David Armour
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- David Armour Architecture
- Based in
- San Francisco
- On San Francisco permits
- Aug 2003 to May 2026
131 permits since 2000 (architect on 111 permits, engineer on 10 permits, authorized agent-others on 7 permits, designer on 6 permits): 84 completed, 16 in progress, 14 never finaled, 17 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 131.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 27, 2026 | In progress issued Jun 2026 | 1950 15th St | Jeff King And Company Inc | 1/f: remodel of kitchen and bathroom, new bathroom window replacing (e). new casework in bedroom #1.Details
1/f: remodel of kitchen and bathroom, new bathroom window replacing (e). new casework in bedroom #1. | $260,000 |
| May 14, 2026 | In progress issued Sep 2026 | 20 Graystone Tr | Crown Construction San Francisco | new mat slab foundation with new conditioned space at 1st floor,including new area under 2nd floor kitchen footprint; new exterior stairs;infill 2 levels of existing lightwell; limited interior remodel.Details
new mat slab foundation with new conditioned space at 1st floor,including new area under 2nd floor kitchen footprint; new exterior stairs;infill 2 levels of existing lightwell; limited interior remodel. | $850,000 |
| Apr 23, 2026 | In progress issued Jun 2026 | 2528 Union St | Colindres & Associates | interior renovation. demo and new non strucutral paritoins, new bath fixtures, replace windows and doors per plans, replace south facade stucco.Details
interior renovation. demo and new non strucutral paritoins, new bath fixtures, replace windows and doors per plans, replace south facade stucco. | $100,000 |
| Apr 17, 2026 | In progress issued May 2026 | 2961 Broderick St | Colindres & Associates | renovation to interior stairs from l1 to l2.Details
renovation to interior stairs from l1 to l2. | $9,000 |
| Mar 3, 2026 | Completed final sign-off Sep 2026 | 110 Pierce St | legalize the following: interior renovation at the attic level including new tile, cabinetry, and plumbing fixtures in the bathroom and new cabinetry, plumbing fixtures and appliance in the wet bar.Details
legalize the following: interior renovation at the attic level including new tile, cabinetry, and plumbing fixtures in the bathroom and new cabinetry, plumbing fixtures and appliance in the wet bar. | $10,000 | |
| Feb 6, 2026 | In progress filed Feb 2026, not yet issued | 2513 Broadway | interior renovation & garage/basement level expansion, foundation work where indicated on plans, renovate 3 bathroooms, replace window sashesDetails
interior renovation & garage/basement level expansion, foundation work where indicated on plans, renovate 3 bathroooms, replace window sashes | $225,000 | |
| Oct 23, 2025 | Completed final sign-off Sep 2026 | 1233 Shrader St | Perez Construction Llc. | interior remodel of 2nd and 3rd floors. casework and lightinfg in bedrooms and family room. relocate existing interior bedroom door. replace existing laundry room door, cabinets wsher and dryer in kind. replace tile in bathroom at 3rd floor.Details
interior remodel of 2nd and 3rd floors. casework and lightinfg in bedrooms and family room. relocate existing interior bedroom door. replace existing laundry room door, cabinets wsher and dryer in kind. replace tile in bathroom at 3rd floor. | $83,307 |
| Oct 14, 2025 | Completed final sign-off Apr 2026 | 2400 Green St | Crown Construction San Francisco | revision to pa# 202402236422: new hvac units and location with screening at roofing.Details
revision to pa# 202402236422: new hvac units and location with screening at roofing. | |
| Oct 6, 2025 | In progress issued Oct 2025 | 2151 Laguna St | Peter Downey Construction Co., Inc. | revision to pa 202507281761, unit 3 - new windows @ kitchen/pantry; removal of kitchen wall w/added ceiling joists; add adjustments to power & lighing; (n) gas fireplace w/gas line for gas log kit; update primary bathroom layoutDetails
revision to pa 202507281761, unit 3 - new windows @ kitchen/pantry; removal of kitchen wall w/added ceiling joists; add adjustments to power & lighing; (n) gas fireplace w/gas line for gas log kit; update primary bathroom layout | |
| Jul 31, 2025 | Expired or cancelled expired Sep 2026 | 2450 Francisco St | revision to pa#202011249642. restore original front facade details to modify the windows. corrective permit to enforcement case 2024-005931enfDetails
revision to pa#202011249642. restore original front facade details to modify the windows. corrective permit to enforcement case 2024-005931enf | ||
| Jul 28, 2025 | Completed final sign-off Dec 2025 | 1330 Masonic Av | Perez Construction Llc. | in kind window replacement. interior renovations on the 2nd and 3rd floors.including in-kind w/ (n) tempered glazing, add wathersealing to (e) entry doors; new hardwood flooring on 3rd floor & tile floor in primary bathroom; other minor improvements including soundproffing & hvacDetails
in kind window replacement. interior renovations on the 2nd and 3rd floors.including in-kind w/ (n) tempered glazing, add wathersealing to (e) entry doors; new hardwood flooring on 3rd floor & tile floor in primary bathroom; other minor improvements including soundproffing & hvac | $75,000 |
| Jul 28, 2025 | In progress issued Aug 2025 | 2151 Laguna St | Peter Downey Construction Co., Inc. | unit 2. interior renovation of existing condo kitchen, bathrooms, powder room, laundry room, foyer and dining room.Details
