102 permits since 2000 (contractor on 96 permits, authorized agent-others on 6 permits): 80 completed, 2 in progress, 18 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 102.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 3, 2025 | Completed final sign-off Dec 2025 | 1632 Hayes St | Cameron Builders Sf | window modification @ east breezeway (1) removal, (1) replacement, (1) new to match replacement; replace and relcoate existing exterior door @ rear facade.Details
window modification @ east breezeway (1) removal, (1) replacement, (1) new to match replacement; replace and relcoate existing exterior door @ rear facade. | $2,125 |
| Jun 25, 2025 | In progress issued Jun 2025 | 614 Elizabeth St | Cameron Builders Sf | provide excavation sequence & shoring to accomdated foundation installation ref to 202408269419Details
provide excavation sequence & shoring to accomdated foundation installation ref to 202408269419 | $25,000 |
| Jun 6, 2025 | In progress issued Jul 2025 | 1632 Hayes St | Cameron Builders Sf | interior renovation of (e) kitchen,laundry & house bath:addition of primary bath en suite within (e)interior floor plan,mechanical system replacement: new air handler and heat pump, new waterheater; new electrical fixtures and devices in areas of work. new plumbing fixtures at area of work.Details
interior renovation of (e) kitchen,laundry & house bath:addition of primary bath en suite within (e)interior floor plan,mechanical system replacement: new air handler and heat pump, new waterheater; new electrical fixtures and devices in areas of work. new plumbing fixtures at area of work. | $74,900 |
| Mar 3, 2023 | Completed final sign-off Jun 2025 | 712 10th Av | Graham Moore Construction Inc | revision to pa#202111051910. rearrange entrance lobby, add new exterior door to unit #2. new steps and path at grade at front yard. new curb & decorative fence at extg landscaping. redesign bathrooms layout at 2nd and 3rd floors.Details
revision to pa#202111051910. rearrange entrance lobby, add new exterior door to unit #2. new steps and path at grade at front yard. new curb & decorative fence at extg landscaping. redesign bathrooms layout at 2nd and 3rd floors. | $5,000 |
| Jan 30, 2023 | Completed final sign-off Jun 2025 | 712 10th Av | Graham Moore Construction Inc | revision to 202209092180 which was for partial foundation replacement. this permit is replace the remaining portion.Details
revision to 202209092180 which was for partial foundation replacement. this permit is replace the remaining portion. | $15,000 |
| Oct 12, 2022 | Completed final sign-off Apr 2023 | 215 Arguello Bl | Graham Moore Construction Inc | master bathroom and split bath remodel in kind. interior paint.Details
master bathroom and split bath remodel in kind. interior paint. | $30,000 |
| Sep 9, 2022 | Completed final sign-off Jun 2025 | 712 10th Av | Graham Moore Construction Inc | shoring for foundation replacement companion permeation grout at adjacent to 710 10th av. ref to 2021 1105 1910 (712 10th av new habitable space)Details
shoring for foundation replacement companion permeation grout at adjacent to 710 10th av. ref to 2021 1105 1910 (712 10th av new habitable space) | $1,000 |
| Sep 9, 2022 | Never finaled issued Oct 2022, no final | 708 10th Av | Graham Moore Construction Inc | install permeation grout at adjacent to 712 10th av. foundation replacement companion shoring. ref to 2021 1105 1910 (712 10th av new habitable space)Details
install permeation grout at adjacent to 712 10th av. foundation replacement companion shoring. ref to 2021 1105 1910 (712 10th av new habitable space) | $1,000 |
| Mar 29, 2022 | Completed final sign-off Dec 2022 | 1030 Chenery St | Graham Moore Construction Inc | this project consists of an interior remodel to an (e) water closet, bathroom and kitchen including in kind replacement of (e) plumbing fixtures, light fixtures, appliances, cabinetry and finishes. there is no change to the (e) location of any fixture, plumbing fixture or cabinetry. the replacementDetails
this project consists of an interior remodel to an (e) water closet, bathroom and kitchen including in kind replacement of (e) plumbing fixtures, light fixtures, appliances, cabinetry and finishes. there is no change to the (e) location of any fixture, plumbing fixture or cabinetry. the replacement | $100,000 |
| Mar 21, 2022 | Completed final sign-off Nov 2022 | 244 04th Av | Graham Moore Construction Inc | revise bpa#202102124625. as requested by bldg inspector robert power. revisions include repair (e) property line wall, (n) fire-rated parapet details. revise 3rd fl bathroom. revise foundation details.Details
