Block 3740, lot 001
101 Howard St
- City’s use
- Commercial Office
- Built
- 1968
- Stories
- 5
- Rooms
- 12 bathrooms
- Building
- 114,556 sq ft
- Lot
- 18,905 sq ft
- Zoning
- C3OSD
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
72 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 24, 2024 | Completed final sign-off Dec 2025 | 101 Howard St | Lynn Safety Inc. | installing anchorage for rooftop equipment for fall protectionDetails
installing anchorage for rooftop equipment for fall protection | $3,605 |
| Jun 29, 2022 | Completed final sign-off Nov 2022 | 101 Howard St | Opening Technologies Inc | 1/f: barrier removal only to comply with the accessible business entrance ordinance 51-16 for the main building entrance on howard st. and for tenant suites a/b/c. all work to comply with da 04/05 abe201903255571.Details
1/f: barrier removal only to comply with the accessible business entrance ordinance 51-16 for the main building entrance on howard st. and for tenant suites a/b/c. all work to comply with da 04/05 abe201903255571. | $15,000 |
| May 11, 2018 | Expired or cancelled cancelled Jan 2026 | 101 Howard St | install (2) wall banners.Details
install (2) wall banners. | $5,000 | |
| May 26, 2017 | Never finaled issued May 2017, no final | 101 Howard St | Acco Engineered Systems Inc. Dba Acco En | boiler and pump replacement at rooftop. original signle unit wt 1520 lb. replace with 2 boilers with 720 lb each.Details
boiler and pump replacement at rooftop. original signle unit wt 1520 lb. replace with 2 boilers with 720 lb each. | $120,000 |
| Dec 18, 2014 | Never finaled issued Dec 2014, no final | 101 Howard St | Bilcor Inc | 3rd floor fire alarm tenant improvement - install 20 ceiling mount speaker-strobes, 1 smoke detector, 2 control relay modules, 1 smoke detector. ref t.i. #2014.0627.9670. n/a maher ordinanceDetails
3rd floor fire alarm tenant improvement - install 20 ceiling mount speaker-strobes, 1 smoke detector, 2 control relay modules, 1 smoke detector. ref t.i. #2014.0627.9670. n/a maher ordinance | $10,000 |
| Nov 14, 2014 | Completed final sign-off Jan 2015 | 101 Howard St | Anderson, Rowe & Buckley, Inc. | 3rd floor t.i. sprinkler: relocated 71 heads and added 10 head. ref. appl. 2014.0627.9673. maher n/a.Details
3rd floor t.i. sprinkler: relocated 71 heads and added 10 head. ref. appl. 2014.0627.9673. maher n/a. | $41,685 |
| Oct 16, 2014 | Completed final sign-off Jan 2015 | 101 Howard St | Novo Construction Inc | 3rd flr: revision to pa 201406279670 & 201402679666 to reconfigure original approved permit; maher n/aDetails
3rd flr: revision to pa 201406279670 & 201402679666 to reconfigure original approved permit; maher n/a | |
| Aug 4, 2014 | Completed final sign-off Aug 2014 | 101 Howard St | Bilcor Inc | relocate 2 ceiling mount speaker-strobes, install 38 ceiling mount speaker/strobes, 14 duct detectors, 14 control relay modules, 2 pull stations, 2 booster panels, 2 signal modules, remove & replace 1 booster panel. t.i.pa# 201405085261. n/a ordinance #155-13.Details
relocate 2 ceiling mount speaker-strobes, install 38 ceiling mount speaker/strobes, 14 duct detectors, 14 control relay modules, 2 pull stations, 2 booster panels, 2 signal modules, remove & replace 1 booster panel. t.i.pa# 201405085261. n/a ordinance #155-13. | $60,000 |
| Jul 31, 2014 | Completed final sign-off Nov 2014 | 101 Howard St | change of use from office to adult educational. sections of 1st & 4th floor. ti pa# 2014-0508-5261. no construction under this permit. ** maher: compliance with ordinance no# 155-13 not required **Details
change of use from office to adult educational. sections of 1st & 4th floor. ti pa# 2014-0508-5261. no construction under this permit. ** maher: compliance with ordinance no# 155-13 not required ** | ||
