Block 0307, lot 001
309 Powell St
- City’s use
- Commercial Hotel
- Built
- 1904
- Stories
- 14
- Units
- 619
- Rooms
- 626 bathrooms
- Building
- 508,714 sq ft
- Lot
- 56,057 sq ft
- Zoning
- C3R
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 6, 2025 | In progress issued Dec 2025 | 335 Powell St | Centric Construction Inc | revision 202301230600- revised electrical alterationsDetails
revision 202301230600- revised electrical alterations | |
| Sep 29, 2025 | Completed final sign-off Apr 2026 | 335 Powell St | Johnson Controls Fire | basement- f/a adds in basement and 4th to add f/a modules and relays for the new generator, leak detection and fsr. add notification devices with nac panel. add smoke detection and duct det for the (n) fsdDetails
basement- f/a adds in basement and 4th to add f/a modules and relays for the new generator, leak detection and fsr. add notification devices with nac panel. add smoke detection and duct det for the (n) fsd | $28,350 |
| Aug 27, 2025 | Completed final sign-off Jun 2026 | 335 Powell St | Rainbow Waterproofing & Restor | reinforcing deteriorated common brick masonry and replacing deteriorated colusa sandstone at northwest corner of buildingDetails
reinforcing deteriorated common brick masonry and replacing deteriorated colusa sandstone at northwest corner of building | $140,000 |
| Aug 25, 2025 | In progress issued Aug 2025 | 335 Powell St | Liberty Fire Systems Inc | basement level-replace (e) main bildling fire pumpDetails
basement level-replace (e) main bildling fire pump | $25,000 |
| Jul 29, 2025 | In progress issued Jul 2025 | 335 Powell St | Pribuss Engineering Inc | modify and add sprinkler head locations to accomodate new fuel pump and electrical room. total: 7 ref 202301230600Details
modify and add sprinkler head locations to accomodate new fuel pump and electrical room. total: 7 ref 202301230600 | $3,850 |
| May 12, 2025 | In progress issued May 2025 | 335 Powell St | Johnson Controls Fire | 12 floor: revision to pa 202411014244 12th fl l- 1 smoke sensor, 3 strobe ceiling, 6 speaker/strobeDetails
12 floor: revision to pa 202411014244 12th fl l- 1 smoke sensor, 3 strobe ceiling, 6 speaker/strobe | $10,000 |
| May 8, 2025 | In progress issued Aug 2025 | 335 Powell St | Centric Construction Inc | adminstrative review for assembly and occuapancy permit number 202306150178. restaurant pdr barDetails
adminstrative review for assembly and occuapancy permit number 202306150178. restaurant pdr bar | |
| Apr 18, 2025 | In progress filed Apr 2025, not yet issued | 335 Powell St | Johnson Controls Fire | to comply with nov#202294105 per updated sequence of operations per inspector's request. (ref#2024-1114-5026)Details
to comply with nov#202294105 per updated sequence of operations per inspector's request. (ref#2024-1114-5026) | $10,000 |
| Mar 25, 2025 | Completed final sign-off Apr 2025 | 331 Powell St | Thomas Swan Sign Co Inc | level 1 & b1: install evacuation mapsDetails
level 1 & b1: install evacuation maps | $2,000 |
| Feb 11, 2025 | In progress issued Feb 2025 | 331 Powell St | Pribuss Engineering Inc | 13/f: fire sprinkler ti on 13th floor - ref gc permit# 202412066325. relocate 9 upright sprinklers for new walls for stockroom.Details
13/f: fire sprinkler ti on 13th floor - ref gc permit# 202412066325. relocate 9 upright sprinklers for new walls for stockroom. | $4,950 |
| Jan 23, 2025 | Completed final sign-off Jan 2025 | 335 Powell St | Pribuss Engineering Inc | fire sprinkler as built revision for 202409170931 per inspector. add 1 new headDetails
fire sprinkler as built revision for 202409170931 per inspector. add 1 new head | $550 |
| Jan 23, 2025 | Completed final sign-off Apr 2025 | 335 Powell St | Pribuss Engineering Inc | 2/fl-fire sprinkler as built revision for 202404190331 per inspector. add 1 new headDetails
2/fl-fire sprinkler as built revision for 202404190331 per inspector. add 1 new head | $550 |
| Jan 23, 2025 | Completed final sign-off Jan 2025 | 331 Powell St | Pribuss Engineering Inc | fire sprinkler as built (permit revision) to 2024-0809-8344 per inspector mooney. document (2) added heads on 1st flDetails
fire sprinkler as built (permit revision) to 2024-0809-8344 per inspector mooney. document (2) added heads on 1st fl | $1,100 |
| Jan 16, 2025 | Completed final sign-off Feb 2025 | 331 Powell St | Johnson Controls Fire | 13/f: fire alarm modification - add 1 nac expander; 1 smoke detector, 1 signal zam; 5 speaker/strobe. ref permit 202410243677Details
13/f: fire alarm modification - add 1 nac expander; 1 smoke detector, 1 signal zam; 5 speaker/strobe. ref permit 202410243677 | $6,500 |
| Dec 12, 2024 | In progress issued Dec 2024 | 335 Powell St | Johnson Controls Fire | level 2- this is an as built for approved fa permit 202408017768- no new additional devices. the only change is to update location of the devicesDetails
level 2- this is an as built for approved fa permit 202408017768- no new additional devices. the only change is to update location of the devices | |
| Dec 6, 2024 | Completed final sign-off Apr 2025 | 331 Powell St | Turner Construction Co | deferred mep for pa#202410243677. replace 1 (e) lightwell window glazing onlyDetails
deferred mep for pa#202410243677. replace 1 (e) lightwell window glazing only | $497,168 |
| Nov 14, 2024 | In progress issued Nov 2024 | 335 Powell St | Johnson Controls Fire | 12th floor meeting rooms. ref pa#202409160809. fire alarm modification. provide new one idnac extender panel, 1 smoke sensor, 1 signal zam, 3 strobes, 6 speaker strobes + remove/relocate/cover as planned.Details
12th floor meeting rooms. ref pa#202409160809. fire alarm modification. provide new one idnac extender panel, 1 smoke sensor, 1 signal zam, 3 strobes, 6 speaker strobes + remove/relocate/cover as planned. | $10,000 |
| Nov 13, 2024 | Completed final sign-off Mar 2025 | 331 Powell St | Turner Construction Co | 13th fl - deferred permit for anchorange of fixed and /or mobile shelving units. ref pa 202410243677Details
13th fl - deferred permit for anchorange of fixed and /or mobile shelving units. ref pa 202410243677 | $50,000 |
| Nov 13, 2024 | Completed final sign-off Dec 2024 | 335 Powell St | Potter Fire Protection | 12/fl-ref 202409160809 relocated (2) fire sprinklersDetails
12/fl-ref 202409160809 relocated (2) fire sprinklers | $1,580 |
| Nov 1, 2024 | In progress issued Nov 2024 | 335 Powell St | Trainor Commercial Construction Inc. | 12th fl- additional lighting to (e) suites for pa #2024-0916-0809. title 24 sheets.Details
12th fl- additional lighting to (e) suites for pa #2024-0916-0809. title 24 sheets. | $30,000 |
| Oct 24, 2024 | Completed final sign-off Apr 2025 | 331 Powell St | Turner Construction Co | tenant improvement project in two areas on the 13th floor to create a rceiving room with storage racks and a remote storage room with a separate office and conference room. new interior partitions, doors, flooring and storage racks, rack attachment deferred submittal.Details
tenant improvement project in two areas on the 13th floor to create a rceiving room with storage racks and a remote storage room with a separate office and conference room. new interior partitions, doors, flooring and storage racks, rack attachment deferred submittal. | $145,500 |
| Oct 22, 2024 | Completed final sign-off Apr 2025 | 335 Powell St | Johnson Controls Fire | carriage level - fire alarm modification. add (1) duct detector, (1) relay, (4) speaker/strobes, (1) strobe. ref permit 202305127657Details
carriage level - fire alarm modification. add (1) duct detector, (1) relay, (4) speaker/strobes, (1) strobe. ref permit 202305127657 | $5,000 |
| Sep 17, 2024 | Completed final sign-off Jan 2025 | 335 Powell St | Pribuss Engineering Inc | gc pa# 202305127657 - modify sprinklers for new speakeasy ti total (19) heads.Details
gc pa# 202305127657 - modify sprinklers for new speakeasy ti total (19) heads. | $16,450 |
| Sep 16, 2024 | In progress issued Oct 2024 | 335 Powell St | Trainor Commercial Construction Inc. | conversion of a hotel suite on 12flr london suite into conference roos and converting an exsiting bathroom into an ada compliant all gender restroom. mep design built.Details
conversion of a hotel suite on 12flr london suite into conference roos and converting an exsiting bathroom into an ada compliant all gender restroom. mep design built. | $194,000 |
| Sep 9, 2024 | Completed final sign-off Apr 2025 | 331 Powell St | revision to pa 202406114197 revise office door 203 configuration. revise electrical room 211 fire ratingDetails
revision to pa 202406114197 revise office door 203 configuration. revise electrical room 211 fire rating | ||
| Aug 22, 2024 | Completed final sign-off Jan 2025 | 331 Powell St | Johnson Controls Fire | level b1 & 1: ref 202406114197 fls modification: 1-nac booster; 1 smoke detectors; 1 signal zam; 3 relays; 7 duct detectors; 20 speaker/strobes.Details
level b1 & 1: ref 202406114197 fls modification: 1-nac booster; 1 smoke detectors; 1 signal zam; 3 relays; 7 duct detectors; 20 speaker/strobes. | $20,000 |
| Aug 15, 2024 | Completed final sign-off May 2025 | 331 Powell St | Turner Construction Co | deferred electrical from pa# 2024-0710-618 includes exterior lighting and controlsDetails
deferred electrical from pa# 2024-0710-618 includes exterior lighting and controls | $19,775 |
| Aug 9, 2024 | Completed final sign-off Jan 2025 | 331 Powell St | Pribuss Engineering Inc | modify sprinklers head locations to accommodate new ceiling and partition layout for existing retail space on basement and 1st fl. ref pa 202406114197Details
modify sprinklers head locations to accommodate new ceiling and partition layout for existing retail space on basement and 1st fl. ref pa 202406114197 | $52,800 |