revise bpa#202102124625. as requested by bldg inspector robert power. revisions include repair (e) property line wall, (n) fire-rated parapet details. revise 3rd fl bathroom. revise foundation details. | |
| Nov 5, 2021 | Completed final sign-off Jun 2025 | 712 10th Av | Cameron Builders Sf, Graham Moore Construction Inc | 1st fl. develope habitable space at rear, with bath, bedroom and family room, 2nd fl. relocate kitche, add (n) bath and (n) interior stairs to 1st fl. 3rd. fl. upgrade kitchen, relocate bath, (n) master bathDetails
1st fl. develope habitable space at rear, with bath, bedroom and family room, 2nd fl. relocate kitche, add (n) bath and (n) interior stairs to 1st fl. 3rd. fl. upgrade kitchen, relocate bath, (n) master bath | $450,000 |
| Nov 1, 2021 | Completed final sign-off Feb 2025 | 527 Alvarado St | Cameron Builders Sf, Graham Moore Construction Inc | addition to rear of building. no alteration to front. interior remodel & extension of 2nd fl kitchen & dining room. cantilevered extension of 3rd fl & layout reconfiguration with 1 (n) bedroom & bathroom. replace (e) interior stair, skylights & (n) flat roof construction. rear yard landscaping.Details
addition to rear of building. no alteration to front. interior remodel & extension of 2nd fl kitchen & dining room. cantilevered extension of 3rd fl & layout reconfiguration with 1 (n) bedroom & bathroom. replace (e) interior stair, skylights & (n) flat roof construction. rear yard landscaping. | $500,000 |
| Aug 31, 2021 | Completed final sign-off Sep 2021 | 4660 19th St | Graham Moore Construction Inc | to obtain a final inspection for work approved under previous permit aplication 202005197594. all work is complete.Details
to obtain a final inspection for work approved under previous permit aplication 202005197594. all work is complete. | |
| Jul 21, 2021 | Completed final sign-off Aug 2021 | 561 Belvedere St | Graham Moore Construction Inc | relocate existing laundry/ add new shower door refinish floors/ repair 2 rotted joist in stirage (siter new one) replace storage room door in kindDetails
relocate existing laundry/ add new shower door refinish floors/ repair 2 rotted joist in stirage (siter new one) replace storage room door in kind | $10,000 |
| Jul 1, 2021 | Completed final sign-off Sep 2021 | 743 47th Av | Graham Moore Construction Inc | remove (e) lath & plaster thru out (ceiling only). install 1 layer 5/8 type x 10 joist bays. r-19 insulation & 2 layer of 5/8 type x to joists.Details
remove (e) lath & plaster thru out (ceiling only). install 1 layer 5/8 type x 10 joist bays. r-19 insulation & 2 layer of 5/8 type x to joists. | $18,000 |
| Jul 1, 2021 | Completed final sign-off Jul 2021 | 2801 Jackson St | Graham Moore Construction Inc | replace (e) kitchen countertops/ plumbing locations to remain the same. install new closet doors. no structural/ no wall removalDetails
replace (e) kitchen countertops/ plumbing locations to remain the same. install new closet doors. no structural/ no wall removal | $35,000 |
| Apr 15, 2021 | Never finaled issued Apr 2021, no final | 2801 Jackson St | Graham Moore Construction Inc | unit #11: replace (e) kitchen countertops. same plumbing location. refinish floors. install new closet doors. paint. no structural work. no wall removal.Details
unit #11: replace (e) kitchen countertops. same plumbing location. refinish floors. install new closet doors. paint. no structural work. no wall removal. | $35,000 |
| Apr 9, 2021 | Completed final sign-off Jul 2021 | 1312 46th Av | Graham Moore Construction Inc | siding repair east siding (rot repair) no visible from street. 30x10 approx. stud removal no more than 3 where reqd. where plywd is removed, install w/ 10d & 6"0-c. edge nailing. 12'0.c.fieled.Details
siding repair east siding (rot repair) no visible from street. 30x10 approx. stud removal no more than 3 where reqd. where plywd is removed, install w/ 10d & 6"0-c. edge nailing. 12'0.c.fieled. | $15,000 |
| Apr 9, 2021 | Never finaled issued Apr 2021, no final | 4418 20th St | Graham Moore Construction Inc | kitchen remodel - no wall removal. no plumbing reconfig. in-kind. all new light to be high efficacy.Details
kitchen remodel - no wall removal. no plumbing reconfig. in-kind. all new light to be high efficacy. | $30,000 |
| Feb 23, 2021 | Never finaled issued Feb 2021, no final | 2801 Jackson St | Graham Moore Construction Inc | in kind bathroom remodel. install laundry hook up in hall closet. no moving walls.Details
