Block 3706, lot 074
50 03rd St
- City’s use
- Commercial Hotel
- Built
- 1983
- Stories
- 35
- Building
- 490,000 sq ft
- Lot
- 39,593 sq ft
- Zoning
- C3R
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
92 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 5, 2026 | In progress issued Mar 2026 | 50 03rd St | City Mechanical Inc | cooling tower replacement.Details
cooling tower replacement. | $196,000 |
| Sep 16, 2022 | Never finaled issued Sep 2022, no final | 50 03rd St | Johnson Controls Fire | as builts, modify (e) f/a system (73) smoke detectors, (38) strobes, (73) smoke detectors, (52) strobes. ref bpa#202110080135Details
as builts, modify (e) f/a system (73) smoke detectors, (38) strobes, (73) smoke detectors, (52) strobes. ref bpa#202110080135 | |
| Aug 31, 2022 | Completed final sign-off Sep 2022 | 50 03rd St | Johnson Controls Fire | 3/f: as built fire permit: relocate (1) speaker strobe and install (1) new speaker strobe in gender neutural bathroom on 3/f. ref permit 202109027703Details
3/f: as built fire permit: relocate (1) speaker strobe and install (1) new speaker strobe in gender neutural bathroom on 3/f. ref permit 202109027703 | |
| May 24, 2022 | Never finaled issued May 2022, no final | 50 03rd St | Pvl Signs & Graphics Inc | install 1 electric, bulletin board sign. "la societe". 18"x24".Details
install 1 electric, bulletin board sign. "la societe". 18"x24". | $2,000 |
| May 24, 2022 | Never finaled issued May 2022, no final | 50 03rd St | Pvl Signs & Graphics Inc | install 1 wall sign. "la societe". 53.5"x66".Details
install 1 wall sign. "la societe". 53.5"x66". | $2,000 |
| May 24, 2022 | Never finaled issued May 2022, no final | 50 03rd St | Pvl Signs & Graphics Inc | install 2 column signs. "la societe".Details
install 2 column signs. "la societe". | $2,000 |
| May 24, 2022 | Completed final sign-off Jul 2022 | 50 03rd St | Pvl Signs & Graphics Inc | install 2 pole banners. "la societe". 58" x 32". non-electric.Details
install 2 pole banners. "la societe". 58" x 32". non-electric. | $2,000 |
| May 24, 2022 | Completed final sign-off Jul 2022 | 50 03rd St | Pvl Signs & Graphics Inc | install 1 vinyl sign. 18.9" x 11.3". "la societe"Details
install 1 vinyl sign. 18.9" x 11.3". "la societe" | $1,000 |
| May 24, 2022 | Completed final sign-off Jul 2022 | 50 03rd St | Pvl Signs & Graphics Inc | install 1 plaque. "la societe"Details
install 1 plaque. "la societe" | $2,000 |
| Feb 24, 2022 | Completed final sign-off Mar 2022 | 50 03rd St | Anderson, Rowe & Buckley, Inc. | 1/f: add 1 sprinkler head (dry) into cooler. relocate 1 sprinkler pendent head cooler.Details
1/f: add 1 sprinkler head (dry) into cooler. relocate 1 sprinkler pendent head cooler. | $1,000 |
| Dec 7, 2021 | Completed final sign-off Apr 2022 | 50 03rd St | Yesco Signs Llc | rev to pa202110120228 to add wireway support behind approved sign bg-1 which includes a change to the proposed attached method.Details
rev to pa202110120228 to add wireway support behind approved sign bg-1 which includes a change to the proposed attached method. | $1,000 |
| Oct 29, 2021 | Completed final sign-off Nov 2021 | 50 03rd St | Anderson, Rowe & Buckley, Inc. | t.i. improvement to extg fire sprinkler system. relocate lower 7 sprinkler heads. ref ti pa 202108267193Details
t.i. improvement to extg fire sprinkler system. relocate lower 7 sprinkler heads. ref ti pa 202108267193 | $3,500 |
| Oct 18, 2021 | Expired or cancelled cancelled Jan 2026 | 50 03rd St | 4/f: rev to pa202009124074: (n) soffits added to project scope to (e) structural and (e) mep constraints. (n) furring at column in guest bathroom in (n) guestroom 430. revised entry and bathroom door heights.Details
4/f: rev to pa202009124074: (n) soffits added to project scope to (e) structural and (e) mep constraints. (n) furring at column in guest bathroom in (n) guestroom 430. revised entry and bathroom door heights. | ||
| Oct 18, 2021 | Completed final sign-off Mar 2022 | 50 03rd St | Aura Fire Safety Inc | relocate 28 fire sprinkler heads on the 4th fl. per t.i. workDetails
relocate 28 fire sprinkler heads on the 4th fl. per t.i. work | $16,000 |
