Block 0327, lot 012
100 Powell St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
115 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 28, 2023 | Completed final sign-off Oct 2024 | 100 Powell St | Kgpco Services Llc | removal of all (e) sprint equipment from the rooftop not to be replaced. a crane will be necessary to remove equipment from the building rooftop which will sit on ellis st. a traffic control plan is included in the plans.Details
removal of all (e) sprint equipment from the rooftop not to be replaced. a crane will be necessary to remove equipment from the building rooftop which will sit on ellis st. a traffic control plan is included in the plans. | $18,000 |
| Mar 27, 2023 | Completed final sign-off Apr 2023 | 114 Powell St | Aura Fire Safety Inc | relocate 14 sprinklers on (e) systemDetails
relocate 14 sprinklers on (e) system | $8,500 |
| Sep 6, 2022 | Never finaled issued Sep 2022, no final | 114 Powell St | Bryan J. Valverde Co | to obtain final inspection for work approed under pa# 201910245437, 201910305964, 201912028455. all work is complete.Details
to obtain final inspection for work approed under pa# 201910245437, 201910305964, 201912028455. all work is complete. | |
| Sep 6, 2022 | Never finaled issued Sep 2022, no final | 114 Powell St | Bryan J. Valverde Co | to obtain final inspection for work approed under pa# 201908209379. all work is complete.Details
to obtain final inspection for work approed under pa# 201908209379. all work is complete. | |
| Jun 16, 2022 | Completed final sign-off Oct 2022 | 114 Powell St | Aura Fire Safety Inc | replace existing dry standpipe by 13ft. upgrade exisiting stanpipe from 5" to 6"Details
replace existing dry standpipe by 13ft. upgrade exisiting stanpipe from 5" to 6" | $9,850 |
| May 10, 2022 | Never finaled issued May 2022, no final | 114 Powell St | Bryan J. Valverde Co | to obtain final inspection for work approved under pa# 2018-0726-5686 all work is completeDetails
to obtain final inspection for work approved under pa# 2018-0726-5686 all work is complete | |
| Nov 10, 2021 | Never finaled issued Nov 2021, no final | 114 Powell St | Bryan J. Valverde Co | revision to pa 2018-0710-4070 & 2020-1106-8384 for installation of (3) door actuatorsDetails
revision to pa 2018-0710-4070 & 2020-1106-8384 for installation of (3) door actuators | $4,000 |
| Sep 17, 2021 | Never finaled issued Sep 2021, no final | 114 Powell St | Bryan J. Valverde Co | revise structural details to extg app#201912028455 to address extg conditionsDetails
revise structural details to extg app#201912028455 to address extg conditions | |
| Mar 9, 2021 | Never finaled issued Apr 2021, no final | 114 Powell St | Bryan J. Valverde Co | non-structural interior demo per ab-017. area of demolition are to remain vacant until future tenant improvement & build-out.Details
non-structural interior demo per ab-017. area of demolition are to remain vacant until future tenant improvement & build-out. | $5,000 |
| Dec 8, 2020 | Never finaled filed Dec 2020, never issued | 114 Powell St | 8 | ||
| Dec 8, 2020 | Never finaled issued Jan 2021, no final | 114 Powell St | Battalion One Fire Protection | as-built plans for permit # 2019-0823-9751Details
as-built plans for permit # 2019-0823-9751 | |
| Nov 6, 2020 | Never finaled issued May 2021, no final | 114 Powell St | Bryan J. Valverde Co | revision to pa# 2018.0710.4070 and 2018.0726.5686 to incorporate new door locations and duct rooting to louvers location approved under pa# 2018.0710.4070Details
revision to pa# 2018.0710.4070 and 2018.0726.5686 to incorporate new door locations and duct rooting to louvers location approved under pa# 2018.0710.4070 | |
| Oct 1, 2020 | Completed final sign-off Jan 2022 | 114 Powell St | Bryan J. Valverde Co | demo of (e) glass back door, replacement with a 90 min. door and frame, demo of 6 (e) windows at demising wall between lot 12 and adjacent lot 11, infill with one layer of brick wall mpta2020-007742ptaDetails
demo of (e) glass back door, replacement with a 90 min. door and frame, demo of 6 (e) windows at demising wall between lot 12 and adjacent lot 11, infill with one layer of brick wall mpta2020-007742pta | $110,000 |
| Aug 22, 2020 | Completed final sign-off Aug 2021 | 114 Powell St | Electric Tech Construction Inc | at&t modification:- remove (2) existing at&t rrus per sector, (6) total-install (1) new at&t rrus per sector, (6) total-install (1) new dc9 per split sector, (3) total-install (2) new dc power trunks per split sector, (6) totalDetails
