Gary Houston
- Listed as
- architect, authorized agent-others
- Firm
- Houston / Tyner
- Based in
- Torrance
- On San Francisco permits
- Apr 2017 to Mar 2026
13 permits since 2000 (architect on 12 permits, authorized agent-others on 1 permit): 9 completed, 2 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 3, 2026 | Completed final sign-off Sep 2026 | 181 03rd St | Centric Construction Inc | lobby: upgrade e) finishes of lobby in "w" hotel. upgrade lighting and n) chandeliers. add interior door/panels in dining area. add tv in lounge. add 2 fire extinguishers cabinets. add misc. metal stud furring and blocking. upgrade mezzanine lighting and finishes. no work to food equipmentDetails
lobby: upgrade e) finishes of lobby in "w" hotel. upgrade lighting and n) chandeliers. add interior door/panels in dining area. add tv in lounge. add 2 fire extinguishers cabinets. add misc. metal stud furring and blocking. upgrade mezzanine lighting and finishes. no work to food equipment | $785,000 |
| Oct 13, 2021 | Completed final sign-off Nov 2022 | 50 03rd St | Plant Construction Co, Lp | renovation to extg 1st floor kitchen to include addition of new walk in cooler and renovation to extg service stations.Details
renovation to extg 1st floor kitchen to include addition of new walk in cooler and renovation to extg service stations. | $75,000 |
| Aug 26, 2021 | Completed final sign-off Nov 2022 | 50 03rd St | Plant Construction Co, Lp | renovation to (e) porte cochere including new finishes, lighting, partial infill of (e) ceiling. sprinkler modifications to be design/build under separate permit. no hvac workDetails
renovation to (e) porte cochere including new finishes, lighting, partial infill of (e) ceiling. sprinkler modifications to be design/build under separate permit. no hvac work | $706,850 |
| Jun 15, 2021 | Completed final sign-off Nov 2022 | 50 03rd St | Plant Construction Co, Lp | ab-017 soft demo nonstructural. sprinkler work to be design/build under separate permit#202106112272Details
ab-017 soft demo nonstructural. sprinkler work to be design/build under separate permit#202106112272 | $454,000 |
| May 24, 2021 | Completed final sign-off Nov 2022 | 50 03rd St | Plant Construction Co, Lp | ab-017 soft demo non-structural. no ceiling, sprinkler or fire life safety scope. floors 4-36. no demo in lobby.Details
ab-017 soft demo non-structural. no ceiling, sprinkler or fire life safety scope. floors 4-36. no demo in lobby. | $1,189,398 |
| Dec 16, 2020 | Completed final sign-off Nov 2022 | 50 03rd St | Plant Construction Co, Lp | lobby level renovation includes new finishes, replacement of lighting, modification to bar & buffet, revision to (e) restaurant layout & (e) giftshop layout. modify (e) elec, plumb, & hvac. 2nd & 3rd floor renovation: new finishes, replace light fixtures. no hvac.Details
lobby level renovation includes new finishes, replacement of lighting, modification to bar & buffet, revision to (e) restaurant layout & (e) giftshop layout. modify (e) elec, plumb, & hvac. 2nd & 3rd floor renovation: new finishes, replace light fixtures. no hvac. | $2,683,405 |
| Dec 15, 2020 | Completed final sign-off Dec 2024 | 340 Stockton St | Centric Construction Inc | renovation to (e) lobby & meeting room levels to include replacement of (e) finishes & millwork. ada upgrades to (e) restrooms. replace (e) lighting. no hvac or structural work.Details
renovation to (e) lobby & meeting room levels to include replacement of (e) finishes & millwork. ada upgrades to (e) restrooms. replace (e) lighting. no hvac or structural work. | $425,000 |
| Nov 30, 2020 | Completed final sign-off Oct 2022 | 50 03rd St | Plant Construction Co, Lp | renovation to all(e) guestrooms+ guestroom corridors, work includes new finishes throughout, tub to shower convension modifications to electrical devices+modification to (e) plumbing for fixture replacement.Details
renovation to all(e) guestrooms+ guestroom corridors, work includes new finishes throughout, tub to shower convension modifications to electrical devices+modification to (e) plumbing for fixture replacement. | $17,993,900 |
| Oct 3, 2020 | Never finaled issued Jan 2021, no final | 50 03rd St | rooms 2714 & 2716: remodel of (e) non-accessible rooms and portion of (e) adj corridor.new finishes throughout,tub to shower conversion, modifications to (e) and addition to (n) electrical devices,modifications to (e) plumbing for fixtures replacement. full guestroom reno under sep permits.Details
rooms 2714 & 2716: remodel of (e) non-accessible rooms and portion of (e) adj corridor.new finishes throughout,tub to shower conversion, modifications to (e) and addition to (n) electrical devices,modifications to (e) plumbing for fixtures replacement. full guestroom reno under sep permits. | $96,811 | |
| Jun 28, 2019 | Expired or cancelled cancelled Jan 2026 | 440 Geary St | 7th flr #720/722. renovation of two guestrooms. new flooring and paint; replacement of plumbing fixtures in existing locations. new electrical outlets. portion of corridor to be renovated with new flooring and paint.Details
7th flr #720/722. renovation of two guestrooms. new flooring and paint; replacement of plumbing fixtures in existing locations. new electrical outlets. portion of corridor to be renovated with new flooring and paint. | $30,000 | |
| Jun 28, 2019 | Expired or cancelled cancelled Jan 2026 | 114 Powell St | 3rd flr #305/306. renovation of two guestrooms. new flooring and paint; new plumbing fixtures in existing location. new electrical outlets. portion of corridor to be renovated with new flooring and paint.Details
3rd flr #305/306. renovation of two guestrooms. new flooring and paint; new plumbing fixtures in existing location. new electrical outlets. portion of corridor to be renovated with new flooring and paint. | $30,000 | |
| Oct 3, 2017 | Completed final sign-off Oct 2018 | 1660 Lyon St | renovation to (e) residential garages including installation of new garage doors, structural footings and beams; one door garage door to be widened per plans.Details
renovation to (e) residential garages including installation of new garage doors, structural footings and beams; one door garage door to be widened per plans. | $15,000 | |
| Apr 20, 2017 | Never finaled issued Jun 2017, no final | 480 Sutter St | Continental Contractors Inc | renovate existing 28th fl concierge lounge. convert existing presidential suite into (1) ada guestroom & (1) non-ada guestroom.n/a maher ordinance (presidential suite conversion to occur under this permit add,in liew of pa #201612296229.no presidential conversion to occur under pa #201612296229.)Details
renovate existing 28th fl concierge lounge. convert existing presidential suite into (1) ada guestroom & (1) non-ada guestroom.n/a maher ordinance (presidential suite conversion to occur under this permit add,in liew of pa #201612296229.no presidential conversion to occur under pa #201612296229.) | $140,000 |