| Oct 13, 2021 | Completed final sign-off Nov 2022 | 50 03rd St | Plant Construction Co, Lp | renovation to extg 1st floor kitchen to include addition of new walk in cooler and renovation to extg service stations.Details
renovation to extg 1st floor kitchen to include addition of new walk in cooler and renovation to extg service stations. | $75,000 |
| Oct 12, 2021 | Completed final sign-off Apr 2022 | 50 03rd St | Yesco Signs Llc | install 2 illuminated single faced wall sign "hyatt regency san francisco downton soma"Details
install 2 illuminated single faced wall sign "hyatt regency san francisco downton soma" | $6,000 |
| Oct 12, 2021 | Completed final sign-off Apr 2022 | 50 03rd St | Yesco Signs Llc | install 1 illuminated single faced wall sign "hyatt regency san francisco downton soma"Details
install 1 illuminated single faced wall sign "hyatt regency san francisco downton soma" | $4,000 |
| Oct 12, 2021 | Completed final sign-off Apr 2022 | 50 03rd St | Yesco Signs Llc | install 1 illuminated single faced wall sign "hyatt regency san francisco downton soma"Details
install 1 illuminated single faced wall sign "hyatt regency san francisco downton soma" | $6,000 |
| Oct 12, 2021 | Completed final sign-off Apr 2022 | 50 03rd St | Yesco Signs Llc | install 1 illuminated single faced wall sign "hyatt regency san francisco downton soma"Details
install 1 illuminated single faced wall sign "hyatt regency san francisco downton soma" | $4,000 |
| Oct 12, 2021 | Completed final sign-off Apr 2022 | 50 03rd St | Yesco Signs Llc | install 1 non-illuminated single faced wall sign "hyatt regency"Details
install 1 non-illuminated single faced wall sign "hyatt regency" | $4,000 |
| Oct 8, 2021 | Completed final sign-off Oct 2022 | 50 03rd St | Johnson Controls Fire | modify existing fire alarm system floors 4-36, add 73 smoke detectors, add 38 strobes, remove/cover 73 smoke detectors/52 strobes to accomodate hearing aid rooms. ref pa 2021-0615-2443.Details
modify existing fire alarm system floors 4-36, add 73 smoke detectors, add 38 strobes, remove/cover 73 smoke detectors/52 strobes to accomodate hearing aid rooms. ref pa 2021-0615-2443. | $10,600 |
| Oct 4, 2021 | Completed final sign-off Dec 2021 | 50 03rd St | Johnson Controls Fire | as built sumit, modify extg fire alarm to approved fire permit # 202108116228Details
as built sumit, modify extg fire alarm to approved fire permit # 202108116228 | |
| Sep 28, 2021 | Completed final sign-off Oct 2022 | 50 03rd St | Anderson, Rowe & Buckley, Inc. | demo permit: remove 1 spinkler from 20 floors, 15-34, room x_06, 20 sprinklers total.Details
demo permit: remove 1 spinkler from 20 floors, 15-34, room x_06, 20 sprinklers total. | $4,500 |
| Sep 16, 2021 | Completed final sign-off Dec 2021 | 50 03rd St | Anderson, Rowe & Buckley, Inc. | t.i. 2020 1216 1147. (e) fire sprinkler system. 1st/f: relocate 123 & 10 removed sprinklers. 2md/f: 9 relocated. 3rd/f: 2 added & 10 relocation.Details
t.i. 2020 1216 1147. (e) fire sprinkler system. 1st/f: relocate 123 & 10 removed sprinklers. 2md/f: 9 relocated. 3rd/f: 2 added & 10 relocation. | $23,000 |
| Sep 2, 2021 | Completed final sign-off Sep 2022 | 50 03rd St | Johnson Controls Fire | fire alarm system modification to (e) system. replace 12 (e) notifiers apliances with new speaker strobes. ref pa 202107224907Details
fire alarm system modification to (e) system. replace 12 (e) notifiers apliances with new speaker strobes. ref pa 202107224907 | $1,500 |
| Aug 30, 2021 | Never finaled filed Aug 2021, never issued | 50 03rd St | fire alarm system modification revision pa 202108116229. 1 smoke detector existing instead of 2 smokes.Details
fire alarm system modification revision pa 202108116229. 1 smoke detector existing instead of 2 smokes. | ||
| Aug 26, 2021 | Completed final sign-off Nov 2022 | 50 03rd St | Plant Construction Co, Lp | renovation to (e) porte cochere including new finishes, lighting, partial infill of (e) ceiling. sprinkler modifications to be design/build under separate permit. no hvac workDetails
renovation to (e) porte cochere including new finishes, lighting, partial infill of (e) ceiling. sprinkler modifications to be design/build under separate permit. no hvac work | $706,850 |
