Block 3722, lot 081
181 03rd St
- City’s use
- Commercial Hotel
- Built
- 1999
- Stories
- 32
- Units
- 404
- Building
- 291,200 sq ft
- Lot
- 22,440 sq ft
- Zoning
- C3S
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
63 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 17, 2026 | Completed final sign-off Sep 2026 | 181 03rd St | Centric Construction Inc | upgrade bar equipment at (e) lobby bar in "w" hotel. revise plumbing + electrical related to upgrade bar equip. please ref pa# 202603036811.Details
upgrade bar equipment at (e) lobby bar in "w" hotel. revise plumbing + electrical related to upgrade bar equip. please ref pa# 202603036811. | $145,000 |
| Mar 3, 2026 | Completed final sign-off Sep 2026 | 181 03rd St | Centric Construction Inc | lobby: upgrade e) finishes of lobby in "w" hotel. upgrade lighting and n) chandeliers. add interior door/panels in dining area. add tv in lounge. add 2 fire extinguishers cabinets. add misc. metal stud furring and blocking. upgrade mezzanine lighting and finishes. no work to food equipmentDetails
lobby: upgrade e) finishes of lobby in "w" hotel. upgrade lighting and n) chandeliers. add interior door/panels in dining area. add tv in lounge. add 2 fire extinguishers cabinets. add misc. metal stud furring and blocking. upgrade mezzanine lighting and finishes. no work to food equipment | $785,000 |
| Feb 9, 2023 | Completed final sign-off Apr 2023 | 181 03rd St | Siemens Industry, Inc. | 4th fl - fire only work to replace 9 smoke detector bases with sounder bases for 9 guest. no ref pa # (fire work only)Details
4th fl - fire only work to replace 9 smoke detector bases with sounder bases for 9 guest. no ref pa # (fire work only) | $4,586 |
| Mar 3, 2020 | Completed final sign-off Aug 2020 | 181 03rd St | R L H Fire Protection Inc | 4th fl - fire srpinkler ti demo spa & change to guestrooms 35 pendent & 10 sidewall. 45 heads total ref pa 2019-0709-5379Details
4th fl - fire srpinkler ti demo spa & change to guestrooms 35 pendent & 10 sidewall. 45 heads total ref pa 2019-0709-5379 | $21,417 |
| Feb 10, 2020 | Completed final sign-off Jun 2021 | 181 03rd St | Siemens Industry, Inc. | ref pa# 201907095379; fire alarm work for the 4th fl. remodel at the guest room areas; additions are 15 smoke detectors, 1 pull station, 1 strobe power supply, 13 speakers, 9 speaker/strobes and 2 strobesDetails
ref pa# 201907095379; fire alarm work for the 4th fl. remodel at the guest room areas; additions are 15 smoke detectors, 1 pull station, 1 strobe power supply, 13 speakers, 9 speaker/strobes and 2 strobes | $26,000 |
| Jul 9, 2019 | Completed final sign-off Oct 2021 | 181 03rd St | Cw Horton General Contractor | demo of (e) spa & convert to guestrooms & small office use. renovation of guestrooms, corridors & elevator lobbies for 4th fl includes non-structural upgrade to interior partitions & fee upgrades.Details
demo of (e) spa & convert to guestrooms & small office use. renovation of guestrooms, corridors & elevator lobbies for 4th fl includes non-structural upgrade to interior partitions & fee upgrades. | $615,132 |
| Oct 4, 2018 | Completed final sign-off Sep 2019 | 181 03rd St | Siemens Industry, Inc. | 6th,7th,17th, 18th,27th floors: fire alarm work for the ada upgrade at 11 rooms. additions are 11 smoke detectors, 11 modules, 3 strobe power supplies, 11 speakers/strobes, and 11 strobes. ref app#201802201648Details
6th,7th,17th, 18th,27th floors: fire alarm work for the ada upgrade at 11 rooms. additions are 11 smoke detectors, 11 modules, 3 strobe power supplies, 11 speakers/strobes, and 11 strobes. ref app#201802201648 | $30,250 |