unit 2. interior renovation of existing condo kitchen, bathrooms, powder room, laundry room, foyer and dining room. | $75,000 |
| Jul 22, 2025 | In progress issued Aug 2025 | 10 Seacliff Av | Citywest Construction Inc. | revision to 202206216738, 202407106140, 202504094044. rebuild stud walls along gl09 btw gl c and f and around the bay windows south gl9 due to dryrot per correction notice 0n g5.7. rebuild bay window, new footing below, new steps to wine storage new skylight avove stair. mis interior changesDetails
revision to 202206216738, 202407106140, 202504094044. rebuild stud walls along gl09 btw gl c and f and around the bay windows south gl9 due to dryrot per correction notice 0n g5.7. rebuild bay window, new footing below, new steps to wine storage new skylight avove stair. mis interior changes | $65,000 |
| Apr 9, 2025 | In progress issued Apr 2025 | 10 Seacliff Av | Citywest Construction Inc. | rev 202206216738 & 202407106140: rebuild the stud walls as (n) tilt-up walk allong gridlines 1/a-g a1-4 to address dry rot and water instrusion and apply (n) wtr proofing per correction notices on g5.7;reduce the depth of juliet balcony at 1/f living rm;provide (n) railing, supporting balcony.Details
rev 202206216738 & 202407106140: rebuild the stud walls as (n) tilt-up walk allong gridlines 1/a-g a1-4 to address dry rot and water instrusion and apply (n) wtr proofing per correction notices on g5.7;reduce the depth of juliet balcony at 1/f living rm;provide (n) railing, supporting balcony. | $20,000 |
| Feb 14, 2025 | In progress filed Feb 2025, not yet issued | 2504 Scott St | horizontal expansion of garage to the est. at 1st level, new unconditioned spa and interior renovation of the hall north of the spa. at 2nd fl, new unconditioned attic space at the rear of garage.Details
horizontal expansion of garage to the est. at 1st level, new unconditioned spa and interior renovation of the hall north of the spa. at 2nd fl, new unconditioned attic space at the rear of garage. | $45,000 | |
| Jan 14, 2025 | Completed final sign-off Apr 2026 | 2400 Green St | Crown Construction San Francisco | revision to pa#: 202402236422. reconfiguratoin of basement, relocate exterior door and pg&e gas meter.Details
revision to pa#: 202402236422. reconfiguratoin of basement, relocate exterior door and pg&e gas meter. | |
| Nov 12, 2024 | Completed final sign-off Nov 2025 | 71 Jordan Av | Citidev Inc. | widen (e) driveway alter one (e) remaining wall and replace one (e) retaining wall with new wall. motified curb cutDetails
widen (e) driveway alter one (e) remaining wall and replace one (e) retaining wall with new wall. motified curb cut | $12,000 |
| Oct 16, 2024 | In progress issued Feb 2025 | 230 Cherry St | Sean O'neill Construction | renovation on all floors. (n) paritial slab on grade. (n) 330sf conditioned space @basement. (n) windows facing street and rear doors, minor siding alterations located at front and rear. 3/f: new bathroom.Details
renovation on all floors. (n) paritial slab on grade. (n) 330sf conditioned space @basement. (n) windows facing street and rear doors, minor siding alterations located at front and rear. 3/f: new bathroom. | $140,000 |
| Oct 4, 2024 | Completed final sign-off Apr 2026 | 2400 Green St | Crown Construction San Francisco | ref 20240223622-(n) stair penthouse @ (e) roof deckDetails
ref 20240223622-(n) stair penthouse @ (e) roof deck | $39,000 |
| Aug 21, 2024 | In progress issued Jan 2025 | 10 Seacliff Av | Citywest Construction Inc. | revision to pa202206216738.update at basement,horiz expansion at the basement by upto 8'vert excav,lowering mat slab south of grid line 5, adjusting windows sizes/location, adding bed,bath.laundry and fitness&reaaranging remaining rooms.1/f:remove pocket door.earth shoring associated with both pasDetails
revision to pa202206216738.update at basement,horiz expansion at the basement by upto 8'vert excav,lowering mat slab south of grid line 5, adjusting windows sizes/location, adding bed,bath.laundry and fitness&reaaranging remaining rooms.1/f:remove pocket door.earth shoring associated with both pas | $150,000 |
| Jul 9, 2024 | In progress issued Jul 2024 | 1615 Monterey Bl | Proano Construction | revision to pa# 202307242839: (n) residential elevator, relocated guest bedroom, primary bedroom ceiling framing changes. previous work under pa# 202308013395 r5. to comply w/ nov# 202425593.Details
revision to pa# 202307242839: (n) residential elevator, relocated guest bedroom, primary bedroom ceiling framing changes. previous work under pa# 202308013395 r5. to comply w/ nov# 202425593. | $110,000 |
| Jun 13, 2024 | Completed final sign-off May 2025 | 134 Delmar St | Crown Construction San Francisco | revision to issued pa # 201812077792 s1 for minor structural changes per plans.Details
revision to issued pa # 201812077792 s1 for minor structural changes per plans. | |
| May 17, 2024 | Completed final sign-off Aug 2025 | 1940 Broadway | Centric Building Inc. | 8/f unit 8: interior renovation. new lighting. no structural, hvac, windows, or envelope changes.Details
8/f unit 8: interior renovation. new lighting. no structural, hvac, windows, or envelope changes. | $60,000 |
| Mar 25, 2024 | Completed final sign-off Apr 2026 | 2400 Green St | Crown Construction San Francisco | new non combustible roof deck, new stair to roof, new skylight, interior renovations on all levels, structural upgradesDetails
