Block 0330, lot 026
55 Cyril Magnin St
- City’s use
- Commercial Hotel
- Built
- 1983
- Stories
- 32
- Units
- 1010
- Building
- 696,431 sq ft
- Lot
- 42,077 sq ft
- Zoning
- C3G
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
94 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 15, 2026 | In progress issued Jul 2026 | 55 Cyril Magnin St | Singular Builders | 22nd floor: remodel of 2 existing hotel guestrooms( rooms 2213 & 2215). remodel of 2 existing guestroom bathrooms only(rooms 2214 & 2218)Details
22nd floor: remodel of 2 existing hotel guestrooms( rooms 2213 & 2215). remodel of 2 existing guestroom bathrooms only(rooms 2214 & 2218) | $90,000 |
| Jan 29, 2026 | Completed final sign-off May 2026 | 55 Cyril Magnin St | Sabah International Incorporated | provide a modification of e) fire alarm system to monitor & control new fsds in fuel pump room on upper level parking. ref to 202507019872Details
provide a modification of e) fire alarm system to monitor & control new fsds in fuel pump room on upper level parking. ref to 202507019872 | $16,000 |
| Dec 30, 2025 | In progress issued Jan 2026 | 55 Cyril Magnin St | Cisco Fire Sprinklers, Inc. | install proper fire protection spacing for new aboveground fuel oil storage tank room. building ref# 2025-0701-9872, existing sprinkler ref# 2015-0925-8113Details
install proper fire protection spacing for new aboveground fuel oil storage tank room. building ref# 2025-0701-9872, existing sprinkler ref# 2015-0925-8113 | $22,929 |
| Aug 8, 2025 | Completed final sign-off Jun 2026 | 55 Cyril Magnin St | Fuel Oil System | replace existing underground storage tank (ust) & associated fuel pipes with new 1200 gl aboveground storage tank in the lower parking level/basement of the 55 cyril mangin bldg. install new remote fill on south, eddy st, side of bldg, inside property line. new fuel oil supply line to enterDetails
replace existing underground storage tank (ust) & associated fuel pipes with new 1200 gl aboveground storage tank in the lower parking level/basement of the 55 cyril mangin bldg. install new remote fill on south, eddy st, side of bldg, inside property line. new fuel oil supply line to enter | $175,000 |
| Aug 1, 2024 | Completed final sign-off Aug 2024 | 55 Cyril Magnin St | Hathaway Dinwiddie Co. | revision to pa#202112224938. unforseen conditions during construction. basement wall discovered to be higher than expected. stone on top of site stairs at cyril magnin and ellis street. to be removed and replaced with concrete stairs.Details
revision to pa#202112224938. unforseen conditions during construction. basement wall discovered to be higher than expected. stone on top of site stairs at cyril magnin and ellis street. to be removed and replaced with concrete stairs. | |
| Jul 16, 2024 | Completed final sign-off Sep 2024 | 55 Cyril Magnin St | Sabah International Incorporated | 18th & 19th fl - provide a modification of the existing fire alarm system for in-room smoke/co for ada rooms. no ref pa #Details
18th & 19th fl - provide a modification of the existing fire alarm system for in-room smoke/co for ada rooms. no ref pa # | $10,000 |
| Jul 12, 2024 | Completed final sign-off Aug 2024 | 55 Cyril Magnin St | R L H Fire Protection Inc | fire sprinkler permit - demo 2 sprinklers for closet removal in rooms 1872 & 1972 ref pa 202305308808Details
fire sprinkler permit - demo 2 sprinklers for closet removal in rooms 1872 & 1972 ref pa 202305308808 | $1,000 |
| Apr 23, 2024 | In progress issued Apr 2024 | 55 Cyril Magnin St | Sabah International Incorporated | provide n) att telguard unit to be tied to e) fire alarm control unit (nobe 01) add a n) single input module for the cellular alarmDetails
provide n) att telguard unit to be tied to e) fire alarm control unit (nobe 01) add a n) single input module for the cellular alarm | $14,273 |