| Aug 23, 2018 | Completed final sign-off Sep 2018 | 181 03rd St | R L H Fire Protection Inc | fire sprinklers: upgrade/replsace (e) po2-lok systems on 27 floors (floors 5-31), 165 uprights, 1074 pendents, 480 sidewalls, 17119 heads total. ref pa #201802201648.Details
fire sprinklers: upgrade/replsace (e) po2-lok systems on 27 floors (floors 5-31), 165 uprights, 1074 pendents, 480 sidewalls, 17119 heads total. ref pa #201802201648. | $1,047,427 |
| Aug 3, 2018 | Never finaled issued Oct 2018, no final | 181 03rd St | Siemens Industry, Inc. | voluntary replacement of the (e) fire alarm control panels (2 main and 4 remote units) and 2 annunciators. all existing 'field' devices will connect onto the new panels.Details
voluntary replacement of the (e) fire alarm control panels (2 main and 4 remote units) and 2 annunciators. all existing 'field' devices will connect onto the new panels. | $280,000 |
| Feb 20, 2018 | Completed final sign-off Jan 2020 | 181 03rd St | Cw Horton General Contractor | renovation of guest rooms, corridors & suites from 5th to 31st floors. work includes (n) showers, casework, finishes, int.signage, mep upgrades. guest room count to be revised from 414 to 401. no exterior work.Details
renovation of guest rooms, corridors & suites from 5th to 31st floors. work includes (n) showers, casework, finishes, int.signage, mep upgrades. guest room count to be revised from 414 to 401. no exterior work. | $7,500,000 |
| Jul 31, 2017 | Never finaled issued Aug 2017, no final | 181 03rd St | Gigabyte Graphics Inc. Dba Fastsigns | to install one electrical double faced projecting signDetails
to install one electrical double faced projecting sign | $7,500 |
| Dec 7, 2016 | Completed final sign-off Jan 2017 | 181 03rd St | Plant Construction Co, Lp | 2nd flor: installation of full height tempered glass partition to maintain continous acoutic barrier. no mep/fire work to be doneDetails
2nd flor: installation of full height tempered glass partition to maintain continous acoutic barrier. no mep/fire work to be done | $40,000 |
| Dec 7, 2016 | Completed final sign-off Feb 2017 | 181 03rd St | Siemens Industry, Inc. | fire alarm work for restroom remodel at floor 1 hotel bar, additions are 3 strobes. reference ti 201611.04.1936Details
fire alarm work for restroom remodel at floor 1 hotel bar, additions are 3 strobes. reference ti 201611.04.1936 | $1,530 |
| Nov 22, 2016 | Completed final sign-off Dec 2016 | 181 03rd St | Allied Fire Protection | 1st flr: fire sprinkler ti - 2 added sprinklers at womens restroom ref 2016-1104-1936Details
1st flr: fire sprinkler ti - 2 added sprinklers at womens restroom ref 2016-1104-1936 | $1,800 |
| Nov 17, 2016 | Completed final sign-off May 2017 | 181 03rd St | Plant Construction Co, Lp | renovation of 6th fl model guest room (615) elevator lobby ff and e built in work includes wall and ceiling new finishes, bath renovation, custom millwork, and electricalDetails
renovation of 6th fl model guest room (615) elevator lobby ff and e built in work includes wall and ceiling new finishes, bath renovation, custom millwork, and electrical | $19,000 |
| Nov 4, 2016 | Completed final sign-off Feb 2017 | 181 03rd St | Plant Construction Co, Lp | ground floor: existing women's restroom remodel into communal lavatory area and 3 individual toilet compartments at hotel barDetails
ground floor: existing women's restroom remodel into communal lavatory area and 3 individual toilet compartments at hotel bar | $85,000 |
| Feb 3, 2016 | Completed final sign-off May 2016 | 181 03rd St | Siemens Industry, Inc. | basement - fire alarms work to add 2 modules ref pa 2016 0202 8613Details
basement - fire alarms work to add 2 modules ref pa 2016 0202 8613 | $1,800 |