at&t modification:- remove (2) existing at&t rrus per sector, (6) total-install (1) new at&t rrus per sector, (6) total-install (1) new dc9 per split sector, (3) total-install (2) new dc power trunks per split sector, (6) total | $29,750 |
| Jan 22, 2020 | Expired or cancelled cancelled Jan 2026 | 114 Powell St | ste #118 - interior t.i. non load bearing partitions, hvac elec lighting and millworkDetails
ste #118 - interior t.i. non load bearing partitions, hvac elec lighting and millwork | $41,958 | |
| Dec 6, 2019 | Completed final sign-off May 2020 | 114 Powell St | Granite Excavation & Demolition Inc | revision to approved pa #201908279975. underpinning on west side revision: make pier w19 a 5'-3" wide pier.Details
revision to approved pa #201908279975. underpinning on west side revision: make pier w19 a 5'-3" wide pier. | |
| Dec 2, 2019 | Never finaled issued Dec 2019, no final | 114 Powell St | Bryan J. Valverde Co, Build Group Inc. | clarify structural work associated with permit 2018-0710-4070 & 201910305964Details
clarify structural work associated with permit 2018-0710-4070 & 201910305964 | $10,000 |
| Oct 30, 2019 | Expired or cancelled cancelled Jan 2026 | 114 Powell St | install electric projecting blade sign "dw"Details
install electric projecting blade sign "dw" | $10,000 | |
| Oct 30, 2019 | Expired or cancelled cancelled Jan 2026 | 114 Powell St | install electric projecting blade sign "daniel wellington"Details
install electric projecting blade sign "daniel wellington" | $10,000 | |
| Oct 30, 2019 | Never finaled issued Nov 2019, no final | 114 Powell St | Bryan J. Valverde Co, Build Group Inc. | revision to pa 2018-0710-4070 to clarify structural work associated w/the referenced permit scopeDetails
revision to pa 2018-0710-4070 to clarify structural work associated w/the referenced permit scope | |
| Oct 24, 2019 | Never finaled issued Nov 2019, no final | 114 Powell St | Bryan J. Valverde Co, Build Group Inc. | title 24 submittal associated with pa 2018-0710-4070 for storefront replacementDetails
title 24 submittal associated with pa 2018-0710-4070 for storefront replacement | |
| Aug 27, 2019 | Completed final sign-off May 2020 | 114 Powell St | Granite Excavation & Demolition Inc | revision due to a sump pit in basement of 72 ellis requires deeper underpinning piers in (6) locations. reivision to shoring permit #2018-1227-9200Details
revision due to a sump pit in basement of 72 ellis requires deeper underpinning piers in (6) locations. reivision to shoring permit #2018-1227-9200 | $16,189 |
| Aug 23, 2019 | Never finaled issued Aug 2019, no final | 114 Powell St | Battalion One Fire Protection | modification of fire alarm system for pump room relocation and demo of underground parking. n/a for maher.Details
modification of fire alarm system for pump room relocation and demo of underground parking. n/a for maher. | $10,000 |
| Aug 20, 2019 | Never finaled issued Sep 2019, no final | 114 Powell St | Bryan J. Valverde Co, Build Group Inc. | demolish selective areas of (e) exterior store front for following purpose, 1) gain info on (e) historic cladding materials for review w/planning, 2) survy header/footer & sidwall connection foundations & utility infrastructures,3) take material samples to confirm presence of hazardous materialsDetails
demolish selective areas of (e) exterior store front for following purpose, 1) gain info on (e) historic cladding materials for review w/planning, 2) survy header/footer & sidwall connection foundations & utility infrastructures,3) take material samples to confirm presence of hazardous materials | $20,000 |
| Jun 28, 2019 | Expired or cancelled cancelled Jan 2026 | 114 Powell St | 3rd flr #305/306. renovation of two guestrooms. new flooring and paint; new plumbing fixtures in existing location. new electrical outlets. portion of corridor to be renovated with new flooring and paint.Details
3rd flr #305/306. renovation of two guestrooms. new flooring and paint; new plumbing fixtures in existing location. new electrical outlets. portion of corridor to be renovated with new flooring and paint. | $30,000 | |
| Jun 13, 2019 | Completed final sign-off May 2020 | 114 Powell St | Granite Excavation & Demolition Inc | install permeation grout as part of temp shoring. ref pa #201812279200Details