| Jun 1, 2023 | Never finaled filed Jun 2023, never issued | 55 Cyril Magnin St | 30/f, 31f & 32/f: add (15)guestrooms to (e) hotels by establishing new rooms. alterations to guestroom level corridors and elevator lobbies. remove/replace interior finishes/furnishings. total guestroom count after construction will be (1039)Details
30/f, 31f & 32/f: add (15)guestrooms to (e) hotels by establishing new rooms. alterations to guestroom level corridors and elevator lobbies. remove/replace interior finishes/furnishings. total guestroom count after construction will be (1039) | $30,000,000 | |
| May 30, 2023 | Completed final sign-off Sep 2024 | 55 Cyril Magnin St | Hathaway Dinwiddie Co. | 18 & 19/f guestrooms 1872 & 1972: removal and replacement of interior finishes and furnishings.Details
18 & 19/f guestrooms 1872 & 1972: removal and replacement of interior finishes and furnishings. | $60,000 |
| Dec 22, 2021 | Completed final sign-off Aug 2024 | 55 Cyril Magnin St | Hathaway Dinwiddie Co. | barrier removal related to the accessible business entrance program, cat ii. inclusive of work at the accessible van parking (porte-cochere), regrading at cyril magnin sidewalk & (e) accessible platform lift.Details
barrier removal related to the accessible business entrance program, cat ii. inclusive of work at the accessible van parking (porte-cochere), regrading at cyril magnin sidewalk & (e) accessible platform lift. | $600,000 |
| Mar 9, 2020 | Never finaled issued Mar 2020, no final | 55 Cyril Magnin St | street spaceDetails
street space | ||
| Feb 21, 2020 | Never finaled issued Feb 2020, no final | 55 Cyril Magnin St | street spaceDetails
street space | ||
| Feb 12, 2020 | Never finaled issued Feb 2020, no final | 55 Cyril Magnin St | street spaceDetails
street space | ||
| Jan 23, 2020 | Never finaled issued Jan 2020, no final | 55 Cyril Magnin St | street spaceDetails
street space | ||
| Jan 13, 2020 | Never finaled issued Jan 2020, no final | 55 Cyril Magnin St | Rainbow Waterproofing & Restor | streer spaceDetails
streer space | |
| Oct 4, 2019 | Completed final sign-off Feb 2020 | 55 Cyril Magnin St | Hathaway Dinwiddie Co. | floor 21 - guestrooms 2115 & 2173: removal and replacement of interior finishes & furnishings for model rooms.Details
floor 21 - guestrooms 2115 & 2173: removal and replacement of interior finishes & furnishings for model rooms. | $168,000 |
| Sep 18, 2019 | Never finaled issued Sep 2019, no final | 55 Cyril Magnin St | street spaceDetails
street space | ||
| Aug 19, 2019 | Never finaled issued Aug 2019, no final | 55 Cyril Magnin St | street spaceDetails
street space | ||
| Jul 18, 2019 | Never finaled issued Jul 2019, no final | 55 Cyril Magnin St | street spaceDetails
street space | ||
| Oct 18, 2017 | Never finaled issued Oct 2017, no final | 55 Cyril Magnin St | street space permitDetails
street space permit | ||
| May 17, 2017 | Completed final sign-off Jan 2018 | 55 Cyril Magnin St | Courtney Inc | reroofingDetails
reroofing | $950,000 |
| Oct 14, 2015 | Never finaled issued Jul 2022, no final | 55 Cyril Magnin St | Lakeview Construction/Wisconsin Lakeview | revision to app#2013-09-10-6438. remodle office, packaging room and gen store room discription of work on plans. n/a for maher ordinance no. 155-13.Details
revision to app#2013-09-10-6438. remodle office, packaging room and gen store room discription of work on plans. n/a for maher ordinance no. 155-13. | |
| Oct 5, 2015 | Expired or cancelled cancelled Aug 2023 | 55 Cyril Magnin St | R L H Fire Protection Inc | 2nd flr: revision for non-rated glass door 201309106438; maher n/aDetails
2nd flr: revision for non-rated glass door 201309106438; maher n/a | |
| Sep 25, 2015 | Completed final sign-off Apr 2025 | 55 Cyril Magnin St | R L H Fire Protection Inc | 2nd floor: add 1 sprinkler. ref app#201309106438. n/a for maherDetails
2nd floor: add 1 sprinkler. ref app#201309106438. n/a for maher | $600 |
| Jul 6, 2015 | Never finaled issued Jul 2015, no final | 55 Cyril Magnin St | Viking Sign Installations | structural revision attachment of sign to bldg permit #201506108590. n/a for maherDetails
