Jacob Obrien
- License
- M39197
- Mechanical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up M39197 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- May 2023 to Sep 2025
6 permits since 2000 (engineer on 6 permits): 4 completed, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Centric Construction Inc (3), Gray West Construction Inc, Hathaway Dinwiddie Co.
- Architects
- Michael Stanton (3), Jeff Degen (2)
- Engineers
- James Ybarra (5), Bradley Young, Mark Steinke, Steven Lew
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 6
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 8, 2025 | Completed final sign-off Nov 2026 | 2675 San Bruno Av | Gray West Construction Inc | interior demo of an (e) bmo bank- interior upgrade to path of travel. serving the area of operation.Details
interior demo of an (e) bmo bank- interior upgrade to path of travel. serving the area of operation. | $750,000 |
| Jun 15, 2023 | Completed final sign-off Sep 2024 | 335 Powell St | Centric Construction Inc | renovation of (e) restaurant seating area. add new lobby bar + finishes. replace interior storefront at private dining room entry. fire sprinkler + alarm under separate permit. **associated with 2023-001338prv project review meeting with rebecca salgado.Details
renovation of (e) restaurant seating area. add new lobby bar + finishes. replace interior storefront at private dining room entry. fire sprinkler + alarm under separate permit. **associated with 2023-001338prv project review meeting with rebecca salgado. | $527,000 |
| Jun 1, 2023 | Never finaled filed Jun 2023, never issued | 55 Cyril Magnin St | 30/f, 31f & 32/f: add (15)guestrooms to (e) hotels by establishing new rooms. alterations to guestroom level corridors and elevator lobbies. remove/replace interior finishes/furnishings. total guestroom count after construction will be (1039)Details
30/f, 31f & 32/f: add (15)guestrooms to (e) hotels by establishing new rooms. alterations to guestroom level corridors and elevator lobbies. remove/replace interior finishes/furnishings. total guestroom count after construction will be (1039) | $30,000,000 | |
| May 30, 2023 | Completed final sign-off Sep 2024 | 55 Cyril Magnin St | Hathaway Dinwiddie Co. | 18 & 19/f guestrooms 1872 & 1972: removal and replacement of interior finishes and furnishings.Details
18 & 19/f guestrooms 1872 & 1972: removal and replacement of interior finishes and furnishings. | $60,000 |
| May 23, 2023 | Completed final sign-off Sep 2024 | 335 Powell St | Centric Construction Inc | renovation of (e) clock bar space to new pdr lounge located north of historic lobby. f/a & f/s under separate permit. seating area only, no food or drink prepDetails
renovation of (e) clock bar space to new pdr lounge located north of historic lobby. f/a & f/s under separate permit. seating area only, no food or drink prep | $148,850 |
| May 1, 2023 | Expired or cancelled cancelled Oct 2024 | 335 Powell St | Centric Construction Inc | lobby level: convert (6) stall women restroom to (9) single occupant all-gender restrooms.Details
lobby level: convert (6) stall women restroom to (9) single occupant all-gender restrooms. | $128,000 |