Michael R. Downey
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Gensler Architect
- Based in
- San Ramon
- On San Francisco permits
- Aug 2004 to Apr 2024
120 permits since 2000 (architect on 117 permits, authorized agent-others on 1 permit, designer on 1 permit, engineer on 1 permit): 95 completed, 15 never finaled, 10 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 120.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 5, 2024 | Completed final sign-off May 2025 | 2460 Alameda St | Metropolitan Electrical Construction | revision to pa#202403228404 to revise bollard detail addition of two ev changers and four car lifts with power and structural on the 1st floor. addition of power and data outlets in 4 locations on the 3rd floor.Details
revision to pa#202403228404 to revise bollard detail addition of two ev changers and four car lifts with power and structural on the 1st floor. addition of power and data outlets in 4 locations on the 3rd floor. | $71,000 |
| Mar 22, 2024 | Completed final sign-off May 2025 | 2460 Alameda St | Metropolitan Electrical Construction | 2 electrical car chargers & convenience chargersDetails
2 electrical car chargers & convenience chargers | $29,865 |
| Mar 21, 2023 | Completed final sign-off Nov 2023 | 1 Bush St | Bcci Construction Company | 18th/f office t.i. demo (e) partition & ceiling. new partitions and finishes, mep includedDetails
18th/f office t.i. demo (e) partition & ceiling. new partitions and finishes, mep included | $1,100,000 |
| Feb 15, 2023 | Completed final sign-off Nov 2023 | 1 Bush St | Bcci Construction Company | 18th fl demo only for (e) office spaceDetails
18th fl demo only for (e) office space | $75,000 |
| Jul 19, 2022 | Expired or cancelled cancelled Jan 2026 | 1 Warriors Wy | reconfiguration of the lobby, existing offices, conference rooms, and restrooms as indicated on the drawings. new finishes for the walls, ceilings, floors, and stairs.Details
reconfiguration of the lobby, existing offices, conference rooms, and restrooms as indicated on the drawings. new finishes for the walls, ceilings, floors, and stairs. | $325,000 | |
| Jul 15, 2022 | Completed final sign-off Feb 2023 | 601 California St | Bcci Construction Company | 18th fl: new partition, millwork, and finishes. new ceilings and lighting. mep deferred.Details
18th fl: new partition, millwork, and finishes. new ceilings and lighting. mep deferred. | $3,000,000 |
| Sep 28, 2021 | Completed final sign-off Nov 2021 | 633 Folsom St | Principal Builders Inc. | to determine occupant load for new assembly permits for sffd review only.Details
to determine occupant load for new assembly permits for sffd review only. | |
| Apr 6, 2021 | Completed final sign-off Dec 2021 | 45 Fremont St | Richlen Construction | 11/f: minor demo of walls, doors and lighting, addition of a conference room and changing of an existing conference room into a recession area, some new ceilings and lighting, new systems furniture, power and data connectivity and finish modifications.Details
11/f: minor demo of walls, doors and lighting, addition of a conference room and changing of an existing conference room into a recession area, some new ceilings and lighting, new systems furniture, power and data connectivity and finish modifications. | $105,000 |
| Dec 21, 2020 | Expired or cancelled cancelled Aug 2022 | 601 Van Ness Av | Novo Construction Inc | 2nd fl, ste 2030 - ti of existing commercial office stapce within a multi tenant floor. no increase in area or change in use. renovation to include new non-load bearing partitions, mechanical, plumbing, elelctrical, ceiling & lighting, floor finishes & furnishingsDetails
2nd fl, ste 2030 - ti of existing commercial office stapce within a multi tenant floor. no increase in area or change in use. renovation to include new non-load bearing partitions, mechanical, plumbing, elelctrical, ceiling & lighting, floor finishes & furnishings | $823,187 |
| Nov 6, 2020 | Completed final sign-off Aug 2022 | 601 Van Ness Av | Novo Construction Inc | ste 2058: t.i. of an (e) commercial office within a multi-tenant floor. no increase in area or change of use. renovation to include new non-load bearing partitions, mechanical, plumbing, electrical, ceiling, lighting, floor finishes, and furnishingsDetails
ste 2058: t.i. of an (e) commercial office within a multi-tenant floor. no increase in area or change of use. renovation to include new non-load bearing partitions, mechanical, plumbing, electrical, ceiling, lighting, floor finishes, and furnishings | $477,490 |
| Sep 14, 2020 | Completed final sign-off Nov 2021 | 633 Folsom St | Principal Builders Inc. | 12th fl: interior tenant improvement at that includes build out of an office with meeting spaces. mep & life safety deferred.Details
12th fl: interior tenant improvement at that includes build out of an office with meeting spaces. mep & life safety deferred. | $2,000,000 |
| Aug 22, 2020 | Completed final sign-off Oct 2021 | 633 Folsom St | Principal Builders Inc. | level 10 & 11: interior tenant improvement that includes buildout of an office with meeting spaces and storage spaces.Details
level 10 & 11: interior tenant improvement that includes buildout of an office with meeting spaces and storage spaces. | $4,100,000 |