in kind bathroom remodel. install laundry hook up in hall closet. no moving walls. | $35,000 |
| Feb 12, 2021 | Completed final sign-off Nov 2022 | 244 04th Av | Graham Moore Construction Inc | interior (e) stair removed @ 1st floor & 1st flr flat tob e restored.remove extg skylights. extg kitchen remodel. extg half bath remodel. new bifold door at french door 2/f.Details
interior (e) stair removed @ 1st floor & 1st flr flat tob e restored.remove extg skylights. extg kitchen remodel. extg half bath remodel. new bifold door at french door 2/f. | $150,000 |
| Dec 30, 2020 | Completed final sign-off Sep 2021 | 4660 19th St | Graham Moore Construction Inc | add skylight at kids bathroom & master bathroom. 32" high parapet to be installed at property line roof near master bathroom.Details
add skylight at kids bathroom & master bathroom. 32" high parapet to be installed at property line roof near master bathroom. | $20,000 |
| Sep 25, 2020 | Never finaled issued Sep 2020, no final | 3851 26th St | Graham Moore Construction Inc | in-kind kitchen & bathroom remodelDetails
in-kind kitchen & bathroom remodel | $90,000 |
| Sep 3, 2020 | Never finaled issued Sep 2020, no final | 297 Surrey St | Graham Moore Construction Inc | conjunction with pa# 202007079669, scope encompasses. main fl:kitchen remodel and relocate interior staircase. remove post and reeplace with new beam. basement:powder room and master bath remodel in kind. enlarge w.i.c., replace wetbar with closet in master suite.Details
conjunction with pa# 202007079669, scope encompasses. main fl:kitchen remodel and relocate interior staircase. remove post and reeplace with new beam. basement:powder room and master bath remodel in kind. enlarge w.i.c., replace wetbar with closet in master suite. | $35,000 |
| Sep 3, 2020 | Completed final sign-off Sep 2021 | 4660 19th St | Graham Moore Construction Inc | revision to pa #202005197594: add new bathroom to existing basement bedroom. there will be a new water pump installed.Details
revision to pa #202005197594: add new bathroom to existing basement bedroom. there will be a new water pump installed. | $40,000 |
| Sep 1, 2020 | Completed final sign-off Dec 2020 | 241 Carl St | Graham Moore Construction Inc | rermodel (e) bathroom in-kind.Details
rermodel (e) bathroom in-kind. | $40,000 |
| Jul 28, 2020 | Completed final sign-off Jun 2021 | 453 Eureka St | Graham Moore Construction Inc | revision to permit #202007079670. full replacement of siding @ rear of building & both lightwells. replace (2) doors upper rear deck. intall painton water proofing on front & back upper decks.Details
revision to permit #202007079670. full replacement of siding @ rear of building & both lightwells. replace (2) doors upper rear deck. intall painton water proofing on front & back upper decks. | $25,000 |
| Jul 7, 2020 | Completed final sign-off Jun 2021 | 453 Eureka St | Graham Moore Construction Inc | partions of siding replacement rear of building only. dry rotDetails
partions of siding replacement rear of building only. dry rot | $25,000 |
| Jul 7, 2020 | Never finaled issued Jul 2020, no final | 297 Surrey St | Graham Moore Construction Inc | kitchen and bathroom remodelDetails
kitchen and bathroom remodel | $65,000 |
| Jul 7, 2020 | Completed final sign-off Sep 2020 | 814 Cole St | Graham Moore Construction Inc | bathroom remodelDetails
bathroom remodel | $30,000 |
| Jun 29, 2020 | Completed final sign-off Oct 2020 | 1591 45th Av | Graham Moore Construction Inc | 1 bathroom remodel in kind, above garage. no structural workDetails
1 bathroom remodel in kind, above garage. no structural work | $20,000 |
| May 19, 2020 | Completed final sign-off Dec 2020 | 4660 19th St | Graham Moore Construction Inc | remodel kitchen and 3 bathroom in kind. no structural workDetails
remodel kitchen and 3 bathroom in kind. no structural work | $150,000 |
| Jan 21, 2020 | Completed final sign-off May 2020 | 340 Taraval St | Graham Moore Construction Inc | to comply with nov201905521: replace failing brick facade in-kind. install new ada door opening push button accessible business entrance program per ordinance 51-16.Details
to comply with nov201905521: replace failing brick facade in-kind. install new ada door opening push button accessible business entrance program per ordinance 51-16. | $20,000 |
| Nov 18, 2019 | Completed final sign-off May 2020 | 2078 32nd Av | Graham Moore Construction Inc | rev to pa# 201911086904; extend (e) kitchen with infill of lightwell reconfigure master bath layoutDetails