| Aug 1, 2024 | Completed final sign-off Dec 2024 | 335 Powell St | Johnson Controls Fire | 2/f: revision to pa 2024-0405-9420 add to scope. add 3 smoke detectors, 1 smoke w relay; 1 pam relay; 6 door holdersDetails
2/f: revision to pa 2024-0405-9420 add to scope. add 3 smoke detectors, 1 smoke w relay; 1 pam relay; 6 door holders | $3,500 |
| Jul 10, 2024 | Completed final sign-off Apr 2025 | 331 Powell St | Turner Construction Co | replace (e) exterior entrance doors & side lights, repair adjacent exterior walls & addition of exterior canopy lighting at (e) canopy. provide power door operator at accessible restroom.Details
replace (e) exterior entrance doors & side lights, repair adjacent exterior walls & addition of exterior canopy lighting at (e) canopy. provide power door operator at accessible restroom. | $120,000 |
| Jun 11, 2024 | Completed final sign-off Apr 2025 | 331 Powell St | Turner Construction Co | 1/f: new interior partitions and ceilings. replacement of (e) stair with (e) door opening. repair of (e) accessible lift in place. updated finishes and lighting. new electrical fixtures, outlets and updated electrical panel. new mech units and updated duct/diffusers.Details
1/f: new interior partitions and ceilings. replacement of (e) stair with (e) door opening. repair of (e) accessible lift in place. updated finishes and lighting. new electrical fixtures, outlets and updated electrical panel. new mech units and updated duct/diffusers. | $2,236,032 |
| Jun 5, 2024 | Completed final sign-off May 2025 | 331 Powell St | Thomas Swan Sign Co Inc, Priority Architectural Graphics Dba Prio | erect a "nintendo san francisco" sign - 42" x 42"Details
erect a "nintendo san francisco" sign - 42" x 42" | $4,000 |
| Jun 4, 2024 | Completed final sign-off May 2025 | 331 Powell St | Thomas Swan Sign Co Inc, Priority Architectural Graphics Dba Prio | to erect electrical wall sign. (nintendo)Details
to erect electrical wall sign. (nintendo) | $5,000 |
| Jun 4, 2024 | Completed final sign-off May 2025 | 331 Powell St | Thomas Swan Sign Co Inc, Priority Architectural Graphics Dba Prio | to erect electrical wall sign. (nintendo)Details
to erect electrical wall sign. (nintendo) | $5,000 |
| Jun 4, 2024 | Completed final sign-off Apr 2025 | 331 Powell St | Priority Architectural Graphics Dba Prio | to erect non electric and non-structural sign.Details
to erect non electric and non-structural sign. | $10,000 |
| Apr 19, 2024 | Completed final sign-off Apr 2024 | 335 Powell St | Pribuss Engineering Inc | ref. gc pa#202305057233. modify sprinklers for added vestibule at lobby. 2 total sprinklers 1st floor.Details
ref. gc pa#202305057233. modify sprinklers for added vestibule at lobby. 2 total sprinklers 1st floor. | $1,028 |
| Apr 19, 2024 | Completed final sign-off Jan 2025 | 335 Powell St | Pribuss Engineering Inc | ref. gc1a #202212299387. modify sprinklers for new ceiling & walls for office space on 2nd floor. total 27 sprinklers.Details
ref. gc1a #202212299387. modify sprinklers for new ceiling & walls for office space on 2nd floor. total 27 sprinklers. | $16,200 |
| Apr 16, 2024 | In progress issued Apr 2024 | 335 Powell St | Aaa Restaurant Fire Control/Dba Aaa Fire | repipe and reconfigure (2) existing ansul r-102 fire suppression systems in the restaurant on geary st side of the hotel on the ground floor. ref pa 202307142193Details
repipe and reconfigure (2) existing ansul r-102 fire suppression systems in the restaurant on geary st side of the hotel on the ground floor. ref pa 202307142193 | $19,000 |
| Apr 5, 2024 | Completed final sign-off Dec 2024 | 335 Powell St | Johnson Controls Fire | ref 202212299387- 2nd floor fa modification to add (1) nac expanding, (1) smoke detector, (2) duct detector; (2) control relay; (8) horn/strobesDetails
ref 202212299387- 2nd floor fa modification to add (1) nac expanding, (1) smoke detector, (2) duct detector; (2) control relay; (8) horn/strobes | $13,000 |
| Apr 2, 2024 | Completed final sign-off Jul 2024 | 335 Powell St | Pribuss Engineering Inc | modify sprinkler head locations to accommodate slight raise in ceiling pocket and addition of an accordian door. total sprinkler in project: 12 ref pa 202310108313Details
modify sprinkler head locations to accommodate slight raise in ceiling pocket and addition of an accordian door. total sprinkler in project: 12 ref pa 202310108313 | $6,168 |
| Mar 15, 2024 | Completed final sign-off Apr 2025 | 335 Powell St | Centric Construction Inc | addition of 2 trellisses on level 2 north and south balcones. work on balcones and adj space performed under bpa#202212299387Details
addition of 2 trellisses on level 2 north and south balcones. work on balcones and adj space performed under bpa#202212299387 | $20,000 |
| Feb 2, 2024 | Completed final sign-off Apr 2025 | 331 Powell St | Turner Construction Co | 1/f: removal of interior partitions, lighting, furnishings and finishes subject to ab-017.Details
1/f: removal of interior partitions, lighting, furnishings and finishes subject to ab-017. | $120,000 |
| Dec 8, 2023 | In progress issued Dec 2023 | 335 Powell St | Johnson Controls Fire | 1/f: this is an as built for approved fa #202310138591 - no new device added. changes inludes only to attached the correct seq of operation matrix to the set.Details
1/f: this is an as built for approved fa #202310138591 - no new device added. changes inludes only to attached the correct seq of operation matrix to the set. | |
| Dec 7, 2023 | Completed final sign-off Dec 2023 | 335 Powell St | Pioneer Fire Inc. | relocate 2 pendents, add 1 pendent, gc t.i. 202209152520Details
relocate 2 pendents, add 1 pendent, gc t.i. 202209152520 | $450 |
| Oct 18, 2023 | Completed final sign-off Feb 2024 | 335 Powell St | Marchetti Group | structural support of ceiling, wall & door assembly at hotel entrance. this new enclosure is supported by 2 floor assembly. the main structure of the assembly is made up of hss beams and columns, using ordinary steel moment frame connecting for 2 lateral support of the assembly. ref pa# 202209152520Details
structural support of ceiling, wall & door assembly at hotel entrance. this new enclosure is supported by 2 floor assembly. the main structure of the assembly is made up of hss beams and columns, using ordinary steel moment frame connecting for 2 lateral support of the assembly. ref pa# 202209152520 | $25,000 |
| Oct 13, 2023 | In progress issued Oct 2023 | 335 Powell St | Johnson Controls Fire | ref 202304256403 & 202212218855. fa modification on 1st fllor oak room: add 1 nac expander, 1 smoke detector, 2 duct decectors, 2 dual relays, 5 spks/strobes.Details
ref 202304256403 & 202212218855. fa modification on 1st fllor oak room: add 1 nac expander, 1 smoke detector, 2 duct decectors, 2 dual relays, 5 spks/strobes. | $10,000 |
| Oct 13, 2023 | Completed final sign-off Dec 2023 | 335 Powell St | Potter Fire Protection | as built drawing ref pa 2023-0922-7176Details
as built drawing ref pa 2023-0922-7176 | |
| Oct 10, 2023 | Completed final sign-off Aug 2024 | 335 Powell St | Centric Construction Inc | revision of ceiling and associated lighting configuration to pdr space. this is a permit revision for 202305238377. remove one door from pdr space.Details
revision of ceiling and associated lighting configuration to pdr space. this is a permit revision for 202305238377. remove one door from pdr space. | |
| Oct 4, 2023 | Completed final sign-off Jan 2024 | 335 Powell St | Marchetti Group | installing 2 linear diffusers w/ accociated duct work & flex. (ref pa# 202209152520)Details
installing 2 linear diffusers w/ accociated duct work & flex. (ref pa# 202209152520) | $12,000 |
| Sep 22, 2023 | Never finaled issued Sep 2023, no final | 335 Powell St | Potter Fire Protection | relocate 12, add 3 and plug 8 fire sprinklers. ref 202212218855.Details
relocate 12, add 3 and plug 8 fire sprinklers. ref 202212218855. | $7,800 |
| Jul 14, 2023 | Completed final sign-off Sep 2024 | 335 Powell St | Centric Construction Inc | renovation of (e) level 1.5 mezzanine kitchen. fire alarm and fire sprinkler under sep permit. no change to (e) mech systems. (e) hvac/hood & duct to remain.Details
renovation of (e) level 1.5 mezzanine kitchen. fire alarm and fire sprinkler under sep permit. no change to (e) mech systems. (e) hvac/hood & duct to remain. | $202,500 |
| Jun 15, 2023 | Completed final sign-off Sep 2024 | 335 Powell St | Centric Construction Inc | renovation of (e) restaurant seating area. add new lobby bar + finishes. replace interior storefront at private dining room entry. fire sprinkler + alarm under separate permit. **associated with 2023-001338prv project review meeting with rebecca salgado.Details
renovation of (e) restaurant seating area. add new lobby bar + finishes. replace interior storefront at private dining room entry. fire sprinkler + alarm under separate permit. **associated with 2023-001338prv project review meeting with rebecca salgado. | $527,000 |
| Jun 9, 2023 | Completed final sign-off Oct 2025 | 335 Powell St | Emcor Services/Mesa Energy Systems Inc | replace 3 outdoor air handler units including new connecting ductwork in-kind.Details
replace 3 outdoor air handler units including new connecting ductwork in-kind. | $840,000 |
| May 23, 2023 | Completed final sign-off Sep 2024 | 335 Powell St | Centric Construction Inc | renovation of (e) clock bar space to new pdr lounge located north of historic lobby. f/a & f/s under separate permit. seating area only, no food or drink prepDetails
renovation of (e) clock bar space to new pdr lounge located north of historic lobby. f/a & f/s under separate permit. seating area only, no food or drink prep | $148,850 |
| May 12, 2023 | Completed final sign-off Jun 2025 | 335 Powell St | Centric Construction Inc | proposed renovation of existing retail space along geary blvd. fire sprinkler and fire alarm-deferred submittalDetails