| Jul 3, 2014 | Completed final sign-off Jan 2015 | 101 Howard St | Bilcor Inc | all floors:replace elevator recall panel, facu, external dialer, external amplifier with 1 facp. replaces all extg 37 smoke detectors with new addressable smoke detectors at same locations. replace all extg 24 pull stations with new addressable pull stations at same locations.Details
all floors:replace elevator recall panel, facu, external dialer, external amplifier with 1 facp. replaces all extg 37 smoke detectors with new addressable smoke detectors at same locations. replace all extg 24 pull stations with new addressable pull stations at same locations. | $36,800 |
| Jul 2, 2014 | Completed final sign-off Sep 2014 | 101 Howard St | Cahill Contractors Inc | hvac renovations to accomodate new layout at 1/f & 4/f. n/a ordinance #155-13.Details
hvac renovations to accomodate new layout at 1/f & 4/f. n/a ordinance #155-13. | $125,000 |
| Jun 27, 2014 | Completed final sign-off Feb 2015 | 101 Howard St | Novo Construction Inc | 3rd floor: partial floor t.i. including selective demolition. new partitions, ceiling and finishes. mech under seperate permit #201406279666. n/a for the maher ordinance #155-13Details
3rd floor: partial floor t.i. including selective demolition. new partitions, ceiling and finishes. mech under seperate permit #201406279666. n/a for the maher ordinance #155-13 | $850,000 |
| Jun 27, 2014 | Completed final sign-off Feb 2015 | 101 Howard St | Novo Construction Inc | 3rd floor: mech, elect, and plmg including new lighting, outlets and ductwork, replacement of plmg fixutres. ref aprchDetails
3rd floor: mech, elect, and plmg including new lighting, outlets and ductwork, replacement of plmg fixutres. ref aprch | $350,000 |
| Jun 9, 2014 | Never finaled issued Jun 2014, no final | 101 Howard St | street spaceDetails
street space | ||
| Jun 4, 2014 | Completed final sign-off Oct 2014 | 101 Howard St | Anderson, Rowe & Buckley, Inc. | tenant improvement to existing fire sprinkler system. 1st fl: 70 sprinklers, 4th fl: 51 sprinklers 155-13 maher not requiredDetails
tenant improvement to existing fire sprinkler system. 1st fl: 70 sprinklers, 4th fl: 51 sprinklers 155-13 maher not required | $60,500 |
| May 8, 2014 | Completed final sign-off Nov 2014 | 101 Howard St | Cahill Const Service Inc | portions 1st & 4th fl interior alteration to prov updated classroom& staff office space for university use. addition of restroom facilities to accommodate classrm uses&break space,no extrerior alterations,mep under separate permit. compliance with maher ordinance #155-13 not req.Details
portions 1st & 4th fl interior alteration to prov updated classroom& staff office space for university use. addition of restroom facilities to accommodate classrm uses&break space,no extrerior alterations,mep under separate permit. compliance with maher ordinance #155-13 not req. | $1,750,000 |
| Apr 17, 2014 | Never finaled issued Apr 2014, no final | 101 Howard St | street space & sidewalk repairDetails
street space & sidewalk repair | ||
| Jun 18, 2013 | Never finaled issued Jun 2013, no final | 101 Howard St | street space and mta parkingDetails
street space and mta parking | ||
| Apr 22, 2013 | Expired or cancelled cancelled Jan 2026 | 101 Howard St | project consists of demoliton of all interior partitions, flooring, ceiling grid and tiles and light fixtures architectural, mechanical, electrical, life safety & sprinkler system modification are not included under this permit. per ab-017Details
project consists of demoliton of all interior partitions, flooring, ceiling grid and tiles and light fixtures architectural, mechanical, electrical, life safety & sprinkler system modification are not included under this permit. per ab-017 | $15,000 | |