structural revision attachment of sign to bldg permit #201506108590. n/a for maher | $1,000 |
| Jun 11, 2015 | Never finaled issued Jun 2015, no final | 55 Cyril Magnin St | Viking Sign Installations | erect an electric single faced wall sign (facing 5th street north).Details
erect an electric single faced wall sign (facing 5th street north). | $5,000 |
| Jun 10, 2015 | Never finaled issued Jun 2015, no final | 55 Cyril Magnin St | Viking Sign Installations | erect two non-electric exterior signs (parc 55); maher n/aDetails
erect two non-electric exterior signs (parc 55); maher n/a | $5,000 |
| Jun 10, 2015 | Never finaled issued Jun 2015, no final | 55 Cyril Magnin St | Viking Sign Installations | 2 illuminated signs, n/a ordinance #155-13Details
2 illuminated signs, n/a ordinance #155-13 | $10,000 |
| Apr 20, 2015 | Completed final sign-off Apr 2015 | 55 Cyril Magnin St | R L H Fire Protection Inc | 2nd flr: fire sprinkler ti - relocate 4 sprinklers ref 2015 0123 6521 maher not req'dDetails
2nd flr: fire sprinkler ti - relocate 4 sprinklers ref 2015 0123 6521 maher not req'd | $3,645 |
| Feb 12, 2015 | Never finaled issued Mar 2015, no final | 55 Cyril Magnin St | Balla Construction | remodel old lobby to work stations office and add new kitchenette on ground floor. n/a for the maher. (hotel/office remodel former lobby with office cubicles - work on ground floor of 33 story building)Details
remodel old lobby to work stations office and add new kitchenette on ground floor. n/a for the maher. (hotel/office remodel former lobby with office cubicles - work on ground floor of 33 story building) | $100,000 |
| Jan 23, 2015 | Never finaled issued Apr 2015, no final | 55 Cyril Magnin St | Prime Builders | project is the limited scope of an (e) single level tenant space "travel traders" new work is to include but not to be limited to the wall finishes, flooring, fixtures, lighting & equipment. n/a maher ordinanceDetails
project is the limited scope of an (e) single level tenant space "travel traders" new work is to include but not to be limited to the wall finishes, flooring, fixtures, lighting & equipment. n/a maher ordinance | $85,000 |
| Dec 18, 2014 | Completed final sign-off Feb 2015 | 55 Cyril Magnin St | Vt Construction | first floor sandwich/coffee shop interior renovation. n/a for maher.Details
first floor sandwich/coffee shop interior renovation. n/a for maher. | $35,000 |
| Sep 10, 2014 | Completed final sign-off Feb 2017 | 55 Cyril Magnin St | R L H Fire Protection Inc | fire sprinkler elevator modernization remove sprinklers in hoistway and machine room per sffd approval letter 9/3/14, add heads in freight elevator shaft and machine roomDetails
fire sprinkler elevator modernization remove sprinklers in hoistway and machine room per sffd approval letter 9/3/14, add heads in freight elevator shaft and machine room | $6,154 |
| Jul 25, 2014 | Completed final sign-off Aug 2014 | 55 Cyril Magnin St | International Waterproofing | reroofingDetails
reroofing | $30,000 |
| Jul 2, 2014 | Completed final sign-off Aug 2014 | 55 Cyril Magnin St | Sneed & Co Construction Inc. | erect signDetails
erect sign | $20,000 |
| Feb 3, 2014 | Completed final sign-off Feb 2014 | 55 Cyril Magnin St | Aura Fire Safety Inc | upgrade fire system for hood & duct. compliance with ordinance #155-13 not required.Details
upgrade fire system for hood & duct. compliance with ordinance #155-13 not required. | $2,500 |
| Jan 10, 2014 | Completed final sign-off Mar 2014 | 55 Cyril Magnin St | Johnson Controls Fire | 5th & 31st floor- change std response sprinklers to quick response sprinklers in room 562,564,566,568,570,3157,3155,3153 per inspector, "as built". sprinkler pa #2013.1220.4722 & room converson #2013.0411.4273. compliance with ordinance #155-13 not required. excavcation <50 cu.yd.Details
