Kevin O'connor
- Listed as
- architect, attorney, authorized agent-others, designer, engineer, lessee, pmt consultant/expediter
- Firm
- Kevin O'connor Inc.
- Based in
- San Francisco
- On San Francisco permits
- Mar 2007 to Oct 2026
732 permits since 2000 (engineer on 659 permits, architect on 52 permits, authorized agent-others on 20 permits, designer on 6 permits, pmt consultant/expediter on 2 permits, attorney on 1 permit, lessee on 1 permit): 480 completed, 76 in progress, 90 never finaled, 86 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 732.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 1620 Jones St | units 5 & 7 kitchen & bathroom remodel. structural reinforcing of joists @ (n) family areaDetails
units 5 & 7 kitchen & bathroom remodel. structural reinforcing of joists @ (n) family area | $90,000 | |
| Sep 15, 2026 | In progress filed Sep 2026, not yet issued | 2132 Pine St | renovate units 2132-2134 pine st. new kitchen, remodel bath, add bath. convert 1st story storage to habitable space adding it to unit 2132. connect with interior stair. replace wood stair at rear with metal in same footprint.Details
renovate units 2132-2134 pine st. new kitchen, remodel bath, add bath. convert 1st story storage to habitable space adding it to unit 2132. connect with interior stair. replace wood stair at rear with metal in same footprint. | $300,000 | |
| Sep 11, 2026 | In progress issued Sep 2026 | 176 Laidley St | Jerimiah F Deasy/General Contractor | kitchen and powder room remodel. relocate washer/dryer to 3/f.Details
kitchen and powder room remodel. relocate washer/dryer to 3/f. | $60,000 |
| Sep 8, 2026 | In progress filed Sep 2026, not yet issued | 6424 California St | new attached adu unit at 1st level.Details
new attached adu unit at 1st level. | $140,000 | |
| Aug 25, 2026 | In progress issued Aug 2026 | 783 31st Av | Talior Construction Inc. | provide excavation sequence and shoring to accommodate foundation installation, to comply nov 202660092.Details
provide excavation sequence and shoring to accommodate foundation installation, to comply nov 202660092. | $5,000 |
| Aug 25, 2026 | In progress issued Aug 2026 | 779 31st Av | Talior Construction Inc. | provide permeation grout and underpining to accommodate adjacent foundation installation, comply nov 202620095.Details
provide permeation grout and underpining to accommodate adjacent foundation installation, comply nov 202620095. | $5,000 |
| Aug 18, 2026 | In progress issued Aug 2026 | 737 Lake St | remove approx 3.5 linear feet of wall between kitchen & dining room on 1st floorDetails
remove approx 3.5 linear feet of wall between kitchen & dining room on 1st floor | $12,000 | |
| Aug 14, 2026 | In progress filed Aug 2026, not yet issued | 2035 Laguna St | priority ab-0004: construct a horizontal addition at all levels for an elevator within the required rear yard.Details
priority ab-0004: construct a horizontal addition at all levels for an elevator within the required rear yard. | $90,000 | |
| Aug 12, 2026 | In progress issued Aug 2026 | 270 Andover St | Abbeyside Construction Inc | revision pa 202604219759 structural strenthening & rear pop-out foundation & lower framing, 3rd fl & attic reinforcingDetails
revision pa 202604219759 structural strenthening & rear pop-out foundation & lower framing, 3rd fl & attic reinforcing | $6,000 |
| Aug 6, 2026 | In progress issued Aug 2026 | 1530 11th Av | San Francisco Design Build | permeation group to accommodate foundation installation at 1528 11th ave- ref 2026003097143. ref shoring permit 202607165150Details
permeation group to accommodate foundation installation at 1528 11th ave- ref 2026003097143. ref shoring permit 202607165150 | $2,000 |
| Jul 30, 2026 | In progress issued Aug 2026 | 574 30th Av | Fox Brothers Construction Inc | revision to pa # 202411014180 - minor interior wall adjustment on 1st and 2nd floor. add rear elevation window on 1st floor, expand interior opening and removal of door and header at kitchen on 2nd floor. replace skylight.Details
revision to pa # 202411014180 - minor interior wall adjustment on 1st and 2nd floor. add rear elevation window on 1st floor, expand interior opening and removal of door and header at kitchen on 2nd floor. replace skylight. | $15,000 |
| Jul 28, 2026 | In progress issued Aug 2026 | 1021 Cole St | Straightedge Construction | provide excavation sequence and shoring to accomodate foundation installation, reference bpa # 202512182133Details
provide excavation sequence and shoring to accomodate foundation installation, reference bpa # 202512182133 | $25,000 |
