John Suarez
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Suarez-Kuehne Architecture
- Based in
- San Francisco
- On San Francisco permits
- Jul 2005 to Mar 2025
23 permits since 2000 (architect on 21 permits, authorized agent-others on 1 permit, engineer on 1 permit): 15 completed, 3 never finaled, 5 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 25, 2025 | Expired or cancelled withdrawn Sep 2025 | 376 Green St | replacement of (e) dry rot wooden rear egress stair with fire escape per sfbc ab-019Details
replacement of (e) dry rot wooden rear egress stair with fire escape per sfbc ab-019 | $85,000 | |
| Feb 28, 2023 | Completed final sign-off May 2023 | 421 Congo St | Michael C Hargrove Construction | interior kitchen remodel @ main lvl & removal of obselete masonry flu enclosure @ lower lvl, main lvl & termination above roof.Details
interior kitchen remodel @ main lvl & removal of obselete masonry flu enclosure @ lower lvl, main lvl & termination above roof. | $45,000 |
| Dec 12, 2022 | Completed final sign-off Jun 2023 | 747 22nd Av | H C L Construction Inc. | permit revision to permit no 202211146361. revision to include reuired structural work for wall removal. demo of 2 windows and 1 new window all windows @ rear elevation.Details
permit revision to permit no 202211146361. revision to include reuired structural work for wall removal. demo of 2 windows and 1 new window all windows @ rear elevation. | $7,500 |
| Nov 14, 2022 | Completed final sign-off Jun 2023 | 747 22nd Av | H C L Construction Inc. | main level interior remodel of kitchen and bathroom. new 200 amp electrical panel at lower level.Details
main level interior remodel of kitchen and bathroom. new 200 amp electrical panel at lower level. | $75,000 |
| Apr 13, 2021 | Completed final sign-off Sep 2023 | 298 Dorantes Av | Mc Gowan Builders | upper level: relocate master suite and add a new bedroom. new wood siding to match/replace (e) wood siding. new stucco to replace (e) wood siding at the (e) turret. new transparent wall assembly at (e) stair main level and at new master bedrm upper levl. new skylight over (e) stair.Details
upper level: relocate master suite and add a new bedroom. new wood siding to match/replace (e) wood siding. new stucco to replace (e) wood siding at the (e) turret. new transparent wall assembly at (e) stair main level and at new master bedrm upper levl. new skylight over (e) stair. | $150,000 |
| Jan 7, 2021 | Completed final sign-off Apr 2021 | 932 Sanchez St | Ideal Builders | replacement in-kind of dry-rotted exterior front entry stair. replace front entry soffit light fixture. provide new electrical outlet and door bell/camera wiring at front entry porch.Details
replacement in-kind of dry-rotted exterior front entry stair. replace front entry soffit light fixture. provide new electrical outlet and door bell/camera wiring at front entry porch. | $25,000 |
| Jan 21, 2020 | Completed final sign-off May 2020 | 340 Taraval St | Graham Moore Construction Inc | to comply with nov201905521: replace failing brick facade in-kind. install new ada door opening push button accessible business entrance program per ordinance 51-16.Details
to comply with nov201905521: replace failing brick facade in-kind. install new ada door opening push button accessible business entrance program per ordinance 51-16. | $20,000 |
| Feb 19, 2019 | Completed final sign-off Sep 2021 | 2529 Ocean Av | barrier removal project to add a stair platform lift to provide accessiblity to the upper fl.(dental suite and offices). no work on lower level). extg street entry to stair lower landing improved. nw accessible entry door /side light, threshold sidwalk warping, main level landingDetails
barrier removal project to add a stair platform lift to provide accessiblity to the upper fl.(dental suite and offices). no work on lower level). extg street entry to stair lower landing improved. nw accessible entry door /side light, threshold sidwalk warping, main level landing | $120,000 | |
| Jul 19, 2017 | Completed final sign-off Sep 2018 | 2469 14th Av | Finbarr Collins Construction Inc. | interior remodel @ main lvl to create new master suite (new master bath & existing bedroom converted to new master closet), interior remodel @ existing guest bath, new conditioned area added at lower lvl in existing garage space to create new media room. some windows replaced in kind &Details
interior remodel @ main lvl to create new master suite (new master bath & existing bedroom converted to new master closet), interior remodel @ existing guest bath, new conditioned area added at lower lvl in existing garage space to create new media room. some windows replaced in kind & | $150,000 |
| Sep 29, 2016 | Never finaled issued Nov 2016, no final | 75 Cerritos Av | Harrow Construction Corporation | demolition of (e) 248 sf covered porch @ rear of house, to be replaced with a new 113 sf deck. addition to main level (above grade 11'-11" where porch has been removed). (e) stucco & door trim will be repaired.Details
demolition of (e) 248 sf covered porch @ rear of house, to be replaced with a new 113 sf deck. addition to main level (above grade 11'-11" where porch has been removed). (e) stucco & door trim will be repaired. | $9,500 |
| Jul 25, 2016 | Completed final sign-off Jul 2017 | 75 Cerritos Av | Harrow Construction Corporation | remodel basement of the property: remove extg walls, remove 2 posts, frame up new walls, install new bathroom, new plmg and electrical, create new family room, install new windows and doors, and new built up floor over extg slab. remove existing stairs from rear porch.Details
