John Davis
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Hornberger-Worstell
- Based in
- San Francisco
- On San Francisco permits
- Dec 2004 to Sep 2022
45 permits since 2000 (architect on 43 permits, authorized agent-others on 1 permit, engineer on 1 permit): 37 completed, 4 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 16, 2022 | Completed final sign-off Oct 2023 | 100 Channel | Hathaway Dinwiddie Co. | revision to mechanical fan and smoke damper matrix for cfc closeout. ref pa# 201509227707.Details
revision to mechanical fan and smoke damper matrix for cfc closeout. ref pa# 201509227707. | |
| Jul 14, 2022 | Never finaled issued Jul 2022, no final | 181 Fremont St | Baxter Construction | 43/f, unit 56a: new wood floors, non structural reconfiguration of kithen, den, master bdrmoom closet, and removal of entry closets. open drywall for the purpose of minor elec work. electrical and sprinkler under sep permitsDetails
43/f, unit 56a: new wood floors, non structural reconfiguration of kithen, den, master bdrmoom closet, and removal of entry closets. open drywall for the purpose of minor elec work. electrical and sprinkler under sep permits | $60,000 |
| Apr 20, 2022 | Completed final sign-off May 2022 | 100 Channel | Hathaway Dinwiddie Co. | revision to pa#201509227707-s3 to 3rd lv meeting room 330 and to demonstrate furniture layout for sffd assembly occupant load for place of assembly operational permit.Details
revision to pa#201509227707-s3 to 3rd lv meeting room 330 and to demonstrate furniture layout for sffd assembly occupant load for place of assembly operational permit. | |
| Aug 4, 2021 | Completed final sign-off May 2022 | 100 Channel | Hathaway Dinwiddie Co. | health plan check review only of previously approved food service facilities on level 2 & 3. ref pa# 201509227707. construction of new kitchens on 2nd and 3rd fl of new bldg.Details
health plan check review only of previously approved food service facilities on level 2 & 3. ref pa# 201509227707. construction of new kitchens on 2nd and 3rd fl of new bldg. | |
| Nov 30, 2020 | Never finaled issued Jan 2021, no final | 181 Fremont St | Baxter Construction | unit 55a: remodel existing living space, less kitchenDetails
unit 55a: remodel existing living space, less kitchen | $150,000 |
| Jan 31, 2020 | Expired or cancelled cancelled Jan 2026 | 1100 Market St | install addition fire pits at rooptop lounge deck. relocate 3 firepits, install 8 new firepits.Details
install addition fire pits at rooptop lounge deck. relocate 3 firepits, install 8 new firepits. | $20,000 | |
| Dec 5, 2019 | Completed final sign-off Jul 2022 | 100 Channel | Hathaway Dinwiddie Co. | revision for pa# 2015/09/22/7707-s3. (arch & mep). and administrative correction to add occupancy codes from only (r-1) to (r-1,a-2,a-3,b,s-2) as previously approved. ** maher: n/a **Details
revision for pa# 2015/09/22/7707-s3. (arch & mep). and administrative correction to add occupancy codes from only (r-1) to (r-1,a-2,a-3,b,s-2) as previously approved. ** maher: n/a ** | |
| Aug 14, 2019 | Completed final sign-off Nov 2021 | 2335 Golden Gate Av | Cahill Contractors Llc., Devcon Construction | revision to pa #201811156026, reduction in the scope of project, elimination of the enlargement of the south lobby entrance & addition of a canvenience stairway, minor revision to mechanical rm, it does not change bldg use, occup, height or measurably impact egress or life safety.Details
revision to pa #201811156026, reduction in the scope of project, elimination of the enlargement of the south lobby entrance & addition of a canvenience stairway, minor revision to mechanical rm, it does not change bldg use, occup, height or measurably impact egress or life safety. | |
| Jul 19, 2017 | Never finaled issued Jul 2017, no final | 1100 Market St | Cahill Const Service Inc | administrative only. no work assembly permit only for ground floor & penthouse. to calculate occupant load.Details
administrative only. no work assembly permit only for ground floor & penthouse. to calculate occupant load. | |
| Jun 2, 2017 | Completed final sign-off Nov 2017 | 1100 Market St | Cahill Contractors Inc | revision to #2016.1003.9399. relocation of 2 fire pits and additions of emergency gas shut off. maher na.Details