| Jul 27, 2026 | In progress filed Jul 2026, not yet issued | 1468 Clay St | reconfigure 1470 clay interior from 3 bedroom, 2 baths to 4 bedroom, 4 baths. reconfigure 1468 clay interior from 3 bedroom, 2.5 baths to 3 bedroom, 3 baths, remodel 2 kitchens, new shear walls, replace in kind all (e) windows, all new drywalls, lights & electricalDetails
reconfigure 1470 clay interior from 3 bedroom, 2 baths to 4 bedroom, 4 baths. reconfigure 1468 clay interior from 3 bedroom, 2.5 baths to 3 bedroom, 3 baths, remodel 2 kitchens, new shear walls, replace in kind all (e) windows, all new drywalls, lights & electrical | $800,000 | |
| Jul 24, 2026 | In progress issued Jul 2026 | 540 Dwight St | Fogarty James A | fire damage repair. re 202653754Details
fire damage repair. re 202653754 | $150,000 |
| Jul 16, 2026 | In progress issued Aug 2026 | 1528 11th Av | San Francisco Design Build | provide excavation sequence and shoring to accomodate foundation installationDetails
provide excavation sequence and shoring to accomodate foundation installation | $2,000 |
| Jul 9, 2026 | In progress issued Jul 2026 | 171 23rd Av | Armour Construction | revision to 202606092795. add new framing and reinforce framing at rear. add washer and dryer to 2nd and 3rd flr. modify bath and 1/2 bath at 3rd flr.Details
revision to 202606092795. add new framing and reinforce framing at rear. add washer and dryer to 2nd and 3rd flr. modify bath and 1/2 bath at 3rd flr. | $25,000 |
| Jun 29, 2026 | In progress issued Jul 2026 | 4278 Cesar Chavez St | Gil Construction & Assoc Inc. | interior remodel of an (e) residential basement and lv 1 (dining rm, stair hall, and connecting stairs). no change to building footprint or envelope area. no excavation. convert 602 gsf of unconditioned basement to conditioned living space. add (1) 138 sf bedrm & (1) 106 sf bathrm. install (1) new..Details
interior remodel of an (e) residential basement and lv 1 (dining rm, stair hall, and connecting stairs). no change to building footprint or envelope area. no excavation. convert 602 gsf of unconditioned basement to conditioned living space. add (1) 138 sf bedrm & (1) 106 sf bathrm. install (1) new.. | $300,000 |
| Jun 15, 2026 | In progress issued Jun 2026 | 1057 Pacific Av | shoring permit for pa# 202504114202. excavation sequence accommdate foundation installtionDetails
shoring permit for pa# 202504114202. excavation sequence accommdate foundation installtion | $20,000 | |
| Jun 12, 2026 | In progress issued Jun 2026 | 1249 Lombard St | Oarcon Inc | new garden deck in front of the buildingDetails
new garden deck in front of the building | $80,000 |
| Jun 9, 2026 | In progress issued Jun 2026 | 171 23rd Av | replace rear stove in kind. unit 173 (2nd flr) remove wall between kitchen and breakfast. kitchen remodel. convert living room into bedroom and dining into living. unit 171 (3rd flr). remove wall between kitchen and office. kitchen remodel convert living room into bedroom and dining into living,Details
replace rear stove in kind. unit 173 (2nd flr) remove wall between kitchen and breakfast. kitchen remodel. convert living room into bedroom and dining into living. unit 171 (3rd flr). remove wall between kitchen and office. kitchen remodel convert living room into bedroom and dining into living, | $100,000 | |
| May 21, 2026 | In progress filed May 2026, not yet issued | 272 Hartford St | Armour Construction | replace front entry stair in-kind. internal audit violation under seperate permitsDetails
replace front entry stair in-kind. internal audit violation under seperate permits | $40,000 |
| May 15, 2026 | In progress filed May 2026, not yet issued | 3720 23rd St | Mario Sarmento | provide excavation swquence and shoring to accommodate foundation installation for foundations of pa 202106091991.Details
provide excavation swquence and shoring to accommodate foundation installation for foundations of pa 202106091991. | $10,000 |
| May 7, 2026 | Completed final sign-off Aug 2026 | 4179 26th St | revision to pa 202508062456 replace approximately 165 lf of footing along west side of buildingDetails
revision to pa 202508062456 replace approximately 165 lf of footing along west side of building | $8,000 | |
| Apr 23, 2026 | In progress issued Apr 2026 | 4063 18th St | Professional Home Designs | install foundation & reinforce framing @ rear structure. voluntary structure strengthening @ main structure to include partial foundation replacement & added shear walls @ 1st floor. reference permit 202512242607.Details
install foundation & reinforce framing @ rear structure. voluntary structure strengthening @ main structure to include partial foundation replacement & added shear walls @ 1st floor. reference permit 202512242607. | $80,000 |