| Aug 11, 2021 | Never finaled issued Aug 2021, no final | 50 03rd St | Johnson Controls Fire | modify existing fire alarm system. as built drawings. ref app# 202107224907Details
modify existing fire alarm system. as built drawings. ref app# 202107224907 | |
| Jul 22, 2021 | Completed final sign-off Dec 2021 | 50 03rd St | Johnson Controls Fire | revision to pa# 202106021473. number of devider change to (4) smoke detectors, (4) duct detectors (8) relays per dwgsDetails
revision to pa# 202106021473. number of devider change to (4) smoke detectors, (4) duct detectors (8) relays per dwgs | |
| Jun 15, 2021 | Completed final sign-off Nov 2022 | 50 03rd St | Plant Construction Co, Lp | ab-017 soft demo nonstructural. sprinkler work to be design/build under separate permit#202106112272Details
ab-017 soft demo nonstructural. sprinkler work to be design/build under separate permit#202106112272 | $454,000 |
| Jun 11, 2021 | Completed final sign-off Sep 2021 | 50 03rd St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system - tenant improvements demo permit 1st floor - 137, 2nd floor - 8, 3rd floor - 10 relocated sprinklersDetails
existing fire sprinkler system - tenant improvements demo permit 1st floor - 137, 2nd floor - 8, 3rd floor - 10 relocated sprinklers | $46,500 |
| Jun 11, 2021 | Completed final sign-off Sep 2021 | 50 03rd St | Aura Fire Safety Inc | relocate 23 fire sprinkler heads on the 3rd floor for ti work.Details
relocate 23 fire sprinkler heads on the 3rd floor for ti work. | $19,850 |
| Jun 8, 2021 | Completed final sign-off Mar 2022 | 50 03rd St | Johnson Controls Fire | modify existing fire alarm system: provide and install: (1) smoke detector, (1) strobe, (1) speaker strobe, and (5) 120 vac smoke detectors that will be installed by electrical gc job ref ti # 2019-1227-0755 (4th floor ti)Details
modify existing fire alarm system: provide and install: (1) smoke detector, (1) strobe, (1) speaker strobe, and (5) 120 vac smoke detectors that will be installed by electrical gc job ref ti # 2019-1227-0755 (4th floor ti) | $6,500 |
| Jun 2, 2021 | Never finaled issued Jun 2021, no final | 50 03rd St | Johnson Controls Fire | modify existing fire alarm: provide and install (2) smoke detectors, (3) duct detectors, (2) monitoring modules, (2) relay modules, (1) strobe and (4) speaker/strobes. ref ti # 2020-0912-4074Details
modify existing fire alarm: provide and install (2) smoke detectors, (3) duct detectors, (2) monitoring modules, (2) relay modules, (1) strobe and (4) speaker/strobes. ref ti # 2020-0912-4074 | $1,500 |
| May 24, 2021 | Completed final sign-off Nov 2022 | 50 03rd St | Plant Construction Co, Lp | ab-017 soft demo non-structural. no ceiling, sprinkler or fire life safety scope. floors 4-36. no demo in lobby.Details
ab-017 soft demo non-structural. no ceiling, sprinkler or fire life safety scope. floors 4-36. no demo in lobby. | $1,189,398 |
| Feb 24, 2021 | Completed final sign-off Apr 2021 | 50 03rd St | Johnson Controls Fire | revision to fa permit # 2020-1208-0568. modify existing fire alarm system. * add (4) duct detectors per 1. per ti permit # 2019-1027-0755Details
revision to fa permit # 2020-1208-0568. modify existing fire alarm system. * add (4) duct detectors per 1. per ti permit # 2019-1027-0755 | $1,500 |
| Dec 16, 2020 | Completed final sign-off Nov 2022 | 50 03rd St | Plant Construction Co, Lp | lobby level renovation includes new finishes, replacement of lighting, modification to bar & buffet, revision to (e) restaurant layout & (e) giftshop layout. modify (e) elec, plumb, & hvac. 2nd & 3rd floor renovation: new finishes, replace light fixtures. no hvac.Details
lobby level renovation includes new finishes, replacement of lighting, modification to bar & buffet, revision to (e) restaurant layout & (e) giftshop layout. modify (e) elec, plumb, & hvac. 2nd & 3rd floor renovation: new finishes, replace light fixtures. no hvac. | $2,683,405 |
| Dec 8, 2020 | Never finaled issued Jan 2021, no final | 50 03rd St | Johnson Controls Fire | basement ti, modify existing fire alarm system, provide and install (3) speaker strobe. ref ti # 2019-1227-0755Details
basement ti, modify existing fire alarm system, provide and install (3) speaker strobe. ref ti # 2019-1227-0755 | $1,500 |