install permeation grout as part of temp shoring. ref pa #201812279200 | $15,000 |
| Mar 4, 2019 | Completed final sign-off Oct 2019 | 100 Powell St | Metropolitan Electrical Construction | 1)install new condenser units on roof for sprint portion of building only. 2) install new air handlers in equip room. 3) install nw hybrid cables and remove old cables. 4)remove extg cooling system and mech ducting, 5)remove extg conduit for power. n/a for maher.Details
1)install new condenser units on roof for sprint portion of building only. 2) install new air handlers in equip room. 3) install nw hybrid cables and remove old cables. 4)remove extg cooling system and mech ducting, 5)remove extg conduit for power. n/a for maher. | $45,000 |
| Dec 27, 2018 | Completed final sign-off May 2020 | 114 Powell St | Granite Excavation & Demolition Inc | underpinning related to 72 ellis project. ref site permit 201508033157s.Details
underpinning related to 72 ellis project. ref site permit 201508033157s. | $98,000 |
| Oct 16, 2018 | Never finaled issued Nov 2018, no final | 114 Powell St | Battalion One Fire Protection | relocation of fire pump to new fire pump room & installation of new 4-inch feed main to existing system. one new sprinkler to be added. ref pa 2016-0913-7590 for new underground service. ref pa 2018-0726-5686 for pump room and mepDetails
relocation of fire pump to new fire pump room & installation of new 4-inch feed main to existing system. one new sprinkler to be added. ref pa 2016-0913-7590 for new underground service. ref pa 2018-0726-5686 for pump room and mep | $80,000 |
| Aug 20, 2018 | Expired or cancelled cancelled Jan 2026 | 114 Powell St | interior only ti - including new elevators, stairs and front desk/counter. infill slab to (e) stair. interior finisheing. no exterior work or work within 10' of storefrontDetails
interior only ti - including new elevators, stairs and front desk/counter. infill slab to (e) stair. interior finisheing. no exterior work or work within 10' of storefront | $1,850,000 | |
| Aug 10, 2018 | Never finaled issued Aug 2018, no final | 114 Powell St | street space onlyDetails
street space only | ||
| Aug 9, 2018 | Completed final sign-off Nov 2019 | 100 Powell St | Advanced Wireless & Logistics Inc | sprint - remove and replace 6 antenas, 3 rrus and removal of a 24" frp shroud for a 36" shroud. n/a for maher.Details
sprint - remove and replace 6 antenas, 3 rrus and removal of a 24" frp shroud for a 36" shroud. n/a for maher. | $20,000 |
| Jul 26, 2018 | Never finaled issued Oct 2018, no final | 114 Powell St | Bryan J. Valverde Co | relocate existing fire pump room backflow preventer, pump & service to new fire pump room in the basement. under separate permit.Details
relocate existing fire pump room backflow preventer, pump & service to new fire pump room in the basement. under separate permit. | $25,000 |
| Jul 10, 2018 | Never finaled issued Sep 2019, no final | 114 Powell St | Bryan J. Valverde Co, Build Group Inc. | storefront replacement @ grd flr, development of design guidelines for storefront. **maher n/a**Details
storefront replacement @ grd flr, development of design guidelines for storefront. **maher n/a** | $1,500,000 |
| Jul 2, 2018 | Never finaled issued Nov 2018, no final | 100 Powell St | Instant Neon | install single-faced window vinyl sign for "swatch". **maher n/a**Details
install single-faced window vinyl sign for "swatch". **maher n/a** | $1,000 |
| Jul 2, 2018 | Never finaled issued Sep 2018, no final | 114 Powell St | Bryan J. Valverde Co | arministrative permit to memorialize re-painting of union square hotel in kmms conservation district for planning department review. 120 powell street on lot 013 will also be painted. in response to 13000-enf.Details
arministrative permit to memorialize re-painting of union square hotel in kmms conservation district for planning department review. 120 powell street on lot 013 will also be painted. in response to 13000-enf. | |
| Jun 7, 2018 | Never finaled issued Jun 2018, no final | 114 Powell St | street spaceDetails
street space | ||
| Nov 6, 2017 | Completed final sign-off Dec 2018 | 114 Powell St | Electric Tech Construction Inc | install (6) proposed lte 2c rru's-12. remove (3) rrus-11. install (1) dc trunk line. install (2) fiber lines.Details
install (6) proposed lte 2c rru's-12. remove (3) rrus-11. install (1) dc trunk line. install (2) fiber lines. | $15,000 |