| Apr 21, 2026 | In progress issued Apr 2026 | 270 Andover St | Abbeyside Construction Inc | voluntary structural strengthening of 1st floor.Details
voluntary structural strengthening of 1st floor. | $22,000 |
| Apr 21, 2026 | In progress issued Apr 2026 | 130 Hazelwood Av | Fastnet Engineering & Const Inc | revision to bpa# 202506209055 2nd floor: remove walls between kitchen dining & living rooms, remodel bathroom. structural strengthening of roof. 1/f: remove closet wall. reconfigure access to beds. infill (e) doorway at 1/f.Details
revision to bpa# 202506209055 2nd floor: remove walls between kitchen dining & living rooms, remodel bathroom. structural strengthening of roof. 1/f: remove closet wall. reconfigure access to beds. infill (e) doorway at 1/f. | $50,000 |
| Apr 20, 2026 | In progress issued Apr 2026 | 2229 Lombard St | revision 202505146411- replace and repair in kind exterior staircase due to dry rot. not visible from street.Details
revision 202505146411- replace and repair in kind exterior staircase due to dry rot. not visible from street. | $12,000 | |
| Apr 7, 2026 | In progress issued Sep 2026 | 666 03rd Av | Bc United Construction Inc | rev to pa#s 202504245159 & 202501299330. 1/f: infill windows next to garage. relocate space & water heater equip. 2/f: add direct vent fireplace, open floor plan. 3/f: add new access to attic, reconfigure primary bath, closet, 2nd bath closet, add new attic window, reinforce attic floor for storage.Details
rev to pa#s 202504245159 & 202501299330. 1/f: infill windows next to garage. relocate space & water heater equip. 2/f: add direct vent fireplace, open floor plan. 3/f: add new access to attic, reconfigure primary bath, closet, 2nd bath closet, add new attic window, reinforce attic floor for storage. | $10,000 |
| Mar 25, 2026 | Expired or cancelled cancelled Aug 2026 | 1914 Greenwich St | Dale Conway & Son Const. | revision to pa# 202506068151, reinforce existing lattice support. drill 4 18"x7' deep caseong, furnish & install 4 hss 6"x4"x3/8"x30'. hot dip galvanized steel tubes & pour 2500 sf concrete around post per plan. cut (e)trellis wall & move forward 12" attach to new beams per plans. to comply for novDetails
revision to pa# 202506068151, reinforce existing lattice support. drill 4 18"x7' deep caseong, furnish & install 4 hss 6"x4"x3/8"x30'. hot dip galvanized steel tubes & pour 2500 sf concrete around post per plan. cut (e)trellis wall & move forward 12" attach to new beams per plans. to comply for nov | $7,000 |
| Feb 26, 2026 | In progress issued Apr 2026 | 825 Faxon Av | Fastnet Engineering & Const Inc | in-kind chimney replacement existing and proposed is cinker brickDetails
in-kind chimney replacement existing and proposed is cinker brick | $20,000 |
| Feb 12, 2026 | Completed final sign-off Aug 2026 | 2711 Harrison St | 1/f: add 2 bedrooms & one bathroom. 2/f: add closet to bedrooms 1 & 2, add laundry. kitchen& bathroom remodel. 3/f: add closet to bedroom 1 & 2. add laundry kitchen & bathroom. remodel bathroom.Details
1/f: add 2 bedrooms & one bathroom. 2/f: add closet to bedrooms 1 & 2, add laundry. kitchen& bathroom remodel. 3/f: add closet to bedroom 1 & 2. add laundry kitchen & bathroom. remodel bathroom. | $150,000 | |
| Feb 4, 2026 | In progress issued Feb 2026 | 130 Hazelwood Av | Fastnet Engineering & Const Inc | new rear yard site retaining walls up to 4'3" in height. provide guardrail where change in elevation is greater than 30". ref#: 202506209055Details
new rear yard site retaining walls up to 4'3" in height. provide guardrail where change in elevation is greater than 30". ref#: 202506209055 | $60,000 |
| Jan 31, 2026 | In progress issued Aug 2026 | 459 27th Av | Sf Builders Inc | new 2-story horizontal rear addition. new office and bathroom on 1/f. relocate kitchen and living from 2/f to 1/f. reconfig stairs, add master bedroom on 2/f.Details
new 2-story horizontal rear addition. new office and bathroom on 1/f. relocate kitchen and living from 2/f to 1/f. reconfig stairs, add master bedroom on 2/f. | $485,000 |
| Dec 30, 2025 | In progress issued Aug 2026 | 452 Fair Oaks St | Abbeyside Construction Inc | rev 202504174627- relocate unit 454 from 2nd fl to 1st fl & reconfigure it w/ 2 bedrooms and 2 baths; expanding unit 452 into 2nd fl and reconfigure w/ 3 bedrooms and 3 baths, study , library & kitchen; (n) front door @ 1st fl. unit 454 - (n) rear landscape stair to yard....Details
rev 202504174627- relocate unit 454 from 2nd fl to 1st fl & reconfigure it w/ 2 bedrooms and 2 baths; expanding unit 452 into 2nd fl and reconfigure w/ 3 bedrooms and 3 baths, study , library & kitchen; (n) front door @ 1st fl. unit 454 - (n) rear landscape stair to yard.... | |