5th & 31st floor- change std response sprinklers to quick response sprinklers in room 562,564,566,568,570,3157,3155,3153 per inspector, "as built". sprinkler pa #2013.1220.4722 & room converson #2013.0411.4273. compliance with ordinance #155-13 not required. excavcation <50 cu.yd. | |
| Jan 10, 2014 | Completed final sign-off Jan 2014 | 55 Cyril Magnin St | Johnson Controls Fire | 2nd floor "chez pim restaurant" add & relocate 3 each fire sprinkler to accomodate new ceiling plan per tenant drawing. ref pa #2013.0920.7399. compliance with ordinance #155-13 not required. excavation <50 cu. yd.Details
2nd floor "chez pim restaurant" add & relocate 3 each fire sprinkler to accomodate new ceiling plan per tenant drawing. ref pa #2013.0920.7399. compliance with ordinance #155-13 not required. excavation <50 cu. yd. | $2,800 |
| Dec 20, 2013 | Completed final sign-off Mar 2014 | 55 Cyril Magnin St | Johnson Controls Fire | add and relocate fire sprinklers on 5th and 31st fl with new quick response fire sprinklers in new hotel rooms on 5th fl rooms 3157,3155,3153 and 31st fl rooms 562,564,566,568 and 570. total 13 each sprinklers. referenced ti 201304114273Details
add and relocate fire sprinklers on 5th and 31st fl with new quick response fire sprinklers in new hotel rooms on 5th fl rooms 3157,3155,3153 and 31st fl rooms 562,564,566,568 and 570. total 13 each sprinklers. referenced ti 201304114273 | $5,805 |
| Dec 13, 2013 | Completed final sign-off Feb 2014 | 55 Cyril Magnin St | Newland Interiors | 2nd fl. revision to pa#2013-0920-7399. change model of dishwasher. add type ii hood over dishwasher. add new partition wall for (n) office for restaurant.Details
2nd fl. revision to pa#2013-0920-7399. change model of dishwasher. add type ii hood over dishwasher. add new partition wall for (n) office for restaurant. | $4,500 |
| Dec 4, 2013 | Completed final sign-off Dec 2013 | 55 Cyril Magnin St | Sneed & Co Construction Inc. | to erect electrical signDetails
to erect electrical sign | $8,114 |
| Dec 3, 2013 | Never finaled issued Dec 2013, no final | 55 Cyril Magnin St | to obtain final inspection for work approved under pa 201106097784; all work is completeDetails
to obtain final inspection for work approved under pa 201106097784; all work is complete | ||
| Oct 31, 2013 | Completed final sign-off Mar 2025 | 55 Cyril Magnin St | Sabah International Incorporated | 5th & 31st fl. provide a modification of existing fire alarm system on 5th & 31st fl. add 1 new remote pwr supple. 1 new smk det. 7 new ceiling speakers, 2 new strobes, 2 new ceiling speaker/strobes.Details
5th & 31st fl. provide a modification of existing fire alarm system on 5th & 31st fl. add 1 new remote pwr supple. 1 new smk det. 7 new ceiling speakers, 2 new strobes, 2 new ceiling speaker/strobes. | $20,375 |
| Sep 20, 2013 | Completed final sign-off Feb 2014 | 55 Cyril Magnin St | Newland Interiors | 2/fl tenant improvement - remodel existing restaurant for new restaurant and expand portion of dining area. work includes: new partitions, ceilings, caseworks and decorative features. install non-load bearing partition for 2nd means of egress. no structural work to build core or shell.Details
2/fl tenant improvement - remodel existing restaurant for new restaurant and expand portion of dining area. work includes: new partitions, ceilings, caseworks and decorative features. install non-load bearing partition for 2nd means of egress. no structural work to build core or shell. | $78,650 |
| Sep 10, 2013 | Never finaled issued Feb 2014, no final | 55 Cyril Magnin St | Lakeview Construction/Wisconsin Lakeview | fedex office to remodel existing ashbury meeting rom. package room and general store room for fedex office use.Details
fedex office to remodel existing ashbury meeting rom. package room and general store room for fedex office use. | $30,000 |
| Aug 13, 2013 | Never finaled issued Aug 2013, no final | 55 Cyril Magnin St | Bens Roofing Inc | reroofingDetails
reroofing | $120,000 |