new non combustible roof deck, new stair to roof, new skylight, interior renovations on all levels, structural upgrades | $400,000 |
| Mar 22, 2024 | Completed final sign-off Oct 2025 | 71 Jordan Av | Citidev Inc. | (n) kitchen pantry, fireplace stone; (n) millwork for fireplace, powder, laundry, primary bath. painting of kitchen cabinets; (n) front door, new gas firepit in backyard replace in kind. millwork for front living room and family lounge; new wine fridge in basement, new light pendants in kitchen, newDetails
(n) kitchen pantry, fireplace stone; (n) millwork for fireplace, powder, laundry, primary bath. painting of kitchen cabinets; (n) front door, new gas firepit in backyard replace in kind. millwork for front living room and family lounge; new wine fridge in basement, new light pendants in kitchen, new | $250,000 |
| Aug 4, 2023 | Completed final sign-off Mar 2024 | 84 Commonwealth Av | Colindres & Associates | revision to 202203089446. repair/reconstruction of northwest chimney due to (e) structual damage.Details
revision to 202203089446. repair/reconstruction of northwest chimney due to (e) structual damage. | $1,000 |
| Aug 1, 2023 | In progress issued Jun 2024 | 1615 Monterey Bl | Proano Construction | horizontal addition at basement, 1st and 2nd floor new rear and side yard patio and concrete pad configuration to align with alterations; note p/a 2023-7242-2839 submitted for an interior remodel, paper form 8 converted to form 3, dmj 09/17/2023;Details
horizontal addition at basement, 1st and 2nd floor new rear and side yard patio and concrete pad configuration to align with alterations; note p/a 2023-7242-2839 submitted for an interior remodel, paper form 8 converted to form 3, dmj 09/17/2023; | $300,000 |
| Jul 24, 2023 | In progress issued Feb 2024 | 1615 Monterey Bl | Proano Construction | interior renovation on all levels. basement: new spa bath, sauna, laundry, sto rm, & interior stairs to 1/f (556 sf). 1/f: new bar, kitchen remodel, install stiars to basement. 2/f: new bath, walk-in closet, skylightDetails
interior renovation on all levels. basement: new spa bath, sauna, laundry, sto rm, & interior stairs to 1/f (556 sf). 1/f: new bar, kitchen remodel, install stiars to basement. 2/f: new bath, walk-in closet, skylight | $100,000 |
| Mar 17, 2023 | Completed final sign-off Mar 2024 | 71 Rico Wy | Forma Construction | interior renovation. 1/f: new bug screen at (e) exterior door. 2/f: replace (e) exterior sliding door, replace (e) skylights, renovate bathroom with new finishes and new steam shower.Details
interior renovation. 1/f: new bug screen at (e) exterior door. 2/f: replace (e) exterior sliding door, replace (e) skylights, renovate bathroom with new finishes and new steam shower. | $30,000 |
| Feb 10, 2023 | Completed final sign-off Sep 2023 | 30 Walnut St | Arrow Builders Inc | revision to pa #202206277136. window replacement at 3rd floor and recessed floor at 2nd floor kitchen hall.Details
revision to pa #202206277136. window replacement at 3rd floor and recessed floor at 2nd floor kitchen hall. | $10,000 |
| Nov 22, 2022 | Completed final sign-off Mar 2024 | 84 Commonwealth Av | Colindres & Associates | voluntary structural strengthening of detached garage w/new skylights & garage revisions. repair (e) garage structural less than 50%Details
voluntary structural strengthening of detached garage w/new skylights & garage revisions. repair (e) garage structural less than 50% | $48,000 |
| Nov 16, 2022 | Never finaled filed Nov 2022, never issued | 71 Jordan Av | expansion of primary bedroom onto (e) deck. bathroom remodel. extension of roofdeck.Details
expansion of primary bedroom onto (e) deck. bathroom remodel. extension of roofdeck. | $95,000 | |
| Oct 12, 2022 | Never finaled issued Oct 2022, no final | 465 Avila St | Proano Construction | rev to pa# 2022-0118-6191 (n) layout 1st fl. (n) balustrade at rear stair (n) struc frmg at 2nd fl. modified kitchen layout (n) windows doors and enterior cement plaster finisis at west facadeDetails
rev to pa# 2022-0118-6191 (n) layout 1st fl. (n) balustrade at rear stair (n) struc frmg at 2nd fl. modified kitchen layout (n) windows doors and enterior cement plaster finisis at west facade | |
| Jun 27, 2022 | Completed final sign-off Sep 2023 | 30 Walnut St | Arrow Builders Inc | 2/f: remodel kitchen, powder room. 3/f: remodel master bath, (e) spare bedroom/bathroom, new laundry closet, new window at stair. 4/f: new window at stair.Details
2/f: remodel kitchen, powder room. 3/f: remodel master bath, (e) spare bedroom/bathroom, new laundry closet, new window at stair. 4/f: new window at stair. | $50,000 |
| Jun 24, 2022 | Never finaled issued Jul 2022, no final | 2107 Broadway | Peter Downey Construction Co., Inc. | basement: t.i. of basement new slab on grade; footings and reinforcement of (e) foundation walls. unit remodel with new kitchen, bathroom, addition of half bath, new entry door/windows. no changes to front facade.Details
basement: t.i. of basement new slab on grade; footings and reinforcement of (e) foundation walls. unit remodel with new kitchen, bathroom, addition of half bath, new entry door/windows. no changes to front facade. | $100,000 |