| Dec 3, 2025 | In progress filed Dec 2025, not yet issued | 90 Edgehill Wy | Switch Construction | all exterior work. (n) terraced planters, (n) rear yard wood deck, (n) site stair to deck, (n) retaining wall at rear yard property line with wood fence, (n) front metal gate w/ sliding driveway gate. (n) recessed front entry gate.Details
all exterior work. (n) terraced planters, (n) rear yard wood deck, (n) site stair to deck, (n) retaining wall at rear yard property line with wood fence, (n) front metal gate w/ sliding driveway gate. (n) recessed front entry gate. | $80,000 |
| Dec 1, 2025 | In progress issued Dec 2025 | 610 Gates St | The Sustainable Cbo Inc Dba Oliver Macki | revision of permit 201704133940, infill (e) property line window openings, relocate rear stairs, remove skylights & add new skylights; add new open railingDetails
revision of permit 201704133940, infill (e) property line window openings, relocate rear stairs, remove skylights & add new skylights; add new open railing | $10,000 |
| Nov 26, 2025 | In progress filed Nov 2025, not yet issued | 2471 Folsom St | replace rear yard staircase in kind.Details
replace rear yard staircase in kind. | $30,000 | |
| Nov 14, 2025 | In progress issued Mar 2026 | 727 Rockdale Dr | De Jong Construction | revision to pa# 202212289235: at 1/f- expand proposed bath, convert proposed half bath to full bath, (n) exterior stairs in side yard, modify proposed interior stairs, relocate exterior door at side yard. at 2/f: new doors from living room to bedroom, replace (e) fireplace and chimney with (n)...Details
revision to pa# 202212289235: at 1/f- expand proposed bath, convert proposed half bath to full bath, (n) exterior stairs in side yard, modify proposed interior stairs, relocate exterior door at side yard. at 2/f: new doors from living room to bedroom, replace (e) fireplace and chimney with (n)... | $10,000 |
| Nov 12, 2025 | In progress issued Feb 2026 | 2942 Lyon St | W. S. Construction Co. | interior remodel of commercial space. kitchen remodel. add new ada bathroom. front of building interior cafe buildout. no structural work.Details
interior remodel of commercial space. kitchen remodel. add new ada bathroom. front of building interior cafe buildout. no structural work. | $100,000 |
| Nov 12, 2025 | Completed final sign-off Apr 2026 | 100 09th Av | Terence Mcmahon Construction | foundation replacement a dry rot repair of studs @ detached garage. does not encroach into public right of wayDetails
foundation replacement a dry rot repair of studs @ detached garage. does not encroach into public right of way | $20,000 |
| Nov 6, 2025 | Completed final sign-off May 2026 | 619 San Bruno Av | Lazo & Devost Inc | revision to 202505216928: add a skylight at kitchen over island, partial structural strengthening of skylight opening. not visible from streetDetails
revision to 202505216928: add a skylight at kitchen over island, partial structural strengthening of skylight opening. not visible from street | $6,500 |
| Oct 24, 2025 | In progress issued Oct 2025 | 421 Laguna St | G M Building And Construction Inc | to comply w/ nov #202544511. fire damage repair of 3rd fl deck and canopy. remodel kitchen like for like unit #421Details
to comply w/ nov #202544511. fire damage repair of 3rd fl deck and canopy. remodel kitchen like for like unit #421 | $8,000 |
| Oct 22, 2025 | In progress issued Dec 2025 | 248 Valley St | A V Construction Services Inc | provide excavation sequence and shoring to accommodate foundation excavation re 202212239051Details
provide excavation sequence and shoring to accommodate foundation excavation re 202212239051 | $20,000 |
| Oct 17, 2025 | Completed final sign-off Oct 2026 | 254 Avila St | J Farley Construction | demolish concrete slab at 1st fl (but garage slab to remain) construct new 1 story sunroom addition to rear of e sf residence. interior remodeling including renovations to provide 1 more bath.Details
demolish concrete slab at 1st fl (but garage slab to remain) construct new 1 story sunroom addition to rear of e sf residence. interior remodeling including renovations to provide 1 more bath. | $70,000 |
| Oct 16, 2025 | Completed final sign-off Jun 2026 | 755 Duncan St | O Donoghue Construction Inc. | provide excavation sequence and shoring to accommodate foundation installation. bpa#: 202303103512.Details
provide excavation sequence and shoring to accommodate foundation installation. bpa#: 202303103512. | $20,000 |
| Oct 10, 2025 | In progress issued Oct 2025 | 262 Lexington St | Blue Bend Construction Inc | revision to pa # 2020-0611-8457. structural revision new foundation inside (e) perimeter since (e) is shared with adjacent. provide excavation sequence & shoring to accommodate foundation installationDetails