| Feb 2, 2016 | Completed final sign-off May 2016 | 181 03rd St | Intelligent Technologies & Services Inc | 1st floor: provide & install new clean agent fire suppression system in 1st flr computer roomDetails
1st floor: provide & install new clean agent fire suppression system in 1st flr computer room | $20,292 |
| Jan 15, 2016 | Completed final sign-off Nov 2016 | 181 03rd St | renew pa# 9922307, 9905281 & 9904038 for final inspection only. all work is completed.Details
renew pa# 9922307, 9905281 & 9904038 for final inspection only. all work is completed. | ||
| Jan 15, 2016 | Completed final sign-off Nov 2016 | 181 03rd St | renew pa# 9903716, 9826448, 9900132 for final inspection only. all work is completed.Details
renew pa# 9903716, 9826448, 9900132 for final inspection only. all work is completed. | ||
| Jan 15, 2016 | Completed final sign-off Nov 2016 | 181 03rd St | renew pa# 200109107883 for final inspection only. all work is completed.Details
renew pa# 200109107883 for final inspection only. all work is completed. | ||
| Nov 24, 2015 | Never finaled issued Dec 2015, no final | 181 03rd St | to renew bldg. permit applications # 9900132, 201105246666, 201011225389 for final inspection only. all work is completed.Details
to renew bldg. permit applications # 9900132, 201105246666, 201011225389 for final inspection only. all work is completed. | ||
| Nov 24, 2015 | Never finaled issued Dec 2015, no final | 181 03rd St | to renew bldg. permit applications nos. 200109107883, 200801283403, 200710125237 for final inspection only. all work is completed.Details
to renew bldg. permit applications nos. 200109107883, 200801283403, 200710125237 for final inspection only. all work is completed. | ||
| Nov 24, 2015 | Never finaled issued Dec 2015, no final | 181 03rd St | to obtain a final inspection for work approved under pa #9922307, 9826448 & 9720862 for final inspection. all work is complete.Details
to obtain a final inspection for work approved under pa #9922307, 9826448 & 9720862 for final inspection. all work is complete. | ||
| Nov 24, 2015 | Never finaled issued Dec 2015, no final | 181 03rd St | to reopen permit # 9905281, 9820163, 200702274996 for final inspection only. all work is complete.Details
to reopen permit # 9905281, 9820163, 200702274996 for final inspection only. all work is complete. | ||
| Nov 24, 2015 | Never finaled issued Dec 2015, no final | 181 03rd St | to obtain a final inspection for work approved under pa #200512150464, 9903716, 9904038 for final inspection only. all work is complete.Details
to obtain a final inspection for work approved under pa #200512150464, 9903716, 9904038 for final inspection only. all work is complete. | ||
| Oct 2, 2015 | Completed final sign-off Apr 2016 | 181 03rd St | Bay City Mechanical Inc | 2nd floor: replace ceiling diffuser. air balancingDetails
2nd floor: replace ceiling diffuser. air balancing | $26,000 |
| Jul 14, 2015 | Completed final sign-off Jul 2015 | 181 03rd St | Allied Fire Protection | fire sprinkler ti 2nd fl industry room relocate 9 sprinkler heads; apn. 201506048123; maher n/aDetails
fire sprinkler ti 2nd fl industry room relocate 9 sprinkler heads; apn. 201506048123; maher n/a | $4,500 |
| Jun 4, 2015 | Completed final sign-off Mar 2016 | 181 03rd St | Plant Construction Co, Lp | renovation 2nd and 3rd fl prefunction spaces, restrooms, corridors. work includes new finishes, elec, av, ceilings, wall surfaces. no exterior, change to exiting, egress or occupancy. mech, plumb, fire sep permitDetails
renovation 2nd and 3rd fl prefunction spaces, restrooms, corridors. work includes new finishes, elec, av, ceilings, wall surfaces. no exterior, change to exiting, egress or occupancy. mech, plumb, fire sep permit | $880,000 |