| Jun 21, 2022 | In progress issued Jun 2024 | 10 Seacliff Av | Citywest Construction Inc. | horizontal addition at rear on 2nd floor, new decks on all floors at rear, new bow window, new sun room at 3rd floor, new raised roof. interior remodel at all levels. new windows at all levels above grade.Details
horizontal addition at rear on 2nd floor, new decks on all floors at rear, new bow window, new sun room at 3rd floor, new raised roof. interior remodel at all levels. new windows at all levels above grade. | $1,250,000 |
| Mar 8, 2022 | Completed final sign-off Mar 2024 | 84 Commonwealth Av | Colindres & Associates | interior renovation on all levels, facade aleration at rear wall, installation of elevator.Details
interior renovation on all levels, facade aleration at rear wall, installation of elevator. | $195,000 |
| Jan 20, 2022 | Completed final sign-off Jan 2024 | 2109 Broadway | Peter Downey Construction Co., Inc. | exterior rear yard work including patio modification, new steps, new retaining wall.Details
exterior rear yard work including patio modification, new steps, new retaining wall. | $30,000 |
| Jan 18, 2022 | Never finaled issued Jan 2022, no final | 465 Avila St | Proano Construction | remodeled kitchen, breakfast room, powder room, hall closets, family room & master bath. new door at rear. new windows & window replacement at rear. new skylight. removal of ***Details
remodeled kitchen, breakfast room, powder room, hall closets, family room & master bath. new door at rear. new windows & window replacement at rear. new skylight. removal of *** | $72,000 |
| Dec 23, 2021 | Completed final sign-off Apr 2024 | 84 Commonwealth Av | Colindres & Associates | renovation of basement level and new stair to 1/f. work includes excavation for rooms down and new foundation.Details
renovation of basement level and new stair to 1/f. work includes excavation for rooms down and new foundation. | $240,000 |
| Nov 30, 2021 | Completed final sign-off Jul 2023 | 2045 Jackson St | Clayton Timbrell & Co | revision to 2019 0326 6236-s1. update structural design to capture as built field conditions.Details
revision to 2019 0326 6236-s1. update structural design to capture as built field conditions. | |
| Nov 22, 2021 | Completed final sign-off Mar 2024 | 84 Commonwealth Av | Colindres & Associates | horizontal expansion of 2'5" @ rear 1st fl within buildable area. interior t.i. under separate permit. this permit scope is only for horizontal expansion.Details
horizontal expansion of 2'5" @ rear 1st fl within buildable area. interior t.i. under separate permit. this permit scope is only for horizontal expansion. | $80,000 |
| Nov 1, 2021 | Completed final sign-off Jan 2024 | 2109 Broadway | Peter Downey Construction Co., Inc. | remodel of interior on 1st,2nd & 3rd floors, (n) dormer (per bulletin 3)Details
remodel of interior on 1st,2nd & 3rd floors, (n) dormer (per bulletin 3) | $275,000 |
| Oct 1, 2021 | Completed final sign-off Jul 2023 | 2045 Jackson St | Clayton Timbrell & Co | remodel of (e) master bathroom suite, 2 remodeled walk in closets, 2 remodeled bathrooms. scope of work under this permit is separate from bpa 201903266236.Details
remodel of (e) master bathroom suite, 2 remodeled walk in closets, 2 remodeled bathrooms. scope of work under this permit is separate from bpa 201903266236. | $20,000 |
| Apr 21, 2021 | Expired or cancelled cancelled Jul 2024 | 3444 Washington St | extend garage wall to prop line & new garage door. interior alteration on 1,2,3 & 4 fl. add (n) stairs & ext. door @ 1st fl. @ 3rd fl, replace balustrades on both roofs, replace roof over main entry with pavers & planters. remove portion of wall @ 4th fl stair to replace with new guard & handrailDetails
extend garage wall to prop line & new garage door. interior alteration on 1,2,3 & 4 fl. add (n) stairs & ext. door @ 1st fl. @ 3rd fl, replace balustrades on both roofs, replace roof over main entry with pavers & planters. remove portion of wall @ 4th fl stair to replace with new guard & handrail | $476,000 | |
| Oct 30, 2020 | Completed final sign-off Mar 2022 | 1330 Masonic Av | Cook Construction | revision to bpa# 201907055221 & 201907055209. to incorporate the clouded changes per plans. n-exterior stair from rear yard down to garage level; n patio at grade at l2; rebuild front stairs; n skylights; n garage door and side door; new window opening on 3rd floor north; new interior stair @gar-l2.Details
revision to bpa# 201907055221 & 201907055209. to incorporate the clouded changes per plans. n-exterior stair from rear yard down to garage level; n patio at grade at l2; rebuild front stairs; n skylights; n garage door and side door; new window opening on 3rd floor north; new interior stair @gar-l2. | |
| Oct 17, 2020 | Expired or cancelled withdrawn Aug 2021 | 222 El Camino Del Mar | replace section of (e) brick rear yard retaining wall with (n) concrete retaining wall.Details
replace section of (e) brick rear yard retaining wall with (n) concrete retaining wall. | $1,000 | |
| Oct 17, 2020 | Completed final sign-off May 2023 | 81 25th Av | Northington Innovations Inc | demo (e) 2nd floor terrace & stairs to be replaced by (n) terrace & stairs. demo of (e) brick retaining wall to be replace w/ (n) concrete retianing wall. rebuild interior stairs betweeen 1st and 2nd floor. remode 1st floor w/ new bathroom, sauna, steam shower, laundry room, and bedroom.Details