revision to pa # 2020-0611-8457. structural revision new foundation inside (e) perimeter since (e) is shared with adjacent. provide excavation sequence & shoring to accommodate foundation installation | $5,000 |
| Sep 4, 2025 | In progress issued Jan 2026 | 540 Dwight St | Fogarty James A | convert existing garage into bedroom add 179 sf of conditioned/habitable space.Details
convert existing garage into bedroom add 179 sf of conditioned/habitable space. | $35,000 |
| Aug 27, 2025 | Completed final sign-off Jan 2026 | 3248 Clay St | Paul Hughes Gen Contractor | structural revision to permit 202503061665. add double psl to assist with load at garage level. added structural details.Details
structural revision to permit 202503061665. add double psl to assist with load at garage level. added structural details. | $2,500 |
| Aug 15, 2025 | In progress issued Sep 2025 | 500 Funston Av | Thomas Doherty Construction Dba Doherty | convert storage into family room on lower level.Details
convert storage into family room on lower level. | $66,000 |
| Jul 31, 2025 | Completed final sign-off Feb 2026 | 366 Stratford Dr | R M Construction | legalize existing family room @ 1st flDetails
legalize existing family room @ 1st fl | $38,000 |
| Jul 8, 2025 | Completed final sign-off Jun 2026 | 945 Faxon Av | dry rot repair at main entry. not visible from street.Details
dry rot repair at main entry. not visible from street. | $8,000 | |
| Jul 3, 2025 | Completed final sign-off Nov 2025 | 1243 Douglass St | Abbeyside Construction Inc | replace existing 2 level rear deck; replace 2 windows with 2 doorsDetails
replace existing 2 level rear deck; replace 2 windows with 2 doors | $27,850 |
| Jun 25, 2025 | In progress issued Jun 2025 | 614 Elizabeth St | Cameron Builders Sf | provide excavation sequence & shoring to accomdated foundation installation ref to 202408269419Details
provide excavation sequence & shoring to accomdated foundation installation ref to 202408269419 | $25,000 |
| Jun 20, 2025 | In progress issued Jul 2025 | 130 Hazelwood Av | Fastnet Engineering & Const Inc | 1st/f: add 2 bedrooms, exercise office rm & family rm, remodel bathroom. 2nd/f: add powder rm, remove wall btw kitchen & dining. remodel kitchen. structural strengthening of entire structureDetails
1st/f: add 2 bedrooms, exercise office rm & family rm, remodel bathroom. 2nd/f: add powder rm, remove wall btw kitchen & dining. remodel kitchen. structural strengthening of entire structure | $450,000 |
| Jun 9, 2025 | In progress issued Jun 2025 | 672 27th Av | O'shaughnessy Construction | revision to permit 202212198619. add new shear walls at gargage and 1/f entry along gridline #3. new enclosed recycling area at garage level to incorporate new shear walls. new doors added to door schedule.Details
revision to permit 202212198619. add new shear walls at gargage and 1/f entry along gridline #3. new enclosed recycling area at garage level to incorporate new shear walls. new doors added to door schedule. | $15,000 |
| Jun 6, 2025 | Completed final sign-off Mar 2026 | 86 Brighton Av | comply w/ov 202536437. replace foundation at front right side of garage. re frame wall above foundation. replace stucco & 1 vinyl windowDetails
comply w/ov 202536437. replace foundation at front right side of garage. re frame wall above foundation. replace stucco & 1 vinyl window | $15,000 | |
| May 30, 2025 | Completed final sign-off Aug 2026 | 244 16th Av | Amber - Tru Construction Inc. | provide excavation sequence and shoring to accomodate foundation excavation ref pa 202009305567, 202501178530Details
provide excavation sequence and shoring to accomodate foundation excavation ref pa 202009305567, 202501178530 | $15,000 |
| May 21, 2025 | Completed final sign-off May 2026 | 619 San Bruno Av | Lazo & Devost Inc | remove wall between kitchen & dining. kitchen remodel partial structural strengthening of rear portion of structureDetails
remove wall between kitchen & dining. kitchen remodel partial structural strengthening of rear portion of structure | $160,000 |
| May 20, 2025 | In progress filed May 2025, not yet issued | 625 Moultrie St | legalize (e) 1st floor unit pursuant to planning code sec 207.2. (n) electric meter & heating system. remodel & reconfigure (e) lower floor unit. (n) fire sprinkler system at lower floor only. seismic upgrade based upon structural plans, (n) matel open railing @ front.Details
legalize (e) 1st floor unit pursuant to planning code sec 207.2. (n) electric meter & heating system. remodel & reconfigure (e) lower floor unit. (n) fire sprinkler system at lower floor only. seismic upgrade based upon structural plans, (n) matel open railing @ front. | $150,000 | |