| Apr 14, 2015 | Completed final sign-off Sep 2015 | 181 03rd St | Plant Construction Co, Lp | 6th flr: renovation of 2 model guest rooms, 616 & 617 and adjacent corridorDetails
6th flr: renovation of 2 model guest rooms, 616 & 617 and adjacent corridor | $90,000 |
| Jun 27, 2014 | Expired or cancelled cancelled Jan 2026 | 181 03rd St | replacement of 2 extg hot water heating boilers with new high efficiency furnace air boilers to meet air quality requirements.Details
replacement of 2 extg hot water heating boilers with new high efficiency furnace air boilers to meet air quality requirements. | $207,000 | |
| Jun 25, 2014 | Completed final sign-off Aug 2015 | 181 03rd St | Siemens Industry, Inc. | fire alarm for 4th fl ti. 1 duct detector, 1 power supply, 15 speaker strobes, 2 strobes, 2 modules. referenced ti 2013.1227.5148Details
fire alarm for 4th fl ti. 1 duct detector, 1 power supply, 15 speaker strobes, 2 strobes, 2 modules. referenced ti 2013.1227.5148 | $10,800 |
| Jun 24, 2014 | Completed final sign-off Dec 2015 | 181 03rd St | Swinerton Builders | revision to pa 201312275148 to include structural changes permtted under pa 201402219044 to shift banquet structure 18". changes to occupancy loading and removal of a convenience door.Details
revision to pa 201312275148 to include structural changes permtted under pa 201402219044 to shift banquet structure 18". changes to occupancy loading and removal of a convenience door. | |
| May 6, 2014 | Completed final sign-off Jun 2014 | 181 03rd St | Westates Mechanical Corporation Inc | install fire sprinklers in new meeting room. extend existing fire sprinkler system @ level 4.Details
install fire sprinklers in new meeting room. extend existing fire sprinkler system @ level 4. | $23,650 |
| Apr 4, 2014 | Completed final sign-off May 2014 | 181 03rd St | Anderson, Rowe & Buckley, Inc. | fire sprinkler system ti. add 24 sprinklers, relocate 7 at 4th fl.Details
fire sprinkler system ti. add 24 sprinklers, relocate 7 at 4th fl. | $16,500 |
| Feb 21, 2014 | Completed final sign-off Mar 2015 | 181 03rd St | Swinerton Builders | minor revision to pa 2010/1122/5389. work on 4th floor, revising of a structural beam, move structure 18" lowering height reducing weight as detailed on plans to include (frp) strengthing. work unde seperate permit., valuation of frp patch work included under this permitDetails
minor revision to pa 2010/1122/5389. work on 4th floor, revising of a structural beam, move structure 18" lowering height reducing weight as detailed on plans to include (frp) strengthing. work unde seperate permit., valuation of frp patch work included under this permit | $40,000 |
| Dec 27, 2013 | Completed final sign-off Apr 2015 | 181 03rd St | Swinerton Builders | renovation on 4th floor of w hotel in banquet hall and fitness center. work includes new fixtures, finishes, mep,infill extg pools with new structural slab. no exterior work, fire protection under separate permit.Details
renovation on 4th floor of w hotel in banquet hall and fitness center. work includes new fixtures, finishes, mep,infill extg pools with new structural slab. no exterior work, fire protection under separate permit. | $500,000 |
| Dec 27, 2013 | Completed final sign-off Apr 2015 | 181 03rd St | Swinerton Builders | renovation to public restroom and mechanical room on 4th floor of w hotel.no exterior work. mech, elect, & fire protection under seperate permit.Details
renovation to public restroom and mechanical room on 4th floor of w hotel.no exterior work. mech, elect, & fire protection under seperate permit. | $60,000 |