demo (e) 2nd floor terrace & stairs to be replaced by (n) terrace & stairs. demo of (e) brick retaining wall to be replace w/ (n) concrete retianing wall. rebuild interior stairs betweeen 1st and 2nd floor. remode 1st floor w/ new bathroom, sauna, steam shower, laundry room, and bedroom. | $100,000 |
| Mar 2, 2020 | Never finaled filed Mar 2020, never issued | 530 Alvarado St | horizontal rear addition. in-fill (e) covered porch to create (n) exercise room on 1st fl below rear deck. in-fill angled corner @ the front facade @ ground fl only, (n) painted wood trellis @ rear deck, all other work under permit 202002194880Details
horizontal rear addition. in-fill (e) covered porch to create (n) exercise room on 1st fl below rear deck. in-fill angled corner @ the front facade @ ground fl only, (n) painted wood trellis @ rear deck, all other work under permit 202002194880 | $50,000 | |
| Feb 19, 2020 | Expired or cancelled cancelled Jan 2026 | 530 Alvarado St | renovate (e) hall, powder room & kitchen on 2nd fl. remove & replace deck & stair to garden on 2nd fl. renovate (e) garage to include (n) mechanical room, & (n) closet, renovate (e) bathrooms & roof terace on the 3rd fl.Details
renovate (e) hall, powder room & kitchen on 2nd fl. remove & replace deck & stair to garden on 2nd fl. renovate (e) garage to include (n) mechanical room, & (n) closet, renovate (e) bathrooms & roof terace on the 3rd fl. | $250,000 | |
| Feb 12, 2020 | Completed final sign-off Aug 2021 | 3522 Clay St | Peter Downey Construction Co., Inc. | interior renovation: including new bedroom on first fl, relocating laundry room and bathroom on the 3rd fl, and new bedroom on the fourth fl.Details
interior renovation: including new bedroom on first fl, relocating laundry room and bathroom on the 3rd fl, and new bedroom on the fourth fl. | $30,000 |
| Feb 12, 2020 | Completed final sign-off Aug 2021 | 3522 Clay St | Peter Downey Construction Co., Inc. | horizontal addition on the 3rd flr over (e) bay window below. all other work under separate permit.Details
horizontal addition on the 3rd flr over (e) bay window below. all other work under separate permit. | $6,000 |
| Feb 10, 2020 | Expired or cancelled cancelled Jan 2026 | 2596 Chestnut St | interior alteration, work includes kitchen remodel, new master suite, renovate upstairs bedroom,new window at front, doors to roof deckDetails
interior alteration, work includes kitchen remodel, new master suite, renovate upstairs bedroom,new window at front, doors to roof deck | $65,000 | |
| Dec 24, 2019 | Never finaled filed Dec 2019, never issued | 115 Avila St | vertical addition for new family room & roof deck plus powder room, facade modifications per plans.**maher n/a**Details
vertical addition for new family room & roof deck plus powder room, facade modifications per plans.**maher n/a** | $100,000 | |
| Oct 24, 2019 | Completed final sign-off Sep 2022 | 3063 Laguna St | Bbc Construction Inc. | improvements includes: replace (e) exterior front stairs leading ot (e) 2nd floor dwelling unit. 1-hr rated wall at property line.(n) roof covering at front door landing; (n) storage below replacement stairs.Details
improvements includes: replace (e) exterior front stairs leading ot (e) 2nd floor dwelling unit. 1-hr rated wall at property line.(n) roof covering at front door landing; (n) storage below replacement stairs. | $20,000 |
| Sep 16, 2019 | Completed final sign-off Oct 2022 | 201 Folsom St | Aaron Gordon Construction Inc | interior alteration of dwelling unit 38a including new interior lighting, new interior partitions, new cabinets. merger at units 38a and 38b under seperate permit #201901049637. n/a for maherDetails
interior alteration of dwelling unit 38a including new interior lighting, new interior partitions, new cabinets. merger at units 38a and 38b under seperate permit #201901049637. n/a for maher | $200,000 |
| Sep 16, 2019 | Completed final sign-off Oct 2022 | 201 Folsom St | Aaron Gordon Construction Inc | revision to app#201811024885. architectural ceiling changes and details. work includes structural details for sliding door, master vanity anchorage, bath vanity support and core wall penetration. n/a for maherDetails
revision to app#201811024885. architectural ceiling changes and details. work includes structural details for sliding door, master vanity anchorage, bath vanity support and core wall penetration. n/a for maher | $75,000 |
| Sep 13, 2019 | Expired or cancelled cancelled Nov 2024 | 4371 17th St | legalization of (e) accessory dwelling unit per ord# 43-14 above deteched garage, facing 17th st. original structure permitted under pa# 9404664.Details
legalization of (e) accessory dwelling unit per ord# 43-14 above deteched garage, facing 17th st. original structure permitted under pa# 9404664. | $80,000 | |
| Aug 30, 2019 | Expired or cancelled cancelled Aug 2022 | 160 Noe St | int remodel to 2 dwelling units. unit 162 - demo (e) rear stair, new concrete pation, master suite at ground flr. new wood deck, laundry and int stair. unit 160 - demo (e) ext stair. new master suite at 3rd flr, new stair, laundry, stair connecting 3rd to atticDetails
int remodel to 2 dwelling units. unit 162 - demo (e) rear stair, new concrete pation, master suite at ground flr. new wood deck, laundry and int stair. unit 160 - demo (e) ext stair. new master suite at 3rd flr, new stair, laundry, stair connecting 3rd to attic | $655,100 | |