| Aug 6, 2020 | Completed final sign-off Apr 2021 | 333 Bush St | Bcci Construction Company | 31st fl - new finishes, walls, millwork & lighting. new non-load bearing partitions, ceilings & floor finishes. mep deferredDetails
31st fl - new finishes, walls, millwork & lighting. new non-load bearing partitions, ceilings & floor finishes. mep deferred | $750,000 |
| Jun 30, 2020 | Completed final sign-off Oct 2021 | 633 Folsom St | Principal Builders Inc. | levels 3 & 4: rev to pa 202001313308. remove fire rating from room number idf 03066 on 3/f & idf 046 on the 4/f per ab-060.0 maher n/a.Details
levels 3 & 4: rev to pa 202001313308. remove fire rating from room number idf 03066 on 3/f & idf 046 on the 4/f per ab-060.0 maher n/a. | |
| May 27, 2020 | Completed final sign-off Oct 2021 | 633 Folsom St | Principal Builders Inc. | interior ti @ lvl 8 & 9. build out of an office w/ meeting spaces & storage spaces that are compromised by a kitchenette area, office space includes construction of huddle, phone rms, open collaboration rms, conference rms, of various sizes. includes (1) all gender restrm (lvl 9) mep deferred.Details
interior ti @ lvl 8 & 9. build out of an office w/ meeting spaces & storage spaces that are compromised by a kitchenette area, office space includes construction of huddle, phone rms, open collaboration rms, conference rms, of various sizes. includes (1) all gender restrm (lvl 9) mep deferred. | $3,000,000 |
| Feb 7, 2020 | Completed final sign-off Oct 2021 | 633 Folsom St | Principal Builders Inc. | interior ti at leve 7; buildout of office with meeting space & storage, kitchenette, coffee prep, huddle rooms, phone rooms, conference rooms. one all gender restroom.Details
interior ti at leve 7; buildout of office with meeting space & storage, kitchenette, coffee prep, huddle rooms, phone rooms, conference rooms. one all gender restroom. | $3,000,000 |
| Jan 31, 2020 | Completed final sign-off Oct 2021 | 633 Folsom St | Principal Builders Inc. | level 3 & 4: interior ti. office with meeting and storage spaces.huddle rooms, phone rooms, open collaberation & conference rooms. one all gender restroomDetails
level 3 & 4: interior ti. office with meeting and storage spaces.huddle rooms, phone rooms, open collaberation & conference rooms. one all gender restroom | $6,000,000 |
| Jan 24, 2020 | Completed final sign-off May 2021 | 45 Fremont St | Richlen Construction | 10 th floor: revision to app#201911258072. includes layout changes and meps.Details
10 th floor: revision to app#201911258072. includes layout changes and meps. | |
| Jan 24, 2020 | Completed final sign-off Oct 2021 | 633 Folsom St | Principal Builders Inc. | 1st fl - interior ti including all hands area, connecting stair fromlevel 1 to level 2 and support including 2 unisex restrooms & beverage bar for employee use only (not open to public). finishes, millwork, ceilings & lightingDetails
1st fl - interior ti including all hands area, connecting stair fromlevel 1 to level 2 and support including 2 unisex restrooms & beverage bar for employee use only (not open to public). finishes, millwork, ceilings & lighting | $4,000,000 |
| Jan 24, 2020 | Completed final sign-off Jun 2021 | 45 Fremont St | Richlen Construction | mep deferred submittal of pa #2019-1230-0901Details
mep deferred submittal of pa #2019-1230-0901 | $600,000 |
| Jan 24, 2020 | Completed final sign-off Jun 2021 | 45 Fremont St | Richlen Construction | 11th floor: revision to app#201911258073 includes layout changes and meps.Details
11th floor: revision to app#201911258073 includes layout changes and meps. | |
| Jan 10, 2020 | Completed final sign-off Oct 2021 | 633 Folsom St | Principal Builders Inc. | 5th and 6th floor interior ti: build out of office, meeting spaces, storage spaces, conference rooms, kitchenette (regular break room), one all gender restroom.Details
5th and 6th floor interior ti: build out of office, meeting spaces, storage spaces, conference rooms, kitchenette (regular break room), one all gender restroom. | $6,000,000 |
| Dec 30, 2019 | Completed final sign-off Jun 2021 | 45 Fremont St | Richlen Construction | full floor ti new non load bearing partitions, floor finishes, furningh ceiling lighting work. mep deferredDetails
full floor ti new non load bearing partitions, floor finishes, furningh ceiling lighting work. mep deferred | $500,000 |
| Dec 27, 2019 | Completed final sign-off Apr 2021 | 245 Market St | Clune Construction Company L P | rev to pa# 201711022935; relocate power door actuators, provide level landing to door activators. n/a maherDetails
rev to pa# 201711022935; relocate power door actuators, provide level landing to door activators. n/a maher | $20,000 |
| Dec 23, 2019 | Completed final sign-off Oct 2021 | 633 Folsom St | Principal Builders Inc. | floor 2: interior tenant improvement includes office, kitchen, dining area, cafe, and accessory storage areas. mep and structural deferred; fire sprinkler, fire alarm. shafts and openings & level 1-2 comm. stair deferred.Details
floor 2: interior tenant improvement includes office, kitchen, dining area, cafe, and accessory storage areas. mep and structural deferred; fire sprinkler, fire alarm. shafts and openings & level 1-2 comm. stair deferred. | $4,000,000 |
