Giampolini & Co Dba Giampolini/Courtney
- Based in
- Emeryville
- On San Francisco permits
- Dec 2009 to Aug 2026
- Last 24 months
- 13 permits filed
35 permits since 2000: 24 completed, 6 in progress, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 19, 2026 | In progress issued Aug 2026 | 539 Bryant St | exterior facade maintenance at private interior lightwell. repainting and localized crack repair. all repairs and finishes to match existing conditions and be completed in kind.Details
exterior facade maintenance at private interior lightwell. repainting and localized crack repair. all repairs and finishes to match existing conditions and be completed in kind. | $125,000 |
| Jul 21, 2026 | Completed final sign-off Jul 2026 | 155 Jackson St | concrete patching, crack repairs at exterior walls. patching will be completed at different levels of exterior bldg elevations. front of bldg, street facing.Details
concrete patching, crack repairs at exterior walls. patching will be completed at different levels of exterior bldg elevations. front of bldg, street facing. | $139,805 |
| May 19, 2026 | Completed final sign-off Jul 2026 | 550 Battery St | survery concrete patching and crack repairs at exterior walls and balconies. patching will be compelted at different levels of to exterior building elevationDetails
survery concrete patching and crack repairs at exterior walls and balconies. patching will be compelted at different levels of to exterior building elevation | $45,838 |
| May 19, 2026 | Completed final sign-off Jul 2026 | 405 Davis Ct | survery concrete patching and crack repairs at exterior walls and balconies. patching will be compelted at different levels of to exterior building elevationDetails
survery concrete patching and crack repairs at exterior walls and balconies. patching will be compelted at different levels of to exterior building elevation | $46,779 |
| May 19, 2026 | Completed final sign-off Jul 2026 | 440 Davis Ct | survery concrete patching and crack repairs at exterior walls and balconies. patching will be compelted at different levels of to exterior building elevationDetails
survery concrete patching and crack repairs at exterior walls and balconies. patching will be compelted at different levels of to exterior building elevation | $32,366 |
| May 14, 2026 | In progress issued Aug 2026 | 2043 19th Av | to comply with nov #202541502, repair concrete roof at rear of property, waterproof top side of concrete roof.Details
to comply with nov #202541502, repair concrete roof at rear of property, waterproof top side of concrete roof. | $50,000 |
| Mar 25, 2026 | Completed final sign-off Jul 2026 | 2330 Bush St | to obtain final inspection for work approved under pa# 202407166604. all work is complete.Details
to obtain final inspection for work approved under pa# 202407166604. all work is complete. | |
| Mar 17, 2026 | Expired or cancelled cancelled Jul 2026 | 460 Davis Ct | prep and repaint portions of exterior facade to match existing. non-structural maintenance. no change to openings, materials, or structural elements.Details
prep and repaint portions of exterior facade to match existing. non-structural maintenance. no change to openings, materials, or structural elements. | $140,000 |
| Jan 26, 2026 | Completed final sign-off Jun 2026 | 2 Henry Adams St | repainting and repointing. all material to match original or existing.Details
repainting and repointing. all material to match original or existing. | $150,000 |
| Dec 17, 2025 | Completed final sign-off Aug 2026 | 495 Geary St | exterior facade repair & stabilization, includes in kind replacement of brick (deteriorated), limted repoint, and discreet anchorage of localized masonry walls. all material to match (e) and to follow secretary of interiors standards for rehabilitationDetails
exterior facade repair & stabilization, includes in kind replacement of brick (deteriorated), limted repoint, and discreet anchorage of localized masonry walls. all material to match (e) and to follow secretary of interiors standards for rehabilitation | $250,000 |
| Dec 9, 2025 | In progress issued Dec 2025 | 2460 Lyon St | exterior maintenance- repainting and repointing. all materials to match existing.Details
exterior maintenance- repainting and repointing. all materials to match existing. | $50,000 |
| Sep 22, 2025 | In progress issued Sep 2025 | 191 San Anselmo Av | exterior maintenence: re paint and repoint mortar joint on fountain. like for like for repair to repair existing. work limited to terminal fountain, both upper and lower fountinas. all work is repair in kind.Details