| Aug 29, 2019 | Completed final sign-off Oct 2021 | 1767 43rd Av | Modern Construction Design | interior remodel at ground floor and 2nd floor. new rear yard wood deck. ground floor: new bathroom, closet and laundry. 2nd floor: new kitchen and wood deckDetails
interior remodel at ground floor and 2nd floor. new rear yard wood deck. ground floor: new bathroom, closet and laundry. 2nd floor: new kitchen and wood deck | $75,000 |
| Jul 24, 2019 | Completed final sign-off Feb 2020 | 498 Haight St | Bannside Construction Inc. | new structural slab @ ground floor commercial spaceDetails
new structural slab @ ground floor commercial space | $5,000 |
| Jul 18, 2019 | Completed final sign-off May 2020 | 514 Funston Av | Urban Builder General Contracting Inc | (n) roof deck over (e) roof @ 2nd floor.Details
(n) roof deck over (e) roof @ 2nd floor. | $10,000 |
| Jul 5, 2019 | Completed final sign-off Mar 2022 | 1330 Masonic Av | Cook Construction | horizontal rear addition on 3 levels-new office & bath on 1st floor, new relocated kitchen on 2nd floor, new roof terrace. reference pa#201907055209 for excavation and structural retaining wall.Details
horizontal rear addition on 3 levels-new office & bath on 1st floor, new relocated kitchen on 2nd floor, new roof terrace. reference pa#201907055209 for excavation and structural retaining wall. | $120,000 |
| Jul 5, 2019 | Completed final sign-off Mar 2022 | 1330 Masonic Av | Cook Construction | renovate (e) kitchen & 3rd fl bath, (n) 3rd fl bath, new patio at 1st fl & new stairs to garden. demo (e) front stairs & replace in kind.Details
renovate (e) kitchen & 3rd fl bath, (n) 3rd fl bath, new patio at 1st fl & new stairs to garden. demo (e) front stairs & replace in kind. | $250,000 |
| Jul 1, 2019 | Completed final sign-off Feb 2020 | 2775 Filbert St | Clayton Timbrell & Co | revision to 201804105926. retain e property line windows on east elevation at 1st and 3rd floorsDetails
revision to 201804105926. retain e property line windows on east elevation at 1st and 3rd floors | |
| Jun 19, 2019 | Completed final sign-off Feb 2020 | 498 Haight St | Bannside Construction Inc. | change of use from retail to office. interior renovation of professional design office w/2 new toilet rooms, 3 private offices; facade alterations to restore 6 original window openings. new accessible entrance door in original location. mep under separate permit.Details
change of use from retail to office. interior renovation of professional design office w/2 new toilet rooms, 3 private offices; facade alterations to restore 6 original window openings. new accessible entrance door in original location. mep under separate permit. | $147,500 |
| Apr 10, 2019 | Expired or cancelled cancelled Nov 2024 | 3766 21st St | horizontal addition @ rear, horizontal addition @ front garage. renovation to all levels including kitchen, (2) baths, powder room. (n) 4th story w/ study & 1/2 bathDetails
horizontal addition @ rear, horizontal addition @ front garage. renovation to all levels including kitchen, (2) baths, powder room. (n) 4th story w/ study & 1/2 bath | $100,000 | |
| Mar 26, 2019 | Completed final sign-off Jul 2023 | 2045 Jackson St | Clayton Timbrell & Co | horizontal addition @ 2nd fl into rear yard-63 sf. renovation of 2nd fl kitchen, work inlcudes new fixtures,work includes new fixtures finishes. **maher n/a**Details
horizontal addition @ 2nd fl into rear yard-63 sf. renovation of 2nd fl kitchen, work inlcudes new fixtures,work includes new fixtures finishes. **maher n/a** | $60,000 |
| Jan 25, 2019 | Never finaled issued Jan 2019, no final | 3800 Washington St | Cook Construction | interior renovation to ground floor kitchen, pantry, wet bar, study room and powder roomDetails
interior renovation to ground floor kitchen, pantry, wet bar, study room and powder room | $55,000 |
| Jan 9, 2019 | Completed final sign-off Oct 2020 | 1940 Vallejo St | Centric Building Inc. | unit#2 - residential unit, partial int remodel, no struct, no change to footprint, bld, hvac or ext envelope (2) ground flr add insulation and mechanical conditioningDetails
unit#2 - residential unit, partial int remodel, no struct, no change to footprint, bld, hvac or ext envelope (2) ground flr add insulation and mechanical conditioning | $200,000 |
| Jan 4, 2019 | Completed final sign-off Oct 2022 | 201 Folsom St | Aaron Gordon Construction Inc | unit merger of 38a and 38b new interior, lighting, partitions, cabinetry. no struct. per lod 20140030352ad, 9 at 10 mergers performed under this lod. this is the 10th merger under lod. fully sprinklered. no change to occ maher naDetails
unit merger of 38a and 38b new interior, lighting, partitions, cabinetry. no struct. per lod 20140030352ad, 9 at 10 mergers performed under this lod. this is the 10th merger under lod. fully sprinklered. no change to occ maher na | $95,000 |
| Jan 2, 2019 | Expired or cancelled cancelled Mar 2023 | 3063 Laguna St | to erect a type v-b, 4-story single dwelling unit with no basement.Details
to erect a type v-b, 4-story single dwelling unit with no basement. | $450,000 | |
| Jan 2, 2019 | Expired or cancelled cancelled Mar 2023 | 3063 Laguna St | to demolish a 1-story, type v-b detached garage.Details
to demolish a 1-story, type v-b detached garage. | $25,000 | |
| Dec 21, 2018 | Completed final sign-off Jul 2022 | 2447 Francisco St | Brian Mac Namara Construction | horizontal addition. renovate & horizontal addition at rear. new roof terrace, new terrace & stair at rear. 2 new bedrooms, 3 new baths. ** maher: n/a **Details