| Nov 25, 2019 | Completed final sign-off Jun 2021 | 45 Fremont St | Richlen Construction | interior demo & ti including mepDetails
interior demo & ti including mep | $2,500,000 |
| Nov 25, 2019 | Completed final sign-off May 2021 | 45 Fremont St | Richlen Construction | 3rd fl - interior demo & ti including mepDetails
3rd fl - interior demo & ti including mep | $2,000,000 |
| Nov 25, 2019 | Completed final sign-off May 2021 | 45 Fremont St | Richlen Construction | 10th flr. interior demo & ti including mepDetails
10th flr. interior demo & ti including mep | $2,500,000 |
| Jul 16, 2019 | Completed final sign-off Mar 2020 | 2 Embarcadero Center | Peacock Construction | 27th flr. demo select furniture. new non-structural partitions, doors, frames, glass, ceiling, grid and tile. sprinklers, mep, life-safety under separate permit. maher n/a.Details
27th flr. demo select furniture. new non-structural partitions, doors, frames, glass, ceiling, grid and tile. sprinklers, mep, life-safety under separate permit. maher n/a. | $67,240 |
| Jul 16, 2019 | Completed final sign-off Mar 2020 | 2 Embarcadero Center | Peacock Construction | 28th flr. demo select furniture. new non-structural partitions, doors, frames, glass, ceiling, grid and tile. sprinklers, mep, life-safety under separate permitDetails
28th flr. demo select furniture. new non-structural partitions, doors, frames, glass, ceiling, grid and tile. sprinklers, mep, life-safety under separate permit | $24,600 |
| Jul 16, 2019 | Completed final sign-off Mar 2020 | 2 Embarcadero Center | Peacock Construction | 26th flr. demo select furniture. new non-structural partitions, doors, frames, glass, ceiling, grid and tile. sprinklers, mep, life-safety under separate permitDetails
26th flr. demo select furniture. new non-structural partitions, doors, frames, glass, ceiling, grid and tile. sprinklers, mep, life-safety under separate permit | $67,240 |
| May 13, 2019 | Never finaled issued Jun 2019, no final | 944 Stockton St | Clune Construction Company L P | install a new atm surround. replace old atm surround exterior. (ref 2019-0207-2345 landing & railing permit)Details
install a new atm surround. replace old atm surround exterior. (ref 2019-0207-2345 landing & railing permit) | $38,679 |
| Mar 7, 2019 | Completed final sign-off Jun 2021 | 1 Market St | G Swanson Constr. Inc. | revision to app#201812037273 switch ada restroom location. modify teller partition. 300 sq ft. n/a for maherDetails
revision to app#201812037273 switch ada restroom location. modify teller partition. 300 sq ft. n/a for maher | $20,000 |
| Feb 28, 2019 | Never finaled issued Apr 2019, no final | 1335 04th St | G Swanson Constr. Inc. | new interior t.i. restrooms, breakroom, teller line, doors, millwork, flooring and mep'sDetails
new interior t.i. restrooms, breakroom, teller line, doors, millwork, flooring and mep's | $600,000 |
| Dec 20, 2018 | Completed final sign-off Jul 2019 | 2325 Noriega St | G Swanson Constr. Inc. | minor remodel to (e) bank; work to include atm replacement and office retrofit, no change in use ore areaDetails
minor remodel to (e) bank; work to include atm replacement and office retrofit, no change in use ore area | $40,000 |
| Dec 5, 2018 | Expired or cancelled cancelled Jan 2026 | 1 Market St | provide level landing 2% max slope for exterior entrance.Details
provide level landing 2% max slope for exterior entrance. | $65,000 | |
| Oct 26, 2018 | Completed final sign-off Jan 2019 | 315 Montgomery St | Bcci Construction Company | revision to permit 201807033636. 13th flr - adding (n) gender neutral single - occupancy restroom. maher n/a.Details
revision to permit 201807033636. 13th flr - adding (n) gender neutral single - occupancy restroom. maher n/a. | $15,000 |
| Jun 25, 2018 | Never finaled issued Sep 2018, no final | 3565 California St | G Swanson Constr. Inc. | voluntary barrier removal: replace non-compliant interior door with accessible door.Details
voluntary barrier removal: replace non-compliant interior door with accessible door. | $20,000 |
| Jun 15, 2018 | Completed final sign-off Jan 2019 | 1945 Irving St | G Swanson Constr. Inc. | t.i. of extg bank of america. interior scope includes new partitions, restroom and breakroom. regrade exterior sidewalk to provide level landing at main entry door and extg atm and night depository.Details
t.i. of extg bank of america. interior scope includes new partitions, restroom and breakroom. regrade exterior sidewalk to provide level landing at main entry door and extg atm and night depository. | $750,000 |
| Apr 13, 2018 | Never finaled filed Apr 2018, never issued | 1 Powell St | Details
| $70,000 | |
| Apr 6, 2018 | Completed final sign-off Sep 2018 | 1640 Van Ness Av | G Swanson Constr. Inc. | ti - demo & improvement within the (e) shell space. construct non load bearing partitions, carpet, flooring, paint finishes, furniture, bld infrastructure systems, minor hvac & heathing changesDetails
ti - demo & improvement within the (e) shell space. construct non load bearing partitions, carpet, flooring, paint finishes, furniture, bld infrastructure systems, minor hvac & heathing changes | $750,000 |