| Apr 11, 2013 | Completed final sign-off Mar 2014 | 55 Cyril Magnin St | Newland Interiors | renovate (e) fitness center into 6 guestrooms.(5th floor) renovate (e) concrete lounge into 3 additional guestrooms.(31/f) no soil disturbaqnceDetails
renovate (e) fitness center into 6 guestrooms.(5th floor) renovate (e) concrete lounge into 3 additional guestrooms.(31/f) no soil disturbaqnce | $513,290 |
| Mar 18, 2013 | Completed final sign-off Apr 2013 | 55 Cyril Magnin St | Sabah International Incorporated | 3rd floor - provide modificaiton to existing fire alarm system for parc 55 fitness center. the additoin shall consist the following: add (7) new ceiling speaker strobes & (1) new power booster supple. (ref #2012.12.27.6903)Details
3rd floor - provide modificaiton to existing fire alarm system for parc 55 fitness center. the additoin shall consist the following: add (7) new ceiling speaker strobes & (1) new power booster supple. (ref #2012.12.27.6903) | $10,861 |
| Mar 11, 2013 | Completed final sign-off Apr 2013 | 55 Cyril Magnin St | Simplexgrinnell Lp. | relocate and add new quick response fire sprinkler per new tenant improvement for new fittness center in existing hotel. 18 each relocate and 7 each plugs, t.i ref pa# 201212276903Details
relocate and add new quick response fire sprinkler per new tenant improvement for new fittness center in existing hotel. 18 each relocate and 7 each plugs, t.i ref pa# 201212276903 | $8,350 |
| Dec 27, 2012 | Completed final sign-off Jun 2013 | 55 Cyril Magnin St | C C Energy | 3rd floor-renovate (e) office space to create a new fitness center for the hotel on 3rd floor. b-10 to b-38Details
3rd floor-renovate (e) office space to create a new fitness center for the hotel on 3rd floor. b-10 to b-38 | $50,000 |
| Jul 20, 2011 | Never finaled issued Jul 2011, no final | 55 Cyril Magnin St | Sabah International Incorporated | renew expired app 200901160334 to complete work and obtain finalDetails
renew expired app 200901160334 to complete work and obtain final | $50,000 |
| Jul 18, 2011 | Completed final sign-off Oct 2011 | 55 Cyril Magnin St | to obtain final inspection for work approved under pa 200104237486; all work has been completed.Details
to obtain final inspection for work approved under pa 200104237486; all work has been completed. | ||
| Jul 18, 2011 | Completed final sign-off Oct 2011 | 55 Cyril Magnin St | to obtain final inspection for work approved under pa 200406297564; all work has been completedDetails
to obtain final inspection for work approved under pa 200406297564; all work has been completed | ||
| Jul 18, 2011 | Completed final sign-off Oct 2011 | 55 Cyril Magnin St | to obtain final inspection for work approved under pa 200008107490; all work has been completedDetails
to obtain final inspection for work approved under pa 200008107490; all work has been completed | ||
| Jul 18, 2011 | Completed final sign-off Jan 2012 | 55 Cyril Magnin St | to obtain final inspection for work approved under pa 9406706; all work has been completedDetails
to obtain final inspection for work approved under pa 9406706; all work has been completed | ||
| Jul 18, 2011 | Completed final sign-off Oct 2011 | 55 Cyril Magnin St | to obtain final inspection for work approved under pa 200403300005; all work has been completedDetails
to obtain final inspection for work approved under pa 200403300005; all work has been completed | ||
| Jul 18, 2011 | Completed final sign-off Jan 2012 | 55 Cyril Magnin St | to obtain final inspection for work approved under pa 200510054779; all work has been completedDetails
to obtain final inspection for work approved under pa 200510054779; all work has been completed | ||
| Jun 9, 2011 | Never finaled issued Sep 2011, no final | 55 Cyril Magnin St | Dan Gillies Construction Services Inc | office ti on the 1st floor. install new partitions, new indoor entry door, new kitchenete and new door to restrooms. install new electrical, new carpet. srinkler and mechanical system under separate permitDetails