| Nov 30, 2020 | Completed final sign-off Oct 2022 | 50 03rd St | Plant Construction Co, Lp | renovation to all(e) guestrooms+ guestroom corridors, work includes new finishes throughout, tub to shower convension modifications to electrical devices+modification to (e) plumbing for fixture replacement.Details
renovation to all(e) guestrooms+ guestroom corridors, work includes new finishes throughout, tub to shower convension modifications to electrical devices+modification to (e) plumbing for fixture replacement. | $17,993,900 |
| Oct 3, 2020 | Never finaled issued Jan 2021, no final | 50 03rd St | rooms 2714 & 2716: remodel of (e) non-accessible rooms and portion of (e) adj corridor.new finishes throughout,tub to shower conversion, modifications to (e) and addition to (n) electrical devices,modifications to (e) plumbing for fixtures replacement. full guestroom reno under sep permits.Details
rooms 2714 & 2716: remodel of (e) non-accessible rooms and portion of (e) adj corridor.new finishes throughout,tub to shower conversion, modifications to (e) and addition to (n) electrical devices,modifications to (e) plumbing for fixtures replacement. full guestroom reno under sep permits. | $96,811 | |
| Sep 16, 2020 | Completed final sign-off Nov 2020 | 50 03rd St | J & C Safety 1st Fire Protection Inc | fs for basement and ground fl: add 10 new pendents, change 4 existing 4 existing dry pendents to regular pendents and relocate 2 existing heads 201912270755Details
fs for basement and ground fl: add 10 new pendents, change 4 existing 4 existing dry pendents to regular pendents and relocate 2 existing heads 201912270755 | $1,100 |
| Sep 12, 2020 | Completed final sign-off Mar 2022 | 50 03rd St | Bryan J. Valverde Co | conversion of (e) 4th floor fitness center into 5 (n) hotel guestrooms. (n) mechanical, electrical, and plumbing work associated with project scope.Details
conversion of (e) 4th floor fitness center into 5 (n) hotel guestrooms. (n) mechanical, electrical, and plumbing work associated with project scope. | $310,625 |
| Mar 16, 2020 | Completed final sign-off Apr 2022 | 50 03rd St | Bryan J. Valverde Co | conversion of (e) 3rd floor administrative offices to (n) fitness center & single occupancy all gender restroom. (n) mechanical, electrical & plumbing work associated with project scopeDetails
conversion of (e) 3rd floor administrative offices to (n) fitness center & single occupancy all gender restroom. (n) mechanical, electrical & plumbing work associated with project scope | $176,093 |
| Dec 27, 2019 | Completed final sign-off Apr 2022 | 50 03rd St | Bryan J. Valverde Co | conversion of e basement kitchen and liquor storage room to administrative offices. new exhaust fan on 4th fl roof with ass ductwork servinbv new offices. new lec and mech scope in e phone room. updates to main entry and accessible path to travelDetails
conversion of e basement kitchen and liquor storage room to administrative offices. new exhaust fan on 4th fl roof with ass ductwork servinbv new offices. new lec and mech scope in e phone room. updates to main entry and accessible path to travel | $140,000 |
| Oct 21, 2019 | Completed final sign-off Oct 2019 | 50 03rd St | rev to pa# 201908128526; to correct the guest room and dwelling unit count on pa# 200701091318 and pa# 201402128356 to 669 guest room 0 dwelling units based on conversion of accessory managers unit to fitness center per p.c. 204, 4a under pa 9201036, and correction of pa# 201908128526 to 681 guestDetails
rev to pa# 201908128526; to correct the guest room and dwelling unit count on pa# 200701091318 and pa# 201402128356 to 669 guest room 0 dwelling units based on conversion of accessory managers unit to fitness center per p.c. 204, 4a under pa 9201036, and correction of pa# 201908128526 to 681 guest | ||
| Aug 12, 2019 | Completed final sign-off Oct 2019 | 50 03rd St | admin permit to correct the guest room and dwelling unit count on pa 200701091318 and 201402128356 to include correct guest room and dwelling unit count.. 669 plus 1 apts.Details
admin permit to correct the guest room and dwelling unit count on pa 200701091318 and 201402128356 to include correct guest room and dwelling unit count.. 669 plus 1 apts. | ||