| May 15, 2025 | In progress issued Jun 2025 | 1528 Hudson Av | structural shoring. ref# 202502240936 & 202206025461.Details
structural shoring. ref# 202502240936 & 202206025461. | $7,500 | |
| May 5, 2025 | In progress issued Sep 2025 | 1100 El Camino Del Mar | Patrick Uniacke | concrete slab on piers with 42 in perimeter wall for sf irish famine memorial plazaDetails
concrete slab on piers with 42 in perimeter wall for sf irish famine memorial plaza | $75,000 |
| May 2, 2025 | In progress issued Nov 2025 | 452 Fair Oaks St | Abbeyside Construction Inc, Ace Drilling & Excavation | scope of work includes expanding unit 452 from 2nd fl to the 1st floor & reconfiguring it with 2 beds & two & 1/2 baths,kitchen,dining,library,& living areas,unit 454 reconfigured with 2 beds,3 baths,kitchen & dining room with roof deck & yard access stair,one story rear horizontal addition.Details
scope of work includes expanding unit 452 from 2nd fl to the 1st floor & reconfiguring it with 2 beds & two & 1/2 baths,kitchen,dining,library,& living areas,unit 454 reconfigured with 2 beds,3 baths,kitchen & dining room with roof deck & yard access stair,one story rear horizontal addition. | $300,000 |
| Apr 29, 2025 | In progress issued Aug 2025 | 1921 48th Av | T & T Construction | add 1 bathroom, 1 bedroom, living room and kitchenette on 1st fl. fill in below existing popout. shift front door towards north property line.Details
add 1 bathroom, 1 bedroom, living room and kitchenette on 1st fl. fill in below existing popout. shift front door towards north property line. | $150,000 |
| Apr 29, 2025 | Completed final sign-off Sep 2025 | 737 Joost Av | Huff Construction Company Inc | replace exsting deck in kind. waterproof south wallDetails
replace exsting deck in kind. waterproof south wall | $30,000 |
| Apr 29, 2025 | Completed final sign-off May 2026 | 485 Day St | revision to pa #202011179094 for adu permit. relocate window at front facade. add 3 skylights, remove wall at 1st floor kitchen and replace with steel beam.Details
revision to pa #202011179094 for adu permit. relocate window at front facade. add 3 skylights, remove wall at 1st floor kitchen and replace with steel beam. | $3,000 | |
| Apr 9, 2025 | Expired or cancelled expired Jun 2026 | 306 Ortega St | Soliz General Construction & Painting | provide permeation grout to accommodate excavation @ adjacent property, 300 ortega street under pa 202503061670Details
provide permeation grout to accommodate excavation @ adjacent property, 300 ortega street under pa 202503061670 | |
| Mar 25, 2025 | In progress issued Mar 2025 | 766 Chenery St | Thomas Le Construction Inc | 2nd fl: remove wall between kitchen and dining. add 1/2 bath. 3rd fl expand and remodel bathroom. enlarge closetDetails
2nd fl: remove wall between kitchen and dining. add 1/2 bath. 3rd fl expand and remodel bathroom. enlarge closet | $95,000 |
| Mar 20, 2025 | Completed final sign-off Sep 2025 | 166 Ellsworth St | P 3 Construction & Remodeling Inc | revision to pa# 202410022151: add structural detail - add footings to lower level, replace small section of foundation. new closet and smaller bath.Details
revision to pa# 202410022151: add structural detail - add footings to lower level, replace small section of foundation. new closet and smaller bath. | $10,000 |
| Mar 20, 2025 | Completed final sign-off Apr 2026 | 175 San Anselmo Av | revision to 202401113844. revise foundation to accommodate field conditionDetails
revision to 202401113844. revise foundation to accommodate field condition | $10,000 | |
| Mar 18, 2025 | Completed final sign-off Apr 2025 | 195 Woolsey St | Amone Corp | revision to 201910245432. add foundation along gridline 3 and revise detail along gridline 4.Details
revision to 201910245432. add foundation along gridline 3 and revise detail along gridline 4. | $10,000 |
| Mar 6, 2025 | Expired or cancelled expired Jun 2026 | 300 Ortega St | Soliz General Construction & Painting | partial foundation excavation sequence plan. provide permeation grout to accommodate excavation.Details
partial foundation excavation sequence plan. provide permeation grout to accommodate excavation. | $22,000 |
| Feb 27, 2025 | In progress issued May 2025 | 585 Connecticut St | Nima Construction | shoring plans for pa 202103166680 & pa 202505216981Details
shoring plans for pa 202103166680 & pa 202505216981 | $50,000 |
| Jan 29, 2025 | In progress issued Apr 2025 | 666 03rd Av | Bc United Construction Inc | voluntary foundation updgrade. kitchen remodel. add full bath to top floor, 2 bathroom remodels. add full bath to ground level.Details