| Feb 28, 2017 | Never finaled issued Feb 2017, no final | 100 Powell St | H C I Systems Inc | installation of 1 new smoke detector above the facp/bps panel. new smoke detecotr to tie into (e) facp 5820xl panel being re-submitted per city of sf ref 201610079852Details
installation of 1 new smoke detector above the facp/bps panel. new smoke detecotr to tie into (e) facp 5820xl panel being re-submitted per city of sf ref 201610079852 | $7,000 |
| Feb 9, 2017 | Completed final sign-off Feb 2017 | 100 Powell St | Battalion One Fire Protection | adjust 20 existing sprinkler heads for new ceiling elevation. add 1 new head in existing closet/nook where existing covereage is lacking. ref pa 2015-108-9278. maher naDetails
adjust 20 existing sprinkler heads for new ceiling elevation. add 1 new head in existing closet/nook where existing covereage is lacking. ref pa 2015-108-9278. maher na | $6,300 |
| Feb 2, 2017 | Never finaled issued Nov 2018, no final | 100 Powell St | Instant Neon | to erect electric, wall, single faced sign. ** maher: n/a **Details
to erect electric, wall, single faced sign. ** maher: n/a ** | $1,000 |
| Feb 2, 2017 | Never finaled issued Nov 2018, no final | 100 Powell St | Instant Neon | to erect electric, projecting, double faced sign x 2 ** maher: n/a **Details
to erect electric, projecting, double faced sign x 2 ** maher: n/a ** | $1,000 |
| Oct 7, 2016 | Completed final sign-off May 2017 | 100 Powell St | H C I Systems Inc | grd fl: hci shall install 5 new notification appliances in swatch tenant space, all new notification shall be tied into new power supply. all strobes shall be synchronized. two new duct detectors shall be installed on two new air handling units. ref 2015-1008-9278 maher naDetails
grd fl: hci shall install 5 new notification appliances in swatch tenant space, all new notification shall be tied into new power supply. all strobes shall be synchronized. two new duct detectors shall be installed on two new air handling units. ref 2015-1008-9278 maher na | $7,413 |
| Sep 13, 2016 | Never finaled issued Nov 2018, no final | 114 Powell St | Battalion One Fire Protection | relocate existing underground fire service only. relocation of above ground feed main and fire pump under separate permit.Details
relocate existing underground fire service only. relocation of above ground feed main and fire pump under separate permit. | $58,000 |
| May 5, 2016 | Expired or cancelled cancelled Aug 2023 | 114 Powell St | Battalion One Fire Protection | relocate existing fire service, fire pump feed main, and backflow preventer to a location in the basment of the union square hotel. existing feed is located in the basement/lower level of the existing parking lot/parking garage which is to be removedDetails
relocate existing fire service, fire pump feed main, and backflow preventer to a location in the basment of the union square hotel. existing feed is located in the basement/lower level of the existing parking lot/parking garage which is to be removed | $35,000 |
| Mar 22, 2016 | Completed final sign-off Oct 2016 | 114 Powell St | Electric Tech Construction Inc | att modification to (e) telecom facility: r&r (3)(e)antennas with (3)(n) antennas;install (3)(n)rrus-11 on (n) h-frame in (e)equip room; install (6)(n) 7/8" coax; install (n) dus-41 in (n) 6601 chassis; maher n/aDetails
att modification to (e) telecom facility: r&r (3)(e)antennas with (3)(n) antennas;install (3)(n)rrus-11 on (n) h-frame in (e)equip room; install (6)(n) 7/8" coax; install (n) dus-41 in (n) 6601 chassis; maher n/a | $20,000 |
| Oct 16, 2015 | Completed final sign-off Jun 2016 | 114 Powell St | Electric Tech Construction Inc | at&t mobility of (e) telecom facility: install (n) xmu; install (3) (n) rrus-32; r&r (6) (e) antennas w/(6) (n) antennas; r&r (4) (e) 18" radomes w/(4) (n) 22" radomes; relocate (3) (e) dtmas. n/a maher ordinance. aka "cyril magnin and ellis" location, misnomer.Details
at&t mobility of (e) telecom facility: install (n) xmu; install (3) (n) rrus-32; r&r (6) (e) antennas w/(6) (n) antennas; r&r (4) (e) 18" radomes w/(4) (n) 22" radomes; relocate (3) (e) dtmas. n/a maher ordinance. aka "cyril magnin and ellis" location, misnomer. | $15,000 |
| Oct 8, 2015 | Never finaled issued Sep 2016, no final | 100 Powell St | Alain Hirsch Construction Corp | gr fl tenant improvement new ceilings, finishes, floors, mechanical, elec, merchandising fixturesDetails