| Apr 22, 2013 | Completed final sign-off Jun 2014 | 101 Howard St | Cahill Contractors Inc | ste 400: project consists of demoliton of all interior partitions, flooring, ceiling grid and tiles and light fixtures architectural, mechanical, electrical, life safety & sprinkler system modification are not included under this permit. per ab-017. n/a maher ordinance # 155-13Details
ste 400: project consists of demoliton of all interior partitions, flooring, ceiling grid and tiles and light fixtures architectural, mechanical, electrical, life safety & sprinkler system modification are not included under this permit. per ab-017. n/a maher ordinance # 155-13 | $15,000 |
| Apr 17, 2013 | Completed final sign-off May 2013 | 101 Howard St | Novo Construction Inc | 3rd floor-restroom upgrades for men's & women's restroom. mep, life safety & fire sprinkler under seperate permitDetails
3rd floor-restroom upgrades for men's & women's restroom. mep, life safety & fire sprinkler under seperate permit | $25,000 |
| Mar 28, 2013 | Completed final sign-off May 2013 | 101 Howard St | C B F Inc | fire alarm tenant improvement on 3rd floor- install 18 ceiling mount speakers-strobes, install booster panel, install 1 smoke detector with base. t.i ref pa# 201301298990Details
fire alarm tenant improvement on 3rd floor- install 18 ceiling mount speakers-strobes, install booster panel, install 1 smoke detector with base. t.i ref pa# 201301298990 | $8,000 |
| Mar 26, 2013 | Completed final sign-off Apr 2013 | 101 Howard St | Anderson, Rowe & Buckley, Inc. | 3rd floor:fire sprinkler system t.i. 84 removed sprinklers, 74 new sprinklers. ref app#201301298990Details
3rd floor:fire sprinkler system t.i. 84 removed sprinklers, 74 new sprinklers. ref app#201301298990 | $14,800 |
| Jan 29, 2013 | Completed final sign-off May 2013 | 101 Howard St | Novo Construction Inc | partial floor tenant improvement to include selective demolition, new partitions, electrical, mech, plumbing, ceiling and finishesDetails
partial floor tenant improvement to include selective demolition, new partitions, electrical, mech, plumbing, ceiling and finishes | $475,000 |
| Jan 25, 2013 | Completed final sign-off May 2013 | 101 Howard St | Novo Construction Inc | #300- minor alteration of interior space, removal of offices & new carpet, per ab-017.Details
#300- minor alteration of interior space, removal of offices & new carpet, per ab-017. | $14,138 |
| Oct 16, 2012 | Completed final sign-off Dec 2012 | 101 Howard St | C B F Inc | all floors-as builts for pa# 2012-0503-9747Details
all floors-as builts for pa# 2012-0503-9747 | |
| Jul 6, 2012 | Never finaled issued Jul 2012, no final | 101 Howard St | street space and metersDetails
street space and meters | ||
| Jun 7, 2012 | Never finaled issued Jun 2012, no final | 101 Howard St | street space permit.Details
street space permit. | ||
| May 7, 2012 | Never finaled issued May 2012, no final | 101 Howard St | street space & mta parking meterDetails
street space & mta parking meter | ||
| May 3, 2012 | Completed final sign-off Dec 2012 | 101 Howard St | C B F Inc | install 1 fire control panel, install 14 smoke detectors & install 6 relaysDetails
install 1 fire control panel, install 14 smoke detectors & install 6 relays | $3,500 |
| May 3, 2012 | Completed final sign-off May 2012 | 101 Howard St | Golden Gate Fire Protection Inc | fire sprinkler system upgrade, relocate 24 pendent sprinkler heads on the 4th floor. upgrade branchline. restrants and e. q. bracing.Details
fire sprinkler system upgrade, relocate 24 pendent sprinkler heads on the 4th floor. upgrade branchline. restrants and e. q. bracing. | $13,000 |
| Apr 30, 2012 | Completed final sign-off May 2012 | 101 Howard St | Bcci Construction Company | mechanical and electrical work associated with approved 201203065488. including relocating 3 vav boxes and new lightingDetails