rev to pa# 201911086904; extend (e) kitchen with infill of lightwell reconfigure master bath layout | $15,000 |
| Nov 8, 2019 | Completed final sign-off May 2020 | 2078 32nd Av | Graham Moore Construction Inc | 3 (8'x8') in kind bath remodel. 1 (12'x12') kitchen in kind remodel.Details
3 (8'x8') in kind bath remodel. 1 (12'x12') kitchen in kind remodel. | $65,000 |
| Nov 6, 2019 | Expired or cancelled cancelled Jan 2026 | 2078 32nd Av | Graham Moore Construction Inc | 3 bathrooms remodel in kind. 1 kitchen remodel. infill lightwellDetails
3 bathrooms remodel in kind. 1 kitchen remodel. infill lightwell | $95,000 |
| Jul 9, 2019 | Completed final sign-off Oct 2019 | 133 Belvedere St | Graham Moore Construction Inc | bathroom remodel, 8' x 8'. no structural workDetails
bathroom remodel, 8' x 8'. no structural work | $30,000 |
| May 16, 2019 | Completed final sign-off Oct 2019 | 295 14th Av | Graham Moore Construction Inc | replace stucco facade in-kindDetails
replace stucco facade in-kind | $40,000 |
| May 10, 2019 | Completed final sign-off Oct 2019 | 215 Crestmont Dr | Graham Moore Construction Inc | remodel 2 bathroom & 1 kitchen in kind. no structural.Details
remodel 2 bathroom & 1 kitchen in kind. no structural. | $45,000 |
| Mar 6, 2019 | Never finaled issued Mar 2019, no final | 68 Ramona Av | street spaceDetails
street space | ||
| Mar 6, 2019 | Never finaled issued Mar 2019, no final | 4445 Irving St | street spaceDetails
street space | ||
| Mar 6, 2019 | Never finaled issued Mar 2019, no final | 295 14th Av | street spaceDetails
street space | ||
| Dec 31, 2018 | Never finaled issued Dec 2018, no final | 4445 Irving St | Graham Moore Construction Inc | in kind kitchen and bathroom remodel. upgrade electricalDetails
in kind kitchen and bathroom remodel. upgrade electrical | $45,000 |
| Dec 14, 2018 | Completed final sign-off Nov 2019 | 4445 Irving St | Graham Moore Construction Inc | add bath room in lower level & upper level renovation (kitchen and upper level bathroom remodeling under separate issued permit).Details
add bath room in lower level & upper level renovation (kitchen and upper level bathroom remodeling under separate issued permit). | $30,000 |
| Oct 17, 2018 | Never finaled issued Oct 2018, no final | 1 Hidalgo Tr | Graham Moore Construction Inc | replace siding on e & s (rear) elevations - not visible - with hardiboard.Details
replace siding on e & s (rear) elevations - not visible - with hardiboard. | $60,000 |
| Sep 28, 2018 | Completed final sign-off Oct 2019 | 295 14th Av | Graham Moore Construction Inc | kitchen remodel power room remodel laundry room remodel new guest bath wic remodelDetails
kitchen remodel power room remodel laundry room remodel new guest bath wic remodel | $95,000 |
| Jul 2, 2018 | Completed final sign-off Aug 2018 | 1386 Florida St | Graham Moore Construction Inc | in-kind bathroom remodelDetails
in-kind bathroom remodel | $15,000 |
| May 25, 2018 | Completed final sign-off Aug 2018 | 1400 Mcallister St | Graham Moore Construction Inc | adminstrative permit to renew expired pa# 201605258363.Details
adminstrative permit to renew expired pa# 201605258363. | |
| May 7, 2018 | Completed final sign-off May 2018 | 1400 Mcallister St | Graham Moore Construction Inc | rev. to 201702078839. to reduce scope of work so that 11(instead of 13) garage doors are replaced. to comply with nov #20162411. remaing two doors to be replaced under future permit.Details
rev. to 201702078839. to reduce scope of work so that 11(instead of 13) garage doors are replaced. to comply with nov #20162411. remaing two doors to be replaced under future permit. | |
| May 4, 2018 | Completed final sign-off Jan 2019 | 734 Lyon St | Graham Moore Construction Inc | new bathroom in extg 4thk floor. new roof skylight. no horizontal or vertical expansion. 4th flr for storage only. not a habitable floor.Details
new bathroom in extg 4thk floor. new roof skylight. no horizontal or vertical expansion. 4th flr for storage only. not a habitable floor. | $15,174 |
| Dec 29, 2017 | Completed final sign-off Mar 2018 | 1400 South Van Ness Av | Graham Moore Construction Inc | remodel master bath in-kind. remodel guest bath in-kinb. install new countertops in kitchen and add new cabinets. no new wall and no existing wall relocation, no structural work. new lighting shall comply with cec 150.0(k)3 and 150.0(k)5.Details
