Ivan Diviney
- Listed as
- contractor, subcontractor
- Firm
- Diviney Construction Inc
- Based in
- Burlingame
- On San Francisco permits
- Dec 2012 to Apr 2026
29 permits since 2000 (contractor on 28 permits, subcontractor on 1 permit): 24 completed, 1 in progress, 2 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 6, 2026 | Completed final sign-off Apr 2026 | 2579 15th Av | Diviney Construction Inc | revision to 202504094037 to reduce scope of work with no work to front facade windows.Details
revision to 202504094037 to reduce scope of work with no work to front facade windows. | |
| Apr 9, 2025 | Completed final sign-off Apr 2026 | 2579 15th Av | Diviney Construction Inc | localized alab on grade/footing replacement. exterior siding replacement. all windows/door replacement. in kind existing deck ledger replacement.Details
localized alab on grade/footing replacement. exterior siding replacement. all windows/door replacement. in kind existing deck ledger replacement. | $70,000 |
| Aug 21, 2024 | In progress issued Jan 2025 | 10 Seacliff Av | Citywest Construction Inc. | revision to pa202206216738.update at basement,horiz expansion at the basement by upto 8'vert excav,lowering mat slab south of grid line 5, adjusting windows sizes/location, adding bed,bath.laundry and fitness&reaaranging remaining rooms.1/f:remove pocket door.earth shoring associated with both pasDetails
revision to pa202206216738.update at basement,horiz expansion at the basement by upto 8'vert excav,lowering mat slab south of grid line 5, adjusting windows sizes/location, adding bed,bath.laundry and fitness&reaaranging remaining rooms.1/f:remove pocket door.earth shoring associated with both pas | $150,000 |
| Apr 25, 2024 | Completed final sign-off Dec 2024 | 279 Arch St | Diviney Construction Inc | to comply with nov 202421076 auto damage repair to post and footingDetails
to comply with nov 202421076 auto damage repair to post and footing | $8,000 |
| Feb 22, 2024 | Completed final sign-off Dec 2024 | 201 Vicente St | Diviney Construction Inc | partial foundation replacement due to tree root damage. new retaining wallDetails
partial foundation replacement due to tree root damage. new retaining wall | $10,000 |
| Dec 13, 2022 | Completed final sign-off Apr 2023 | 1263 05th Av | Diviney Construction Inc | to comply to violation# 202295188: items 2-8. weather strip, fire extinguisher, smoke detectors, carbon monoxide alarm, repair electrical outlets, plumbing permit by plumber to fix hot water. provide heat in each habitable room.Details
to comply to violation# 202295188: items 2-8. weather strip, fire extinguisher, smoke detectors, carbon monoxide alarm, repair electrical outlets, plumbing permit by plumber to fix hot water. provide heat in each habitable room. | $17,500 |
| Sep 29, 2021 | Completed final sign-off Mar 2022 | 2501 Ocean Av | Diviney Construction Inc | revision 202105271214. voluntary strengthening to add beams and posts to reinforce floor joists.Details
revision 202105271214. voluntary strengthening to add beams and posts to reinforce floor joists. | $50,000 |
| May 27, 2021 | Completed final sign-off Mar 2022 | 2501 Ocean Av | Bach Construction, Inc., Diviney Construction Inc | t.i. of 1st and 2nd floors. install 2 (n) bathrooms on first floor and 1 (n) bathrooms on 2nd floor. (e) medical office to remain on 1st floor. 2nd floor change to accounting. mep deferred.Details
t.i. of 1st and 2nd floors. install 2 (n) bathrooms on first floor and 1 (n) bathrooms on 2nd floor. (e) medical office to remain on 1st floor. 2nd floor change to accounting. mep deferred. | $868,803 |
| Feb 19, 2020 | Expired or cancelled expired Oct 2025 | 429 Grand View Av | G-Max Construction, Diviney Construction Inc | proposed strengthening of (e) footing along gridlines b between gridlines 2 & 3. ref pa201906173584Details
proposed strengthening of (e) footing along gridlines b between gridlines 2 & 3. ref pa201906173584 | $5,000 |
| Dec 13, 2019 | Completed final sign-off Jan 2024 | 378 08th Av | Mc Gowan Builders, Diviney Construction Inc | to erect a 3-story, type 5b, two residential unit building. **to comply w/ maher ord# 155-13, route to health**Details
to erect a 3-story, type 5b, two residential unit building. **to comply w/ maher ord# 155-13, route to health** | $1,200,500 |
| Sep 6, 2019 | Completed final sign-off Jan 2020 | 1471 47th Av | Diviney Construction Inc | replace approx. 33 linear feet of footing and siding along south side of building. to comply with nov #201980752.Details
replace approx. 33 linear feet of footing and siding along south side of building. to comply with nov #201980752. | $8,000 |
| Aug 16, 2019 | Never finaled issued Sep 2019, no final | 2939 Vallejo St | J M K Construction Inc, Diviney Construction Inc | rear yard modifications to expand useable area. add bay window to 2nd floor on south facade. modifications to extg kitchenDetails
rear yard modifications to expand useable area. add bay window to 2nd floor on south facade. modifications to extg kitchen | |
| Jan 25, 2019 | Completed final sign-off Nov 2020 | 2708 35th Av | Diviney Construction Inc | remodel/legalize (e) ground fl family room, add a bathroom at ground fl; remodel the existing 2nd fl.Details