| Oct 27, 2017 | Never finaled issued Oct 2017, no final | 50 03rd St | Johnson Controls Fire | cellar, 1st & 2nd floors: fire alarm modification. addition of (5) monitor modules for co sensorDetails
cellar, 1st & 2nd floors: fire alarm modification. addition of (5) monitor modules for co sensor | $3,000 |
| Dec 30, 2015 | Completed final sign-off Jan 2016 | 50 03rd St | Transceive Communications Inc. | t-mobile temporary installation of 1' mw dish on lower roof on non penetrating roof mount for special event from 1-13-16 until 1-17-16. monitor is required for installation and operation. n/a ordinance #155-13Details
t-mobile temporary installation of 1' mw dish on lower roof on non penetrating roof mount for special event from 1-13-16 until 1-17-16. monitor is required for installation and operation. n/a ordinance #155-13 | $1,700 |
| Dec 2, 2015 | Completed final sign-off Jan 2021 | 50 03rd St | Webcor Construction Lp | tie back from shoring for 706 mission street.Details
tie back from shoring for 706 mission street. | $10,000 |
| Dec 9, 2014 | Completed final sign-off Jan 2015 | 50 03rd St | United California Glass And Door | to obtain final inspection for work approved under pa#201102240868. all work is complete.Details
to obtain final inspection for work approved under pa#201102240868. all work is complete. | |
| Dec 9, 2014 | Completed final sign-off Dec 2014 | 50 03rd St | United California Glass And Door | to obtain final inspection for work approved under pa#201201132257. all work is complete.Details
to obtain final inspection for work approved under pa#201201132257. all work is complete. | |
| Aug 1, 2014 | Completed final sign-off Jan 2015 | 50 03rd St | Johnson Controls Fire | 33/36th flrs: t.i. 201402128356, fire alarm modification for guest room renovation on flr 33 & 36. 4 new speakers and 4 new smoke alarms. maher n/aDetails
33/36th flrs: t.i. 201402128356, fire alarm modification for guest room renovation on flr 33 & 36. 4 new speakers and 4 new smoke alarms. maher n/a | $6,000 |
| Jul 31, 2014 | Completed final sign-off Dec 2014 | 50 03rd St | R L H Fire Protection Inc | flrs: 33 & 36: ti 201402128356, fire sprinkler permits, relocate 7 and delete 9 pendant sprinklers on the 33rd and 36th flrs; maher n/aDetails
flrs: 33 & 36: ti 201402128356, fire sprinkler permits, relocate 7 and delete 9 pendant sprinklers on the 33rd and 36th flrs; maher n/a | $3,598 |
| Apr 18, 2014 | Never finaled issued Apr 2014, no final | 50 03rd St | Johnson Controls Fire | penthouse- fire alarm modification. add 6 relays for elevator modernization. reference ti #201312234813Details
penthouse- fire alarm modification. add 6 relays for elevator modernization. reference ti #201312234813 | $2,600 |
| Feb 12, 2014 | Completed final sign-off Jan 2015 | 50 03rd St | Plant Construction Company Lp | convert 1 conference room on 33/f & 2 suites on 36/f into 7 guest rooms. work includes new showers, plumbing fixtures, finishes, millwork, partitions. electrical, plumbing, mechanical as required to complete the project scope. work also includes infill an (e) opening in 36/f structural slab.Details
convert 1 conference room on 33/f & 2 suites on 36/f into 7 guest rooms. work includes new showers, plumbing fixtures, finishes, millwork, partitions. electrical, plumbing, mechanical as required to complete the project scope. work also includes infill an (e) opening in 36/f structural slab. | $210,000 |
| Dec 23, 2013 | Completed final sign-off May 2014 | 50 03rd St | Plant Construction Company Lp | revision to 201304154588 and 201308164584. removal of existing vestibule and exterior improvements from project scope. existing entry system to remainDetails
revision to 201304154588 and 201308164584. removal of existing vestibule and exterior improvements from project scope. existing entry system to remain | |
| Dec 23, 2013 | Completed final sign-off Mar 2014 | 50 03rd St | R L H Fire Protection Inc | remove fire sprinklers from elevator machine rooms for the passenger & service elevatoirs per sffd ab#2.01. all pipe to be removed & plugged outside of rooms.Details