revision to #2016.1003.9399. relocation of 2 fire pits and additions of emergency gas shut off. maher na. | $2,000 |
| Oct 12, 2016 | Completed final sign-off Oct 2017 | 1100 Market St | Cahill Contractors Inc | revision to 201305106635 exterior revision to meet city planning reqs for historical storefront and entry. work to include marquee, transom. louvers finishes (n) warerproofing for marquee roof. maher naDetails
revision to 201305106635 exterior revision to meet city planning reqs for historical storefront and entry. work to include marquee, transom. louvers finishes (n) warerproofing for marquee roof. maher na | |
| Oct 3, 2016 | Completed final sign-off Nov 2017 | 1100 Market St | Cahill Contractors Inc | installation of 8 removable fire pits and 1 fixed fire pit on roof deck. n/a ordinance #155-13Details
installation of 8 removable fire pits and 1 fixed fire pit on roof deck. n/a ordinance #155-13 | $12,500 |
| Mar 17, 2016 | Completed final sign-off Dec 2016 | 2335 Golden Gate Av | Build Group Inc. | int. alterations to (e) bldg; minor vol. seismic strengthening of bldg structure; voluntary remodeling of (e) public rstrms; addition of a new elevator serving all flr levels; replace certain (e) bldg mech equip., no ext. alter. & no added or removed (e) bldg sq. ft. under this scope of work.Details
int. alterations to (e) bldg; minor vol. seismic strengthening of bldg structure; voluntary remodeling of (e) public rstrms; addition of a new elevator serving all flr levels; replace certain (e) bldg mech equip., no ext. alter. & no added or removed (e) bldg sq. ft. under this scope of work. | $1,300,000 |
| Dec 18, 2015 | Completed final sign-off Sep 2017 | 1100 Market St | Cahill Contractors Inc | reference approved plans 201501236548. removal of extg wood framed mezzanine and replace with new non combustable steel frame mezz.. n/a for maher.Details
reference approved plans 201501236548. removal of extg wood framed mezzanine and replace with new non combustable steel frame mezz.. n/a for maher. | $175,000 |
| Dec 18, 2015 | Completed final sign-off Sep 2017 | 1100 Market St | Cahill Contractors Inc | revision to app#201501236548. construction of 5 inch shotcrete wall at basement along mcallister street to support new sidewalk. n/a for maher.Details
revision to app#201501236548. construction of 5 inch shotcrete wall at basement along mcallister street to support new sidewalk. n/a for maher. | $37,000 |
| Dec 18, 2015 | Completed final sign-off Sep 2017 | 1100 Market St | Cahill Contractors Inc | reference approved plans per app#201305106635. replace side walk over the vault and sidewalk elevator and construct a 5 inch shotcrete wall to support sidewalk and construct a shotcrete wall around propose transformer vault. intergrate vault & sidewall elevator pits. n/a for maher.Details
reference approved plans per app#201305106635. replace side walk over the vault and sidewalk elevator and construct a 5 inch shotcrete wall to support sidewalk and construct a shotcrete wall around propose transformer vault. intergrate vault & sidewall elevator pits. n/a for maher. | $42,000 |
| Nov 2, 2015 | Completed final sign-off May 2016 | 2497 Golden Gate Av | Build Group Inc. | revision to p/a#201506300360 solely for clarificatin of the construction of the public restroom facilities, previously indicated as " pre-fabricated under a deferred submittal. n/a for maher ordinance 155-13.Details
revision to p/a#201506300360 solely for clarificatin of the construction of the public restroom facilities, previously indicated as " pre-fabricated under a deferred submittal. n/a for maher ordinance 155-13. | $1,000 |
| Oct 15, 2015 | Completed final sign-off May 2016 | 2497 Golden Gate Av | Build Group Inc. | revision to 2015-06-30-0360 solely for the purpose of changing the structural system from concrete/smu/steel to cast-in-place concrete at owner's direction. maher ord n/a.Details
revision to 2015-06-30-0360 solely for the purpose of changing the structural system from concrete/smu/steel to cast-in-place concrete at owner's direction. maher ord n/a. | |
| Sep 22, 2015 | Completed final sign-off May 2024 | 100 Channel | Hathaway Dinwiddie Co. | to erect 17 stories, no basement, 250 room, type 1, hotel bldg. note: this is transient housing/r-1 occupancy, not dwelling units.Details