mechanical and electrical work associated with approved 201203065488. including relocating 3 vav boxes and new lighting | $133,215 |
| Apr 19, 2012 | Completed final sign-off May 2012 | 101 Howard St | C B F Inc | 4th floor-install 6 speaker/strobes, install 1 smoke detector. tenant improvement pa# 2012-0306-5488Details
4th floor-install 6 speaker/strobes, install 1 smoke detector. tenant improvement pa# 2012-0306-5488 | $3,000 |
| Apr 6, 2012 | Never finaled issued Apr 2012, no final | 101 Howard St | street space permit.Details
street space permit. | ||
| Mar 23, 2012 | Never finaled issued Mar 2012, no final | 101 Howard St | street space permit.Details
street space permit. | ||
| Mar 6, 2012 | Completed final sign-off May 2012 | 101 Howard St | Bcci Construction Company | 4th floor-renovations & remodeling of a partial area of the (e) 4th floor converting 1 large classroom into 3 smaller classrooms along with other minor floor plan modifications. mep & fire protection under separate permit.Details
4th floor-renovations & remodeling of a partial area of the (e) 4th floor converting 1 large classroom into 3 smaller classrooms along with other minor floor plan modifications. mep & fire protection under separate permit. | $321,000 |
| Mar 5, 2012 | Completed final sign-off Sep 2012 | 101 Howard St | Giampolini & Co Dba Giampolini/Courtney | various steps to mitigate the deterioration of masonry. patch holes or spall in brick or mortar, repoint, scrape and clean balcony steel at brick penetrations and recoat, fill any gaps at scuppers, removal of protruding steel, repair cracks on finish coat.Details
various steps to mitigate the deterioration of masonry. patch holes or spall in brick or mortar, repoint, scrape and clean balcony steel at brick penetrations and recoat, fill any gaps at scuppers, removal of protruding steel, repair cracks on finish coat. | $40,000 |
| Feb 29, 2012 | Never finaled issued Feb 2012, no final | 101 Howard St | street space and mta parkingDetails
street space and mta parking | ||
| Aug 4, 2010 | Completed final sign-off Sep 2010 | 101 Howard St | Anderson, Rowe & Buckley, Inc. | 4th floor-tenant improvements-(e) fire sprinkler system, number relocated sprinklers-7Details
4th floor-tenant improvements-(e) fire sprinkler system, number relocated sprinklers-7 | $2,100 |
| Jul 27, 2010 | Completed final sign-off Sep 2010 | 101 Howard St | modify existing hvac system to provide cooling and heating for new layout. add 1 cooling only box and 1 reheat boxDetails
modify existing hvac system to provide cooling and heating for new layout. add 1 cooling only box and 1 reheat box | $15,000 | |
| Jul 15, 2010 | Completed final sign-off Sep 2010 | 101 Howard St | minor demo and construction of a class room on the 4th floor. sprinkler, hvac, elec and life safety under separate permitDetails
minor demo and construction of a class room on the 4th floor. sprinkler, hvac, elec and life safety under separate permit | $65,000 | |
| Apr 22, 2010 | Never finaled issued Apr 2010, no final | 101 Howard St | Anderson, Rowe & Buckley, Inc. | basement: add new isolation fire sprinkler control valve. assembly in basement- new fc connection- fire alarm connection separate permit- new bracing.Details
basement: add new isolation fire sprinkler control valve. assembly in basement- new fc connection- fire alarm connection separate permit- new bracing. | $2,800 |
| Dec 17, 2008 | Never finaled issued Apr 2009, no final | 101 Howard St | C B F Inc | generator/ ats,new 200 amp panelDetails
generator/ ats,new 200 amp panel | $50,000 |
| Sep 8, 2008 | Completed final sign-off Feb 2009 | 101 Howard St | installation of new steel platform on roof for future diesel powered generator. no increase in area, unoccupied space. generator shall be installed under separate permit.Details