| Feb 15, 2018 | Completed final sign-off Sep 2019 | 245 Market St | Clune Construction Company L P | revision to app#201708104421. work consisting of interior t.i. partitions, ceiling, finishes and mep. n/a for maherDetails
revision to app#201708104421. work consisting of interior t.i. partitions, ceiling, finishes and mep. n/a for maher | $350,000 |
| Jan 31, 2018 | Completed final sign-off Jun 2018 | 600 Battery St | Novo Construction Inc | 2nd flr - interior renovation to create a 2nd flr demise making this floor multi tenant. mep & fire life safety under sep permit maher naDetails
2nd flr - interior renovation to create a 2nd flr demise making this floor multi tenant. mep & fire life safety under sep permit maher na | $40,000 |
| Oct 30, 2017 | Completed final sign-off Jan 2023 | 33 New Montgomery St | G Swanson Constr. Inc., Clune Construction Company L P | replacement of existing atm's with atm's. minor electrical, structural. change one office & one atm room to a training room. n/a maher ordinanceDetails
replacement of existing atm's with atm's. minor electrical, structural. change one office & one atm room to a training room. n/a maher ordinance | $175,000 |
| Oct 17, 2017 | Expired or cancelled cancelled Jan 2026 | 4638 Mission St | Clune Construction Company L P | voluntary ada barrier removal project regrade in front of (e) citi bank exterior thru-the-wall atm to provide level landing for wheelchair. no change in use or occupancy. no work to exterior facadeDetails
voluntary ada barrier removal project regrade in front of (e) citi bank exterior thru-the-wall atm to provide level landing for wheelchair. no change in use or occupancy. no work to exterior facade | $55,525 |
| Oct 16, 2017 | Completed final sign-off Mar 2019 | 2198 Chestnut St | Clune Construction Company L P | voluntary ada barrier removal at existing citibank. to provide level landing at existing atm's in the exterior within property line. addition of handrail per grade modification. no interior scope. no change use or occupancyDetails
voluntary ada barrier removal at existing citibank. to provide level landing at existing atm's in the exterior within property line. addition of handrail per grade modification. no interior scope. no change use or occupancy | $42,506 |
| Oct 10, 2017 | Completed final sign-off Apr 2018 | 444 Castro St | Clune Construction Company L P | voluntary ada barrier removal project at (e) citibank. regrade in front of (e) exterior thru-the-wall atm to provide level landing & path of travel.Details
voluntary ada barrier removal project at (e) citibank. regrade in front of (e) exterior thru-the-wall atm to provide level landing & path of travel. | $51,065 |
| Aug 28, 2017 | Never finaled filed Aug 2017, never issued | 3565 California St | G Swanson Constr. Inc. | replacement of atm equipment, required accessiblility upgrades of sidewalk at atm to achieve level landing.Details
replacement of atm equipment, required accessiblility upgrades of sidewalk at atm to achieve level landing. | $75,000 |
| Aug 10, 2017 | Completed final sign-off Sep 2019 | 245 Market St | Clune Construction Company L P | demo partitions, doors, millwork, floor & mep. create offices, ada restrooms, breakroom, load bearing partitions, mepDetails
demo partitions, doors, millwork, floor & mep. create offices, ada restrooms, breakroom, load bearing partitions, mep | $1,500,000 |
| Jul 25, 2017 | Completed final sign-off Nov 2017 | 1455 Market St | Deb Construction Llc | basement l02- modify (e) storage space to accommodate a (n) mailroom processing center. work includes remove (e) chainlink fences, install non-bearing partitions, doors, millworks, rcp, mep. security system & upgrade unisex restroom. n/a ordinance #155-13Details
basement l02- modify (e) storage space to accommodate a (n) mailroom processing center. work includes remove (e) chainlink fences, install non-bearing partitions, doors, millworks, rcp, mep. security system & upgrade unisex restroom. n/a ordinance #155-13 | $425,000 |
| Jul 20, 2017 | Completed final sign-off Jun 2019 | 245 Winston Dr | Clune Construction Company L P | 1st fl tenant improvement in e bank of america. includes demo of walls, millwork, furniture, new non load bearing partition, add new equipment, furniture, interior finishesDetails
1st fl tenant improvement in e bank of america. includes demo of walls, millwork, furniture, new non load bearing partition, add new equipment, furniture, interior finishes | $1,900,000 |
| Mar 6, 2017 | Completed final sign-off Feb 2019 | 1844 Market St | G Swanson Constr. Inc., Coast Sign Incorporated | erect electric, single face sign.Details
erect electric, single face sign. | $5,000 |
| Dec 1, 2016 | Never finaled issued Jan 2017, no final | 33 New Montgomery St | G Swanson Constr. Inc. | full remodel of (e) banking center 1. remove (e) interior partitions. 2. construct new offices. 3. new accessible unisex restroom. 4. new lighting per title 24. 5. upgrade interior finishes. revision to 201506249741 maher naDetails
full remodel of (e) banking center 1. remove (e) interior partitions. 2. construct new offices. 3. new accessible unisex restroom. 4. new lighting per title 24. 5. upgrade interior finishes. revision to 201506249741 maher na | $500,000 |