remove fire sprinklers from elevator machine rooms for the passenger & service elevatoirs per sffd ab#2.01. all pipe to be removed & plugged outside of rooms. | $4,780 |
| Oct 29, 2013 | Completed final sign-off Oct 2013 | 50 03rd St | Johnson Controls Fire | fire alarm ti to lobby on the 1st fl as built 1 strobe 201307172007Details
fire alarm ti to lobby on the 1st fl as built 1 strobe 201307172007 | |
| Sep 25, 2013 | Completed final sign-off Jan 2015 | 50 03rd St | Horizon Retail Construction Inc | lobby level - new retail space is connected to existing lobby lounge. millwork installation & final power connection, arch work only. ref. to pa# 201304154588Details
lobby level - new retail space is connected to existing lobby lounge. millwork installation & final power connection, arch work only. ref. to pa# 201304154588 | $64,621 |
| Sep 10, 2013 | Completed final sign-off Oct 2013 | 50 03rd St | R L H Fire Protection Inc | 1st floor fire sprinkler permit - relocate 13 & add 3 pendent sprinklers. ref pa #201304154588. no sprinklers in the vestibule under this permit.Details
1st floor fire sprinkler permit - relocate 13 & add 3 pendent sprinklers. ref pa #201304154588. no sprinklers in the vestibule under this permit. | $8,224 |
| Aug 16, 2013 | Completed final sign-off May 2014 | 50 03rd St | Plant Construction Company Lp | revision to pa# 2013-0415-4588-clarification of code interpation for rated corridors in hotel lobbyDetails
revision to pa# 2013-0415-4588-clarification of code interpation for rated corridors in hotel lobby | |
| Jul 17, 2013 | Completed final sign-off Jan 2014 | 50 03rd St | Simplexgrinnell Lp. | lobby fire alarm tenant improvement -westin hotel - (1) new speaker/strobe, (1) new strobe. ref pa #2013.04.15.4588Details
lobby fire alarm tenant improvement -westin hotel - (1) new speaker/strobe, (1) new strobe. ref pa #2013.04.15.4588 | $6,000 |
| Apr 15, 2013 | Completed final sign-off May 2014 | 50 03rd St | Plant Construction Company Lp | lobby - conension of (e) lobby lounge to retail space, retail space build out under separate permit. replacement of existing revolving door & swing door with new vestibule, renovate existing luggage storage room, fire alarm & sprinklers under separate permit.Details
lobby - conension of (e) lobby lounge to retail space, retail space build out under separate permit. replacement of existing revolving door & swing door with new vestibule, renovate existing luggage storage room, fire alarm & sprinklers under separate permit. | $600,000 |
| Apr 5, 2013 | Completed final sign-off Nov 2013 | 50 03rd St | ref to approved pa# 201212035334. modified layout for the accessible parking spaces in the basement parking gargae.Details
ref to approved pa# 201212035334. modified layout for the accessible parking spaces in the basement parking gargae. | $15,000 | |
| Mar 26, 2013 | Completed final sign-off Apr 2013 | 50 03rd St | R L H Fire Protection Inc | fire sprinkler permit: relocate 14, add 2 and delete 2 pendent sprinklers. t.i. app#201212035334Details
fire sprinkler permit: relocate 14, add 2 and delete 2 pendent sprinklers. t.i. app#201212035334 | $8,000 |
| Mar 20, 2013 | Completed final sign-off May 2013 | 50 03rd St | Simplexgrinnell Lp. | fire alarm tenant improvement to (e) restaurant. 2 new speaker strobes.Details
fire alarm tenant improvement to (e) restaurant. 2 new speaker strobes. | $1,200 |
| Dec 3, 2012 | Completed final sign-off Dec 2013 | 50 03rd St | Plant Construction Company Lp | interior renovation of (e) restaurant, bar & lobby lounge, accessibility upgrades at 1st fl restrooms, bsmt parking garage & exterior renovation of exterior patio & restaurant entrance. interior improvements include new partitions, flooring, lighting, booths, furniture & accessibility upgrades. elecDetails
interior renovation of (e) restaurant, bar & lobby lounge, accessibility upgrades at 1st fl restrooms, bsmt parking garage & exterior renovation of exterior patio & restaurant entrance. interior improvements include new partitions, flooring, lighting, booths, furniture & accessibility upgrades. elec | $750,000 |
| Jul 18, 2012 | Completed final sign-off Nov 2012 | 50 03rd St | Simplexgrinnell Lp. | provide and install new 2 smoke detectors and 1 control relay for roll down doors located in the cellar (basement)Details