gr fl tenant improvement new ceilings, finishes, floors, mechanical, elec, merchandising fixtures | $152,000 |
| Jul 7, 2015 | Expired or cancelled cancelled Jun 2018 | 100 Powell St | (n) roller shutter w/ housing above alcove, 75% opening for planning guidelines. (2)(n) white single letter log sign (6'-7' long). stainless steel blade sign (2'-0" long) (6)(n) wall graphics, special facade features.Details
(n) roller shutter w/ housing above alcove, 75% opening for planning guidelines. (2)(n) white single letter log sign (6'-7' long). stainless steel blade sign (2'-0" long) (6)(n) wall graphics, special facade features. | $15,000 | |
| Apr 22, 2015 | Completed final sign-off Dec 2015 | 114 Powell St | Electric Tech Construction Inc | modification to (e) at&t facility: install 3(n) rrus-12 w/a2 modules, 6(n) diplexes, (n) inmer duct w/fiber & dc cables; r&r 3(e) antennas w 3(n), 1(e) dul w/2(n) dus41 & 1(n) xmu, 3(e) surge sups. w/3(n) surge sups, 2(e) radomes w/2(n) radomes, (e) screen w/(n) screen; remove (e) rbs 2206 cabinet..Details
modification to (e) at&t facility: install 3(n) rrus-12 w/a2 modules, 6(n) diplexes, (n) inmer duct w/fiber & dc cables; r&r 3(e) antennas w 3(n), 1(e) dul w/2(n) dus41 & 1(n) xmu, 3(e) surge sups. w/3(n) surge sups, 2(e) radomes w/2(n) radomes, (e) screen w/(n) screen; remove (e) rbs 2206 cabinet.. | $35,000 |
| Jul 10, 2014 | Expired or cancelled cancelled Jul 2016 | 112 Powell St | Mina-Tree Signs, Inc | erect an electric single faced wall sign. n/a maher ordinanceDetails
erect an electric single faced wall sign. n/a maher ordinance | $3,000 |
| Jul 10, 2014 | Expired or cancelled cancelled Jul 2016 | 112 Powell St | Mina-Tree Signs, Inc | erect an electric double faced projecting signDetails
erect an electric double faced projecting sign | $2,000 |
| May 1, 2014 | Expired or cancelled cancelled Jul 2016 | 100 Powell St | International Commercial Awning, Inc. | paint non structural sign- compliance with mahner ordinance no.155-13 not requiredDetails
paint non structural sign- compliance with mahner ordinance no.155-13 not required | $4,500 |
| Apr 15, 2014 | Expired or cancelled cancelled May 2017 | 104 Powell St | Instant Neon | erect non electric, double faced projecting sign. maher-compliance with ordinance no. 155-13.not required.Details
erect non electric, double faced projecting sign. maher-compliance with ordinance no. 155-13.not required. | $1,500 |
| Mar 10, 2014 | Expired or cancelled cancelled May 2017 | 104 Powell St | Instant Neon | painted sign.Details
painted sign. | $500 |
| Mar 10, 2014 | Expired or cancelled cancelled May 2017 | 104 Powell St | Instant Neon | erect a non-electric wall sign.Details
erect a non-electric wall sign. | $1,500 |
| Feb 28, 2014 | Expired or cancelled cancelled Jan 2026 | 114 Powell St | Rago Neon Inc. | erect electric, wall, projecting, double-faced, direct new sign.Details
erect electric, wall, projecting, double-faced, direct new sign. | $20,000 |
| Jun 26, 2013 | Completed final sign-off Jul 2015 | 114 Powell St | Costrotta Construc Management Inc | a modification to a an existing unmanned telecommunicaiton facility consisting of adding (3) rrus-11s to an existing at&t facility. no antenna changes, no new antenna whatsoever.Details
a modification to a an existing unmanned telecommunicaiton facility consisting of adding (3) rrus-11s to an existing at&t facility. no antenna changes, no new antenna whatsoever. | $6,000 |
| Mar 1, 2013 | Expired or cancelled expired May 2019 | 114 Powell St | Triton Tower Inc | revision to 201108041799. relocate hvac system from the side of building to the roof. change from 5 ton to 3 ton. use of existing shaft for routing of flue and lines.Details
revision to 201108041799. relocate hvac system from the side of building to the roof. change from 5 ton to 3 ton. use of existing shaft for routing of flue and lines. | $15,000 |
| Feb 28, 2013 | Completed final sign-off Dec 2015 | 100 Powell St | Overland Contracting Inc | remove (3)(e)sprint antennas, install (3) (n) antennas in new radomes add (6) rrus, swap (1)gps antenna. replace (3)(e) equipment cabinets with (2) cabinets in basement.Details
remove (3)(e)sprint antennas, install (3) (n) antennas in new radomes add (6) rrus, swap (1)gps antenna. replace (3)(e) equipment cabinets with (2) cabinets in basement. | $45,000 |
| Aug 14, 2012 | Never finaled issued Aug 2012, no final | 110 Powell St | J C Builders | install freestanding atm machine for 'bangkok noodles & thai bbq'Details