remodel master bath in-kind. remodel guest bath in-kinb. install new countertops in kitchen and add new cabinets. no new wall and no existing wall relocation, no structural work. new lighting shall comply with cec 150.0(k)3 and 150.0(k)5. | $45,000 |
| Sep 26, 2017 | Completed final sign-off May 2018 | 857 Alvarado St | Graham Moore Construction Inc | revision to pa #201703131329 & #201705055796. kitchen remodel, install radiant floor heating, sound proofing system, new hardwood flooring.Details
revision to pa #201703131329 & #201705055796. kitchen remodel, install radiant floor heating, sound proofing system, new hardwood flooring. | $22,000 |
| Jul 18, 2017 | Completed final sign-off Nov 2018 | 208 02nd Av | Graham Moore Construction Inc | revision to the original proposed deck permit #201411121329. reducing of the utility room & structural changes to lower deck guardrails will be changed from wire mesh to glass & a built in bench will be constructed by light wellDetails
revision to the original proposed deck permit #201411121329. reducing of the utility room & structural changes to lower deck guardrails will be changed from wire mesh to glass & a built in bench will be constructed by light well | $1,500 |
| Jun 22, 2017 | Completed final sign-off Apr 2019 | 730 Cabrillo St | Graham Moore Construction Inc | remodel of single family residence including new kitchen. plumbing, electrical, mechanical and structural work. no work on front facade. no fire alarm or sprinkler work (under sep permit - per joe duffy 3/1/18). new rear yard deck less than 10' hight in buildable area.Details
remodel of single family residence including new kitchen. plumbing, electrical, mechanical and structural work. no work on front facade. no fire alarm or sprinkler work (under sep permit - per joe duffy 3/1/18). new rear yard deck less than 10' hight in buildable area. | $750,000 |
| Jun 22, 2017 | Completed final sign-off Apr 2019 | 730 Cabrillo St | Graham Moore Construction Inc | demo/removal of interior finishes. install 1/2" plywood w/8d nails, 6"o/c throughout.Details
demo/removal of interior finishes. install 1/2" plywood w/8d nails, 6"o/c throughout. | $15,000 |
| Jun 19, 2017 | Completed final sign-off Nov 2018 | 857 Alvarado St | Graham Moore Construction Inc | revision to pa #201705055796 - add footing & slab (kitchen) - voluntary seismic strengthening.Details
revision to pa #201705055796 - add footing & slab (kitchen) - voluntary seismic strengthening. | $8,000 |
| Jun 2, 2017 | Completed final sign-off Aug 2017 | 2550 18th Av | Graham Moore Construction Inc | restroom improvements and accessible restroom renovation. 1st phase of voluntary seismic strengtheing project for st cecilia school. seismic strengthening project will be permitted under a seperate and subsequent permitDetails
restroom improvements and accessible restroom renovation. 1st phase of voluntary seismic strengtheing project for st cecilia school. seismic strengthening project will be permitted under a seperate and subsequent permit | $84,500 |
| May 24, 2017 | Completed final sign-off Jan 2018 | 1209 Shrader St | Graham Moore Construction Inc | remodel existing kitchen & full bath. add 1/2 bath. front living room to be altered to become a bedroom. new replacement of windows at rear porch. seismic improvements at ground floor level.Details
remodel existing kitchen & full bath. add 1/2 bath. front living room to be altered to become a bedroom. new replacement of windows at rear porch. seismic improvements at ground floor level. | $124,500 |
| May 5, 2017 | Never finaled issued May 2017, no final | 857 Alvarado St | Graham Moore Construction Inc | voluntary seismic strengthening.Details
voluntary seismic strengthening. | $20,000 |
| May 2, 2017 | Completed final sign-off Feb 2019 | 208 02nd Av | Graham Moore Construction Inc | revision to 201411121329 s1 remodel (e) bathrooms on main flr of unit 208. (e) north bathroom will have new valve in shower over tub. 2nd bthrm will be connected to (e) bedrm, (e) bathrm will have tub removed & only have shower new toilet & sink, new ele/plm in (e) bthrmDetails
revision to 201411121329 s1 remodel (e) bathrooms on main flr of unit 208. (e) north bathroom will have new valve in shower over tub. 2nd bthrm will be connected to (e) bedrm, (e) bathrm will have tub removed & only have shower new toilet & sink, new ele/plm in (e) bthrm | $10,000 |
| Apr 10, 2017 | Completed final sign-off Feb 2019 | 208 02nd Av | Graham Moore Construction Inc | revision to pa 2014-112-1329 s1 to modify sprinkler system from entire bldg to only the top 2 floor per based off of npfa 13-r. fire sprinkler for 2nd unit (3rd & 4th floor) only will be on separate permit.Details