proposed renovation of existing retail space along geary blvd. fire sprinkler and fire alarm-deferred submittal | $225,000 |
| May 5, 2023 | Completed final sign-off Sep 2024 | 335 Powell St | Centric Construction Inc | replace (e) revolving door & swing doors w/vestibule and store front. mep under sep permit fire alarm & sprinkler under sep permitDetails
replace (e) revolving door & swing doors w/vestibule and store front. mep under sep permit fire alarm & sprinkler under sep permit | $40,000 |
| May 1, 2023 | Expired or cancelled cancelled Oct 2024 | 335 Powell St | Centric Construction Inc | lobby level: convert (6) stall women restroom to (9) single occupant all-gender restrooms.Details
lobby level: convert (6) stall women restroom to (9) single occupant all-gender restrooms. | $128,000 |
| Apr 25, 2023 | Completed final sign-off Jan 2024 | 335 Powell St | Trainor Commercial Construction Inc. | mep & food service drawings associted w/pa# 202212218855, fire sprinkler & alarm deferredDetails
mep & food service drawings associted w/pa# 202212218855, fire sprinkler & alarm deferred | $160,000 |
| Apr 21, 2023 | Completed final sign-off Jun 2023 | 335 Powell St | Pioneer Fire Inc. | 31st fl - replace poz lock fire sprinkler with new nfpa approved fire sprinkler system. ref pa 2023-0308-3282Details
31st fl - replace poz lock fire sprinkler with new nfpa approved fire sprinkler system. ref pa 2023-0308-3282 | $16,350 |
| Apr 10, 2023 | Completed final sign-off Jun 2023 | 335 Powell St | Johnson Controls Fire | fire alarm modification on 31st fl. add 1 nac extender, 7 smoke detectos, 5 ceiling strobes, 6 horn strobesDetails
fire alarm modification on 31st fl. add 1 nac extender, 7 smoke detectos, 5 ceiling strobes, 6 horn strobes | $25,000 |
| Mar 8, 2023 | Completed final sign-off Sep 2023 | 335 Powell St | Marchetti Group | demo ceiling & sidewall supply & return grilles. add new ceiling and sidewall supply and return grilles. ref t.i. pa#2022-1221-8859. mech review only.Details
demo ceiling & sidewall supply & return grilles. add new ceiling and sidewall supply and return grilles. ref t.i. pa#2022-1221-8859. mech review only. | $15,000 |
| Mar 8, 2023 | Completed final sign-off Sep 2023 | 335 Powell St | Marchetti Group | 31st fl - revision to pa 2022-1221-8859 conversion of (e) ada tub bathroom to ada roll-in shower bathroom. 8 guestrooms converted to 4 master guestrooms by merging 4 rooms to their adjoining room. batroom in guestroom 3194 reconfigured.Details
31st fl - revision to pa 2022-1221-8859 conversion of (e) ada tub bathroom to ada roll-in shower bathroom. 8 guestrooms converted to 4 master guestrooms by merging 4 rooms to their adjoining room. batroom in guestroom 3194 reconfigured. | $190,000 |
| Jan 23, 2023 | Completed final sign-off Apr 2026 | 335 Powell St | Centric Construction Inc | replacement of existing emergency transformer(generator).relocation from 32nd fl roof to 4th floor roof.installation of new electrical room and fuel pump room at service level.Details
replacement of existing emergency transformer(generator).relocation from 32nd fl roof to 4th floor roof.installation of new electrical room and fuel pump room at service level. | $375,000 |
| Dec 29, 2022 | Completed final sign-off Apr 2025 | 335 Powell St | minor permit to alter application requst to convert 2 roof decks on the 2/f east side of the building facing union square to occupied decks for social events. access will be through (e) windows that will be changed to doors. the adjacent meeting rooms will be reconfigured.Details
minor permit to alter application requst to convert 2 roof decks on the 2/f east side of the building facing union square to occupied decks for social events. access will be through (e) windows that will be changed to doors. the adjacent meeting rooms will be reconfigured. | $345,000 | |
| Dec 21, 2022 | Completed final sign-off Jan 2024 | 335 Powell St | Trainor Commercial Construction Inc. | lobby, level 1 - remodel of oak room and medallion room into private hotel lounge. mep and food service drwgs under separate permits. fire sprinkler and alarm drwgs as deferred submittalDetails
lobby, level 1 - remodel of oak room and medallion room into private hotel lounge. mep and food service drwgs under separate permits. fire sprinkler and alarm drwgs as deferred submittal | $160,000 |
| Dec 21, 2022 | Completed final sign-off Sep 2023 | 335 Powell St | Marchetti Group | renovation of 8 guest rooms on level 31 no change to number of guest rooms, construction including mior demo, plumbing fixtures, new walls and finishes any mep sprinkler and fire alarm shall be done as part of a seperate permit.Details
renovation of 8 guest rooms on level 31 no change to number of guest rooms, construction including mior demo, plumbing fixtures, new walls and finishes any mep sprinkler and fire alarm shall be done as part of a seperate permit. | $160,000 |
| Dec 5, 2022 | Completed final sign-off Dec 2022 | 345 Powell St | Golden Gate Sign Company Inc. | install (6) (d) sets of acrylic fco letter sets on existing canopies.Details
install (6) (d) sets of acrylic fco letter sets on existing canopies. | $4,000 |
| Nov 16, 2022 | Completed final sign-off Nov 2023 | 335 Powell St | The Lawson Roofing Co Inc. | reroofingDetails
reroofing | $1,679,291 |
| Sep 20, 2022 | Completed final sign-off Oct 2022 | 345 Powell St | Liberty Fire Systems Inc | relocate (14) (e) pendent sprinklers. demo (2) (e) pendent sprinklers. ref ti permit app 202207138336Details
relocate (14) (e) pendent sprinklers. demo (2) (e) pendent sprinklers. ref ti permit app 202207138336 | $7,000 |
| Sep 15, 2022 | Completed final sign-off Feb 2024 | 335 Powell St | Marchetti Group | barrier removal to replace non-accessible rotating doors and side doors with two sets of automatic sliding doors (no public right away)Details
barrier removal to replace non-accessible rotating doors and side doors with two sets of automatic sliding doors (no public right away) | |
| Aug 8, 2022 | Completed final sign-off Aug 2022 | 335 Powell St | Pioneer Fire Inc. | remove (17) pendent sprinkler heads and arm overs.Details
remove (17) pendent sprinkler heads and arm overs. | $3,400 |
| Jul 13, 2022 | Completed final sign-off Dec 2022 | 345 Powell St | Hardesty And Associates | g/f: interior remodel of (e) retail shop. interior walls, fixture and finishes to be demolished. new interior non load bearing walls to be installed. new doors and ceiling. new lighting and new fixtures and finishes to be installed.Details
g/f: interior remodel of (e) retail shop. interior walls, fixture and finishes to be demolished. new interior non load bearing walls to be installed. new doors and ceiling. new lighting and new fixtures and finishes to be installed. | $1,000,000 |
| Jun 3, 2022 | Never finaled issued Aug 2022, no final | 335 Powell St | Marchetti Group | demolition in discoveries gift shop. remove fixtures, furnishings, ceiling, walls, casework & supporting structures of those items to reveal eisting structural. ab-007 appliesDetails
demolition in discoveries gift shop. remove fixtures, furnishings, ceiling, walls, casework & supporting structures of those items to reveal eisting structural. ab-007 applies | $8,000 |
| Feb 16, 2021 | Completed final sign-off Mar 2021 | 335 Powell St | Johnson Controls Fire | modify existing fire alarm system (1) heat detector, (1) strobe, (1) speaker strobe ref for ti: 2020-0829-2929Details
modify existing fire alarm system (1) heat detector, (1) strobe, (1) speaker strobe ref for ti: 2020-0829-2929 | $1,500 |
| Jan 22, 2021 | Completed final sign-off Apr 2021 | 335 Powell St | Trainor Commercial Construction Inc. | rev pa 202008292929: food service equip rev to electrical per food service equip, rev to hood assemby details on arch and mech drawings, mnor rev to interior elevations.Details
rev pa 202008292929: food service equip rev to electrical per food service equip, rev to hood assemby details on arch and mech drawings, mnor rev to interior elevations. | |
| Dec 10, 2020 | Completed final sign-off Feb 2021 | 335 Powell St | Johnson Controls Fire | relocate 2 each and add 2 each fire sprinkler heads at the bistro lobby on the first floor because of new walls below. install 1 each sprinkler head for obstruction at duct shaft total of 5 fire sprinkler heads.Details
relocate 2 each and add 2 each fire sprinkler heads at the bistro lobby on the first floor because of new walls below. install 1 each sprinkler head for obstruction at duct shaft total of 5 fire sprinkler heads. | $9,560 |
| Aug 29, 2020 | Completed final sign-off Mar 2021 | 335 Powell St | Trainor Commercial Construction Inc. | demolish (e) lobby bistro bar, portion of boh kitchen, millwork & finishes. renovate (e) lobby bistro bar, new non-rated partitions, seating, millwork, lighting & finishes. electrical modifications for new millwork & kitchen equipment. new type2 hood & ducting. modify plumbing & ada pot & restroomsDetails
demolish (e) lobby bistro bar, portion of boh kitchen, millwork & finishes. renovate (e) lobby bistro bar, new non-rated partitions, seating, millwork, lighting & finishes. electrical modifications for new millwork & kitchen equipment. new type2 hood & ducting. modify plumbing & ada pot & restrooms | $158,000 |
| Feb 28, 2020 | Expired or cancelled cancelled Jan 2026 | 335 Powell St | t.i. to extg 13th floor offices to include demolition and replacement of floor finishes, wall finishes, selected partitons, clg fixtures & light fixtures. installation of new hvac & ada upgrade modifications to extg restrooms incl. new plmg fixtures as noted.Details