install freestanding atm machine for 'bangkok noodles & thai bbq' | $1,500 |
| Aug 6, 2012 | Completed final sign-off Oct 2012 | 110 Powell St | K Y J Construction Company | add gyp board ceiling in the storage room of basement at bottom of e 2x12 ceiling joists to cover up all openings at the ceiling and walls as required by dept of public health. extend e fire sprinkler system to protect space below new ceilingDetails
add gyp board ceiling in the storage room of basement at bottom of e 2x12 ceiling joists to cover up all openings at the ceiling and walls as required by dept of public health. extend e fire sprinkler system to protect space below new ceiling | $6,500 |
| Mar 1, 2012 | Completed final sign-off May 2012 | 106 Powell St | Star Plumbing & Fire Const Co. | remodel (e) retail space for retail cookie sales & icecream, (n) counters & shelves.Details
remodel (e) retail space for retail cookie sales & icecream, (n) counters & shelves. | $5,000 |
| Sep 27, 2011 | Never finaled issued Sep 2011, no final | 114 Powell St | street space permitDetails
street space permit | ||
| Aug 4, 2011 | Completed final sign-off Dec 2013 | 114 Powell St | Triton Tower Inc | install an unmanned wireless facility for at & t, consisting of 9 panel antennas on the roof & associated equipment in the basement.Details
install an unmanned wireless facility for at & t, consisting of 9 panel antennas on the roof & associated equipment in the basement. | $131,035 |
| Aug 19, 2009 | Completed final sign-off Oct 2010 | 100 Powell St | Metropolitan Electrical Construction, Cccs, Inc | wts facility installation of 1 bts equipment cabinet, 3 rf panel antennas concealed within 2 frp radomes, 1 gps andtenna on rooftop.Details
wts facility installation of 1 bts equipment cabinet, 3 rf panel antennas concealed within 2 frp radomes, 1 gps andtenna on rooftop. | $45,000 |
| Apr 4, 2008 | Never finaled issued Apr 2008, no final | 114 Powell St | street space permit only.Details
street space permit only. | ||
| Mar 6, 2008 | Never finaled issued Mar 2008, no final | 114 Powell St | street space permitDetails
street space permit | ||
| Feb 12, 2008 | Completed final sign-off Mar 2009 | 114 Powell St | revision to pa# 2007/09/26/3830 to create separate application for interior remodeling work for 120 powell per distric inspector request.Details
revision to pa# 2007/09/26/3830 to create separate application for interior remodeling work for 120 powell per distric inspector request. | ||
| Jan 18, 2008 | Never finaled issued Jan 2008, no final | 114 Powell St | street spaceDetails
street space | ||
| Nov 29, 2007 | Never finaled issued Nov 2007, no final | 114 Powell St | street space permitDetails
street space permit | ||
| Sep 26, 2007 | Completed final sign-off Mar 2009 | 114 Powell St | interior remodelling of some guest rooms and demo non structural partitions designated flooring, ceiling, fixtures and millwork-- new partition walls where needed-- replace lavatory and tubs in some bathrooms, upgrade some bathrooms to ada compliant bathrooms.Details
interior remodelling of some guest rooms and demo non structural partitions designated flooring, ceiling, fixtures and millwork-- new partition walls where needed-- replace lavatory and tubs in some bathrooms, upgrade some bathrooms to ada compliant bathrooms. | $1,130,000 | |
| May 16, 2007 | Never finaled issued Jul 2007, no final | 114 Powell St | Intelligent Technologies & Services Inc | replace existing facp w/ new facp detection & controls.Details
replace existing facp w/ new facp detection & controls. | $22,000 |
| May 1, 2007 | Never finaled issued May 2007, no final | 100 Powell St | Sign & Sign Again | space #291 - sign permit - non electric, projecting, double faced.Details
space #291 - sign permit - non electric, projecting, double faced. | |
| May 1, 2007 | Never finaled issued May 2007, no final | 100 Powell St | Sign & Sign Again | space #291 - sign permit - electric, wall, single faced.Details
space #291 - sign permit - electric, wall, single faced. | |
| Aug 4, 2006 | Completed final sign-off Apr 2007 | 100 Powell St | Tidalwave Enterprises | demo-wall, floor tile, remove ceiling tiles, remove some wood trim, new stud & gyp board wall, new ceiling tiles, light fixtures, store fixtures, shelving, paint walls, ceiling, grid, storefront modification (minor), signage modify (e) electrical, panels remain; (e) plumbing fixtures remain,Details