installation of new steel platform on roof for future diesel powered generator. no increase in area, unoccupied space. generator shall be installed under separate permit. | $15,000 | |
| Aug 6, 2008 | Completed final sign-off Feb 2009 | 101 Howard St | Anderson, Rowe & Buckley, Inc. | 1st floor: relocate 3 sprinklers, add 1 head existingDetails
1st floor: relocate 3 sprinklers, add 1 head existing | $900 |
| Jul 28, 2008 | Completed final sign-off Feb 2009 | 101 Howard St | relocate 2 supply air diffusers and relocate 2 thermostats. ref app #200807156701Details
relocate 2 supply air diffusers and relocate 2 thermostats. ref app #200807156701 | $7,000 | |
| Jul 15, 2008 | Completed final sign-off Feb 2009 | 101 Howard St | t.i. minor demo and construction . demo one office and 2 storage rooms and construction of new glass partition. no sprinkler, mech, electrical or lifes safety under this permit.Details
t.i. minor demo and construction . demo one office and 2 storage rooms and construction of new glass partition. no sprinkler, mech, electrical or lifes safety under this permit. | $30,000 | |
| Aug 17, 2007 | Completed final sign-off Feb 2008 | 101 Howard St | mep drg. for tenant improvement. provide and install vav/cooling only box, pneumatic thermostat, return air grille. relocate ex. supply grille and 1 ex.pneumatic thermostat. this is revision to permit # 2007/07/24/7637Details
mep drg. for tenant improvement. provide and install vav/cooling only box, pneumatic thermostat, return air grille. relocate ex. supply grille and 1 ex.pneumatic thermostat. this is revision to permit # 2007/07/24/7637 | $5,000 | |
| Jul 24, 2007 | Completed final sign-off Feb 2008 | 101 Howard St | tenant improvement on 2nd floor signle tenant space, minor demolition of interior walls and millworks, install new millwork and doors.mech and fire safty on separate permitDetails
tenant improvement on 2nd floor signle tenant space, minor demolition of interior walls and millworks, install new millwork and doors.mech and fire safty on separate permit | $70,000 | |
| Nov 28, 2006 | Completed final sign-off Mar 2007 | 101 Howard St | oti-2 4 th floor meDetails
oti-2 4 th floor me | $5,000 | |
| Nov 15, 2006 | Expired or cancelled expired Feb 2009 | 101 Howard St | Anderson, Rowe & Buckley, Inc. | t.i. to existing fire sprinkler system. 1 relocate, 1 add, 1 removed.Details
t.i. to existing fire sprinkler system. 1 relocate, 1 add, 1 removed. | $500 |
| Oct 26, 2006 | Completed final sign-off Mar 2007 | 101 Howard St | ot1-1 4th floor, el, me, ls, spDetails
ot1-1 4th floor, el, me, ls, sp | $72,500 | |
| Sep 15, 2006 | Completed final sign-off Dec 2006 | 101 Howard St | oti-1 gfl el me ls spDetails
oti-1 gfl el me ls sp | $30,000 | |
| Mar 14, 2005 | Completed final sign-off Jun 2005 | 101 Howard St | C B F Inc | life safety system modification,furnish & install 1 new strobeDetails
life safety system modification,furnish & install 1 new strobe | $500 |
| Nov 29, 2004 | Expired or cancelled expired Jun 2005 | 101 Howard St | West Coast Sign | erect a single faced non-electric wall signDetails
erect a single faced non-electric wall sign | |
| Oct 12, 2004 | Completed final sign-off Jun 2005 | 101 Howard St | oti-02 1st floor: me & sp onlyDetails
oti-02 1st floor: me & sp only | $14,500 | |
| Sep 1, 2004 | Completed final sign-off Jun 2005 | 101 Howard St | oti-1 1/f el, me, ls, spDetails
oti-1 1/f el, me, ls, sp | $58,326 | |
| Feb 20, 2004 | Never finaled issued Feb 2004, no final | 101 Howard St | C B F Inc | life safty system modification at 101 howard st 4th floor whartonDetails
life safty system modification at 101 howard st 4th floor wharton | $5,000 |