| Nov 23, 2016 | Completed final sign-off Apr 2018 | 1 Powell St | G Swanson Constr. Inc. | install power door system to extg front entry door. barrier removal only; voluntary ada upgrades n/a for maherDetails
install power door system to extg front entry door. barrier removal only; voluntary ada upgrades n/a for maher | $17,000 |
| Nov 15, 2016 | Completed final sign-off Jul 2017 | 555 California St | Clune Construction Company L P | interior ti on floor 44 - drywall, paint, carpet & finishes. mech & electrical. alarm/sprinkler deferred.Details
interior ti on floor 44 - drywall, paint, carpet & finishes. mech & electrical. alarm/sprinkler deferred. | $984,000 |
| Oct 7, 2016 | Expired or cancelled cancelled Jan 2026 | 430 Bush St | upgrade (e) restroom facilities & drinking fountain to comply with current accessibility reqs at 1st floor maher naDetails
upgrade (e) restroom facilities & drinking fountain to comply with current accessibility reqs at 1st floor maher na | $130,000 | |
| Sep 19, 2016 | Never finaled issued Sep 2016, no final | 680 Folsom St | Novo Construction Inc | 5/f- revision to 201608034041 to change 1 hour rated partitons to new unrated partitionDetails
5/f- revision to 201608034041 to change 1 hour rated partitons to new unrated partition | |
| Sep 1, 2016 | Never finaled filed Sep 2016, never issued | 430 Bush St | replace non historical entry gate with alum glazed entry doors. replace damaged glass panes with clear laminated glass panes maher naDetails
replace non historical entry gate with alum glazed entry doors. replace damaged glass panes with clear laminated glass panes maher na | $14,000 | |
| Aug 24, 2016 | Completed final sign-off Jan 2017 | 220 Montgomery St | San Francisco Commercial Builders Inc | suite #144: revision to app#201606240784: construct 2 common 1-hr f.r. cooridor and restrooms with demising wall to seperate the two suites and install new doors, cieling and closets.Details
suite #144: revision to app#201606240784: construct 2 common 1-hr f.r. cooridor and restrooms with demising wall to seperate the two suites and install new doors, cieling and closets. | |
| Aug 3, 2016 | Never finaled issued Aug 2016, no final | 680 Folsom St | Novo Construction Inc | 5th flr: ti-minor demo, new construction of non load bearing partitions, new carpet, paint and finishes. mep & fire life safety under separate permit.Details
5th flr: ti-minor demo, new construction of non load bearing partitions, new carpet, paint and finishes. mep & fire life safety under separate permit. | $300,000 |
| Jun 1, 2016 | Completed final sign-off Nov 2018 | 2701 Mission St | G Swanson Constr. Inc. | tenant improvement to (e)bank: scope includes demolition of non-bearing partitions,atms,teller line,acoustic ceiling & removal of furniture & finishes.(e)restrooms,stairs,night drop & vault to remain,new scope includes offices,breakroom,tellerline,doors,millwork,floor finish & associated hvac,a/v &Details
tenant improvement to (e)bank: scope includes demolition of non-bearing partitions,atms,teller line,acoustic ceiling & removal of furniture & finishes.(e)restrooms,stairs,night drop & vault to remain,new scope includes offices,breakroom,tellerline,doors,millwork,floor finish & associated hvac,a/v & | $900,000 |
| May 12, 2016 | Completed final sign-off Jul 2016 | 220 Montgomery St | San Francisco Commercial Builders Inc | demo ste 144: remove existing interior walls, doors, ceilings and light fixtures ; maher n/a ti separate permit.Details
demo ste 144: remove existing interior walls, doors, ceilings and light fixtures ; maher n/a ti separate permit. | $35,000 |
| May 12, 2016 | Completed final sign-off Jul 2016 | 220 Montgomery St | San Francisco Commercial Builders Inc | demo suite #132: remove existing interior walls, ceilings systems, light fixtures & cap off floor mounted electrical boxes of suite 132; maher n/a. vacant space - ti separte permitsDetails
demo suite #132: remove existing interior walls, ceilings systems, light fixtures & cap off floor mounted electrical boxes of suite 132; maher n/a. vacant space - ti separte permits | $32,000 |
| Mar 31, 2016 | Completed final sign-off Jun 2016 | 430 Bush St | Paradigm General Contractors | revision to 201507211990 for lever 3 and 5, revision to vestibules, infill perimeter wall opening and remove abandoned electrical panels; n/a maher ord. 155-13Details
revision to 201507211990 for lever 3 and 5, revision to vestibules, infill perimeter wall opening and remove abandoned electrical panels; n/a maher ord. 155-13 | $10,000 |
| Mar 21, 2016 | Completed final sign-off Feb 2019 | 1844 Market St | G Swanson Constr. Inc. | addition of 2 walk-up atms and atm room in (e) vacant space. upgrade ramp handrails per ada compliance, hvac, electrical.Details
addition of 2 walk-up atms and atm room in (e) vacant space. upgrade ramp handrails per ada compliance, hvac, electrical. | $94,030 |
| Dec 15, 2015 | Completed final sign-off Mar 2017 | 999 Green St | Derry Casey Builders | #2102 - remodel of (e) kitchen , (e) master bath, (e) hall bath , (e) powder room, master closet bed closets, hall closets. all workj is non-structural only.Details
#2102 - remodel of (e) kitchen , (e) master bath, (e) hall bath , (e) powder room, master closet bed closets, hall closets. all workj is non-structural only. | $50,000 |