demo-wall, floor tile, remove ceiling tiles, remove some wood trim, new stud & gyp board wall, new ceiling tiles, light fixtures, store fixtures, shelving, paint walls, ceiling, grid, storefront modification (minor), signage modify (e) electrical, panels remain; (e) plumbing fixtures remain, | $150,000 |
| Sep 7, 2005 | Never finaled issued Sep 2005, no final | 102 Powell St | streetspaceDetails
streetspace | ||
| May 16, 2005 | Completed final sign-off Jun 2005 | 104 Powell St | Signs America Inc Dba Sign A Rama | erect a single faced electric wall signDetails
erect a single faced electric wall sign | |
| May 5, 2005 | Never finaled issued May 2005, no final | 102 Powell St | street spaceDetails
street space | ||
| Mar 23, 2005 | Completed final sign-off Jun 2005 | 104 Powell St | Simplex Grinnell | install ceiling horn/strobes, wall horn/store on g/f.Details
install ceiling horn/strobes, wall horn/store on g/f. | $3,500 |
| Feb 25, 2005 | Never finaled issued Feb 2005, no final | 102 Powell St | street space permitDetails
street space permit | ||
| Feb 25, 2005 | Never finaled issued Feb 2005, no final | 100 Powell St | Coll Construction, Inc. | revision to permit 200501102919 for additional inspectionDetails
revision to permit 200501102919 for additional inspection | $8,000 |
| Feb 24, 2005 | Completed final sign-off Jun 2005 | 104 Powell St | demolish extg store front bulkhead sign and hval grilles/install new hvac curtain louverDetails
demolish extg store front bulkhead sign and hval grilles/install new hvac curtain louver | $30,000 | |
| Feb 24, 2005 | Expired or cancelled expired Sep 2005 | 102 Powell St | replace existing floor tile and upgrade electrical and plumbing pipe to 200502145413Details
replace existing floor tile and upgrade electrical and plumbing pipe to 200502145413 | $1,000 | |
| Feb 17, 2005 | Completed final sign-off Jun 2005 | 104 Powell St | Simplex Grinnell | add two pendent sprinkler m, relocate three and re-cuit (e) drop to new ceiling height. replaceDetails
add two pendent sprinkler m, relocate three and re-cuit (e) drop to new ceiling height. replace | $1,220 |
| Feb 14, 2005 | Completed final sign-off Sep 2005 | 102 Powell St | convert extg ice cream store to jewelery store/replace extg entrance door with 3'0x9'0 temp glassDetails
convert extg ice cream store to jewelery store/replace extg entrance door with 3'0x9'0 temp glass | $10,800 | |
| Jan 31, 2005 | Completed final sign-off Jun 2005 | 104 Powell St | demo exist interior finishes and partitions.install new interior finishes and partitions to create..Details
demo exist interior finishes and partitions.install new interior finishes and partitions to create.. | $65,000 | |
| Jan 10, 2005 | Completed final sign-off Mar 2005 | 100 Powell St | Coll Construction, Inc. | to renew for final pa 9608404 & 9515218 onlyDetails
to renew for final pa 9608404 & 9515218 only | |
| Dec 7, 2004 | Completed final sign-off Jan 2005 | 114 Powell St | Bay Fire Protection | fire sprinkler t.i. in exit hallway in basementDetails
fire sprinkler t.i. in exit hallway in basement | $1,000 |
| Oct 1, 2004 | Completed final sign-off Jan 2005 | 114 Powell St | new exit corridor sprinkler under seperate permit for inspector manual pegourousDetails
new exit corridor sprinkler under seperate permit for inspector manual pegourous | $10,000 | |
| Apr 30, 2004 | Completed final sign-off Aug 2004 | 110 Powell St | Metropolitan Electrical Construction | mechanical permit only: connection to fire alarm under separate applicationDetails
mechanical permit only: connection to fire alarm under separate application | $12,000 |
| Apr 19, 2004 | Completed final sign-off Aug 2004 | 100 Powell St | Metropolitan Electrical Construction | renew pa 200205035644 & 200106212056Details
renew pa 200205035644 & 200106212056 | $200 |
| Mar 15, 2004 | Completed final sign-off Mar 2004 | 100 Powell St | California Constrution Co | reroofingDetails
reroofing | $61,500 |
| Feb 20, 2004 | Never finaled issued Feb 2004, no final | 114 Powell St | Simplex Grinnell | add 1 smoke detector, replace & relocate 1 audioable/visual device @ basement electrical closetDetails
add 1 smoke detector, replace & relocate 1 audioable/visual device @ basement electrical closet | $3,200 |
| Oct 22, 2002 | Completed final sign-off Oct 2002 | 110 Powell St | Simplex Grinnell | install ansul fire system in kitche hood.Details