horizontal addition. renovate & horizontal addition at rear. new roof terrace, new terrace & stair at rear. 2 new bedrooms, 3 new baths. ** maher: n/a ** | $250,000 |
| Dec 7, 2018 | Completed final sign-off Dec 2021 | 2749 Steiner St | Everbuilt Construction, Inc., Caruso Construction Inc. | horizontal addition at rear. convert exterior entry to interior entry foyer. renovate kitchen. relocate landry room. renovate 2 bathrooms at 3rd floor.Details
horizontal addition at rear. convert exterior entry to interior entry foyer. renovate kitchen. relocate landry room. renovate 2 bathrooms at 3rd floor. | $100,000 |
| Dec 7, 2018 | Completed final sign-off May 2025 | 136 Delmar St | Crown Construction San Francisco | demolish 1-story, type 5, single family building.Details
demolish 1-story, type 5, single family building. | $10,000 |
| Dec 7, 2018 | Completed final sign-off May 2025 | 136 Delmar St | Crown Construction San Francisco | erect 3-story, type 5-b, 1 basement, 2 dwelling units building (1 unit adu)Details
erect 3-story, type 5-b, 1 basement, 2 dwelling units building (1 unit adu) | $125,000 |
| Nov 30, 2018 | Completed final sign-off Aug 2019 | 1225 Waller St | Footfour Builders | interior only rmeodel to 2nd fl - converting (e) kitchen to bedroom. reocate (e) kitchen & laundry. (n) master bath. no horizontal/vertical additions. no exterior work visible from st.Details
interior only rmeodel to 2nd fl - converting (e) kitchen to bedroom. reocate (e) kitchen & laundry. (n) master bath. no horizontal/vertical additions. no exterior work visible from st. | $95,000 |
| Oct 22, 2018 | Completed final sign-off Nov 2022 | 1582 Dolores St | Rico's General Construction | (n) roof deck on 2nd storyDetails
(n) roof deck on 2nd story | $10,000 |
| Oct 16, 2018 | Completed final sign-off Nov 2022 | 1580 Dolores St | Db2 Contractors Inc 8 Dba Re Renovations, Rico's General Construction | interior ti of all 3 flrs. work incl (n) stair openings, kitchen and bathroom relocation, (n) mster suite.Details
interior ti of all 3 flrs. work incl (n) stair openings, kitchen and bathroom relocation, (n) mster suite. | |
| Aug 3, 2018 | Never finaled issued Aug 2018, no final | 168 Corbett Av | Modern Construction Design | remodel of (e) kitchen & bathroom, addition of washer and dryer to both units.Details
remodel of (e) kitchen & bathroom, addition of washer and dryer to both units. | $85,000 |
| Jun 27, 2018 | Completed final sign-off Nov 2018 | 350 Jersey St | Forma Construction | revision to pa #201704285182. reconfiguration of interior stair. modification of ground fl room layout. add half bath at g/f. addition of slab plan.Details
revision to pa #201704285182. reconfiguration of interior stair. modification of ground fl room layout. add half bath at g/f. addition of slab plan. | |
| Jun 6, 2018 | Completed final sign-off Jun 2020 | 242 Presidio Av | Millans Construction | horizontal addition. at 3rd floor, rear. replace (e) windows at front facade, (n) skylights per plans. **maher n/a**Details
horizontal addition. at 3rd floor, rear. replace (e) windows at front facade, (n) skylights per plans. **maher n/a** | $75,000 |
| Jun 6, 2018 | Never finaled issued Sep 2022, no final | 63 Rico Wy | Forma Construction | renovation of (e) 2 story single family residence. vertical addition of (n) 3rd story. roof terrace & stair penthouse. 3rd floor includes master suite, office, bathroom & bedrooms. **maher n/a**Details
renovation of (e) 2 story single family residence. vertical addition of (n) 3rd story. roof terrace & stair penthouse. 3rd floor includes master suite, office, bathroom & bedrooms. **maher n/a** | $125,000 |
| May 21, 2018 | Completed final sign-off Sep 2019 | 431 Avila St | Cook Construction | revision to 201710040350 & 201701088019 revised floorplan structural details & replacement of 4th flr roof. this revision superceedes 201212176385 maher naDetails
revision to 201710040350 & 201701088019 revised floorplan structural details & replacement of 4th flr roof. this revision superceedes 201212176385 maher na | |
| Apr 10, 2018 | Completed final sign-off Nov 2021 | 1754 Fell St | Crown Construction San Francisco | basement: new foundation, replace (e) rear ratining walls; new ext. openings/int. layout; 1/f: new ext. door @ kitchen, new wood deck/stone patio, new ext. stair to basement; 2/f: new bathroom & closets, remove (e) brick chimney @ rear - not visible from street.Details
basement: new foundation, replace (e) rear ratining walls; new ext. openings/int. layout; 1/f: new ext. door @ kitchen, new wood deck/stone patio, new ext. stair to basement; 2/f: new bathroom & closets, remove (e) brick chimney @ rear - not visible from street. | $100,000 |
| Apr 5, 2018 | Expired or cancelled withdrawn Aug 2018 | 136 Delmar St | renovation of & addition to (e) one-story over basement sfd. (n) 1 car garage & (n) 1 bedrm unit @ basement. renovate & expand (e) 1st fl kitchen, living & dining rms, (n) powder rm. (n) 2nd fl w/2 baths, (n) 3rd fl w/ family rm, bedrm & bath.Details
renovation of & addition to (e) one-story over basement sfd. (n) 1 car garage & (n) 1 bedrm unit @ basement. renovate & expand (e) 1st fl kitchen, living & dining rms, (n) powder rm. (n) 2nd fl w/2 baths, (n) 3rd fl w/ family rm, bedrm & bath. | $125,000 | |