to erect 17 stories, no basement, 250 room, type 1, hotel bldg. note: this is transient housing/r-1 occupancy, not dwelling units. | $60,000,000 |
| Jun 30, 2015 | Completed final sign-off May 2016 | 2497 Golden Gate Av | Build Group Inc. | erect one-story fire sprinklered recreation building.Details
erect one-story fire sprinklered recreation building. | $3,200,000 |
| Jun 30, 2015 | Completed final sign-off Apr 2016 | 2497 Golden Gate Av | removal of existing field turf & subsoil, new baseball field set at 1 or 2 feet lower elevation; new field to be synthetic turf with fill, sub-drainage, liner to meet sfpuc requirements.maher ordinance n/aDetails
removal of existing field turf & subsoil, new baseball field set at 1 or 2 feet lower elevation; new field to be synthetic turf with fill, sub-drainage, liner to meet sfpuc requirements.maher ordinance n/a | $900,000 | |
| Apr 10, 2015 | Completed final sign-off Sep 2017 | 1100 Market St | Cahill Const Service Inc, Build Group Inc. | revision to pa# 2013/05/10/6635. repair fire & smoke damage to historic lobby. replace (e) doors with rated doors, replace laundry chute with rated laundry chute. ** maher: compliance with ordinance no# 155-13 not required **Details
revision to pa# 2013/05/10/6635. repair fire & smoke damage to historic lobby. replace (e) doors with rated doors, replace laundry chute with rated laundry chute. ** maher: compliance with ordinance no# 155-13 not required ** | $25,000 |
| Feb 12, 2015 | Completed final sign-off Dec 2017 | 1100 Market St | Cahill Const Service Inc, Build Group Inc. | to repair fire damage. replace damaged walls + ceilings on guestroom flr w/rated construction. incorporate guestroom bathrooms w/rated doors, replace (e) laundry chutes w/rated (n) chutes and doors. replace damaged wood sub-flr + concrete slab at 2nd fl w/(n) structural steel frame + concrete deck.Details
to repair fire damage. replace damaged walls + ceilings on guestroom flr w/rated construction. incorporate guestroom bathrooms w/rated doors, replace (e) laundry chutes w/rated (n) chutes and doors. replace damaged wood sub-flr + concrete slab at 2nd fl w/(n) structural steel frame + concrete deck. | $100,000 |
| Feb 4, 2015 | Completed final sign-off Mar 2016 | 1100 Market St | Build Group Inc. | demolition to remove damaged plaster walls, doors, ceilings, interior windows and door trim, laundry chute at 2nd to 7th floors only, damaged wood sub floor, conscrete slab on 2nd flDetails
demolition to remove damaged plaster walls, doors, ceilings, interior windows and door trim, laundry chute at 2nd to 7th floors only, damaged wood sub floor, conscrete slab on 2nd fl | $60,000 |
| Jan 23, 2015 | Completed final sign-off Sep 2017 | 1100 Market St | Build Group Inc. | structural upgrade for sidewalk. no building demo under this permit. sidewalk upgrade along mcallister st. maher n/a.Details
structural upgrade for sidewalk. no building demo under this permit. sidewalk upgrade along mcallister st. maher n/a. | $80,000 |
| Jan 12, 2015 | Completed final sign-off Feb 2016 | 101 California St | Level 10 Construction Lp | #4225- new t.i. work for new property sales and leasing office, including new client presentation areas, new and non-functional model residential unit, accessory offices and support areas & break room. includes mep. n/a ordinance #155-13Details
#4225- new t.i. work for new property sales and leasing office, including new client presentation areas, new and non-functional model residential unit, accessory offices and support areas & break room. includes mep. n/a ordinance #155-13 | $650,000 |
| Jul 31, 2014 | Completed final sign-off Nov 2014 | 101 Howard St | change of use from office to adult educational. sections of 1st & 4th floor. ti pa# 2014-0508-5261. no construction under this permit. ** maher: compliance with ordinance no# 155-13 not required **Details
change of use from office to adult educational. sections of 1st & 4th floor. ti pa# 2014-0508-5261. no construction under this permit. ** maher: compliance with ordinance no# 155-13 not required ** | ||