install ansul fire system in kitche hood. | $3,000 |
| Oct 21, 2002 | Completed final sign-off Oct 2002 | 110 Powell St | Cosco Fire Protection Inc. | revision to pa 200210108757Details
revision to pa 200210108757 | $2,500 |
| Oct 11, 2002 | Completed final sign-off Oct 2002 | 110 Powell St | Simplex Grinnell | remodel of tenant space per new occupantDetails
remodel of tenant space per new occupant | $7,000 |
| Oct 10, 2002 | Completed final sign-off Oct 2002 | 110 Powell St | Cosco Fire Protection Inc. | add thrre sprinkler heads @ first fl.Details
add thrre sprinkler heads @ first fl. | $3,500 |
| Sep 30, 2002 | Completed final sign-off Oct 2002 | 110 Powell St | to erect a single-faced electrical signDetails
to erect a single-faced electrical sign | $6,000 | |
| Aug 29, 2002 | Completed final sign-off Oct 2002 | 110 Powell St | Sphinx Inc Dba Pharaoh Construction | revision 200006280240:change in storefront for disabled access,change countertops, furred out wallsDetails
revision 200006280240:change in storefront for disabled access,change countertops, furred out walls | $6,000 |
| Jun 28, 2002 | Completed final sign-off Oct 2002 | 110 Powell St | Sphinx Inc Dba Pharaoh Construction | dining room remodel consistiong new flooring/partial height wall/upgrade restrm to ada requirmntDetails
dining room remodel consistiong new flooring/partial height wall/upgrade restrm to ada requirmnt | $45,000 |
| May 3, 2002 | Expired or cancelled expired Jan 2004 | 114 Powell St | Metropolitan Electrical Construction | revision to 200106212056-installation & operation of antennas and associated equipment cabs for spriDetails
revision to 200106212056-installation & operation of antennas and associated equipment cabs for spri | $20,000 |
| Mar 26, 2002 | Expired or cancelled expired Sep 2002 | 102 Powell St | to erect electric wall signDetails
to erect electric wall sign | ||
| Jul 30, 2001 | Expired or cancelled expired Jul 2002 | 110 Powell St | street spaceDetails
street space | ||
| Jul 6, 2001 | Expired or cancelled cancelled Oct 2002 | 114 Powell St | Simplex Grinnell*** See 802591**** | fire alarm upgrade as-builts, revision to permit 200101059337Details
fire alarm upgrade as-builts, revision to permit 200101059337 | |
| Jun 21, 2001 | Expired or cancelled expired Jan 2004 | 114 Powell St | install and operation of antenna and assoc. equip. on existing flagpoleDetails
install and operation of antenna and assoc. equip. on existing flagpole | $40,000 | |
| Jun 21, 2001 | Expired or cancelled cancelled Oct 2024 | 114 Powell St | install antennas and assoc. equipment cabinet, existing flagpoleDetails
install antennas and assoc. equipment cabinet, existing flagpole | $40,000 | |
| Apr 20, 2001 | Expired or cancelled expired Jan 2004 | 114 Powell St | proposed boiler room fire wall enclosureDetails
proposed boiler room fire wall enclosure | $35,000 | |
| Jan 19, 2001 | Expired or cancelled expired Mar 2002 | 114 Powell St | Simplex Grinnell*** See 802591**** | extend fire sprinkler sys to basement, entire g/fl. connect (e) fire pump to (e) sys. install siesmiDetails
extend fire sprinkler sys to basement, entire g/fl. connect (e) fire pump to (e) sys. install siesmi | $111,000 |
| Jan 5, 2001 | Expired or cancelled expired Jan 2004 | 114 Powell St | Simplex Grinnell*** See 802591**** | fire alarm upgrade for entire buildingDetails
fire alarm upgrade for entire building | $450,000 |
| Sep 1, 2000 | Expired or cancelled expired Mar 2001 | 114 Powell St | remove (e) partition wall and install (n) wall in same location, at basement level for boiler rm encDetails
remove (e) partition wall and install (n) wall in same location, at basement level for boiler rm enc | $8,000 | |
| Apr 20, 2000 | Expired or cancelled withdrawn Apr 2000 | 114 Powell St | revise to appl #9819893 add sprinklr at g/f levl retailDetails
revise to appl #9819893 add sprinklr at g/f levl retail | $2,000 | |
| Mar 27, 2000 | Expired or cancelled expired Jul 2000 | 100 Powell St | sidewalk repairDetails
sidewalk repair | ||
| Feb 22, 2000 | Expired or cancelled expired Aug 2000 | 114 Powell St | sprinkler revision to app #9819893Details
sprinkler revision to app #9819893 | ||
| Feb 14, 2000 | Expired or cancelled expired Sep 2000 | 114 Powell St | Simplex Grinnell*** See 802591**** | renewal of application 9810222Details
renewal of application 9810222 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.