voluntary foundation updgrade. kitchen remodel. add full bath to top floor, 2 bathroom remodels. add full bath to ground level. | $172,000 |
| Jan 21, 2025 | In progress issued Jan 2025 | 764 24th Av | D3 Construction | remove wall bewtween kitchen and dining room on 2nd fl. remodel powder room on 2nd fl.Details
remove wall bewtween kitchen and dining room on 2nd fl. remodel powder room on 2nd fl. | $50,000 |
| Jan 8, 2025 | Completed final sign-off May 2026 | 95 Nordhoff St | replace (e) 6' wood fence to be rebuilt at appx. 9 feet tall. install (n) passage gate as well as a dual gate entrance to rear yard. fence is facing front of street. top of gable at +10'Details
replace (e) 6' wood fence to be rebuilt at appx. 9 feet tall. install (n) passage gate as well as a dual gate entrance to rear yard. fence is facing front of street. top of gable at +10' | $2,200 | |
| Dec 2, 2024 | In progress issued Nov 2025 | 574 30th Av | capture rear garage space for den, living space, laundry and bath. re-arrange upstair primary bath, add bath, renovate kitchen. new rear yard deck, 243 sqft.Details
capture rear garage space for den, living space, laundry and bath. re-arrange upstair primary bath, add bath, renovate kitchen. new rear yard deck, 243 sqft. | $300,000 | |
| Nov 18, 2024 | Completed final sign-off Dec 2024 | 201 Gellert Dr | Electric M D | battery storage system to provide temporary power to 2 residential dwelling units until pg&e energizes the building; 29.2 kwh; inverter (eg4 18 kpv) (rule 21, ca.approved); 2 batteries (eg4 pro 14.6 kwh 48 dclfp) (ul1973, ul954oa approved).Details
battery storage system to provide temporary power to 2 residential dwelling units until pg&e energizes the building; 29.2 kwh; inverter (eg4 18 kpv) (rule 21, ca.approved); 2 batteries (eg4 pro 14.6 kwh 48 dclfp) (ul1973, ul954oa approved). | $20,000 |
| Oct 31, 2024 | In progress filed Oct 2024, not yet issued | 779 Naples St | comply with nov #202315554. remove unauthorized unit on 1st flDetails
comply with nov #202315554. remove unauthorized unit on 1st fl | $4,500 | |
| Oct 8, 2024 | In progress issued Nov 2024 | 1430 Chestnut St | relocate kitchen and dining room from 2nd flr to 1st flr. create master bedroom and bathroom on 2nd flr. enclose rear popout.Details
relocate kitchen and dining room from 2nd flr to 1st flr. create master bedroom and bathroom on 2nd flr. enclose rear popout. | $80,000 | |
| Oct 4, 2024 | In progress issued Apr 2025 | 1721 Scott St | new door to replace window for accessible entry at the front of the bldg. remodel ground fl tenant space. replace foundation w/ (n) slab on grade. repair (e) deck and stairs on rear of building, 50% max.Details
new door to replace window for accessible entry at the front of the bldg. remodel ground fl tenant space. replace foundation w/ (n) slab on grade. repair (e) deck and stairs on rear of building, 50% max. | $311,000 | |
| Oct 4, 2024 | In progress issued Oct 2024 | 2039 Taraval St | rev 202403067197 to include addition of a step and guardrail for abe 20206261748, as providing a compliant ramp is technically infeasible.Details
rev 202403067197 to include addition of a step and guardrail for abe 20206261748, as providing a compliant ramp is technically infeasible. | ||
| Sep 17, 2024 | In progress issued May 2025 | 721 Teresita Bl | Mullins General Construction & Fine Pain | repair rear deck joists and beam in kind. replace deck footings.Details
repair rear deck joists and beam in kind. replace deck footings. | $25,000 |
| Sep 3, 2024 | Completed final sign-off Nov 2024 | 1642 Noriega St | R M Construction | to obtain final inspection for work approved under 201911187560. all work is completeDetails
to obtain final inspection for work approved under 201911187560. all work is complete | |
| Aug 22, 2024 | Completed final sign-off Aug 2025 | 700 15th Av | revision to pa# 202403218294: remodel bath on 1/f. remodel master bath on 3/f. replace steel channel with built-up wood beam.Details
revision to pa# 202403218294: remodel bath on 1/f. remodel master bath on 3/f. replace steel channel with built-up wood beam. | ||
| Aug 22, 2024 | Completed final sign-off Dec 2024 | 1737 Sutter St | Dunros Construction | replace approximately 25 lineal feet of guardrail @ 2nd fl walkway not visible from street. new guardrail to replace existing non-compliant guardrail.Details
replace approximately 25 lineal feet of guardrail @ 2nd fl walkway not visible from street. new guardrail to replace existing non-compliant guardrail. | $30,000 |