revision to pa 2014-112-1329 s1 to modify sprinkler system from entire bldg to only the top 2 floor per based off of npfa 13-r. fire sprinkler for 2nd unit (3rd & 4th floor) only will be on separate permit. | |
| Mar 13, 2017 | Completed final sign-off May 2018 | 857 Alvarado St | Graham Moore Construction Inc | remodel master bath, bedrooms & dining room. install new lighting, install new pocket & hardware in existing locations. layout remains unchnged in-kind.Details
remodel master bath, bedrooms & dining room. install new lighting, install new pocket & hardware in existing locations. layout remains unchnged in-kind. | $45,000 |
| Feb 7, 2017 | Completed final sign-off Aug 2018 | 1400 Mcallister St | Graham Moore Construction Inc | revision to 201601076585 to include replacement of 13 new garage doors and comply with nov 201624111.Details
revision to 201601076585 to include replacement of 13 new garage doors and comply with nov 201624111. | $10,000 |
| Jan 18, 2017 | Completed final sign-off Apr 2017 | 442 Mangels Av | Graham Moore Construction Inc | kitchen remodel, new flooring, cabinets/counter tops. no structural.Details
kitchen remodel, new flooring, cabinets/counter tops. no structural. | $25,000 |
| Jan 17, 2017 | Never finaled issued Aug 2017, no final | 1209 Shrader St | Graham Moore Construction Inc | new exterior deck @ rear of property approx 4'6" above grade, and new single french door to replace existing window.Details
new exterior deck @ rear of property approx 4'6" above grade, and new single french door to replace existing window. | $18,500 |
| Dec 15, 2016 | Completed final sign-off Apr 2017 | 105 Scott St | Graham Moore Construction Inc | bathroom & kitchen remodel, no sturctural work.Details
bathroom & kitchen remodel, no sturctural work. | $45,000 |
| Aug 16, 2016 | Completed final sign-off Feb 2017 | 507 11th Av | Graham Moore Construction Inc | revision to ref pa 201607223120: rebuild rear stair in-kind. repair footing & walls lower level.Details
revision to ref pa 201607223120: rebuild rear stair in-kind. repair footing & walls lower level. | $30,000 |
| Aug 12, 2016 | Completed final sign-off Feb 2017 | 124 Noriega St | Graham Moore Construction Inc | removel kitchen and bath, add 2 new skylightsDetails
removel kitchen and bath, add 2 new skylights | $35,000 |
| Aug 11, 2016 | Completed final sign-off Oct 2016 | 1400 Golden Gate Av | Graham Moore Construction Inc | partial remodel of 2 bathrooms. no sructuralDetails
partial remodel of 2 bathrooms. no sructural | $18,500 |
| Jul 28, 2016 | Never finaled issued Aug 2016, no final | 765 14th Av | Graham Moore Construction Inc | replace 46' of (e) footing. n/a maher ord. 155-13Details
replace 46' of (e) footing. n/a maher ord. 155-13 | $15,000 |
| Jul 22, 2016 | Completed final sign-off Feb 2017 | 507 11th Av | Graham Moore Construction Inc | replace dryrot damaged siding @ rear of building, water damage repair interior closet under exterior stair; dryrot @ stair & exterior (fire) wall @ rear of building. stair repair less than 50%Details
replace dryrot damaged siding @ rear of building, water damage repair interior closet under exterior stair; dryrot @ stair & exterior (fire) wall @ rear of building. stair repair less than 50% | $8,000 |
| May 25, 2016 | Completed final sign-off Aug 2018 | 1400 Mcallister St | Graham Moore Construction Inc | revision to pa #201601076585 soft story ordinance 66-13 : move moment frames locations (2).Details
revision to pa #201601076585 soft story ordinance 66-13 : move moment frames locations (2). | |
| Jan 7, 2016 | Completed final sign-off Aug 2018 | 1400 Mcallister St | Graham Moore Construction Inc | structural strengtheing to mitigate soft story and strengthening 1st level wall to bring building into compliance with sf ordinance 66-13. ref wb clasen drawing project 25579 dated 9/14/15Details
structural strengtheing to mitigate soft story and strengthening 1st level wall to bring building into compliance with sf ordinance 66-13. ref wb clasen drawing project 25579 dated 9/14/15 | $80,000 |
| Dec 4, 2015 | Completed final sign-off Feb 2016 | 188 Lippard Av | Graham Moore Construction Inc | revision to 201408254662: replace corroded and crumbling foundation at basement. work already scheduled under 201408254662.Details
revision to 201408254662: replace corroded and crumbling foundation at basement. work already scheduled under 201408254662. | $17,500 |