| Dec 1, 2017 | Completed final sign-off Mar 2021 | 1529 Dolores St | Green Metro Inc | add 1 family room, bedroom, mudroom, bathroom, laundry at ground floor.remove(e) deck add (n) deck and patio at rear. new interior stair from ground to 2nd floor. remodel kitchen & powder at 2nd floor. add 1 master bathroom, remodel (e) bathroom at 3rd floor.Details
add 1 family room, bedroom, mudroom, bathroom, laundry at ground floor.remove(e) deck add (n) deck and patio at rear. new interior stair from ground to 2nd floor. remodel kitchen & powder at 2nd floor. add 1 master bathroom, remodel (e) bathroom at 3rd floor. | $250,000 |
| Oct 19, 2017 | Completed final sign-off Apr 2019 | 2834 Jackson St | Jeff King And Company Inc | revision to pa %201612275925 - rear yard renovation includes 30" retaining walls, exterior stair, patio, fireplace & grill.Details
revision to pa %201612275925 - rear yard renovation includes 30" retaining walls, exterior stair, patio, fireplace & grill. | $60,000 |
| Aug 2, 2017 | Expired or cancelled cancelled Aug 2022 | 2209 North Point St | horizontal & vertical addition. renovation at an existing 3-story single family dwelling with horizontal addition at cast light well and partial vertical addition of a 4 th floor.Details
horizontal & vertical addition. renovation at an existing 3-story single family dwelling with horizontal addition at cast light well and partial vertical addition of a 4 th floor. | $250,000 | |
| Jun 8, 2017 | Never finaled issued Jun 2017, no final | 3867 Washington St | Hughes & Company Construction, Inc | to comply with complaint 201575974 and to document the installation of 2 condenser units on the roof of sfdDetails
to comply with complaint 201575974 and to document the installation of 2 condenser units on the roof of sfd | $6,500 |
| May 30, 2017 | Never finaled issued Jun 2017, no final | 59 Rico Wy | Forma Construction | revision to 210603313627, minor structural changes to layout and reduction in rear bay window. no changes affect code complianceDetails
revision to 210603313627, minor structural changes to layout and reduction in rear bay window. no changes affect code compliance | |
| Apr 28, 2017 | Completed final sign-off Nov 2019 | 350 Jersey St | Forma Construction | vertical & horizontal addition. renovation of (e) 2 story sfd into 3 (three) story sfd. additonal bedrooms, bath & family room.Details
vertical & horizontal addition. renovation of (e) 2 story sfd into 3 (three) story sfd. additonal bedrooms, bath & family room. | $400,000 |
| Feb 24, 2017 | Completed final sign-off May 2017 | 492 Douglass St | Cullinane Plastering | new fire place on the 3rd floor per app#201305156968Details
new fire place on the 3rd floor per app#201305156968 | $1,000 |
| Aug 10, 2016 | Completed final sign-off Nov 2018 | 127 05th Av | Spe Construction Inc. | remodel on all floors: add 1 bedroom, 1 bath family rm, laundry, closets, stairs @ basement. renovate kitchen @ 1st. renovate master bedroom & (e) bath, add master bath & laundry closet @ 2nd. renovated (e) bath 0n 3rdDetails
remodel on all floors: add 1 bedroom, 1 bath family rm, laundry, closets, stairs @ basement. renovate kitchen @ 1st. renovate master bedroom & (e) bath, add master bath & laundry closet @ 2nd. renovated (e) bath 0n 3rd | $185,000 |
| Jul 18, 2016 | Completed final sign-off Nov 2018 | 127 05th Av | Spe Construction Inc. | new rear deck & framed stair in set back less than 10' from grade, replace windows at sun room & living room, no other work, all other work under pa #201608104652.Details
new rear deck & framed stair in set back less than 10' from grade, replace windows at sun room & living room, no other work, all other work under pa #201608104652. | $85,000 |
| Jul 5, 2016 | Completed final sign-off Apr 2019 | 2834 Jackson St | Jeff King And Company Inc | interior renovations on basement & 3 floors. exterior modification on rear & side elevations. in kind, custom wood sash replacement to match (e) dimensions profiles and upper sash divisions on front windows. single -story rear addition under sep permit.Details
interior renovations on basement & 3 floors. exterior modification on rear & side elevations. in kind, custom wood sash replacement to match (e) dimensions profiles and upper sash divisions on front windows. single -story rear addition under sep permit. | $120,000 |
| Apr 8, 2016 | Never finaled issued Apr 2016, no final | 1275 Fell St | G Swanson Constr. Inc. | voluntary accessible upgrades to the banking center. customer facing areas and exterior landings and path of travel. no work to exterior of building.Details
voluntary accessible upgrades to the banking center. customer facing areas and exterior landings and path of travel. no work to exterior of building. | $50,000 |
| Mar 31, 2016 | Completed final sign-off May 2019 | 59 Rico Wy | Forma Construction | remodel of 3 story single family residence with horizontal addition at rear on all three levels, adding 1 bedroom, 2 bathrms, family roomDetails
remodel of 3 story single family residence with horizontal addition at rear on all three levels, adding 1 bedroom, 2 bathrms, family room | $300,000 |
| Mar 31, 2016 | Expired or cancelled cancelled Sep 2017 | 1591 Shrader St | building addition deck & balcony at (e) 3-story single family dwellingDetails
building addition deck & balcony at (e) 3-story single family dwelling | $25,000 |