| Aug 12, 2024 | Completed final sign-off Jan 2025 | 4229 Moraga St | Vonnegut Thoreau Construction | revision to pa # 2024-0513-1955. remove depressed slab & drain from scope. install two walkable skylights on roof deckDetails
revision to pa # 2024-0513-1955. remove depressed slab & drain from scope. install two walkable skylights on roof deck | $5,000 |
| Jul 22, 2024 | In progress filed Jul 2024, not yet issued | 94 Wabash Tr | Fastnet Engineering & Const Inc | new 683sf adu at 1/f. replace all windows.Details
new 683sf adu at 1/f. replace all windows. | $100,000 |
| Jul 11, 2024 | Completed final sign-off Feb 2025 | 190 Riverton Dr | revision to 202404180200 replace footing along north and east side for approx 35 lineal feet. replace slab on grade at bedroom and bath at gr fl. kitchen remodel at main fl planDetails
revision to 202404180200 replace footing along north and east side for approx 35 lineal feet. replace slab on grade at bedroom and bath at gr fl. kitchen remodel at main fl plan | $30,000 | |
| Jul 9, 2024 | Completed final sign-off Nov 2024 | 1120 Cole St | North Bay Construction | install 2 (n) winodws 3x4 at the rear of the bldgDetails
install 2 (n) winodws 3x4 at the rear of the bldg | $5,000 |
| Jun 18, 2024 | In progress issued Jun 2024 | 39 Nordhoff St | North Gate Builders Inc | replace (e) exterior stair with (n) enclosed stair. kitchen remodel on 2nd fl; add 1 bath & 1 bedroom on 1st fl. stair not visible from streetDetails
replace (e) exterior stair with (n) enclosed stair. kitchen remodel on 2nd fl; add 1 bath & 1 bedroom on 1st fl. stair not visible from street | $100,000 |
| Jun 17, 2024 | Completed final sign-off Jan 2025 | 1547 Oakdale Av | Allied Bay Contractors | add 1 full bath on 2nd flDetails
add 1 full bath on 2nd fl | $20,000 |
| Jun 13, 2024 | Completed final sign-off Nov 2024 | 1251 Dolores St | Amber - Tru Construction Inc. | replace approx 15 lf of perimeter site retaining wall with new fence on top.Details
replace approx 15 lf of perimeter site retaining wall with new fence on top. | $25,000 |
| Jun 6, 2024 | Completed final sign-off Mar 2025 | 178 Page St | North Bay Construction | 3rd fl remodel. remove wall between kitchen and dining. remove partial walls between family and hallway, living and office. kitchen remodel and 2 baths remodel.Details
3rd fl remodel. remove wall between kitchen and dining. remove partial walls between family and hallway, living and office. kitchen remodel and 2 baths remodel. | $100,000 |
| May 23, 2024 | Completed final sign-off Jun 2025 | 46 Surrey St | enlarge closet & add dormer for new 2nd fl bathroomDetails
enlarge closet & add dormer for new 2nd fl bathroom | $12,000 | |
| May 21, 2024 | In progress filed May 2024, not yet issued | 20 Mclaren Av | new site retaining walls, rebuild roof deck over garageDetails
new site retaining walls, rebuild roof deck over garage | $110,000 | |
| May 17, 2024 | Completed final sign-off Mar 2025 | 2238 41st Av | revised structural due to existing condition for permit 202311160881. relocation of post and beam.Details
revised structural due to existing condition for permit 202311160881. relocation of post and beam. | ||
| May 13, 2024 | Completed final sign-off Dec 2024 | 4229 Moraga St | Vonnegut Thoreau Construction | replace (e) window with a door at south wall not visible from the street. add 3'x6'x4' slab with drain.Details
replace (e) window with a door at south wall not visible from the street. add 3'x6'x4' slab with drain. | $10,000 |
| Apr 25, 2024 | In progress issued Apr 2024 | 135 03rd Av | revision to pa# 2017-0407-3489 delete sliding glass door at west elevation. provide 2 (n) windows and (n) door at south elevationDetails
revision to pa# 2017-0407-3489 delete sliding glass door at west elevation. provide 2 (n) windows and (n) door at south elevation | ||
| Apr 23, 2024 | Completed final sign-off Sep 2024 | 673 Andover St | Freemodel Inc. | revision to permit 202307061521. structural revisions/updates as requested by field inspector.Details
revision to permit 202307061521. structural revisions/updates as requested by field inspector. | |
| Apr 19, 2024 | Completed final sign-off Sep 2024 | 734 Vermont St | Huff Construction Company Inc | to repair leaks at e) roof decks. finishes will be removed & new waterproofing membrance will be installed. new 42" tall, 1-hr rated firewall to be install at property line on decks. e) rails & stairs to be made code complaint. extending roofing 2nd & 3rd fl roof decksDetails
to repair leaks at e) roof decks. finishes will be removed & new waterproofing membrance will be installed. new 42" tall, 1-hr rated firewall to be install at property line on decks. e) rails & stairs to be made code complaint. extending roofing 2nd & 3rd fl roof decks | $49,000 |