcony. no exterior work.Details
unit 511: revision to permit 202307283238 to show furred walls along concrete walls near kitchen, living area, bedrooms and balcony. no exterior work. | $8,500 |
| Aug 24, 2023 | Completed final sign-off Oct 2023 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 611: revision to permit 202307283239 to show furred walls along concrete walls near kitchen, living area, bedrooms and balcony. no exterior work.Details
unit 611: revision to permit 202307283239 to show furred walls along concrete walls near kitchen, living area, bedrooms and balcony. no exterior work. | $8,500 |
| Aug 23, 2023 | Completed final sign-off Feb 2024 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unti# 2209: rehabilitate existing kitchen and bathroom, no removal of any structural walls.Details
unti# 2209: rehabilitate existing kitchen and bathroom, no removal of any structural walls. | $70,000 |
| Aug 23, 2023 | Completed final sign-off Sep 2023 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit#: 412: revision to permit 202307273107 to show furred walls along concrete walls near kitchen, living area, bedrooms, and patio area. no exterior work.Details
unit#: 412: revision to permit 202307273107 to show furred walls along concrete walls near kitchen, living area, bedrooms, and patio area. no exterior work. | $5,000 |
| Aug 23, 2023 | Completed final sign-off Sep 2023 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit# 508 revision to 202307252925to show furred walls along concrete wall near kitchen, living area, balcony. no exterior work.Details
unit# 508 revision to 202307252925to show furred walls along concrete wall near kitchen, living area, balcony. no exterior work. | $8,500 |
| Aug 22, 2023 | Completed final sign-off Sep 2023 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | 4/f unit 408: revision to permit 202307252889 to show furred walls along concrete wall near kitchen, living area and balcony. no exterior work.Details
4/f unit 408: revision to permit 202307252889 to show furred walls along concrete wall near kitchen, living area and balcony. no exterior work. | $5,000 |
| Jul 28, 2023 | Completed final sign-off Sep 2023 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 411 - rehabilitate (e) kitchen and bathroom; no removal if structural walls; install washer/dryerDetails
unit 411 - rehabilitate (e) kitchen and bathroom; no removal if structural walls; install washer/dryer | $70,000 |
| Jul 28, 2023 | Completed final sign-off Oct 2023 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 611 - rehabilitate (e) kitchen and bathrokom; no removal if structural walls; install washer/dryerDetails
unit 611 - rehabilitate (e) kitchen and bathrokom; no removal if structural walls; install washer/dryer | $70,000 |
| Jul 28, 2023 | Completed final sign-off Oct 2023 | 440 Davis Ct | Camp Roofing Ltd Dba Camp Construction | unit 511 - rehabilitate (e) kitchen and bathrokom; no removal if structural walls; install washer/dryerDetails
unit 511 - rehabilitate (e) kitchen and bathrokom; no removal if structural walls; install washer/dryer | $70,000 |