remodel basement of the property: remove extg walls, remove 2 posts, frame up new walls, install new bathroom, new plmg and electrical, create new family room, install new windows and doors, and new built up floor over extg slab. remove existing stairs from rear porch. | $85,000 |
| Nov 13, 2015 | Expired or cancelled expired Jul 2021 | 309 Judah St | dry rot repair 120 sq ft, replace in kind no change to front, repair at front & side corner of store front of 319 judah st.Details
dry rot repair 120 sq ft, replace in kind no change to front, repair at front & side corner of store front of 319 judah st. | $2,000 | |
| Oct 7, 2015 | Expired or cancelled expired Oct 2024 | 34 Madrone Av | Nicholas Spencer Firth Gen Contr | interior remodel of 2 upper floor bathrooms.Details
interior remodel of 2 upper floor bathrooms. | $40,000 |
| Apr 30, 2015 | Never finaled issued Jul 2015, no final | 472 Pacheco St | Mullan Enterprises Inc | master bath remodel on 2nd flDetails
master bath remodel on 2nd fl | $35,000 |
| Aug 21, 2014 | Never finaled issued Sep 2014, no final | 240 Lombard St | Saarman Construction,Ltd. | replace (e) storefront doors with (n) automatic doors (3) locations, install (n) ceramic tile at (2) storefront doors, 130 sq.ft, 111 chestnut st & 220 lombard, install (n) handrails at 220 chestnut st & 111 chestnut entry way, new structural steel beam & posts (e) awning modifications, work at 111Details
replace (e) storefront doors with (n) automatic doors (3) locations, install (n) ceramic tile at (2) storefront doors, 130 sq.ft, 111 chestnut st & 220 lombard, install (n) handrails at 220 chestnut st & 111 chestnut entry way, new structural steel beam & posts (e) awning modifications, work at 111 | $117,000 |
| Feb 24, 2014 | Expired or cancelled withdrawn Aug 2014 | 240 Lombard St | Saarman Construction,Ltd. | replace existing store front doors wiht new automatic sliding doors, install new ceramic tile at storefront doors 130 sf approx, install new steel handrails at storefront entry way.Details
replace existing store front doors wiht new automatic sliding doors, install new ceramic tile at storefront doors 130 sf approx, install new steel handrails at storefront entry way. | $135,000 |
| Jan 16, 2014 | Completed final sign-off Nov 2015 | 2662 15th Av | Cal C A D E Construction Inc | replace damaged foundation elements (resulting from a city water main breakage on 15th ave feb, 2013), remodel for recreation room, laundry, bathroom and office on lower level. new windows at rear. plumbing, & electric on seperate permit.Details
replace damaged foundation elements (resulting from a city water main breakage on 15th ave feb, 2013), remodel for recreation room, laundry, bathroom and office on lower level. new windows at rear. plumbing, & electric on seperate permit. | $90,000 |
| Nov 15, 2012 | Completed final sign-off Feb 2013 | 482 Bright St | Royal Lyon Construction | revision to 2o1208076743. keep (e) double hung window at rear rather than replace with tilt-turn unit. minor electrical changesDetails
revision to 2o1208076743. keep (e) double hung window at rear rather than replace with tilt-turn unit. minor electrical changes | |
| Aug 7, 2012 | Completed final sign-off Feb 2013 | 482 Bright St | Streiffer Burnham Const., Inc. | lower floor remodel of extg family room: bathroom to bedroom, closet, and bathroom.Details
lower floor remodel of extg family room: bathroom to bedroom, closet, and bathroom. | $45,000 |
| Apr 4, 2011 | Completed final sign-off Mar 2012 | 75 Cerritos Av | Harrow Construction Corporation | remodel kit.; remove non-load bearing wall between kit. & breakfast rm. remove greenhouse window in kit. & frame in for (n) window in (n) location. install (n) window, reframe wall between kit. & bathrm. & clo. install (n) cabinets, (n) finish flr., replace french doors from breakfast rm. to foyer.Details
remodel kit.; remove non-load bearing wall between kit. & breakfast rm. remove greenhouse window in kit. & frame in for (n) window in (n) location. install (n) window, reframe wall between kit. & bathrm. & clo. install (n) cabinets, (n) finish flr., replace french doors from breakfast rm. to foyer. | $22,000 |
| Feb 8, 2007 | Expired or cancelled cancelled Aug 2011 | 690 Funston Av | addition of teo roof dormers to bring light into middle story & minor interior remodeling.Details
addition of teo roof dormers to bring light into middle story & minor interior remodeling. | $50,000 | |
| Feb 23, 2006 | Completed final sign-off Apr 2007 | 1039 Cole St | Art Of Construction Inc | horizontal extension at upper level of a new family room(190 sf)over an extg kchn minor interior remodel including 1 bathrooms and creation of a new powder room on main level (addition of 10 sf)deck at rear is replaced with new enlarged deck.Details
horizontal extension at upper level of a new family room(190 sf)over an extg kchn minor interior remodel including 1 bathrooms and creation of a new powder room on main level (addition of 10 sf)deck at rear is replaced with new enlarged deck. | $95,000 |
| Jul 8, 2005 | Completed final sign-off Jan 2007 | 2279 14th Av | remodel of bath/powder to bath/laundry on main level. this "fills" in an existing lightwell (additioDetails
remodel of bath/powder to bath/laundry on main level. this "fills" in an existing lightwell (additio | $40,000 |