exterior maintenence: re paint and repoint mortar joint on fountain. like for like for repair to repair existing. work limited to terminal fountain, both upper and lower fountinas. all work is repair in kind. | $50,000 |
| Nov 14, 2024 | Completed final sign-off Jun 2025 | 1333 Bush St | revision to bpa# 2024-0305-7089: back of building: remove and replace existing stucco w/ new stucco.Details
revision to bpa# 2024-0305-7089: back of building: remove and replace existing stucco w/ new stucco. | $25,000 |
| Sep 13, 2024 | Completed final sign-off Mar 2026 | 1075 California St | exterior repairs including repair and selective replacement of roof level and 3rd level terra cotta balustrades and reinstallation or selective replacement of terra cotta urns. repair facade elements, including treatment of structural steel column in se corner and associated brick repair. selectiveDetails
exterior repairs including repair and selective replacement of roof level and 3rd level terra cotta balustrades and reinstallation or selective replacement of terra cotta urns. repair facade elements, including treatment of structural steel column in se corner and associated brick repair. selective | $1,750,000 |
| Jul 26, 2024 | In progress issued Jul 2024 | 888 Brannan St | exterior maintenance at non-historic elevations flat wall concrete spall repair consisting of matcheng mortar (back of building)Details
exterior maintenance at non-historic elevations flat wall concrete spall repair consisting of matcheng mortar (back of building) | $75,000 |
| Jul 16, 2024 | Completed final sign-off Jul 2026 | 2330 Bush St | exterior maintenance: repainting & repointing. visible to the street. repair mortar joint at bricks.Details
exterior maintenance: repainting & repointing. visible to the street. repair mortar joint at bricks. | $50,000 |
| Jul 15, 2024 | In progress issued Jul 2024 | 2390 Bush St | exterior maintenance to include repainting and repointing church building. no removal of of cladding elements are planned at this timeDetails
exterior maintenance to include repainting and repointing church building. no removal of of cladding elements are planned at this time | $100,000 |
| Aug 2, 2021 | Completed final sign-off Nov 2021 | 110 Sutter St | sw corner stuctural repairs. ref facade repair & maintenance pa# 202011168984. install new verical supports for (e) stone with ss anchorage & plaets to (e) steel columng. patch holes to match (e) characteristics & color of (e) stone.Details
sw corner stuctural repairs. ref facade repair & maintenance pa# 202011168984. install new verical supports for (e) stone with ss anchorage & plaets to (e) steel columng. patch holes to match (e) characteristics & color of (e) stone. | $100,000 |
| Jul 22, 2021 | Completed final sign-off Jan 2022 | 1250 Jones St | exterior concrete patching, coating of concrete high rise per refer pa 202001141831, & 202101293592. new work: structural steel repairs at sw & nw corner. ne columm permitted per 202101293592.Details
exterior concrete patching, coating of concrete high rise per refer pa 202001141831, & 202101293592. new work: structural steel repairs at sw & nw corner. ne columm permitted per 202101293592. | $70,000 |
| Jan 29, 2021 | Completed final sign-off Jan 2022 | 1250 Jones St | concrete patching, coating of concrete clad high rise. new structural steel repairs at corner column. ref pa# 202001141831Details
concrete patching, coating of concrete clad high rise. new structural steel repairs at corner column. ref pa# 202001141831 | $26,000 |
| Nov 16, 2020 | Completed final sign-off Nov 2021 | 110 Sutter St | facade repair and maintenance at sutter street and trinity street include sandstone crack & spall repair, refurbishement of (e) windows and (e) guardrails. maher n/aDetails
facade repair and maintenance at sutter street and trinity street include sandstone crack & spall repair, refurbishement of (e) windows and (e) guardrails. maher n/a | $600,000 |
| Oct 16, 2018 | Completed final sign-off Jun 2021 | 495 Geary St | facade restoration & roof replacement. ** maher: n/a **Details
facade restoration & roof replacement. ** maher: n/a ** | $2,500,000 |
| Feb 15, 2018 | Completed final sign-off Jun 2018 | 601 Townsend St | paint windows, replace window perimeter caulking, repair failed parge coatings at window sills and ledges. repair any loose bricks. repair mortar joints as required. rinse walls with water.Details
paint windows, replace window perimeter caulking, repair failed parge coatings at window sills and ledges. repair any loose bricks. repair mortar joints as required. rinse walls with water. | $500,000 |