t.i. to extg 13th floor offices to include demolition and replacement of floor finishes, wall finishes, selected partitons, clg fixtures & light fixtures. installation of new hvac & ada upgrade modifications to extg restrooms incl. new plmg fixtures as noted. | $132,000 | |
| Jul 30, 2019 | Never finaled issued Jul 2019, no final | 335 Powell St | Walschon Fire Protection Inc | relocate 2 pendents in area of work to accomodate new ceiling; replace with 2 new pendent after heads are relocate; no seismic upgrade in area of workDetails
relocate 2 pendents in area of work to accomodate new ceiling; replace with 2 new pendent after heads are relocate; no seismic upgrade in area of work | $7,066 |
| Jan 14, 2019 | Completed final sign-off Sep 2019 | 335 Powell St | Tom Rectenwald Const. Inc. | t.i. for fed ex office business center. maher n/a.Details
t.i. for fed ex office business center. maher n/a. | $140,000 |
| Jul 5, 2018 | Never finaled issued Jul 2018, no final | 335 Powell St | M C S Construction Services | rev to pa#201806061126; revision to lighting & electrical work in level 32Details
rev to pa#201806061126; revision to lighting & electrical work in level 32 | |
| Jun 6, 2018 | Completed final sign-off Jan 2019 | 335 Powell St | M C S Construction Services | 32nd fl - demolition of a non-load bearing partition, ceiling, detailing and repair. updating of light fixtures. no change to occupant loadDetails
32nd fl - demolition of a non-load bearing partition, ceiling, detailing and repair. updating of light fixtures. no change to occupant load | $64,000 |
| Mar 12, 2018 | Completed final sign-off Mar 2018 | 335 Powell St | R L H Fire Protection Inc | 6/f: fire sprinkler ti 3 added pendent & 3 relocated pendent 6 head total reference app# 201706290680Details
6/f: fire sprinkler ti 3 added pendent & 3 relocated pendent 6 head total reference app# 201706290680 | $9,539 |
| Mar 1, 2018 | Expired or cancelled cancelled Jan 2026 | 335 Powell St | Cw Horton General Contractor | revision to pa #201709259458: change standpipe access to inside shower stall through swing door glass panel in bathroom (type 11), n/a for maherDetails
revision to pa #201709259458: change standpipe access to inside shower stall through swing door glass panel in bathroom (type 11), n/a for maher | |
| Jan 22, 2018 | Completed final sign-off Feb 2018 | 335 Powell St | R L H Fire Protection Inc | 12/fl fire sprinklers: add two heads in remodeled suite #1239. ref. pa #201706290680. maher naDetails
12/fl fire sprinklers: add two heads in remodeled suite #1239. ref. pa #201706290680. maher na | $2,800 |
| Dec 29, 2017 | Completed final sign-off Jan 2018 | 335 Powell St | R L H Fire Protection Inc | f/s 4th fl: move one head in suite 435. ref #201706290680. maher naDetails
f/s 4th fl: move one head in suite 435. ref #201706290680. maher na | $2,800 |
| Nov 6, 2017 | Never finaled issued Nov 2017, no final | 337 Powell St | street spaceDetails
street space | ||
| Oct 20, 2017 | Never finaled issued Nov 2017, no final | 335 Powell St | Cw Horton General Contractor | mep - for general remoedl of guestroom corridor w/replacement of light fixtures. limited remodel of guest room bath rooms. ref arch #201709259458. maher na. floors 3-12 onlyDetails
mep - for general remoedl of guestroom corridor w/replacement of light fixtures. limited remodel of guest room bath rooms. ref arch #201709259458. maher na. floors 3-12 only | |
| Oct 13, 2017 | Never finaled issued Oct 2017, no final | 335 Powell St | Cw Horton General Contractor | revision to pa #201709259458. construction of decorative elements adjacent to stair enclosure floors 3 thru 12. maher naDetails
revision to pa #201709259458. construction of decorative elements adjacent to stair enclosure floors 3 thru 12. maher na | |
| Sep 25, 2017 | Never finaled issued Oct 2017, no final | 335 Powell St | Cw Horton General Contractor | remodel main corridors & guestroom baths. corridor: new portals, chandeliers, signage & wall sconces. guest baths: replace plumbing fixtures in 600 rooms. move walls/fixtures in 102 rooms. no changes to occupancy/hvac/fire life 0n/a maherDetails
remodel main corridors & guestroom baths. corridor: new portals, chandeliers, signage & wall sconces. guest baths: replace plumbing fixtures in 600 rooms. move walls/fixtures in 102 rooms. no changes to occupancy/hvac/fire life 0n/a maher | $3,000,000 |
| Sep 25, 2017 | Never finaled issued Oct 2017, no final | 335 Powell St | Cw Horton General Contractor | remodel 7 accessible guest rooms w/mobility features, accessible bedroom area update to 2016 guidelines, renovate (e) accessible baths with new tub or roll-in shower. work conjunction with future permit for renovate approx. 102 guest rooms. no changes to occupancy/hvac/fire life safety. n/a maherDetails
remodel 7 accessible guest rooms w/mobility features, accessible bedroom area update to 2016 guidelines, renovate (e) accessible baths with new tub or roll-in shower. work conjunction with future permit for renovate approx. 102 guest rooms. no changes to occupancy/hvac/fire life safety. n/a maher | $150,000 |
| Aug 10, 2017 | Never finaled issued Mar 2019, no final | 335 Powell St | demolition of (e) admin offices & stair. demolition of (e) lightwell wall & (e) infill roofto expand (e) lightwell. (n) guestrooms & storage in former admin space. (n) finishes to match (e). install (n) lighting & plumbing fixtures. (n) roof structure @ lightwell & (n) window. (n) mech unit on roofDetails
demolition of (e) admin offices & stair. demolition of (e) lightwell wall & (e) infill roofto expand (e) lightwell. (n) guestrooms & storage in former admin space. (n) finishes to match (e). install (n) lighting & plumbing fixtures. (n) roof structure @ lightwell & (n) window. (n) mech unit on roof | $1,500,000 | |
| Jun 29, 2017 | Never finaled issued Jul 2017, no final | 335 Powell St | Cw Horton General Contractor | renovation of (e) 4 suites on 3rd, 4th, 6th and 12th floors. all areas of work will receive replacement or relocation of (e) plumbing & electrical fixtures, new millwork, new floor, wall, ceiling finishes, minor reconfiguration of interior walls (non-structural). new or replacement doors & frames.Details
renovation of (e) 4 suites on 3rd, 4th, 6th and 12th floors. all areas of work will receive replacement or relocation of (e) plumbing & electrical fixtures, new millwork, new floor, wall, ceiling finishes, minor reconfiguration of interior walls (non-structural). new or replacement doors & frames. | $520,000 |
| May 5, 2017 | Never finaled filed May 2017, never issued | 421 Post St | convert office space to accessory massage (16' by 12'). no physical alteration of space.Details
convert office space to accessory massage (16' by 12'). no physical alteration of space. | ||
| Jan 6, 2017 | Never finaled issued Jan 2017, no final | 335 Powell St | Johnson Controls Fire | basement - carriage level- as built drawings consist of changing ceiling mount peaker/strobe to new wall mount strobe only & ceiling mount speakers. ref pa #201610059630 & #201612094585. n/a maher ordinanceDetails
basement - carriage level- as built drawings consist of changing ceiling mount peaker/strobe to new wall mount strobe only & ceiling mount speakers. ref pa #201610059630 & #201612094585. n/a maher ordinance | |
| Dec 9, 2016 | Never finaled issued Dec 2016, no final | 335 Powell St | Johnson Controls Fire | tenant improvement of carriage level consist of adding 4 speaker/strobes, 1 strobeDetails
tenant improvement of carriage level consist of adding 4 speaker/strobes, 1 strobe | $3,000 |
| Nov 16, 2016 | Completed final sign-off Feb 2017 | 335 Powell St | Potter Fire Protection | basement- relocate (19) and demo (10) fire sprinklers. t.i. pa#201609198079. n/a ordinance #155-13Details
basement- relocate (19) and demo (10) fire sprinklers. t.i. pa#201609198079. n/a ordinance #155-13 | $10,000 |
| Nov 15, 2016 | Never finaled issued Nov 2016, no final | 335 Powell St | Shawmut Woodworking & Supply Inc | review of evacuaton signs. n/a for maher.Details
review of evacuaton signs. n/a for maher. | $5,000 |
| Sep 19, 2016 | Never finaled issued Oct 2016, no final | 335 Powell St | Angotti & Reilly Inc. | basement- demo of existing locker rooms and spa treatment rooms to expand and renovate fitness center. n/a ordinance #155-13Details
basement- demo of existing locker rooms and spa treatment rooms to expand and renovate fitness center. n/a ordinance #155-13 | $395,000 |
| May 12, 2016 | Completed final sign-off Oct 2016 | 335 Powell St | Cw Horton General Contractor | revision to pa#2016-0422-5497, to remodel existing corridor on 11/f change out lights, (n) wall coverings carpet, paint, 2 (n) fire/life safety, seperate permit. n/a ordinance #155-13Details
revision to pa#2016-0422-5497, to remodel existing corridor on 11/f change out lights, (n) wall coverings carpet, paint, 2 (n) fire/life safety, seperate permit. n/a ordinance #155-13 | $15,000 |
| May 5, 2016 | Completed final sign-off Aug 2016 | 335 Powell St | Cw Horton General Contractor | remodel of extg men and women's restroom(32nd floor). new finishes, plumbing fixtures, and accessories to replace extg. no lighting fixts. n/a for maherDetails
remodel of extg men and women's restroom(32nd floor). new finishes, plumbing fixtures, and accessories to replace extg. no lighting fixts. n/a for maher | $45,000 |
| Apr 22, 2016 | Completed final sign-off Oct 2016 | 335 Powell St | Cw Horton General Contractor | 11th floor-main bldg-guestrms #1109 & #1172. build (2) model rooms & baths in (e) guestrms/baths. cosmetic remodel. work includes (2) new showers, plbg fixtures, replacement of selected light fixtures w/new, no hvac, no ext. work. n/a maher ordDetails
11th floor-main bldg-guestrms #1109 & #1172. build (2) model rooms & baths in (e) guestrms/baths. cosmetic remodel. work includes (2) new showers, plbg fixtures, replacement of selected light fixtures w/new, no hvac, no ext. work. n/a maher ord | $45,000 |