| Dec 14, 2015 | Completed final sign-off Jul 2016 | 600 Battery St | Source Planning And Construction Inc | 1st floor - revision to pa #201510280968 - door schedule, wall connection & type, etc. n/a maher ordinanceDetails
1st floor - revision to pa #201510280968 - door schedule, wall connection & type, etc. n/a maher ordinance | |
| Oct 28, 2015 | Completed final sign-off Jul 2016 | 600 Battery St | Source Planning And Construction Inc | 1st floor: interior renovation of an (e) open office area making the space a conference room. maher naDetails
1st floor: interior renovation of an (e) open office area making the space a conference room. maher na | $71,995 |
| Jul 21, 2015 | Completed final sign-off Jun 2016 | 430 Bush St | Paradigm General Contractors | demo(e)non-load bearing partitions,ceilings,ductwork,elec conduit& plumbing fixtures.install new ceiling,interior partitions,lighting,doors, finishes&plumbing fixtures.alter both mech&elec sys.refinish interior side(e)exterior window frames.n/a maher ord.Details
demo(e)non-load bearing partitions,ceilings,ductwork,elec conduit& plumbing fixtures.install new ceiling,interior partitions,lighting,doors, finishes&plumbing fixtures.alter both mech&elec sys.refinish interior side(e)exterior window frames.n/a maher ord. | $3,500,000 |
| Jun 24, 2015 | Never finaled issued Nov 2015, no final | 625 Market St | G Swanson Constr. Inc., Evans & Son Inc | remodel of (e) bank space including new 24 hour vestible, new millwork, walls, lighting and finishes as well as new bank equipment. no change to use or occupancy. mep included- sprinklers and fire alarm separate-Details
remodel of (e) bank space including new 24 hour vestible, new millwork, walls, lighting and finishes as well as new bank equipment. no change to use or occupancy. mep included- sprinklers and fire alarm separate- | $1,200,000 |
| Jun 24, 2015 | Never finaled issued Nov 2015, no final | 33 New Montgomery St | G Swanson Constr. Inc., Evans & Son Inc | remodel of extg bank space including new private offices, new accessible toilet room, walls, lighting millwork finishes and furniture. no change to use or occupancy. work to include mechanical, electrical, and plumbing. fire sprinkler and alarm work to be under separate permit. n/a for maher.Details
remodel of extg bank space including new private offices, new accessible toilet room, walls, lighting millwork finishes and furniture. no change to use or occupancy. work to include mechanical, electrical, and plumbing. fire sprinkler and alarm work to be under separate permit. n/a for maher. | $750,000 |
| Apr 23, 2015 | Never finaled issued Jun 2015, no final | 315 Montgomery St | Balfour Beatty Construction Llc | interior work only at first floor, includes raised floor, new access ramp, new offices & meeting rooms, ceiling design, restrooms and breakroom. also, includes new furniture & finishes. compliance with maher ordinance no 155-13 not required.Details
interior work only at first floor, includes raised floor, new access ramp, new offices & meeting rooms, ceiling design, restrooms and breakroom. also, includes new furniture & finishes. compliance with maher ordinance no 155-13 not required. | $600,000 |
| Mar 6, 2015 | Completed final sign-off Jun 2015 | 1275 Fell St | G Swanson Constr. Inc. | reference 201407030459. reduced count at teller line and replace with interior partitions. reducing ada upgrade work due to inaccurate estimate on for c, da checklist. (removed mens restroom upgrade from original scope. both restrooms to be unisex.Details
reference 201407030459. reduced count at teller line and replace with interior partitions. reducing ada upgrade work due to inaccurate estimate on for c, da checklist. (removed mens restroom upgrade from original scope. both restrooms to be unisex. | |
| Mar 5, 2015 | Expired or cancelled withdrawn Jun 2015 | 315 Montgomery St | 1st fl modification to add business office space. work includes new raised fl w/access ramp, new offices, new ceiling design. new restrooms, few meeting rooms,and breakroom this also includes new furniture and finishes. n/a for maher ordinance.Details
1st fl modification to add business office space. work includes new raised fl w/access ramp, new offices, new ceiling design. new restrooms, few meeting rooms,and breakroom this also includes new furniture and finishes. n/a for maher ordinance. | $1,000,000 | |
| Dec 19, 2014 | Completed final sign-off Jan 2016 | 315 Montgomery St | Deb Construction Llc, Davcal, Inc. | tenant improvement 6th fl. modification of 1 conference room and new network equipment room. maher not req. life safety deferred.Details
tenant improvement 6th fl. modification of 1 conference room and new network equipment room. maher not req. life safety deferred. | $300,000 |
| Dec 5, 2014 | Completed final sign-off Jan 2016 | 315 Montgomery St | Deb Construction Llc, Davcal, Inc. | 5th flr: existing tenant use to remain as business use. tenant improvement includes the construction of new private offices & addition of furniture by furniture vendor & tenant on 5th flr; maher n/aDetails
5th flr: existing tenant use to remain as business use. tenant improvement includes the construction of new private offices & addition of furniture by furniture vendor & tenant on 5th flr; maher n/a | $400,000 |