| Feb 18, 2004 | Completed final sign-off Jul 2004 | 101 Howard St | Bcci Construction Company | oti-3,4th fl-spDetails
oti-3,4th fl-sp | $5,000 |
| Jan 20, 2004 | Completed final sign-off Jul 2004 | 101 Howard St | Bcci Construction Company | oti-2 4th fl-el, meDetails
oti-2 4th fl-el, me | $12,000 |
| Dec 19, 2003 | Completed final sign-off Jul 2004 | 101 Howard St | Bcci Construction Company | oti-1 4th fl, el, me, sp, lsDetails
oti-1 4th fl, el, me, sp, ls | $75,000 |
| Nov 17, 2003 | Completed final sign-off Feb 2004 | 101 Howard St | removal of pair of double doors separating elevator lobby from the corridorDetails
removal of pair of double doors separating elevator lobby from the corridor | $20,000 | |
| Oct 14, 2003 | Completed final sign-off Dec 2003 | 101 Howard St | removal of accessibily barriers in the extg 4th flr men's and women's restrmDetails
removal of accessibily barriers in the extg 4th flr men's and women's restrm | $32,000 | |
| Mar 15, 2002 | Expired or cancelled expired Jul 2002 | 101 Howard St | street spaceDetails
street space | ||
| Nov 21, 2001 | Completed final sign-off Aug 2002 | 101 Howard St | Bcci Construction Company | rev to #1 to permit 200108236767-equivalent facilition for disabled access of the 6th flor by enclosDetails
rev to #1 to permit 200108236767-equivalent facilition for disabled access of the 6th flor by enclos | |
| Nov 1, 2001 | Completed final sign-off Aug 2002 | 101 Howard St | Bcci Construction Company | fire sprinkler was on floors 5/6Details
fire sprinkler was on floors 5/6 | $25,000 |
| Nov 1, 2001 | Completed final sign-off Aug 2002 | 101 Howard St | Bcci Construction Company | life safety system were on the mezzagined and 5th floorsDetails
life safety system were on the mezzagined and 5th floors | $22,000 |
| Nov 1, 2001 | Completed final sign-off Aug 2002 | 101 Howard St | Bcci Construction Company | shop drawings for interior stair. this stair approved on #200108236767. these drawings are for detaiDetails
shop drawings for interior stair. this stair approved on #200108236767. these drawings are for detai | $450 |
| Sep 25, 2001 | Expired or cancelled expired Mar 2002 | 101 Howard St | street space permitDetails
street space permit | ||
| Sep 4, 2001 | Completed final sign-off Aug 2002 | 101 Howard St | Bcci Construction Company | roof scren for mechanical equipment-thin screen to match existing adjacent screens, app 200108236767Details
roof scren for mechanical equipment-thin screen to match existing adjacent screens, app 200108236767 | $6,000 |
| Aug 23, 2001 | Completed final sign-off Aug 2002 | 101 Howard St | Bcci Construction Company | 5th & 6th fl.- tenant improvement including new walls, doorws, celing & finishes includes elec,Details
5th & 6th fl.- tenant improvement including new walls, doorws, celing & finishes includes elec, | $1,800,000 |
| Jul 5, 2001 | Completed final sign-off Aug 2002 | 101 Howard St | Bcci Construction Company | fire sprinklers & life safety systems to remain operationalDetails
fire sprinklers & life safety systems to remain operational | $18,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Bcci Construction Company (12), Anderson, Rowe & Buckley, Inc. (7), C B F Inc (7), Novo Construction Inc (6), Bilcor Inc (3), Cahill Contractors Inc (2), Acco Engineered Systems Inc. Dba Acco En, Cahill Const Service Inc, Giampolini & Co Dba Giampolini/Courtney, Golden Gate Fire Protection Inc, Lynn Safety Inc., Opening Technologies Inc, West Coast Sign
- Architects
- Douglas Booth (6), Al Johansen (2), John Davis (2), Craig W. Ristow, Michael Knauff, Scott E Clement, Steve Connelly
- Engineers
- Craig Ristow, Eugene Tuan, Rodrigo Santos
- Authorized agent-otherss
- Michael Knauff
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.