| Mar 30, 2016 | Completed final sign-off May 2016 | 335 Powell St | Johnson Controls Fire | service level- fire alarm ti, 2 new monitor modules for fire sprinkler tamper switch at service level. maher naDetails
service level- fire alarm ti, 2 new monitor modules for fire sprinkler tamper switch at service level. maher na | $2,500 |
| Mar 18, 2016 | Never finaled issued Mar 2016, no final | 335 Powell St | street space permitDetails
street space permit | ||
| Feb 29, 2016 | Completed final sign-off Mar 2016 | 335 Powell St | R L H Fire Protection Inc | fire sprinkler tenant improvement cut 4 drops to fit new ceiling height, ref pa 2015-0330-2298. maher naDetails
fire sprinkler tenant improvement cut 4 drops to fit new ceiling height, ref pa 2015-0330-2298. maher na | $1,300 |
| Feb 12, 2016 | Never finaled issued Feb 2016, no final | 335 Powell St | Shawmut Woodworking & Supply Inc | installation of temporary barricade n/a maher ordinanceDetails
installation of temporary barricade n/a maher ordinance | $1,000 |
| Dec 11, 2015 | Never finaled issued Dec 2015, no final | 335 Powell St | street spaceDetails
street space | ||
| Nov 24, 2015 | Completed final sign-off Dec 2015 | 335 Powell St | Johnson Controls Fire | record drawings to final. 201508204856, 201511132545,201511203205Details
record drawings to final. 201508204856, 201511132545,201511203205 | |
| Nov 20, 2015 | Completed final sign-off Dec 2015 | 335 Powell St | Johnson Controls Fire | as built changes consist of re-label devices on mapnet schedule, see sheet fa.602, add (1) detector for supply fan in mezz. level, original pa#201508204856. n/a ordinance #155-13Details
as built changes consist of re-label devices on mapnet schedule, see sheet fa.602, add (1) detector for supply fan in mezz. level, original pa#201508204856. n/a ordinance #155-13 | |
| Nov 13, 2015 | Completed final sign-off Dec 2015 | 335 Powell St | Johnson Controls Fire | submitting revised drawings per inspector mike patt & electrical inspector paul for 2015-0820-4856-adding pull staion. module and smoke detector and elimante 1 device. mechanical plan revision required.Details
submitting revised drawings per inspector mike patt & electrical inspector paul for 2015-0820-4856-adding pull staion. module and smoke detector and elimante 1 device. mechanical plan revision required. | |
| Nov 10, 2015 | Never finaled issued Nov 2015, no final | 335 Powell St | Belaire Enterprises Inc | install 3 awnings to match existing. no signageDetails
install 3 awnings to match existing. no signage | $10,000 |
| Oct 29, 2015 | Completed final sign-off Nov 2015 | 335 Powell St | Shawmut Woodworking & Supply Inc | revision to app#201506249727 and 201503302298 due to field conditions. n/a for maherDetails
revision to app#201506249727 and 201503302298 due to field conditions. n/a for maher | |
| Oct 7, 2015 | Never finaled issued Oct 2015, no final | 335 Powell St | street spaceDetails
street space | ||
| Sep 30, 2015 | Never finaled issued Sep 2015, no final | 335 Powell St | street spaceDetails
street space | ||
| Sep 17, 2015 | Completed final sign-off Dec 2015 | 335 Powell St | Shawmut Woodworking & Supply Inc | 2nd floor - revision to pa 2015-0416-3827. alteration to egress door; (n) ceilings and rated walls in basement. maher na. sprinkler deferred (if required)Details
2nd floor - revision to pa 2015-0416-3827. alteration to egress door; (n) ceilings and rated walls in basement. maher na. sprinkler deferred (if required) | |
| Aug 27, 2015 | Expired or cancelled cancelled Jan 2026 | 335 Powell St | revision to pa 2015 0317 1114: to accomodate field conditions. maher naDetails
revision to pa 2015 0317 1114: to accomodate field conditions. maher na | ||
| Aug 24, 2015 | Never finaled issued Nov 2015, no final | 335 Powell St | Shawmut Woodworking & Supply Inc | erect non-electric, projecting, single-faced, non-illuminated (n) sign. n/a for maher ordinanceDetails
erect non-electric, projecting, single-faced, non-illuminated (n) sign. n/a for maher ordinance | $5,000 |
| Aug 24, 2015 | Never finaled issued Aug 2015, no final | 335 Powell St | R L H Fire Protection Inc | fire sprinkler tenant improvement basement, 1st and 2nd floor 188 heads reference pa 2015-0416-3827. n/a ordinance #155-13Details
fire sprinkler tenant improvement basement, 1st and 2nd floor 188 heads reference pa 2015-0416-3827. n/a ordinance #155-13 | $125,095 |
| Aug 24, 2015 | Never finaled issued Nov 2015, no final | 335 Powell St | Shawmut Woodworking & Supply Inc | erect electric, projecting, single-faced, indirect, (n) sign. n/a for maher ordinance.Details
erect electric, projecting, single-faced, indirect, (n) sign. n/a for maher ordinance. | $5,000 |
| Aug 24, 2015 | Never finaled issued Nov 2015, no final | 335 Powell St | Shawmut Woodworking & Supply Inc | non-structural sign n/a for maher ordinance.Details
non-structural sign n/a for maher ordinance. | $5,000 |
| Aug 20, 2015 | Completed final sign-off Dec 2015 | 335 Powell St | Johnson Controls Fire | fire alarm tenant improvement at service level, carriage level, and mezzanine level for victorias secret tenant space. 1 booster panel, 6 pull boxes, 5 smokes, 1 heat, 20 duct smokes, 3 modules, 10 relays, 6 strobes, 31 speaker/strobes. ref appl 2015-04-16-3827.Details
fire alarm tenant improvement at service level, carriage level, and mezzanine level for victorias secret tenant space. 1 booster panel, 6 pull boxes, 5 smokes, 1 heat, 20 duct smokes, 3 modules, 10 relays, 6 strobes, 31 speaker/strobes. ref appl 2015-04-16-3827. | $50,000 |
| Jul 29, 2015 | Expired or cancelled cancelled Jan 2020 | 335 Powell St | propose to install an indoor das system to be installed in & throughout the hotel with the headend on the 18th fl, demo a non-structural wall, run coax for wireless system.Details
propose to install an indoor das system to be installed in & throughout the hotel with the headend on the 18th fl, demo a non-structural wall, run coax for wireless system. | $110,000 | |
| Jul 29, 2015 | Never finaled issued Aug 2015, no final | 335 Powell St | Cw Horton General Contractor | mezz. below 2/f- cosmetic renovation of (2) meeting rooms, work includes capret, paint & wall coverings. new light fixtures to replace existing, new lighting controls. no exterior work. n/a ordinance #155-13Details
mezz. below 2/f- cosmetic renovation of (2) meeting rooms, work includes capret, paint & wall coverings. new light fixtures to replace existing, new lighting controls. no exterior work. n/a ordinance #155-13 | $350,000 |
| Jul 24, 2015 | Expired or cancelled cancelled Nov 2024 | 335 Powell St | Cw Horton General Contractor | mezz below 2nd & 2nd flr; cosmetic renovation of (5) existing meeting/convention rooms, work includes carpet, paint wall covering & replacement of (e) light fixtures with new light fix & controls;maher n/aDetails
mezz below 2nd & 2nd flr; cosmetic renovation of (5) existing meeting/convention rooms, work includes carpet, paint wall covering & replacement of (e) light fixtures with new light fix & controls;maher n/a | $600,000 |
| Jul 8, 2015 | Expired or cancelled cancelled Jan 2026 | 335 Powell St | cDetails
c | $10,000 | |
| Jul 6, 2015 | Completed final sign-off Jan 2016 | 335 Powell St | Johnson Controls Fire | fire alarm tenant improvement to 3rd floor tower bldg. provide & install 1 new module for supervision of mechanical room refrigerant leak detection system pa 201505287353. n/a for maher.Details
fire alarm tenant improvement to 3rd floor tower bldg. provide & install 1 new module for supervision of mechanical room refrigerant leak detection system pa 201505287353. n/a for maher. | $3,000 |
| Jun 24, 2015 | Completed final sign-off Nov 2015 | 335 Powell St | Shawmut Woodworking & Supply Inc | revision to pa#201503171114, revision to lateral system design. n/a ordinance #155-13Details
revision to pa#201503171114, revision to lateral system design. n/a ordinance #155-13 | |
| Jun 9, 2015 | Completed final sign-off Oct 2015 | 335 Powell St | Walschon Fire Protection Inc | install new flow loop on (e) vertical 500 gpm fire pump. add new bracing to new flow loop in basement. maher n/a.Details
install new flow loop on (e) vertical 500 gpm fire pump. add new bracing to new flow loop in basement. maher n/a. | $24,170 |
| May 28, 2015 | Never finaled issued May 2015, no final | 335 Powell St | Acco Engineered Systems Inc. Dba Acco En | 3/f -replacement of 1 chiller in (e) mechanical room, equipment anchorage, seismic calculations, electrical will be seperate/deferred submission from mechanical. n/a ordinance #155-13Details
3/f -replacement of 1 chiller in (e) mechanical room, equipment anchorage, seismic calculations, electrical will be seperate/deferred submission from mechanical. n/a ordinance #155-13 | $600,000 |
| Apr 16, 2015 | Completed final sign-off Dec 2015 | 335 Powell St | Shawmut Woodworking & Supply Inc | interior t.i. for (n) victoria secret retail work in westin st francis on union square. work includes (n) floors, walls, ceiling, millwork, finishes, mep & structural int fitout work. structural core & shell filed separately. n/a for maher ordinance.Details
interior t.i. for (n) victoria secret retail work in westin st francis on union square. work includes (n) floors, walls, ceiling, millwork, finishes, mep & structural int fitout work. structural core & shell filed separately. n/a for maher ordinance. | $3,019,846 |
| Apr 1, 2015 | Never finaled issued Apr 2015, no final | 335 Powell St | street spaceDetails
street space | ||