| Dec 5, 2014 | Completed final sign-off Jan 2016 | 315 Montgomery St | Deb Construction Llc, Davcal, Inc. | flrs: 3 & 4: existing tenant use to remain as business use. tenant improvement includes the construction of new private offices, new conference room, and addition of furniture by furniture vendor & tenant on floor 3 & 4: maher n/a. life safety deferred submittals.Details
flrs: 3 & 4: existing tenant use to remain as business use. tenant improvement includes the construction of new private offices, new conference room, and addition of furniture by furniture vendor & tenant on floor 3 & 4: maher n/a. life safety deferred submittals. | $380,000 |
| Jul 7, 2014 | Completed final sign-off Apr 2015 | 288 West Portal Av | G Swanson Constr. Inc. | addition of glass (banit barrier) over extg tellerline for added security. ada upgrades up to 20% construction cost. install railing at front of building by the atms.Details
addition of glass (banit barrier) over extg tellerline for added security. ada upgrades up to 20% construction cost. install railing at front of building by the atms. | $75,000 |
| Jul 3, 2014 | Completed final sign-off Jun 2015 | 1275 Fell St | G Swanson Constr. Inc. | additoin of bandit barrier (bullet resistant glass) to existing teller line, accessible upgrades ot existing toilet room.Details
additoin of bandit barrier (bullet resistant glass) to existing teller line, accessible upgrades ot existing toilet room. | $75,000 |
| Jul 3, 2014 | Completed final sign-off Mar 2015 | 2701 Mission St | G Swanson Constr. Inc. | addition of glass (bandit barrier) over existing teller line for added security.Details
addition of glass (bandit barrier) over existing teller line for added security. | $75,000 |
| Jun 19, 2014 | Completed final sign-off Jul 2015 | 680 Folsom St | Novo Construction Inc | 4th floor tenant improvement to include non-load bearing partitions, new ceiling,new carpet & finishes. new mechanical & electrical work.Details
4th floor tenant improvement to include non-load bearing partitions, new ceiling,new carpet & finishes. new mechanical & electrical work. | $2,500,000 |
| May 15, 2014 | Never finaled filed May 2014, never issued | 430 Bush St | demolition of (e) non load bearing partition, ceiling & finishes. install new non-load bearing partition, ceiling & finishes. modification of (e) mechanical, electrical & plumbing distribution system. replace (e) windows glazing. 1 hr on building sides & non rated on bush street side. replaceDetails
demolition of (e) non load bearing partition, ceiling & finishes. install new non-load bearing partition, ceiling & finishes. modification of (e) mechanical, electrical & plumbing distribution system. replace (e) windows glazing. 1 hr on building sides & non rated on bush street side. replace | $3,000,000 | |
| May 8, 2014 | Completed final sign-off Jan 2015 | 430 Bush St | C. Overaa & Co | 6th floor - demolition of existing non load bearing partitions, ceiling, finishes, existing ductwork,electrical conduit & panels. n/a ordinance #155-13.Details
6th floor - demolition of existing non load bearing partitions, ceiling, finishes, existing ductwork,electrical conduit & panels. n/a ordinance #155-13. | $50,000 |
| Feb 10, 2014 | Completed final sign-off Aug 2014 | 3565 California St | G Swanson Constr. Inc. | 1st floor: installation of new teller line and bandit barrier and new furniture for workstationsDetails
1st floor: installation of new teller line and bandit barrier and new furniture for workstations | $100,000 |
| Sep 6, 2013 | Completed final sign-off Mar 2015 | 88 Kearny St | Novo Construction Inc, Swinerton Builders | working as citibank: remodel of (e) bank branch on ground level, new wall construction, millwork finishes, new plmg & electrical work, new structural steel to supplement (e) structural at interior atm & modification of (e) hvac system. no exterior work under this permitDetails
working as citibank: remodel of (e) bank branch on ground level, new wall construction, millwork finishes, new plmg & electrical work, new structural steel to supplement (e) structural at interior atm & modification of (e) hvac system. no exterior work under this permit | $800,000 |
| Oct 25, 2012 | Completed final sign-off Apr 2013 | 301 Clement St | Merbrink Construction Inc | interior remodel of existing bank on ground floor only. new offices, cubicles, finishes and equipment.Details
interior remodel of existing bank on ground floor only. new offices, cubicles, finishes and equipment. | $85,525 |
| Oct 10, 2012 | Completed final sign-off Mar 2013 | 401 California St | Frans Construction Inc. | minor interior remodel of existing chase bank, new offices, ceiling & finishes.Details
minor interior remodel of existing chase bank, new offices, ceiling & finishes. | $135,239 |
| Oct 5, 2012 | Completed final sign-off Mar 2013 | 700 Market St | Gidel & Kocal Construction Co Inc | tenant improvement of existing bank (chase). new offices, non-structural partitions, new ceiling, new finishes, expansion of bank to existing vacant space. interior work only. f/a and sprinkler on separate permit.Details