office ti on the 1st floor. install new partitions, new indoor entry door, new kitchenete and new door to restrooms. install new electrical, new carpet. srinkler and mechanical system under separate permit | $80,000 |
| Mar 2, 2011 | Completed final sign-off Dec 2011 | 55 Cyril Magnin St | Plant Construction Company Lp | renovate room 3065 into an ada accessible suite. renovate room 3061 to upgrade finishes and ff and e's into room and bathroomDetails
renovate room 3065 into an ada accessible suite. renovate room 3061 to upgrade finishes and ff and e's into room and bathroom | $50,000 |
| Feb 24, 2011 | Never finaled issued Dec 2011, no final | 55 Cyril Magnin St | installation of e-911 antenna as required by fcc.Details
installation of e-911 antenna as required by fcc. | $5,000 | |
| Jul 3, 2009 | Never finaled filed Jul 2009, never issued | 55 Cyril Magnin St | Exxell Corp. Dba Exxell Fire Systems | (7) ul-300 commercial kitchen hood fire suppresion upgrade. ul-300 commercial kitchen exhaust duct fire suppresion upgrade. revision to appl. 2009/0219/2365.Details
(7) ul-300 commercial kitchen hood fire suppresion upgrade. ul-300 commercial kitchen exhaust duct fire suppresion upgrade. revision to appl. 2009/0219/2365. | $23,500 |
| Jun 8, 2009 | Completed final sign-off Jul 2009 | 55 Cyril Magnin St | Golden Gate Sign Company Inc. | erect an electric single faced illuminated wall sign.Details
erect an electric single faced illuminated wall sign. | $20,000 |
| Jun 2, 2009 | Completed final sign-off Aug 2009 | 55 Cyril Magnin St | Plant Construction Company Lp | revision to pa# 2009-0519-8711-scope of work is reduction of scope: installation of only 1 glass awning/canopy at hotel entry instead of 3 awnings, no other workDetails
revision to pa# 2009-0519-8711-scope of work is reduction of scope: installation of only 1 glass awning/canopy at hotel entry instead of 3 awnings, no other work | |
| May 19, 2009 | Completed final sign-off Aug 2009 | 55 Cyril Magnin St | Plant Construction Company Lp | remove 3 (e) awnings above entry to hotel. retain (e) steel structure.install 3 (n) glass awnings as shown on drawing. signage under awnings separate permit.Details
remove 3 (e) awnings above entry to hotel. retain (e) steel structure.install 3 (n) glass awnings as shown on drawing. signage under awnings separate permit. | $25,000 |
| Apr 17, 2009 | Completed final sign-off Aug 2009 | 55 Cyril Magnin St | Plant Construction Company Lp | occupant load only for fire department public assembly p-142 permit. ti for hotel floor 1-4 on previously approved pa# 2008/09/29/2908.Details
occupant load only for fire department public assembly p-142 permit. ti for hotel floor 1-4 on previously approved pa# 2008/09/29/2908. | |
| Feb 19, 2009 | Expired or cancelled expired Jan 2011 | 55 Cyril Magnin St | Exxell Corp. Dba Exxell Fire Systems | ul300 upgrade to fire suppression systemDetails
ul300 upgrade to fire suppression system | $4,500 |
| Jan 16, 2009 | Expired or cancelled expired Jan 2011 | 55 Cyril Magnin St | Sabah International Incorporated | project consists of replacing & upgrade of (e) fire alarm system with new one including firemans override panel system to replace over 3 phases. all 3 phases will be under this permit application and work for all 3 phases is contained within this permit application. fire alarm certification requiredDetails
project consists of replacing & upgrade of (e) fire alarm system with new one including firemans override panel system to replace over 3 phases. all 3 phases will be under this permit application and work for all 3 phases is contained within this permit application. fire alarm certification required | $240,000 |
| Dec 18, 2008 | Completed final sign-off Aug 2009 | 55 Cyril Magnin St | Allied Fire Protection | level 1: relocate 4 sprinkler heads; level 2: relocate 53 and add 13 sprinkler heads; level 3: relocate 18 & add 13 sprinkler heads; level 4: relocate 6 sprinkler heads.Details