| Mar 30, 2015 | Never finaled issued Oct 2015, no final | 335 Powell St | Shawmut Woodworking & Supply Inc | exterior renovation of existing tenant. new store front windows & door in (e) openings. new dome awnings and canopies entry; ** maher: compliance with ordinance no# 155-13 not required **Details
exterior renovation of existing tenant. new store front windows & door in (e) openings. new dome awnings and canopies entry; ** maher: compliance with ordinance no# 155-13 not required ** | $600,000 |
| Mar 17, 2015 | Completed final sign-off Dec 2015 | 335 Powell St | Shawmut Woodworking & Supply Inc | structural demo & core & shell work only. new stairs from basement to 1st floor. new elevator from basement to 2nd floor. new "ground" stairs from 1st floor to 2nd floor. t.i. on separate permit. ** maher: compliance with ordinance no# 155-13 not required **Details
structural demo & core & shell work only. new stairs from basement to 1st floor. new elevator from basement to 2nd floor. new "ground" stairs from 1st floor to 2nd floor. t.i. on separate permit. ** maher: compliance with ordinance no# 155-13 not required ** | $1,019,846 |
| Feb 25, 2015 | Completed final sign-off Nov 2015 | 335 Powell St | Shawmut Woodworking & Supply Inc | interior non-structural demo of basement, first and second floor per plan for ab-017. t.i. under separate permit. maher n/a.Details
interior non-structural demo of basement, first and second floor per plan for ab-017. t.i. under separate permit. maher n/a. | $50,000 |
| Jun 26, 2014 | Expired or cancelled cancelled Jan 2026 | 335 Powell St | Mcclure Electric Inc | 14th floor - provide title 24 for t.i #2013.0807.3755. n/a maher ordinanceDetails
14th floor - provide title 24 for t.i #2013.0807.3755. n/a maher ordinance | $150,000 |
| May 5, 2014 | Completed final sign-off Dec 2014 | 335 Powell St | Marchetti Construction Inc. | rev. to pa#201308073755, eliminate copy room #1402 & enlarge office #1402. change the wall type to non rated walls in office #1402, 1404, 1405 & 1406. electrical, plumbing & fire life safety under seperate permit. n/a ordinance #155-13.Details
rev. to pa#201308073755, eliminate copy room #1402 & enlarge office #1402. change the wall type to non rated walls in office #1402, 1404, 1405 & 1406. electrical, plumbing & fire life safety under seperate permit. n/a ordinance #155-13. | |
| Apr 28, 2014 | Completed final sign-off Jul 2014 | 335 Powell St | R L H Fire Protection Inc | 14th floor-fire sprinkler: relocate 44, add one, and delete 3 pendent sprinklers. t.i. app#201308073755. n/a for the maher ordinance #155-13Details
14th floor-fire sprinkler: relocate 44, add one, and delete 3 pendent sprinklers. t.i. app#201308073755. n/a for the maher ordinance #155-13 | $23,130 |
| Apr 7, 2014 | Never finaled issued May 2014, no final | 335 Powell St | Norge Air Inc/Simonsen Air Condition & H | 14th floor - install new flex duct branches on existing supply air main duct to new suppl yair outlets. ref t.i. #2013.0807.3755. compliance with ordinance #155-13 not requiredDetails
14th floor - install new flex duct branches on existing supply air main duct to new suppl yair outlets. ref t.i. #2013.0807.3755. compliance with ordinance #155-13 not required | $30,000 |
| Apr 4, 2014 | Completed final sign-off Jul 2014 | 335 Powell St | Johnson Controls Fire | fire alarm ti to 14th fl 1 new booser panel, 2 new smoke detectors, 2 new strobes, 23 new speaker strobes, t.i. 2013.0807.3755. compliance with ordinance #155-13 not required.Details
fire alarm ti to 14th fl 1 new booser panel, 2 new smoke detectors, 2 new strobes, 23 new speaker strobes, t.i. 2013.0807.3755. compliance with ordinance #155-13 not required. | $15,000 |
| Dec 27, 2013 | Never finaled issued Dec 2013, no final | 335 Powell St | street spaceDetails
street space | ||
| Oct 29, 2013 | Completed final sign-off Jan 2014 | 335 Powell St | Johnson Controls Fire | fire alarm ti, 2 new strobes, 1 speaker 4th flDetails
fire alarm ti, 2 new strobes, 1 speaker 4th fl | $6,000 |
| Oct 28, 2013 | Completed final sign-off Apr 2014 | 335 Powell St | Cw Horton General Contractor | voluntary barrier removal and widening doors. replacing 5 bathrtubs with 5 roll in showers in extg accessable guest rooms.Details
voluntary barrier removal and widening doors. replacing 5 bathrtubs with 5 roll in showers in extg accessable guest rooms. | $250,000 |
| Oct 18, 2013 | Completed final sign-off Feb 2014 | 335 Powell St | Transbay Fire Protection | voluntary seismic fire sprinkler upgrade-re install braces on basement, 13th, 17th tower. re install hangers to meet code on mezzanine, 10th,13th floors, add 2 6" metraflex between tower & main bldg with 4 way braces upstream & downstream of motraflex.Details
voluntary seismic fire sprinkler upgrade-re install braces on basement, 13th, 17th tower. re install hangers to meet code on mezzanine, 10th,13th floors, add 2 6" metraflex between tower & main bldg with 4 way braces upstream & downstream of motraflex. | $109,916 |
| Aug 7, 2013 | Completed final sign-off Dec 2014 | 335 Powell St | Marchetti Construction Inc. | 1)remodel extg office space(t.i.) on 14th floor. add shower and bath. 2)accessiblity upgrade for extg men/women toilets. 3)mechanical, electrical, plumbing, fire life safty to be under seperate permits.; compliance with ord 155-13 not requiredDetails
1)remodel extg office space(t.i.) on 14th floor. add shower and bath. 2)accessiblity upgrade for extg men/women toilets. 3)mechanical, electrical, plumbing, fire life safty to be under seperate permits.; compliance with ord 155-13 not required | $120,000 |
| Mar 26, 2013 | Never finaled issued Mar 2013, no final | 335 Powell St | street space and sidewalk repairDetails
street space and sidewalk repair | ||
| Feb 20, 2013 | Never finaled issued Oct 2013, no final | 320 Geary St | Howard S. Wright Constructors Lp | to erect electric, wall, single faced sign.Details
to erect electric, wall, single faced sign. | $500 |
| Feb 15, 2013 | Never finaled issued Feb 2013, no final | 335 Powell St | Aaa Flag & Banner Mfg Co Inc | mount 2 banners for "all star game" 10 mounting pts/banner. concrete anchors used or attachment to bldg. temp banners to celebrate mlb world baseball classic to be removed march 20-21, 2013, install set for mar 6-8, 2013Details
mount 2 banners for "all star game" 10 mounting pts/banner. concrete anchors used or attachment to bldg. temp banners to celebrate mlb world baseball classic to be removed march 20-21, 2013, install set for mar 6-8, 2013 | $25,000 |
| Jan 7, 2013 | Never finaled issued Jan 2013, no final | 335 Powell St | Simplexgrinnell Lp. | fire alarm system alteration. add 2 speaker/strobes to basement(service level)Details
fire alarm system alteration. add 2 speaker/strobes to basement(service level) | $2,000 |
| Nov 19, 2012 | Expired or cancelled cancelled Jan 2026 | 320 Geary St | Howard S. Wright Constructors Lp | revision approved pa#2012-0711-4541. lighting changes only.Details
revision approved pa#2012-0711-4541. lighting changes only. | $1,000 |
| Nov 2, 2012 | Never finaled issued Nov 2012, no final | 320 Geary St | Howard S. Wright Constructors Lp | revision to pa# 2012-0711-4541-changes proposed include a new 120 minute rated assembly at the east side of the bar seating area, changes to the light fixture specsDetails
revision to pa# 2012-0711-4541-changes proposed include a new 120 minute rated assembly at the east side of the bar seating area, changes to the light fixture specs | $8,500 |
| Nov 2, 2012 | Completed final sign-off Feb 2013 | 335 Powell St | Marchetti Construction Inc. | to obtain final inspection for work approved under pa#201106087728 all work is complete.Details
to obtain final inspection for work approved under pa#201106087728 all work is complete. | |
| Nov 1, 2012 | Completed final sign-off Mar 2013 | 320 Geary St | Westates Mechanical Corporation Inc | 1st floor:add 22 pendent and 5 upright fire sprinkler head relocate feed main. app#201207114541Details
1st floor:add 22 pendent and 5 upright fire sprinkler head relocate feed main. app#201207114541 | $14,850 |
| Oct 30, 2012 | Never finaled issued Nov 2012, no final | 320 Geary St | Simplexgrinnell Lp. | fire alarm system ti new booster panel, 1 smoke, 2 pulls, 3 duct smoke with relay, 1 relay module,5 strobes, 3 speaker/strobesDetails
fire alarm system ti new booster panel, 1 smoke, 2 pulls, 3 duct smoke with relay, 1 relay module,5 strobes, 3 speaker/strobes | $8,400 |
| Sep 10, 2012 | Completed final sign-off Mar 2013 | 320 Geary St | Howard S. Wright Constructors Lp | facade alteration to install (n) entrance at storefront and (n) louvers to replace (e) per historic code 8-901.5 this work is exempt from energy compliance ti under separate permit.Details
facade alteration to install (n) entrance at storefront and (n) louvers to replace (e) per historic code 8-901.5 this work is exempt from energy compliance ti under separate permit. | $17,500 |
| Sep 7, 2012 | Expired or cancelled cancelled Jan 2026 | 320 Geary St | basement, 1st & 2nd floor interior non-structural demolition permit in advance of tenant improvement permit under separate permit. accessibility will be installed as part of t.i. under ab-017.Details
basement, 1st & 2nd floor interior non-structural demolition permit in advance of tenant improvement permit under separate permit. accessibility will be installed as part of t.i. under ab-017. | $5,500 | |
| Jul 11, 2012 | Completed final sign-off Mar 2013 | 320 Geary St | Howard S. Wright Constructors Lp | the interior remodel of 2 extg adjacent retail shops to create a single tenant space that shall serve as a new wine bar. an opening in an extg demising wall will be made to connect the 2 spaces. an extg 2/f space will be removed. add 2 restrooms. exterior alteration under seperate facade permit.Details