provide and install new 2 smoke detectors and 1 control relay for roll down doors located in the cellar (basement) | $5,000 |
| Jan 13, 2012 | Expired or cancelled expired Jan 2015 | 50 03rd St | United California Glass And Door | install new cookson rolling door to replace extg manually operated door per fire inspectors correction notice. door to be activated by fire alarm system installed under app#200611157807.Details
install new cookson rolling door to replace extg manually operated door per fire inspectors correction notice. door to be activated by fire alarm system installed under app#200611157807. | $5,000 |
| Feb 24, 2011 | Expired or cancelled expired Jan 2015 | 50 03rd St | installation of e-911 antenna as required by fcc.Details
installation of e-911 antenna as required by fcc. | $5,000 | |
| Oct 24, 2007 | Never finaled issued Oct 2007, no final | 50 03rd St | Plant Construction Co, Lp | as-built documentation of ground floor renovations completed under p.a. 20070111152Details
as-built documentation of ground floor renovations completed under p.a. 20070111152 | |
| May 15, 2007 | Expired or cancelled expired Oct 2013 | 50 03rd St | Dpw Inc. | relocate 3 sprinkler heads for new guestrooms only on 4th floorDetails
relocate 3 sprinkler heads for new guestrooms only on 4th floor | $6,000 |
| May 4, 2007 | Expired or cancelled withdrawn Aug 2007 | 50 03rd St | Plant Construction Company Lp | non-stuctural demo of drywall partitions &finishes.new drywall partitions,new bar fixtures,finishes,new accessible restrooms(2), cabinetry for lobby bar.creating a new occupant load for bar in lobby. note:elec, hvac,& plumbing on separate permits.Details
non-stuctural demo of drywall partitions &finishes.new drywall partitions,new bar fixtures,finishes,new accessible restrooms(2), cabinetry for lobby bar.creating a new occupant load for bar in lobby. note:elec, hvac,& plumbing on separate permits. | $600,000 |
| Apr 12, 2007 | Never finaled issued Apr 2007, no final | 50 03rd St | Bal Aire Mechanical Inc | 35th floor 6 guest rooms replace 6 bathroom exhaust and fans/replace 2 f/c units (2 new ones)(fan coil)Details
35th floor 6 guest rooms replace 6 bathroom exhaust and fans/replace 2 f/c units (2 new ones)(fan coil) | $30,000 |
| Mar 29, 2007 | Expired or cancelled expired Oct 2013 | 50 03rd St | Bal Aire Mechanical Inc | 4th floor fitness center: replace 28 ex fans, relocate some outlets and duct work and tsats.add 1 ac units split systemDetails
4th floor fitness center: replace 28 ex fans, relocate some outlets and duct work and tsats.add 1 ac units split system | $25,000 |
| Mar 27, 2007 | Expired or cancelled expired Oct 2013 | 50 03rd St | Bal Aire Mechanical Inc | 1st flr: relocate 16 linear outlets and related ductwork, 3rd floor, relocate outlets and related ductwork, relocate vabs and tsats, add 1 ex fan for harvard meeting rm, add 5 smoke/fire dampers.Details
1st flr: relocate 16 linear outlets and related ductwork, 3rd floor, relocate outlets and related ductwork, relocate vabs and tsats, add 1 ex fan for harvard meeting rm, add 5 smoke/fire dampers. | $125,000 |
| Mar 9, 2007 | Never finaled issued Mar 2007, no final | 50 03rd St | Dpw Inc. | relocate 57 existing heads, add 3 new and plug off 1 existing head for new ceilings in meeting roomsDetails
relocate 57 existing heads, add 3 new and plug off 1 existing head for new ceilings in meeting rooms | $20,000 |
| Jan 11, 2007 | Expired or cancelled expired Oct 2013 | 50 03rd St | Plant Construction Co, Lp | 1st fl - renovations to lobby; lounge, restaurant, bar & port cochere. 3rd fl-renovation to meeting rooms, corridors and pre-function areas. exterior-modify marquere canopy, install decorative glass on facade over (e) facade. replace (e) marble w/cement fiber panels, glass/alum storefront.Details
1st fl - renovations to lobby; lounge, restaurant, bar & port cochere. 3rd fl-renovation to meeting rooms, corridors and pre-function areas. exterior-modify marquere canopy, install decorative glass on facade over (e) facade. replace (e) marble w/cement fiber panels, glass/alum storefront. | $1,500,000 |