| Jun 9, 2014 | Completed final sign-off Jun 2015 | 900 North Point St | Swinerton Builders | voluntary structural strengthening of vacant commerical (ice-cream) floor level in clock tower, partial interior demolition, permention grouting of foundation/soils. f.r.p. strengthening at masonry walls. no exterior work, work located in 3 story clock tower building. n/a maher ordinanceDetails
voluntary structural strengthening of vacant commerical (ice-cream) floor level in clock tower, partial interior demolition, permention grouting of foundation/soils. f.r.p. strengthening at masonry walls. no exterior work, work located in 3 story clock tower building. n/a maher ordinance | $300,000 |
| May 8, 2014 | Completed final sign-off Nov 2014 | 101 Howard St | Cahill Const Service Inc | portions 1st & 4th fl interior alteration to prov updated classroom& staff office space for university use. addition of restroom facilities to accommodate classrm uses&break space,no extrerior alterations,mep under separate permit. compliance with maher ordinance #155-13 not req.Details
portions 1st & 4th fl interior alteration to prov updated classroom& staff office space for university use. addition of restroom facilities to accommodate classrm uses&break space,no extrerior alterations,mep under separate permit. compliance with maher ordinance #155-13 not req. | $1,750,000 |
| Nov 5, 2013 | Completed final sign-off Oct 2017 | 1100 Market St | Cahill Contractors Inc, Build Group Inc. | mep work on floors 2-7 only. architectural nder separate permit. basement, 1st floor & mezz under separate permit.Details
mep work on floors 2-7 only. architectural nder separate permit. basement, 1st floor & mezz under separate permit. | $2,000,000 |
| May 10, 2013 | Completed final sign-off Dec 2017 | 1100 Market St | Build Group Inc. | tenant improvement at hotel basement, ground fl and new construction at roof top terrace penthouse. mep, sprinkler & fire alarm on seperate permit ** maher: compliance with ordinance no# 155-13 not required **Details
tenant improvement at hotel basement, ground fl and new construction at roof top terrace penthouse. mep, sprinkler & fire alarm on seperate permit ** maher: compliance with ordinance no# 155-13 not required ** | $5,000,000 |
| May 10, 2013 | Completed final sign-off Sep 2017 | 1100 Market St | Build Group Inc. | upgrade of existing guestrooms and bathrooms on the 2nd fl through 7th fl. fire alarm, fire sprinkler and mep under seperate permit.Details
upgrade of existing guestrooms and bathrooms on the 2nd fl through 7th fl. fire alarm, fire sprinkler and mep under seperate permit. | $1,100,000 |
| Jan 28, 2013 | Completed final sign-off Sep 2017 | 1100 Market St | Build Group Inc. | seismic retrofit of (e) hotel. new complying (e) stairs, corridors & exits. upgrade guestrooms to be accessible.Details
seismic retrofit of (e) hotel. new complying (e) stairs, corridors & exits. upgrade guestrooms to be accessible. | $1,650,000 |
| Jun 24, 2008 | Completed final sign-off Sep 2008 | 301 Powell St | revision to pa# 2008/01/28/3351 for verification of occupant load needed for fire department assembly permit.Details
revision to pa# 2008/01/28/3351 for verification of occupant load needed for fire department assembly permit. | ||
| May 27, 2008 | Completed final sign-off Dec 2008 | 301 Powell St | revision to appl #200801283351 - revision to door schedule -fire rated doors not required. all interior work. match door schedule on sheet a9.11 on appv'd 200801283351.Details
revision to appl #200801283351 - revision to door schedule -fire rated doors not required. all interior work. match door schedule on sheet a9.11 on appv'd 200801283351. | ||
| Mar 25, 2008 | Completed final sign-off Nov 2008 | 888 Howard St | Webcor Construction Lp | floor 7 thru 11: revision to appl #200208154137-s4 to eliminate ws sprinklers. provide 1-hour fire rated interior wall over window assembly at light courts at 2 locations on the south bldg elevation. complaint #200796901.Details
floor 7 thru 11: revision to appl #200208154137-s4 to eliminate ws sprinklers. provide 1-hour fire rated interior wall over window assembly at light courts at 2 locations on the south bldg elevation. complaint #200796901. | $75,000 |