the interior remodel of 2 extg adjacent retail shops to create a single tenant space that shall serve as a new wine bar. an opening in an extg demising wall will be made to connect the 2 spaces. an extg 2/f space will be removed. add 2 restrooms. exterior alteration under seperate facade permit. | $159,709 |
| Apr 25, 2012 | Completed final sign-off May 2012 | 335 Powell St | Simplexgrinnell Lp. | add 2 smokes to existing fire alarm system at service level electrical vaultsDetails
add 2 smokes to existing fire alarm system at service level electrical vaults | $3,000 |
| Jun 8, 2011 | Never finaled issued Jul 2011, no final | 335 Powell St | Marchetti Construction Inc. | remodel to selected portions of (e) hotel fitness center: remove 2 massage rooms/convert that space to weight training; install custom mill work free standing portal & pair glass entry doors; remodel (e) storage area to treatment room - paint, floor, wall covering. fire /life safety udner separateDetails
remodel to selected portions of (e) hotel fitness center: remove 2 massage rooms/convert that space to weight training; install custom mill work free standing portal & pair glass entry doors; remodel (e) storage area to treatment room - paint, floor, wall covering. fire /life safety udner separate | $160,000 |
| Apr 13, 2011 | Expired or cancelled expired Jun 2013 | 345 Powell St | Teutonic Construction Inc | moving & existing non-bearing wall, remove existing purchase of sale station & replace w/new purchase of sales station. reference pa#200510266538Details
moving & existing non-bearing wall, remove existing purchase of sale station & replace w/new purchase of sales station. reference pa#200510266538 | $5,000 |
| Apr 6, 2011 | Completed final sign-off Apr 2012 | 335 Powell St | Metropolis Metal Works | barrier removal project - install new handrails on original 1913 marble stairway at post st hotel entryDetails
barrier removal project - install new handrails on original 1913 marble stairway at post st hotel entry | $41,000 |
| Dec 23, 2010 | Completed final sign-off Oct 2011 | 335 Powell St | Pacific Coast Sales & Service Inc | roof-(e) unit replacement: ahu-10 (air handling unit)Details
roof-(e) unit replacement: ahu-10 (air handling unit) | $280,000 |
| Jun 9, 2010 | Expired or cancelled cancelled Jan 2026 | 331 Powell St | interior non-bearing partition removal of fitting rms. & replacement w/ (n) relocation (e) basement stockrm. entry door; extension of 1st. flr. interior balcony; (n) paint & partial replacement of flooring @ sales area; relocation of 1st. flr. point of sale to balcony extension; elec. minor alteratiDetails
interior non-bearing partition removal of fitting rms. & replacement w/ (n) relocation (e) basement stockrm. entry door; extension of 1st. flr. interior balcony; (n) paint & partial replacement of flooring @ sales area; relocation of 1st. flr. point of sale to balcony extension; elec. minor alterati | $150,000 | |
| Dec 3, 2009 | Never finaled issued Feb 2012, no final | 335 Powell St | Otis Elevator Co | st francis hotel. install (n) elev. controls on all flrs. (n) technology that will provide equivalent facilitation for path of travel not currently defined by ca title 24. provide new hall stations and announcements in place of traditional call fixtures in lobbies and each landing for 15 elevators.Details
st francis hotel. install (n) elev. controls on all flrs. (n) technology that will provide equivalent facilitation for path of travel not currently defined by ca title 24. provide new hall stations and announcements in place of traditional call fixtures in lobbies and each landing for 15 elevators. | $317,855 |
| Nov 12, 2009 | Never finaled issued Nov 2009, no final | 335 Powell St | Cw Horton General Contractor | construct new guest accessible ice machine room of public corridor-31st floor, tower. new 1 hr non structural partitions and 30 min door/closer, wall, ceiling & floor finishes. plumb & elect in connection with relocation of (e) ice machine. fire/life safety and fire sprinkler under seperate permit.Details
construct new guest accessible ice machine room of public corridor-31st floor, tower. new 1 hr non structural partitions and 30 min door/closer, wall, ceiling & floor finishes. plumb & elect in connection with relocation of (e) ice machine. fire/life safety and fire sprinkler under seperate permit. | $10,000 |
| Oct 19, 2009 | Completed final sign-off Apr 2010 | 335 Powell St | Cw Horton General Contractor | st francis hotel. remodel reception lobby and tower elevator lobby. voluntary accessibility upgrade of geray st entry doors located approx. 25 feet from street. wall finishes change. paint clgs, new ltg to replace less than 50% existing at reception lobby. new power operated doors at geary entryDetails
st francis hotel. remodel reception lobby and tower elevator lobby. voluntary accessibility upgrade of geray st entry doors located approx. 25 feet from street. wall finishes change. paint clgs, new ltg to replace less than 50% existing at reception lobby. new power operated doors at geary entry | $200,000 |
| Sep 2, 2009 | Never finaled issued Sep 2009, no final | 335 Powell St | Acco Engineered Systems Inc. Dba Acco En | install and furnish 9 ductless split systems to cool elevator rooms. hvacDetails
install and furnish 9 ductless split systems to cool elevator rooms. hvac | $174,000 |
| Aug 13, 2009 | Expired or cancelled withdrawn Sep 2009 | 335 Powell St | Simplex Grinnell | 6th floor - install (6) existing smoke detectors, (29) new smoke detectors, (2) new wall mounted sprinkler/strobes and (21) new control modules.Details
6th floor - install (6) existing smoke detectors, (29) new smoke detectors, (2) new wall mounted sprinkler/strobes and (21) new control modules. | $10,000 |
| Jun 25, 2009 | Never finaled issued Sep 2009, no final | 335 Powell St | Simplex Grinnell | install 6 smoke detectors, 29 new smoke detectors, addition of 2 new wall mounted speaker/strobes and add 21 new control modules.Details
install 6 smoke detectors, 29 new smoke detectors, addition of 2 new wall mounted speaker/strobes and add 21 new control modules. | $30,000 |
| Jun 22, 2009 | Completed final sign-off Mar 2010 | 335 Powell St | Marchetti Construction Inc. | mechanical work only. clock bar - existing hvac alterations project. install new 5 ton-heat pump hvac unit. new ducted outside air. new ducted return air, add new fire damper at tenant space demising wall. use (e) hotel condenser water piping.Details
mechanical work only. clock bar - existing hvac alterations project. install new 5 ton-heat pump hvac unit. new ducted outside air. new ducted return air, add new fire damper at tenant space demising wall. use (e) hotel condenser water piping. | $60,000 |
| Jun 9, 2009 | Completed final sign-off Nov 2009 | 343 Powell St | J M E Construction Services Inc | minor remodel of (e) retail space. non-structural demolition & construction of partition ceilings, millwork & finishes. mep under separate permit.Details
minor remodel of (e) retail space. non-structural demolition & construction of partition ceilings, millwork & finishes. mep under separate permit. | $25,000 |
| Jan 6, 2009 | Completed final sign-off Apr 2010 | 335 Powell St | barrier removal project, mezzanine mens public toilet, mezzanine woments public toilet, & mens public toilet, borgiarm, make lavs accessible, urinals accessible, w.c. stall in each accessible, new lig, new fl, wall fins. new partitions for stalls. no alt to fire/life safety.Details
barrier removal project, mezzanine mens public toilet, mezzanine woments public toilet, & mens public toilet, borgiarm, make lavs accessible, urinals accessible, w.c. stall in each accessible, new lig, new fl, wall fins. new partitions for stalls. no alt to fire/life safety. | $131,250 | |
| Nov 25, 2008 | Never finaled issued Nov 2008, no final | 335 Powell St | Simplex Grinnell | 14th floor-install 1 smoke detector, 1 strobe, 1 horn/strobe & sync module on 14th floor room 3180 onlyDetails
14th floor-install 1 smoke detector, 1 strobe, 1 horn/strobe & sync module on 14th floor room 3180 only | $5,000 |
| Nov 17, 2008 | Completed final sign-off Jun 2009 | 335 Powell St | Cw Horton General Contractor | cosmetic remodel of 4 (e) public toilet rms.on mezzanine &2nd fl. main bldg. -st.francis hotel.new lav counter tops, faucets,stone flrs, wainscots flrs, (n) fluorescent lights fixt.paint & wall covering.no alts to fire alarm or fire sprinkler system. no hvac or water heater system alteration.Details
cosmetic remodel of 4 (e) public toilet rms.on mezzanine &2nd fl. main bldg. -st.francis hotel.new lav counter tops, faucets,stone flrs, wainscots flrs, (n) fluorescent lights fixt.paint & wall covering.no alts to fire alarm or fire sprinkler system. no hvac or water heater system alteration. | $175,000 |
| Nov 3, 2008 | Completed final sign-off Jan 2009 | 335 Powell St | Marchetti Construction Inc. | remodel 15 (e) accessible guestrm bathrooms in main bldg. 1 & 59 series guestrooms. new grab bars, new vanity counter tops, new stone floors & shower surrounds, new flourscent lights, new faucets, tub & shower valves. (e) hvac, hot water generation no work. fire, life safety no workDetails
remodel 15 (e) accessible guestrm bathrooms in main bldg. 1 & 59 series guestrooms. new grab bars, new vanity counter tops, new stone floors & shower surrounds, new flourscent lights, new faucets, tub & shower valves. (e) hvac, hot water generation no work. fire, life safety no work | $150,000 |
| Sep 5, 2008 | Completed final sign-off Jun 2009 | 335 Powell St | Cw Horton General Contractor | remodel 6 suites-31st flr (tower) except for some major work in (e) h.c accessible guestroom bath (3180), other work is cosmetic in nature, new wall coverings, paint, carpet, light fixtures, stone finishes, counters in bathrooms, etc. no alteration to hvac or hot water systems, fire, life safety sepDetails