| Nov 15, 2017 | Never finaled issued Nov 2017, no final | 1090 Chestnut St | street spaceDetails
street space | |
| Mar 23, 2017 | Completed final sign-off May 2017 | 1 Daniel Burnham Ct | 3rd floor:demolition/removal of non-structural, non rated, partitions, electrical, ceiling tiles, and light fixtures. construction of new 1 hour rated partitions. new lighitng fixtures and new ceiling. mep and fire uner separate permit. n/a for maher.Details
3rd floor:demolition/removal of non-structural, non rated, partitions, electrical, ceiling tiles, and light fixtures. construction of new 1 hour rated partitions. new lighitng fixtures and new ceiling. mep and fire uner separate permit. n/a for maher. | $299,250 |
| Aug 3, 2016 | Expired or cancelled cancelled Jan 2026 | 275 Battery St | demo of non-structural partitions in existing office space. ab017 applies to the projectDetails
demo of non-structural partitions in existing office space. ab017 applies to the project | $72,400 |
| May 8, 2014 | Never finaled issued May 2014, no final | 170 King St | stucco & lath repair exterior in kind. n/a maherDetails
stucco & lath repair exterior in kind. n/a maher | $153,537 |
| Apr 10, 2014 | Completed final sign-off Jun 2017 | 685 Market St | consist exterior facade maintenance & repair incl removal (e) paint,brick masonry repair & restoration, structural steel repair, terra cotta repair & restoration, sheet metal repair & restoration, flashing & water proofing, gfrc repair, new paint. ** maher ordinance# 155-13 not applicable **Details
consist exterior facade maintenance & repair incl removal (e) paint,brick masonry repair & restoration, structural steel repair, terra cotta repair & restoration, sheet metal repair & restoration, flashing & water proofing, gfrc repair, new paint. ** maher ordinance# 155-13 not applicable ** | $4,739,000 |
| Apr 3, 2013 | Completed final sign-off Jul 2013 | 300 Montgomery St | replace 76 window heads with gfrc window headsDetails
replace 76 window heads with gfrc window heads | $68,000 |
| Mar 5, 2012 | Completed final sign-off Sep 2012 | 101 Howard St | various steps to mitigate the deterioration of masonry. patch holes or spall in brick or mortar, repoint, scrape and clean balcony steel at brick penetrations and recoat, fill any gaps at scuppers, removal of protruding steel, repair cracks on finish coat.Details
various steps to mitigate the deterioration of masonry. patch holes or spall in brick or mortar, repoint, scrape and clean balcony steel at brick penetrations and recoat, fill any gaps at scuppers, removal of protruding steel, repair cracks on finish coat. | $40,000 |
| Dec 7, 2011 | Completed final sign-off May 2013 | 550 Kearny St | install new steel frame trellis over main entry & east half of front elevation exterior work onlyDetails
install new steel frame trellis over main entry & east half of front elevation exterior work only | $85,000 |
| Jul 28, 2011 | Completed final sign-off Apr 2013 | 550 Kearny St | remodel (e) building lobby & ground floor retail space, new interior partitions, entry doors, storefront, glazing, lighting & slab infill (retail tenant improvement under separate permit)Details
remodel (e) building lobby & ground floor retail space, new interior partitions, entry doors, storefront, glazing, lighting & slab infill (retail tenant improvement under separate permit) | $250,000 |
| Feb 4, 2011 | Never finaled issued Feb 2011, no final | 255 California St | title 24 electricalwork. see main app#201012206994Details
title 24 electricalwork. see main app#201012206994 | |
| Feb 1, 2011 | Completed final sign-off May 2011 | 255 California St | new drywall, ceiling, lighting,finishes in elev lobby. new lighting in un-occupied tenant area. removing class iii standpipe outlet and hose cabinet. building is 100% sprinklered. no change in use or occupancy. no added area. floor is not occupied/will not soon be occupied.Details
new drywall, ceiling, lighting,finishes in elev lobby. new lighting in un-occupied tenant area. removing class iii standpipe outlet and hose cabinet. building is 100% sprinklered. no change in use or occupancy. no added area. floor is not occupied/will not soon be occupied. | $75,000 |
| Dec 23, 2009 | Completed final sign-off Sep 2011 | 405 Taylor St | exterior window replacement, painting, and masonry and sheet metal maintenance/repair. highrise building no rescue window required. new doors on roof.Details
exterior window replacement, painting, and masonry and sheet metal maintenance/repair. highrise building no rescue window required. new doors on roof. | $1,800,000 |