| Jan 28, 2008 | Completed final sign-off Apr 2010 | 301 Powell St | ti for lobby area on the ground floor. new drywall partitions and ceilings, doors, cabinetry and finishes for hotel bar. electrical, hvac & plumbing, sprinkler & life/safety seperate permit.Details
ti for lobby area on the ground floor. new drywall partitions and ceilings, doors, cabinetry and finishes for hotel bar. electrical, hvac & plumbing, sprinkler & life/safety seperate permit. | $633,000 | |
| Nov 28, 2007 | Completed final sign-off Nov 2008 | 888 Howard St | revision to approved permit application #200208154137. provide one standpipe outlet on the refuge side of the horisontal exit wall near the center door of the ballroom on the 5th floor. similar solution was previously submitted and approved for 3rd floor which is submitted agin to document the appDetails
revision to approved permit application #200208154137. provide one standpipe outlet on the refuge side of the horisontal exit wall near the center door of the ballroom on the 5th floor. similar solution was previously submitted and approved for 3rd floor which is submitted agin to document the app | ||
| Oct 24, 2007 | Never finaled issued Oct 2007, no final | 50 03rd St | Plant Construction Co, Lp | as-built documentation of ground floor renovations completed under p.a. 20070111152Details
as-built documentation of ground floor renovations completed under p.a. 20070111152 | |
| Aug 27, 2007 | Completed final sign-off Dec 2007 | 524 Post St | Plant Construction Co, Lp | replace of existing elevator machine room & solarium structure with new code complaint elevator machine room and solarium structure. work has bben completed under appl#200404272414 & 200609293749 need planning sign off only for final. 'as built'.Details
replace of existing elevator machine room & solarium structure with new code complaint elevator machine room and solarium structure. work has bben completed under appl#200404272414 & 200609293749 need planning sign off only for final. 'as built'. | |
| May 4, 2007 | Expired or cancelled withdrawn Aug 2007 | 50 03rd St | Plant Construction Company Lp | non-stuctural demo of drywall partitions &finishes.new drywall partitions,new bar fixtures,finishes,new accessible restrooms(2), cabinetry for lobby bar.creating a new occupant load for bar in lobby. note:elec, hvac,& plumbing on separate permits.Details
non-stuctural demo of drywall partitions &finishes.new drywall partitions,new bar fixtures,finishes,new accessible restrooms(2), cabinetry for lobby bar.creating a new occupant load for bar in lobby. note:elec, hvac,& plumbing on separate permits. | $600,000 |
| Jan 11, 2007 | Expired or cancelled expired Oct 2013 | 50 03rd St | Plant Construction Co, Lp | 1st fl - renovations to lobby; lounge, restaurant, bar & port cochere. 3rd fl-renovation to meeting rooms, corridors and pre-function areas. exterior-modify marquere canopy, install decorative glass on facade over (e) facade. replace (e) marble w/cement fiber panels, glass/alum storefront.Details
1st fl - renovations to lobby; lounge, restaurant, bar & port cochere. 3rd fl-renovation to meeting rooms, corridors and pre-function areas. exterior-modify marquere canopy, install decorative glass on facade over (e) facade. replace (e) marble w/cement fiber panels, glass/alum storefront. | $1,500,000 |
| Jan 8, 2007 | Expired or cancelled expired Aug 2008 | 50 03rd St | Plant Construction Company Lp | selective interior and exterior non structural demolition on floors 1,3,4,35,36. this is for demo only. elec,hvac,life safety,sprinklers, and plumbing on separate permitDetails
selective interior and exterior non structural demolition on floors 1,3,4,35,36. this is for demo only. elec,hvac,life safety,sprinklers, and plumbing on separate permit | $50,000 |
| Dec 31, 2004 | Completed final sign-off Jul 2005 | 181 03rd St | provide mechanical, electrical, and plumbing/4th floor t.i. under app #200412302351Details
provide mechanical, electrical, and plumbing/4th floor t.i. under app #200412302351 | $250,000 | |
| Dec 30, 2004 | Completed final sign-off Jul 2005 | 181 03rd St | remove 11 guestrooms and install spa & manicure salon by removing interior walls.no structural workDetails
remove 11 guestrooms and install spa & manicure salon by removing interior walls.no structural work | $250,000 |