| Apr 24, 2013 | Expired or cancelled withdrawn Jan 2016 | 181 03rd St | Webcor Construction Lp | shoring tiebacks under east side of hotel for support of temporary excavation at lot to east.Details
shoring tiebacks under east side of hotel for support of temporary excavation at lot to east. | $168,333 |
| Nov 6, 2012 | Completed final sign-off Dec 2012 | 181 03rd St | Cannon Constructors North Inc | revision to appn 201109235331; to establish hotel dwelling unit count from 414 to 404 on work under this permit. administrative only to establish unit count 404 units documented on pa 201109235331 cover page of plans and approved by dcpDetails
revision to appn 201109235331; to establish hotel dwelling unit count from 414 to 404 on work under this permit. administrative only to establish unit count 404 units documented on pa 201109235331 cover page of plans and approved by dcp | |
| Aug 1, 2012 | Completed final sign-off Sep 2012 | 181 03rd St | Siemens Industry, Inc. | 1st floor: addition of relay module, onto the fire alarm system, for interface to unlock the exterior doors on the ground floor from the outside to allow firefighters access to the building after hours upon alarm conditions.Details
1st floor: addition of relay module, onto the fire alarm system, for interface to unlock the exterior doors on the ground floor from the outside to allow firefighters access to the building after hours upon alarm conditions. | $500 |
| Apr 19, 2012 | Never finaled issued Apr 2012, no final | 181 03rd St | street space with metersDetails
street space with meters | ||
| Apr 18, 2012 | Completed final sign-off Jul 2012 | 181 03rd St | Siemens Industry, Inc. | fire alarm ada rooms on floor 5,6,7,8,9,19, 22, 28, 31. addition of 25 smoke detectors, 25 speaker/strobes, 25 strobes, 25 strobes, 24 control modules, 9 relay modules, and 9 power supplies for the ada upgrade of 24 guest rooms(1 room is a 2-room unit. all devices connect onto the fire alarm system.Details
fire alarm ada rooms on floor 5,6,7,8,9,19, 22, 28, 31. addition of 25 smoke detectors, 25 speaker/strobes, 25 strobes, 25 strobes, 24 control modules, 9 relay modules, and 9 power supplies for the ada upgrade of 24 guest rooms(1 room is a 2-room unit. all devices connect onto the fire alarm system. | $50,900 |
| Oct 6, 2011 | Completed final sign-off Aug 2012 | 181 03rd St | Rudolph Commercial Interiors Inc, Rci | revision to 201104144040: gr fl change to roll down fire door in lieu of smoke wall and doors. 2nd fl: change to roll down fire door in lieu of smoke wall and doors. changes to footprint of proposed bar. revision to occupant load calculations. fire alartm and smoke detection separate permit-Details
revision to 201104144040: gr fl change to roll down fire door in lieu of smoke wall and doors. 2nd fl: change to roll down fire door in lieu of smoke wall and doors. changes to footprint of proposed bar. revision to occupant load calculations. fire alartm and smoke detection separate permit- | $80,000 |
| Sep 23, 2011 | Completed final sign-off Dec 2012 | 181 03rd St | Plant Construction Company Lp, Cannon Constructors North Inc | interior barrier removal at existing hotel guest rooms only, 24 total guest rooms affected at various floors. minor plumbing work required to relocate some (e) toilets, not change in use or occupancy.(e)fire sprinklers unchanged intent to comply with 2010 c.b.c accessibility req'mts.Details
interior barrier removal at existing hotel guest rooms only, 24 total guest rooms affected at various floors. minor plumbing work required to relocate some (e) toilets, not change in use or occupancy.(e)fire sprinklers unchanged intent to comply with 2010 c.b.c accessibility req'mts. | $165,000 |