remodel/legalize (e) ground fl family room, add a bathroom at ground fl; remodel the existing 2nd fl. | $51,989 |
| Sep 13, 2018 | Expired or cancelled cancelled May 2020 | 2939 Vallejo St | J M K Construction Inc, Diviney Construction Inc | rear yard modifications to expand useable rear yard area. add bay window to 2nd floor on south (rear yard) facade. modifications to existing kitchenDetails
rear yard modifications to expand useable rear yard area. add bay window to 2nd floor on south (rear yard) facade. modifications to existing kitchen | $350,000 |
| Jun 6, 2018 | Never finaled issued Jun 2018, no final | 526 46th Av | Diviney Construction Inc | rev to bpa 201802131112 - install 18" & 24" 1/2" metal rail at two curved front balconies to meet code. no other work.Details
rev to bpa 201802131112 - install 18" & 24" 1/2" metal rail at two curved front balconies to meet code. no other work. | $3,000 |
| Apr 25, 2018 | Completed final sign-off Jun 2018 | 1387 35th Av | Diviney Construction Inc | repair dry rot on exterior front facade archectectrual over hang replace in kind. less than 50% replacementDetails
repair dry rot on exterior front facade archectectrual over hang replace in kind. less than 50% replacement | $5,000 |
| Apr 25, 2018 | Completed final sign-off Feb 2019 | 526 46th Av | Diviney Construction Inc | revision to 21802131112 repair dry rot at front facade in kind. less than 50% replacementDetails
revision to 21802131112 repair dry rot at front facade in kind. less than 50% replacement | $5,000 |
| Mar 5, 2018 | Completed final sign-off Mar 2018 | 2954 21st St | Diviney Construction Inc | to comply with complaint #201829751. repair rear stair dryrot, investigate front stair, repair corridor, ceiling & walls, item #2Details
to comply with complaint #201829751. repair rear stair dryrot, investigate front stair, repair corridor, ceiling & walls, item #2 | $2,500 |
| Feb 13, 2018 | Completed final sign-off Feb 2019 | 526 46th Av | Diviney Construction Inc | remove all stucco on front facade replace 2 sliding doors and 2 windows in kind with aluminum. replace all stucco.Details
remove all stucco on front facade replace 2 sliding doors and 2 windows in kind with aluminum. replace all stucco. | $25,000 |
| Sep 14, 2017 | Completed final sign-off Aug 2022 | 531 24th Av | Diviney Construction Inc | soft story retrofit per 2016 sfebc ch 4d per 2016 cebc app a4Details
soft story retrofit per 2016 sfebc ch 4d per 2016 cebc app a4 | $75,000 |
| May 30, 2017 | Completed final sign-off Sep 2018 | 33 Shields St | Balla Construction And Design, Diviney Construction Inc | new wood deck at rear of (e) propertyDetails
new wood deck at rear of (e) property | $5,000 |
| Apr 7, 2017 | Completed final sign-off Jun 2017 | 1275 10th Av | Diviney Construction Inc | dryrot open up to investigate leak and replace siding and possibly vynal window in rear same. approx. 5'x10' area.Details
dryrot open up to investigate leak and replace siding and possibly vynal window in rear same. approx. 5'x10' area. | $1,000 |
| Jan 25, 2017 | Completed final sign-off May 2017 | 1659 Dolores St | Diviney Construction Inc | repair rear exterior stairs dryrot damage, less than 50%.Details
repair rear exterior stairs dryrot damage, less than 50%. | $7,000 |
| Apr 18, 2016 | Completed final sign-off Dec 2016 | 3351 Cesar Chavez St | Diviney Construction Inc | 16 windows. -replace existing aluminum windows with fiberglass windows, no framing or stucco work. windows are not in kind but closely match profile of aluminum windows. u factor not > .32Details
16 windows. -replace existing aluminum windows with fiberglass windows, no framing or stucco work. windows are not in kind but closely match profile of aluminum windows. u factor not > .32 | $18,500 |
| Nov 26, 2014 | Completed final sign-off Jun 2016 | 154 Downey St | Diviney Construction Inc | seismic retrofit program for soft story.Details
seismic retrofit program for soft story. | $20,000 |
| Jul 8, 2013 | Completed final sign-off Aug 2013 | 1383 Shafter Av | Diviney Construction Inc | replace rear wood deck in like kind. replace stucco at rear & right side due to dryrot damage.Details
replace rear wood deck in like kind. replace stucco at rear & right side due to dryrot damage. | $9,000 |
| Jun 14, 2013 | Completed final sign-off Jul 2013 | 42 Prospect Av | Diviney Construction Inc | replace some decking boards & siding at front of property. less than 50%Details
replace some decking boards & siding at front of property. less than 50% | $500 |
| May 22, 2013 | Completed final sign-off Jul 2013 | 1383 Shafter Av | Diviney Construction Inc | replacement in kind of extg front entry stairs.Details
replacement in kind of extg front entry stairs. | $4,000 |
| Dec 3, 2012 | Completed final sign-off Dec 2012 | 3854 19th Av | Diviney Construction Inc | remove stucco around window, repair dry rot, patch stucco, insulate & sheetrock inside. window is located to right side of entry door. repairs are in kindDetails
remove stucco around window, repair dry rot, patch stucco, insulate & sheetrock inside. window is located to right side of entry door. repairs are in kind | $1,200 |