remodel 6 suites-31st flr (tower) except for some major work in (e) h.c accessible guestroom bath (3180), other work is cosmetic in nature, new wall coverings, paint, carpet, light fixtures, stone finishes, counters in bathrooms, etc. no alteration to hvac or hot water systems, fire, life safety sep | $900,000 |
| Aug 22, 2008 | Never finaled issued Aug 2008, no final | 335 Powell St | street spaceDetails
street space | ||
| Aug 11, 2008 | Expired or cancelled cancelled Feb 2010 | 301 Powell St | combine 2 ground floor retail tenant spaces into one ground floor bar tenant. add (n) ada restroom. reconfigure (e) 2nd floor of retail space as storage room. replace (e) store front entry with new. change in use m to a2.Details
combine 2 ground floor retail tenant spaces into one ground floor bar tenant. add (n) ada restroom. reconfigure (e) 2nd floor of retail space as storage room. replace (e) store front entry with new. change in use m to a2. | $400,000 | |
| Jun 25, 2008 | Never finaled issued Jun 2008, no final | 301 Powell St | Alart Mechanical Contractors | as-built w/pipe routing change, reference pa #200804109373.Details
as-built w/pipe routing change, reference pa #200804109373. | |
| Jun 24, 2008 | Completed final sign-off Sep 2008 | 301 Powell St | revision to pa# 2008/01/28/3351 for verification of occupant load needed for fire department assembly permit.Details
revision to pa# 2008/01/28/3351 for verification of occupant load needed for fire department assembly permit. | ||
| Jun 17, 2008 | Completed final sign-off Sep 2008 | 335 Powell St | Simplex Grinnell | carriage level-install 3 speakers/strobes to carriage level cloch bar space.Details
carriage level-install 3 speakers/strobes to carriage level cloch bar space. | $5,000 |
| May 27, 2008 | Completed final sign-off Dec 2008 | 301 Powell St | revision to appl #200801283351 - revision to door schedule -fire rated doors not required. all interior work. match door schedule on sheet a9.11 on appv'd 200801283351.Details
revision to appl #200801283351 - revision to door schedule -fire rated doors not required. all interior work. match door schedule on sheet a9.11 on appv'd 200801283351. | ||
| Apr 10, 2008 | Expired or cancelled expired Jan 2011 | 301 Powell St | Alart Mechanical Contractors | remove/replace (e) fire sprinkler with associated piping at new bar/pantry, new heads at 2 branch lines, add 5 seismic brace assemblies at (e) 4" main.Details
remove/replace (e) fire sprinkler with associated piping at new bar/pantry, new heads at 2 branch lines, add 5 seismic brace assemblies at (e) 4" main. | $4,400 |
| Jan 28, 2008 | Completed final sign-off Apr 2010 | 301 Powell St | ti for lobby area on the ground floor. new drywall partitions and ceilings, doors, cabinetry and finishes for hotel bar. electrical, hvac & plumbing, sprinkler & life/safety seperate permit.Details
ti for lobby area on the ground floor. new drywall partitions and ceilings, doors, cabinetry and finishes for hotel bar. electrical, hvac & plumbing, sprinkler & life/safety seperate permit. | $633,000 | |
| Jan 7, 2008 | Never finaled issued Jan 2008, no final | 335 Powell St | Sign Productions Inc.(Grant Sign Co) | sign face replacement onlyDetails
sign face replacement only | |
| Dec 21, 2007 | Never finaled issued Dec 2007, no final | 301 Powell St | lobby - 1st floor existing retail space adjacent to lobby: non structural interior demolition of drywall partitions and finishes, work will be performed in accordance with sfbc ab-17.Details
lobby - 1st floor existing retail space adjacent to lobby: non structural interior demolition of drywall partitions and finishes, work will be performed in accordance with sfbc ab-17. | $20,000 | |
| Oct 17, 2007 | Expired or cancelled cancelled Jan 2026 | 335 Powell St | replacing the face of a sign.Details
replacing the face of a sign. | ||
| Oct 17, 2007 | Expired or cancelled cancelled Jan 2026 | 335 Powell St | installation of awning above existing signDetails
installation of awning above existing sign | ||
| Jun 20, 2007 | Never finaled issued Jun 2007, no final | 335 Powell St | single faced non electric temporary bannerDetails
single faced non electric temporary banner | ||
| Sep 7, 2006 | Completed final sign-off Feb 2007 | 335 Powell St | Marchetti Construction Inc. | no wk involving existing ada guestrooms.remodel 2 existing guestroom suites,cosmetic only.no alter to bldg structure,hvac or fire/life safety.scope of wk incl faucets/shower controls chg out/bathroom light fixture chg. wall coverings,flr materals,paint,trim,redo marble.no street space use.Details
no wk involving existing ada guestrooms.remodel 2 existing guestroom suites,cosmetic only.no alter to bldg structure,hvac or fire/life safety.scope of wk incl faucets/shower controls chg out/bathroom light fixture chg. wall coverings,flr materals,paint,trim,redo marble.no street space use. | $465,000 |
| Aug 29, 2006 | Completed final sign-off Aug 2006 | 335 Powell St | Simplex Grinnell | add 1 strobe to the bathroom. relocate 1 smoke detector at ground floorDetails
add 1 strobe to the bathroom. relocate 1 smoke detector at ground floor | $1,580 |
| Aug 18, 2006 | Completed final sign-off Feb 2007 | 335 Powell St | Marchetti Construction Inc. | remodel (cosmetic only), (9) selected guestrm bathrms on 3rd, 11th and 12th floors. shower valve & sink faucet change out, new vanity cab, new marble floor tile & shower surround, new flourescent light fixtures, new mirror & toilet accessories, new paint, wall paper, reverse some (e) door swings.Details
remodel (cosmetic only), (9) selected guestrm bathrms on 3rd, 11th and 12th floors. shower valve & sink faucet change out, new vanity cab, new marble floor tile & shower surround, new flourescent light fixtures, new mirror & toilet accessories, new paint, wall paper, reverse some (e) door swings. | $99,000 |
| Jul 21, 2006 | Completed final sign-off Aug 2006 | 335 Powell St | Rcm Fire Protection Inc. | relocate 2 heads, install 1 new headDetails
relocate 2 heads, install 1 new head | $3,000 |
| Jul 18, 2006 | Completed final sign-off Aug 2006 | 335 Powell St | revision to apprvd pa#200606123788. work is to revise location of bathroom fixtures. relocate fiting room. revise fixtures @ cash-wrap area.Details
revision to apprvd pa#200606123788. work is to revise location of bathroom fixtures. relocate fiting room. revise fixtures @ cash-wrap area. | $5,000 | |
| Jun 27, 2006 | Completed final sign-off Jun 2006 | 335 Powell St | Marchetti Construction Inc. | this application to renew the following expired appl#3:2003112133238-selective demolition, 2004060287420-aaa fire protection, 200406287422 aaa fire protection=restaurat michaelmina, st francisco otel final by bldg insp.Details
this application to renew the following expired appl#3:2003112133238-selective demolition, 2004060287420-aaa fire protection, 200406287422 aaa fire protection=restaurat michaelmina, st francisco otel final by bldg insp. | |
| Jun 27, 2006 | Completed final sign-off Jun 2006 | 335 Powell St | Marchetti Construction Inc. | this application to renew the following expired appli#3:200404141301 fire sprinkler, 200404262213-simplex fire alarm, 200507147652 sivios heg supplemental-restaurant michael mina st. francs hotel, final by blds. insp.Details
this application to renew the following expired appli#3:200404141301 fire sprinkler, 200404262213-simplex fire alarm, 200507147652 sivios heg supplemental-restaurant michael mina st. francs hotel, final by blds. insp. | |
| Jun 12, 2006 | Completed final sign-off Aug 2006 | 335 Powell St | t.i. for new retail store in lobby of st. francis hotel. work includes new partitions, fixtures, finishes new bathroom, with plumbing & lighting. otherwise no change to mech or lighting. no exterior work, signage under separate permit. fire protection under separate permit.Details
t.i. for new retail store in lobby of st. francis hotel. work includes new partitions, fixtures, finishes new bathroom, with plumbing & lighting. otherwise no change to mech or lighting. no exterior work, signage under separate permit. fire protection under separate permit. | $250,000 | |
| May 3, 2006 | Completed final sign-off Nov 2006 | 335 Powell St | Marchetti Construction Inc. | remodel 25 selected guestroom bathrooms on 3rd fl, main bldg. shower valve & sink faucet change-out,new vanity new marble floor tile and shower surround new vanity light fixture,new mirror,toilet accessories,new paint, vinyl walll covering,reverse some (e) door swings.Details
remodel 25 selected guestroom bathrooms on 3rd fl, main bldg. shower valve & sink faucet change-out,new vanity new marble floor tile and shower surround new vanity light fixture,new mirror,toilet accessories,new paint, vinyl walll covering,reverse some (e) door swings. | $275,000 |
| Mar 17, 2006 | Never finaled issued Mar 2006, no final | 335 Powell St | Simplex Grinnell | installation of (2) ansul fire systems. one in the employee kitchen on the g/f, and one on the main kitchen on the 2nd floorDetails
installation of (2) ansul fire systems. one in the employee kitchen on the g/f, and one on the main kitchen on the 2nd floor | $6,000 |
| Nov 29, 2005 | Completed final sign-off Mar 2006 | 335 Powell St | Simplex Grinnell | addition devices for t.i: (1) smoke detector, (1) duct detector, (1) pull station, (2) speaker /strobes, (2) strobes.Details
addition devices for t.i: (1) smoke detector, (1) duct detector, (1) pull station, (2) speaker /strobes, (2) strobes. | $8,000 |
| Nov 14, 2005 | Completed final sign-off Mar 2006 | 345 Powell St | Ayoob & Peery Plumbing Co Inc | 1st floor - fire sprinkler 17 relocated sprinkler head.Details
1st floor - fire sprinkler 17 relocated sprinkler head. | $2,200 |