| Jan 9, 2007 | Expired or cancelled expired Oct 2013 | 50 03rd St | Plant Construction Co, Lp | interior remodeling on floors 4, 35 and 36/:convert office space into 5 guest rooms construct new fittness center. 35 and 36th flr:interiro remodeling , removing interconnecting stair between floor 35 and 36Details
interior remodeling on floors 4, 35 and 36/:convert office space into 5 guest rooms construct new fittness center. 35 and 36th flr:interiro remodeling , removing interconnecting stair between floor 35 and 36 | $650,000 |
| Jan 8, 2007 | Expired or cancelled expired Aug 2008 | 50 03rd St | Plant Construction Company Lp | selective interior and exterior non structural demolition on floors 1,3,4,35,36. this is for demo only. elec,hvac,life safety,sprinklers, and plumbing on separate permitDetails
selective interior and exterior non structural demolition on floors 1,3,4,35,36. this is for demo only. elec,hvac,life safety,sprinklers, and plumbing on separate permit | $50,000 |
| Nov 15, 2006 | Never finaled issued Jun 2007, no final | 50 03rd St | Simplex Grinnell | add 19 tac panels, 420 smoke detectors, 78 detectors w/ sounder base, 11 single station detectors, 52 speakers, 20 speakers strobes and 457 strobes. work on all floors.Details
add 19 tac panels, 420 smoke detectors, 78 detectors w/ sounder base, 11 single station detectors, 52 speakers, 20 speakers strobes and 457 strobes. work on all floors. | $215,000 |
| Jul 20, 2005 | Completed final sign-off Dec 2005 | 50 03rd St | remodel of exterior plaze area. new plaza level landscaping replace (e) plaze and new concrete.Details
remodel of exterior plaze area. new plaza level landscaping replace (e) plaze and new concrete. | $50,000 | |
| May 2, 2005 | Expired or cancelled expired Jun 2008 | 50 03rd St | Michael Bovo & Associates | voluntaryreplacement f non functioning co-ordinators at elevators lobby. installation of edge guardsDetails
voluntaryreplacement f non functioning co-ordinators at elevators lobby. installation of edge guards | $1,500 |
| Apr 1, 2004 | Completed final sign-off Jul 2004 | 50 03rd St | Arrow Sign Company | renew appl#200202219724 for final inspectionDetails
renew appl#200202219724 for final inspection | |
| Aug 28, 2003 | Never finaled issued Aug 2003, no final | 50 03rd St | street space and sidewalk repairDetails
street space and sidewalk repair | ||
| Feb 20, 2003 | Expired or cancelled expired Jul 2004 | 50 03rd St | Simplex Grinnell | replace existing 2120 main facp w/new simplex 4100 u main facp. tranfer existing zones fr (e) kiddieDetails
replace existing 2120 main facp w/new simplex 4100 u main facp. tranfer existing zones fr (e) kiddie | $107,000 |
| Nov 8, 2002 | Completed final sign-off Apr 2005 | 50 03rd St | new corridor to garage/garage submitted under seperate app #200210310448 -Details
new corridor to garage/garage submitted under seperate app #200210310448 - | $800,000 | |
| Jul 8, 2002 | Never finaled filed Jul 2002, never issued | 50 03rd St | remove 4 pane exterior windows, replace with new door & stucco fill-in wallDetails
remove 4 pane exterior windows, replace with new door & stucco fill-in wall | $3,500 | |
| Feb 21, 2002 | Expired or cancelled expired Jul 2004 | 50 03rd St | Arrow Sign Company | erect a electric wall single faced signDetails
erect a electric wall single faced sign | |
| Jul 18, 2001 | Expired or cancelled expired Aug 2003 | 50 03rd St | Pacific Signaling System | to renew permit#2000/03/10/4038 for final inspection.Details
to renew permit#2000/03/10/4038 for final inspection. | |
| Mar 10, 2000 | Expired or cancelled expired Mar 2001 | 50 03rd St | Pacific Signaling System | removal & disconnection of (e) unit duct smoke detectors. convert (e) duct housings to 5-boxesDetails
removal & disconnection of (e) unit duct smoke detectors. convert (e) duct housings to 5-boxes | |
| Feb 28, 2000 | Completed final sign-off May 2000 | 50 03rd St | move toilet fixtures and non-load bearing partition to make hotel (e) hotel guestrooms consistentDetails
move toilet fixtures and non-load bearing partition to make hotel (e) hotel guestrooms consistent | $77,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.