tenant improvement of existing bank (chase). new offices, non-structural partitions, new ceiling, new finishes, expansion of bank to existing vacant space. interior work only. f/a and sprinkler on separate permit. | $450,000 |
| Sep 12, 2012 | Completed final sign-off Apr 2013 | 2166 Chestnut St | Merbrink Construction Inc | minor interior remodel of existing bank: new offices, finsihes, bank equipment including mechanical & electrical work.Details
minor interior remodel of existing bank: new offices, finsihes, bank equipment including mechanical & electrical work. | $130,575 |
| Aug 16, 2012 | Completed final sign-off Mar 2013 | 2750 Van Ness Av | Gidel & Kocal Construction Co Inc | bank branch to receive minor interior work which consist of: new private offices, new cubicles, ada upgrades & finishes. fire alarm & fire sprinklers under separate permit.Details
bank branch to receive minor interior work which consist of: new private offices, new cubicles, ada upgrades & finishes. fire alarm & fire sprinklers under separate permit. | $200,000 |
| Apr 17, 2012 | Completed final sign-off Oct 2012 | 400 Post St | Lorentz Bruun Co., Inc. | rev to pa# 2011/11/01/8054. 3539 sqft interior t.i for a retail banking center, this project was previously approved/permited, but client asked gensler to redesign. project includes 24 hr atm vestiblue, sliding glass nanwall system, lobby, hospitality area for customers, teller line, offices,Details
rev to pa# 2011/11/01/8054. 3539 sqft interior t.i for a retail banking center, this project was previously approved/permited, but client asked gensler to redesign. project includes 24 hr atm vestiblue, sliding glass nanwall system, lobby, hospitality area for customers, teller line, offices, | |
| Oct 21, 2011 | Never finaled issued Mar 2012, no final | 400 Post St | Lorentz Bruun Co., Inc. | building alteration - minor: replacement of storefront system, entrances & bulkhead, addition of canopy at corner of building. replace a portion of existing sidewalk in r.o.w. to meet accessibility codes.Details
building alteration - minor: replacement of storefront system, entrances & bulkhead, addition of canopy at corner of building. replace a portion of existing sidewalk in r.o.w. to meet accessibility codes. | $400,000 |
| Apr 15, 2011 | Completed final sign-off Nov 2011 | 2835 Geary Bl | G Swanson Constr. Inc. | install bandit barrier (ballistic fiberglass) over existing teller line.Details
install bandit barrier (ballistic fiberglass) over existing teller line. | $120,000 |
| Apr 12, 2011 | Completed final sign-off Jun 2011 | 600 Battery St | Source Planning And Construction Inc | tenant improvement for partial 1st. flr. to construct millwork finishes and non-load bearing partitions. mep sep permit including lighting.Details
tenant improvement for partial 1st. flr. to construct millwork finishes and non-load bearing partitions. mep sep permit including lighting. | $250,000 |
| Sep 25, 2008 | Completed final sign-off Jan 2009 | 600 Battery St | Bcci Construction Company | 1st & 2nd floor tenant improvement to include new non-load bearing partitions, demountable partitions, millwork, fixtures, doors & finishes. mep & l.s. under separate permits.Details
1st & 2nd floor tenant improvement to include new non-load bearing partitions, demountable partitions, millwork, fixtures, doors & finishes. mep & l.s. under separate permits. | $1,400,000 |
| May 23, 2008 | Completed final sign-off Aug 2008 | 3250 Mission St | Swinerton Builders | revision to pa# 2007/12/17/0631 to revise badit barrier architectural detailsDetails
revision to pa# 2007/12/17/0631 to revise badit barrier architectural details | |
| Mar 13, 2008 | Completed final sign-off Jun 2008 | 575 Market St | Gci, Inc | full floor t.i. to construct new doors, walls and partitions with new restrooms. demo permit previusly pull under pa# 200803105163. all trade & life safety permit to be submitted separately. occupancy will be finaled only after umbrella permit is approved.Details
full floor t.i. to construct new doors, walls and partitions with new restrooms. demo permit previusly pull under pa# 200803105163. all trade & life safety permit to be submitted separately. occupancy will be finaled only after umbrella permit is approved. | $400,000 |
| Feb 14, 2008 | Expired or cancelled expired May 2009 | 345 Montgomery St | Skyline Construction | revision to appl.#2007/1108/7711. convert full height partition to partial height partition.Details
revision to appl.#2007/1108/7711. convert full height partition to partial height partition. | $1,000 |
| Dec 28, 2007 | Completed final sign-off Mar 2008 | 315 Montgomery St | Swinerton Builders | build a 2 hour rated landing at central stair on the 12th floor to comply with code. move door at stair# 2 to receive 12" clearance and update hardware at exit stair doors. electrical under separate permit.Details
build a 2 hour rated landing at central stair on the 12th floor to comply with code. move door at stair# 2 to receive 12" clearance and update hardware at exit stair doors. electrical under separate permit. | $59,000 |
| Dec 13, 2007 | Completed final sign-off Jan 2008 | 5150 Mission St | Turner Construction Co | revision to plans 200612159942 atm vestibule revision and parking lot access.Details
revision to plans 200612159942 atm vestibule revision and parking lot access. |