| May 24, 2011 | Completed final sign-off Aug 2011 | 181 03rd St | Siemens Industry, Inc. | addition of a fire alarm remote command center at 1st fl security room. the panel will connect onto the existing fire alarm systemDetails
addition of a fire alarm remote command center at 1st fl security room. the panel will connect onto the existing fire alarm system | $3,500 |
| Jan 20, 2011 | Never finaled issued Jan 2011, no final | 181 03rd St | street space permit & street space permitDetails
street space permit & street space permit | ||
| Dec 15, 2010 | Completed final sign-off May 2011 | 181 03rd St | Martinelli Environmental Graph | awning sign with internally lit l.e.d.'s - single faced electric signDetails
awning sign with internally lit l.e.d.'s - single faced electric sign | $29,709 |
| Dec 15, 2010 | Completed final sign-off May 2011 | 181 03rd St | Martinelli Environmental Graph | install awning on northside of howard st. with lighted "w" on both sides and frontDetails
install awning on northside of howard st. with lighted "w" on both sides and front | $29,709 |
| Nov 22, 2010 | Never finaled issued Dec 2010, no final | 181 03rd St | add new steel-frame room with structural wall and roof framing, roofing, glazing. add plumbing fixtures to meet occupancy requirements, doors, finishes. note: fire sprinklers, electrical, hvac, life-safety on separate permits.Details
add new steel-frame room with structural wall and roof framing, roofing, glazing. add plumbing fixtures to meet occupancy requirements, doors, finishes. note: fire sprinklers, electrical, hvac, life-safety on separate permits. | $450,000 | |
| Aug 5, 2010 | Expired or cancelled withdrawn Dec 2016 | 181 03rd St | revision to appl #201006255328revision to number of dwellings, number of rooms reduced by 3 as part of this application: combine room #3103 & 33105, room #3109 & #3110, room #3114 & #3115.Details
revision to appl #201006255328revision to number of dwellings, number of rooms reduced by 3 as part of this application: combine room #3103 & 33105, room #3109 & #3110, room #3114 & #3115. | ||
| Aug 5, 2010 | Expired or cancelled withdrawn Dec 2016 | 181 03rd St | revision to pa# 2010-0625-5328-revision to number of dwelling, number of rooms reduced by 3 as part of this project.Details
revision to pa# 2010-0625-5328-revision to number of dwelling, number of rooms reduced by 3 as part of this project. | ||
| Aug 5, 2010 | Completed final sign-off Sep 2010 | 181 03rd St | Rudolph Commercial Interiors Inc, Rci | revision to appl # 201006255328 -revision to number of dwellings,number of rooms reduced by 3 as part of this application, combine room #3103 & # 3105, room #3104 & #3110, room #3114 & #3115.Details
revision to appl # 201006255328 -revision to number of dwellings,number of rooms reduced by 3 as part of this application, combine room #3103 & # 3105, room #3104 & #3110, room #3114 & #3115. | |
| Jun 25, 2010 | Completed final sign-off Sep 2010 | 181 03rd St | Rudolph Commercial Interiors Inc, Rci | 31st. flr.; suites only; interior hotel rm. renov. minor drywall demolition & repair. casework demolition. (n) furniture, millwork, paint & flr. covering. no change to clg./lighting/sprinkler. (n) shower installation. minor relocation of drywall partitions. (e) mech./elec./structure to remain, no chDetails
31st. flr.; suites only; interior hotel rm. renov. minor drywall demolition & repair. casework demolition. (n) furniture, millwork, paint & flr. covering. no change to clg./lighting/sprinkler. (n) shower installation. minor relocation of drywall partitions. (e) mech./elec./structure to remain, no ch | $224,000 |
| Jul 31, 2008 | Completed final sign-off Nov 2008 | 181 03rd St | Zebra Awning Co Inc | fabricate and install 1 quarter circle awning, steel frame fabric cover, graphics on front and side. install over employee entrance.Details
