Stephen Scaife
- Listed as
- engineer
- On San Francisco permits
- Jan 2018 to Jan 2025
4 permits since 2000 (engineer on 4 permits): 3 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 23, 2025 | Completed final sign-off Mar 2026 | 2750 19th St | Metcon Ti, Inc | deferred mep for pa # 2024-0829-9734 (ref pa #2017-1215-665 s & 2020-0715-0223) level 01- add (n) plumbing to restrooms, janitor's closet & breakroom, new hvac equipment for space conditioning & ventilation. add lighting & power for new ti space. mezzanine- add lighting & power for (n) ti spaceDetails
deferred mep for pa # 2024-0829-9734 (ref pa #2017-1215-665 s & 2020-0715-0223) level 01- add (n) plumbing to restrooms, janitor's closet & breakroom, new hvac equipment for space conditioning & ventilation. add lighting & power for new ti space. mezzanine- add lighting & power for (n) ti space | $750,000 |
| Sep 16, 2021 | Expired or cancelled withdrawn Nov 2021 | 1023 Mission St | Wci-Gc Inc | revision to pa 2021-0324-7162 for architectura changes including new conference room, break area, basement restrooms. first review of deferred mepDetails
revision to pa 2021-0324-7162 for architectura changes including new conference room, break area, basement restrooms. first review of deferred mep | $245,000 |
| Jul 9, 2019 | Completed final sign-off Oct 2021 | 181 03rd St | Cw Horton General Contractor | demo of (e) spa & convert to guestrooms & small office use. renovation of guestrooms, corridors & elevator lobbies for 4th fl includes non-structural upgrade to interior partitions & fee upgrades.Details
demo of (e) spa & convert to guestrooms & small office use. renovation of guestrooms, corridors & elevator lobbies for 4th fl includes non-structural upgrade to interior partitions & fee upgrades. | $615,132 |
| Jan 22, 2018 | Completed final sign-off Apr 2019 | 241 California St | J & K Project Mgmt Consultants Llc | ti of the (e) space on ground level that includes non-structural partitions, doors, fixtures, finishes, electrical, mechanical, and plumbing. maher naDetails
ti of the (e) space on ground level that includes non-structural partitions, doors, fixtures, finishes, electrical, mechanical, and plumbing. maher na | $700,000 |