| Feb 17, 2015 | Completed final sign-off Jun 2016 | 164 Belvedere St | Graham Moore Construction Inc | replace and lower existing foundation by 15". no change in occupancy or use. new retaining wall at rear yard.Details
replace and lower existing foundation by 15". no change in occupancy or use. new retaining wall at rear yard. | $30,000 |
| Nov 12, 2014 | Completed final sign-off Feb 2019 | 208 02nd Av | Graham Moore Construction Inc | horizontal addition of 3'-9" in rear (93.75 sq. ft) (e) attic roof to be alterd. height to remain. (e) attic to be converted to habitable area. convert (e) rear flat roof of (e) 3rd floor to roof deck.Details
horizontal addition of 3'-9" in rear (93.75 sq. ft) (e) attic roof to be alterd. height to remain. (e) attic to be converted to habitable area. convert (e) rear flat roof of (e) 3rd floor to roof deck. | $100,000 |
| May 12, 2014 | Completed final sign-off Apr 2015 | 113 Webster St | Graham Moore Construction Inc | dry rot repair - 3rd / 4th floor (exploratory soft demo)Details
dry rot repair - 3rd / 4th floor (exploratory soft demo) | $8,500 |
| Apr 22, 2014 | Completed final sign-off May 2014 | 309 Duncan St | Graham Moore Construction Inc | to comply with physical inspection report #cc-7723Details
to comply with physical inspection report #cc-7723 | $1,500 |
| Apr 22, 2014 | Completed final sign-off Jul 2014 | 340 Baker St | Graham Moore Construction Inc | remodel unit 4. new kitchen cabinets, appliances, remodel bathroom. add interior walls and doorsDetails
remodel unit 4. new kitchen cabinets, appliances, remodel bathroom. add interior walls and doors | $30,000 |
| Apr 22, 2014 | Completed final sign-off May 2014 | 307 Duncan St | Graham Moore Construction Inc | to comply with physical inspection report #cc-7537Details
to comply with physical inspection report #cc-7537 | $1,500 |
| Apr 22, 2014 | Completed final sign-off May 2014 | 309 Duncan St | Graham Moore Construction Inc | to obtain final inspection for work approved under pa# 9715998. all work is complete.Details
to obtain final inspection for work approved under pa# 9715998. all work is complete. | |
| Mar 20, 2013 | Completed final sign-off Jul 2013 | 253 Waller St | Graham Moore Construction Inc | bath remodel: replace of finishes, fixtures in extg deteriorated bathroom. install new skylight.Details
bath remodel: replace of finishes, fixtures in extg deteriorated bathroom. install new skylight. | $9,000 |
| Jul 18, 2012 | Completed final sign-off Oct 2012 | 304 Waller St | Graham Moore Construction Inc | add forced air system to 1 unit in 9 units (304)Details
add forced air system to 1 unit in 9 units (304) | $6,000 |
| Jun 1, 2012 | Completed final sign-off Oct 2012 | 304 Waller St | Graham Moore Construction Inc | remodel one kitchen and one bath. upgrade electrical. no structural workDetails
remodel one kitchen and one bath. upgrade electrical. no structural work | $42,000 |
| Mar 8, 2012 | Completed final sign-off Aug 2012 | 307 Duncan St | Graham Moore Construction Inc | scope of work is to repair wood rot found in 8 ceiling/ floor joist and siding. all wood rot will be replaced in kind and back /rear of house will have placement of new flashing around windows and exterior doors. new siding will match extg. approx 110 sq.ft.Details
scope of work is to repair wood rot found in 8 ceiling/ floor joist and siding. all wood rot will be replaced in kind and back /rear of house will have placement of new flashing around windows and exterior doors. new siding will match extg. approx 110 sq.ft. | $6,500 |
| Oct 7, 2011 | Completed final sign-off Feb 2012 | 2841 Turk Bl | Graham Moore Construction Inc | replace (e) skylight w/ new dual glazed, curb mounted skylight. construct new 1 hr rated, 30" high parapet at roof along propwerty line wall adjacent to skylightDetails
replace (e) skylight w/ new dual glazed, curb mounted skylight. construct new 1 hr rated, 30" high parapet at roof along propwerty line wall adjacent to skylight | $2,500 |
| Aug 31, 2011 | Completed final sign-off Aug 2012 | 1028 Prague St | Graham Moore Construction Inc | revision to appl #201006043888 - change in footing design, remove skylight, upgrade slab, change of stair detail.Details
revision to appl #201006043888 - change in footing design, remove skylight, upgrade slab, change of stair detail. | |
| Jul 1, 2011 | Completed final sign-off Feb 2012 | 2841 Turk Bl | Graham Moore Construction Inc | exterior work : replace rotted/damaged walls/roof/siding in like kind. replace 4 skylights. interior work @ #2841: remodel entire interiorw/new finishes, kitchen, bath & associated electrical work. garage area: provide (1) new store room & remodel (e) storeroom.Details