fabricate and install 1 quarter circle awning, steel frame fabric cover, graphics on front and side. install over employee entrance. | $925 |
| Jul 31, 2008 | Completed final sign-off Nov 2008 | 181 03rd St | Zebra Awning Co Inc | erect non-electric, single faced sign. hand paint lettering on front and 2 sides of awning at masset place walkway.Details
erect non-electric, single faced sign. hand paint lettering on front and 2 sides of awning at masset place walkway. | $210 |
| May 21, 2008 | Completed final sign-off Jun 2008 | 181 03rd St | Cannon Constructors North Inc | renew pa#200702274996 for final inspection.Details
renew pa#200702274996 for final inspection. | |
| Jan 28, 2008 | Expired or cancelled expired Jan 2012 | 181 03rd St | Cw Horton General Contractor | guest room suites renovation to 9 suites total. 6 jr. suites - floor 23-28. 3 extreme suites - floor 31. under separate permit: fire protection/fire alarm, sprinkler, hvac, electrical plumbing.Details
guest room suites renovation to 9 suites total. 6 jr. suites - floor 23-28. 3 extreme suites - floor 31. under separate permit: fire protection/fire alarm, sprinkler, hvac, electrical plumbing. | $180,000 |
| Feb 27, 2007 | Expired or cancelled expired Jun 2008 | 181 03rd St | Cannon Constructors North Inc | install and connect new gas decorative appliance in hotel lobby. modify and replace millwork as neededDetails
install and connect new gas decorative appliance in hotel lobby. modify and replace millwork as needed | $24,500 |
| Feb 14, 2007 | Completed final sign-off Oct 2007 | 181 03rd St | Pwi Construction Inc | 392 guest rooms renovation. no changes to building envelope.Details
392 guest rooms renovation. no changes to building envelope. | $600,000 |
| Dec 15, 2005 | Expired or cancelled expired Aug 2007 | 181 03rd St | Thomas Swan Sign Co Inc | to erect non-electric, projecting, double faced, sign.Details
to erect non-electric, projecting, double faced, sign. | $1,000 |
| Mar 1, 2005 | Completed final sign-off Jul 2005 | 181 03rd St | E. J. Weber Elect.Co Inc | fire alarm tenant modification.not 905 smoke control buildingDetails
fire alarm tenant modification.not 905 smoke control building | $38,600 |
| Dec 30, 2004 | Completed final sign-off Jul 2005 | 181 03rd St | remove 11 guestrooms and install spa & manicure salon by removing interior walls.no structural workDetails
remove 11 guestrooms and install spa & manicure salon by removing interior walls.no structural work | $250,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Siemens Industry, Inc. (10), Plant Construction Co, Lp (5), Cannon Constructors North Inc (4), Swinerton Builders (4), Cw Horton General Contractor (3), Rudolph Commercial Interiors Inc, Rci (3), Allied Fire Protection (2), Centric Construction Inc (2), Martinelli Environmental Graph (2), R L H Fire Protection Inc (2), Zebra Awning Co Inc (2), Anderson, Rowe & Buckley, Inc., Bay City Mechanical Inc, E. J. Weber Elect.Co Inc, Gigabyte Graphics Inc. Dba Fastsigns, Intelligent Technologies & Services Inc, Plant Construction Company Lp, Pwi Construction Inc, Thomas Swan Sign Co Inc, Webcor Construction Lp, Westates Mechanical Corporation Inc
- Architects
- Jeffery Kovel (3), Stephen Lochte (3), John Winder (2), William Wickett (2), John C Davis, Siemens Fire Safety
- Engineers
- Benjamin Noggle, Felix Roth, Felix Roth, Jeff Brink, Jeffrey Ouellette, Julie L Heidbrede, Marc Press, Paul O'neill, Peter Kraut, Stephen Lochte, Stephen Scaife
- Authorized agent-otherss
- Gary Houston
- Designers
- Siemens Building Technologies
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.