level 1: relocate 4 sprinkler heads; level 2: relocate 53 and add 13 sprinkler heads; level 3: relocate 18 & add 13 sprinkler heads; level 4: relocate 6 sprinkler heads. | $29,700 |
| Oct 23, 2008 | Never finaled issued Oct 2008, no final | 55 Cyril Magnin St | street space permit only.Details
street space permit only. | ||
| Sep 29, 2008 | Completed final sign-off Aug 2009 | 55 Cyril Magnin St | t.i. for (e) hotel for floors 1-4. work includes new partitions, ceilings, finishes, mechanical, electrical, plumbing. new kitchen equipment. no exterior work. fire protection under seperate permitDetails
t.i. for (e) hotel for floors 1-4. work includes new partitions, ceilings, finishes, mechanical, electrical, plumbing. new kitchen equipment. no exterior work. fire protection under seperate permit | $4,000,000 | |
| Aug 5, 2008 | Completed final sign-off Apr 2009 | 55 Cyril Magnin St | infill floor openings on 3d & 4th flr. added infill area totals 3827 sq ft no work in any guest rooms, 3964 sq ft. will be redesignated from hotel function (reception) to retail to maintain fl area radial(f.a.r.)structural applicaion only. t.i., m.e.p.or fire protection under separate permit.Details
infill floor openings on 3d & 4th flr. added infill area totals 3827 sq ft no work in any guest rooms, 3964 sq ft. will be redesignated from hotel function (reception) to retail to maintain fl area radial(f.a.r.)structural applicaion only. t.i., m.e.p.or fire protection under separate permit. | $200,000 | |
| Jul 3, 2008 | Completed final sign-off Sep 2008 | 55 Cyril Magnin St | renovate three guest rms on 30th fl, unit 3007,3015,3055 change tubs to showers, install new vanity and toilet and provide, f.f. & e. upgrade of 4 guestrooms on this floor including 3007, 3015,3055, 3016 & 3064.Details
renovate three guest rms on 30th fl, unit 3007,3015,3055 change tubs to showers, install new vanity and toilet and provide, f.f. & e. upgrade of 4 guestrooms on this floor including 3007, 3015,3055, 3016 & 3064. | $50,000 | |
| Jul 3, 2008 | Completed final sign-off Sep 2008 | 55 Cyril Magnin St | renovate batroom in five guest room suites, 3115, 3161, 3207, 3255 & 3261. work also includes installing new finishes f. f.& e's in eleven guestrooms on floors 31 & 32, units 3115, 3161, 3207, 3255, 3261, 3116, 3164, 3216, 3264, 3161 & 3215.Details
renovate batroom in five guest room suites, 3115, 3161, 3207, 3255 & 3261. work also includes installing new finishes f. f.& e's in eleven guestrooms on floors 31 & 32, units 3115, 3161, 3207, 3255, 3261, 3116, 3164, 3216, 3264, 3161 & 3215. | $100,000 | |
| Nov 27, 2007 | Completed final sign-off Jan 2008 | 55 Cyril Magnin St | Sierra Electric Co | fire alarm system on 5th floor. new audible/visual notification appliances. a dual synchronization module. 5 speaker storbes, 2 strobes, 1 syn module. work is conjunction with bldg. appl#200707126549Details
fire alarm system on 5th floor. new audible/visual notification appliances. a dual synchronization module. 5 speaker storbes, 2 strobes, 1 syn module. work is conjunction with bldg. appl#200707126549 | $11,000 |
| Nov 26, 2007 | Completed final sign-off Jan 2008 | 55 Cyril Magnin St | Plant Construction Company Lp | 5th floor: revision to appl #200707126549, existing fitness center revise fitness room from a3 to b,Details
5th floor: revision to appl #200707126549, existing fitness center revise fitness room from a3 to b, | |
| Nov 5, 2007 | Completed final sign-off Jan 2008 | 55 Cyril Magnin St | Dpw Inc. | 5th floor - relocate (11) existing head and plug-off (11) for new ceiling and wall layouts. no work to be done on residential units. ref arch appl. #2007.0712.6549.Details
5th floor - relocate (11) existing head and plug-off (11) for new ceiling and wall layouts. no work to be done on residential units. ref arch appl. #2007.0712.6549. | $5,000 |