exterior work : replace rotted/damaged walls/roof/siding in like kind. replace 4 skylights. interior work @ #2841: remodel entire interiorw/new finishes, kitchen, bath & associated electrical work. garage area: provide (1) new store room & remodel (e) storeroom. | $82,800 |
| Jun 3, 2011 | Expired or cancelled cancelled Jan 2026 | 160 26th Av | Graham Moore Construction Inc | replace damaged deck in kind at rear, install new steel frame.Details
replace damaged deck in kind at rear, install new steel frame. | $15,000 |
| Mar 16, 2011 | Completed final sign-off Jul 2011 | 258 Page St | Graham Moore Construction Inc | remodel kitchen and bath. move 1 doorway. remove part of wall between main kitchen and pantry. add 1/2 bath. move wall between 1/2 bath and bathroom. all work in top unit.Details
remodel kitchen and bath. move 1 doorway. remove part of wall between main kitchen and pantry. add 1/2 bath. move wall between 1/2 bath and bathroom. all work in top unit. | $30,000 |
| Jun 4, 2010 | Completed final sign-off Aug 2012 | 1028 Prague St | Graham Moore Construction Inc | remodel / addition of 4' to (e) structure. move (e) staircase & add deck above the new structure. remodel (e) bathroom.Details
remodel / addition of 4' to (e) structure. move (e) staircase & add deck above the new structure. remodel (e) bathroom. | $60,000 |
| Feb 8, 2010 | Completed final sign-off Mar 2010 | 3101 Fillmore St | Graham Moore Construction Inc | install display cabinets, paint and patch flooring to existing retail specialty grocery store. no structural, no plumbing, no electrical and hvac under this permit. referenced pa# 2004.08.18.1858 expired and it has been renewed.Details
install display cabinets, paint and patch flooring to existing retail specialty grocery store. no structural, no plumbing, no electrical and hvac under this permit. referenced pa# 2004.08.18.1858 expired and it has been renewed. | $22,000 |
| Jan 15, 2010 | Completed final sign-off Jul 2010 | 300 Waller St | Graham Moore Construction Inc | remodel bathroom & kitchen in kind, upgrade electrical, upgrade furnace heating at apt #306 waller streetDetails
remodel bathroom & kitchen in kind, upgrade electrical, upgrade furnace heating at apt #306 waller street | $60,000 |
| Jan 13, 2010 | Never finaled issued Jan 2010, no final | 101 Webster St | Graham Moore Construction Inc | street spaceDetails
street space | |
| Oct 21, 2009 | Completed final sign-off Nov 2009 | 101 Webster St | Graham Moore Construction Inc | remove siding, insulate, waterproof, vapor barrier & paint. use hardi siding, 1/2 sheathing will be added. replace mudsill lightwell (rot repair). full height, 20 linearDetails
remove siding, insulate, waterproof, vapor barrier & paint. use hardi siding, 1/2 sheathing will be added. replace mudsill lightwell (rot repair). full height, 20 linear | $12,000 |
| Sep 21, 2009 | Completed final sign-off Nov 2009 | 101 Webster St | Graham Moore Construction Inc | to obtain final inspection for work approved under pa #200803137104. all work is complete.Details
to obtain final inspection for work approved under pa #200803137104. all work is complete. | |
| Sep 21, 2009 | Completed final sign-off Nov 2009 | 101 Webster St | Graham Moore Construction Inc | renewal of application 200804240521.Details
renewal of application 200804240521. | |
| Sep 21, 2009 | Completed final sign-off Oct 2009 | 103 Webster St | Graham Moore Construction Inc | revision to application 200909026088. add 1/2" sheating cdx 10d @ b"x 12" in field. area 1600 sq ft. new siding .Details
revision to application 200909026088. add 1/2" sheating cdx 10d @ b"x 12" in field. area 1600 sq ft. new siding . | $2,000 |
| Sep 2, 2009 | Completed final sign-off Oct 2009 | 101 Webster St | Graham Moore Construction Inc | remove siding/insulate walls, waterproof, vapor barrier, reside & paint. hardi plank siding will be used. insulate with r-13 minimum for wallsDetails
remove siding/insulate walls, waterproof, vapor barrier, reside & paint. hardi plank siding will be used. insulate with r-13 minimum for walls | $18,000 |
| Apr 24, 2008 | Never finaled issued Apr 2008, no final | 101 Webster St | Graham Moore Construction Inc | add forced air furnace to unit 101 webster. new duct work and b vent.Details
add forced air furnace to unit 101 webster. new duct work and b vent. | $4,500 |