| Jul 12, 2007 | Completed final sign-off Jan 2008 | 55 Cyril Magnin St | Plant Construction Company Lp | interior remodel of existing fitness center on 5th floorDetails
interior remodel of existing fitness center on 5th floor | $50,000 |
| Oct 5, 2005 | Expired or cancelled expired Jul 2006 | 55 Cyril Magnin St | California Roof Management | reroofingDetails
reroofing | $7,000 |
| Oct 15, 2004 | Never finaled issued Oct 2004, no final | 55 Cyril Magnin St | sidewalkDetails
sidewalk | ||
| Jun 29, 2004 | Expired or cancelled expired Aug 2005 | 55 Cyril Magnin St | H H Construction | re apply for fire dept plan check with approved#200403300005. orig. cost of job $21,000 fir feesDetails
re apply for fire dept plan check with approved#200403300005. orig. cost of job $21,000 fir fees | |
| May 4, 2004 | Never finaled issued May 2004, no final | 55 Cyril Magnin St | street space permitDetails
street space permit | ||
| Mar 30, 2004 | Expired or cancelled expired Aug 2005 | 55 Cyril Magnin St | remodel coffee shop on grd fl.upgrade restrm to comply ada/t24 req re-arrange counter,sinks&equipDetails
remodel coffee shop on grd fl.upgrade restrm to comply ada/t24 req re-arrange counter,sinks&equip | $21,000 | |
| Oct 2, 2003 | Completed final sign-off Oct 2003 | 55 Cyril Magnin St | renew #200104237486 & 200008107490Details
renew #200104237486 & 200008107490 | ||
| Mar 4, 2003 | Completed final sign-off May 2004 | 55 Cyril Magnin St | barrier removal/install wheelchair lift at northwest bldg entrance and change door hardwareDetails
barrier removal/install wheelchair lift at northwest bldg entrance and change door hardware | $50,000 | |
| Apr 23, 2001 | Expired or cancelled expired Aug 2001 | 55 Cyril Magnin St | A & M Lath & Plastering Inc. **Check Id* | modify 1st rl men's/women's restrm entrance door to meet ada recq.install automatic door to comply wDetails
modify 1st rl men's/women's restrm entrance door to meet ada recq.install automatic door to comply w | $800 |
| Jan 19, 2001 | Completed final sign-off Jan 2002 | 55 Cyril Magnin St | upgrade 30 rms. for hearing impared use, fire alarm work onlyDetails
upgrade 30 rms. for hearing impared use, fire alarm work only | $33,000 | |
| Jan 2, 2001 | Completed final sign-off Jul 2001 | 55 Cyril Magnin St | Richlen Construction | add electrical boxes in rooms on floors 27, 28, 29 & 31Details
add electrical boxes in rooms on floors 27, 28, 29 & 31 | $60,000 |
| Nov 30, 2000 | Completed final sign-off Jul 2001 | 55 Cyril Magnin St | Richlen Construction | obtain bid signoff & approval for membrane penetrations for n elec boxes installd in e 2 hr wallDetails
obtain bid signoff & approval for membrane penetrations for n elec boxes installd in e 2 hr wall | $65,000 |
| Aug 10, 2000 | Expired or cancelled expired Dec 2000 | 55 Cyril Magnin St | Aquamatic Fire Protection | sprinkler modification of concierge lounge (three relocates) 31st floor onlyDetails
sprinkler modification of concierge lounge (three relocates) 31st floor only | $1,000 |
| Jul 27, 2000 | Completed final sign-off Sep 2000 | 55 Cyril Magnin St | Skaggs General Contractor | revision to #20000531140: revision to door swing @ egress door framDetails
revision to #20000531140: revision to door swing @ egress door fram | |
| May 31, 2000 | Completed final sign-off Sep 2000 | 55 Cyril Magnin St | Skaggs General Contractor | concierge lounge 31st floor remodelDetails
concierge lounge 31st floor remodel | $90,000 |
| May 25, 2000 | Completed final sign-off Sep 2000 | 55 Cyril Magnin St | Skaggs General Contractor | remodel lounge 31st floor.Details
remodel lounge 31st floor. | $4,700 |
| Mar 10, 2000 | Completed final sign-off Oct 2001 | 55 Cyril Magnin St | A & M Lath & Plastering Inc. **Check Id* | concierce front desk, restrooms to be accessible, barier removalDetails
concierce front desk, restrooms to be accessible, barier removal | $20,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.