Peter Liang
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Blue Truck Inc.
- Based in
- San Francisco
- On San Francisco permits
- Sep 2016 to Oct 2026
26 permits since 2000 (architect on 23 permits, authorized agent-others on 1 permit, designer on 1 permit, engineer on 1 permit): 15 completed, 8 in progress, 1 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 60 Laidley St | minor footprint revisions: smaller bay wdw at front, recessed front entry, expansion under (ew) roof at rear and into (e) crawlspace. interior layout updates. new siding, new exterior doors and windows.Details
minor footprint revisions: smaller bay wdw at front, recessed front entry, expansion under (ew) roof at rear and into (e) crawlspace. interior layout updates. new siding, new exterior doors and windows. | $490,000 | |
| Sep 25, 2026 | In progress filed Sep 2026, not yet issued | 226 Rutledge St | Superbuilt | remodel of front and rear facades with new design, windows and siding. remodel of existing 1st floor entry. new interior spiral stair to connect 1st and 2nd floors. no added square footage.Details
remodel of front and rear facades with new design, windows and siding. remodel of existing 1st floor entry. new interior spiral stair to connect 1st and 2nd floors. no added square footage. | $75,000 |
| May 21, 2026 | In progress issued May 2026 | 290 Rutledge St | Planart Construction Corp | remodel of sfd, new wood siding in place of (e) , remodel (e) 3rd floor bathroom (in kind replacement of fixtures). replacement 3rd floor window (not street visible), new decking at 3rd floor deck (not street visible)Details
remodel of sfd, new wood siding in place of (e) , remodel (e) 3rd floor bathroom (in kind replacement of fixtures). replacement 3rd floor window (not street visible), new decking at 3rd floor deck (not street visible) | $50,000 |
| Dec 29, 2025 | In progress issued May 2026 | 201 Buena Vista East Av | Krekow Jennings Inc. | permit amendment to bpa #202401043396 to include the renovation to first-floor unit with structural improvements, and modifications to the terrace, courtyard, and yard.Details
permit amendment to bpa #202401043396 to include the renovation to first-floor unit with structural improvements, and modifications to the terrace, courtyard, and yard. | $250,000 |
| Jun 30, 2025 | Completed final sign-off May 2026 | 420 Monterey Bl | Planart Construction Corp | existing front decks to be replaced in original location and size. front windows and doors to be replaced in existing openings. existing wood siding to remain and be painted.Details
existing front decks to be replaced in original location and size. front windows and doors to be replaced in existing openings. existing wood siding to remain and be painted. | $30,000 |
| Apr 24, 2025 | In progress issued Aug 2025 | 3845 26th St | Bay Home Remodeling | horizontal addition to (e) 2-unit residential bldg. new front windows. new front doors at entry, in-kind. renovation throughout levels 1-4. new stair core. new rear decks. 4-new dormers at level 4 with skylight. new sprinkler throughout levels 1-4. renovate bathrooms and 2-kitchens. new rear windowsDetails
horizontal addition to (e) 2-unit residential bldg. new front windows. new front doors at entry, in-kind. renovation throughout levels 1-4. new stair core. new rear decks. 4-new dormers at level 4 with skylight. new sprinkler throughout levels 1-4. renovate bathrooms and 2-kitchens. new rear windows | $501,000 |
| Sep 13, 2024 | Completed final sign-off Feb 2026 | 3595 Folsom St | Wei Li Construction | interior and exterior renovation to single family home. interior work includes new primary suite, kitchen remodel, replace e gas fireplace. exterior work includes new windows, new siding, new doors, new parapetDetails
interior and exterior renovation to single family home. interior work includes new primary suite, kitchen remodel, replace e gas fireplace. exterior work includes new windows, new siding, new doors, new parapet | $240,000 |
| Sep 6, 2024 | Completed final sign-off Mar 2025 | 19 Delano Av | A-1 Dynamic Builders Inc. | revision to pa #202408198977 and 202401244520. new opening in center line wallDetails
revision to pa #202408198977 and 202401244520. new opening in center line wall | |
| Aug 19, 2024 | Completed final sign-off Feb 2025 | 650 Florida St | unit c. work on ground floor. interior tenant improvement. minor wall layout revision and update finishes. all non-structural no change of use. no change in square footage. existing accessible entrance and path to restroom to remain.Details
unit c. work on ground floor. interior tenant improvement. minor wall layout revision and update finishes. all non-structural no change of use. no change in square footage. existing accessible entrance and path to restroom to remain. | $5,000 | |
| May 22, 2024 | Completed final sign-off Feb 2025 | 306 Rutledge St | Cameron Builders Sf | interioer renovation of 2 bedrooms and 2 bathrooms. revision of rear deck and stairs. no work visible from the street.Details
interioer renovation of 2 bedrooms and 2 bathrooms. revision of rear deck and stairs. no work visible from the street. | $150,000 |
| Jan 24, 2024 | Completed final sign-off Mar 2025 | 19 Delano Av | A-1 Dynamic Builders Inc. | partial voluntary rebuild of existing foundation. no work visible from the streetDetails
partial voluntary rebuild of existing foundation. no work visible from the street | $20,000 |
| Dec 4, 2023 | In progress issued Nov 2024 | 3224 Folsom St | renovation of single family home no expansion beyond (e) foot print additional habitalbe space (650) added in (e) garage and below rear extension interior remodel work includes updated kitchen, new stairway, new living space exterior work at rear only.Details
renovation of single family home no expansion beyond (e) foot print additional habitalbe space (650) added in (e) garage and below rear extension interior remodel work includes updated kitchen, new stairway, new living space exterior work at rear only. | $500,000 | |
| Apr 12, 2023 | In progress issued Feb 2024 | 74 Banks St | Stingray Builders Inc. | facade and interior remodel of a single family residence, no changes in building footprint work includes - front and rear exterior remodel and residing - garage, kitchen, and bath remodels - new upper floor deck and trellis, removal of sunroom and fill-in of upper floorDetails
facade and interior remodel of a single family residence, no changes in building footprint work includes - front and rear exterior remodel and residing - garage, kitchen, and bath remodels - new upper floor deck and trellis, removal of sunroom and fill-in of upper floor | $500,000 |
| Feb 21, 2023 | Expired or cancelled withdrawn Mar 2023 | 238 Fillmore St | renovation of extg duplex: rear facade reconfiguration, interior layout (bathroom and kitchen). remodel, basement excavation and structural upgradeDetails
renovation of extg duplex: rear facade reconfiguration, interior layout (bathroom and kitchen). remodel, basement excavation and structural upgrade | $200,000 | |
| Dec 15, 2022 | Completed final sign-off Apr 2023 | 61 Anderson St | rear deck: fix deck, replace trexDetails
rear deck: fix deck, replace trex | $8,000 | |
| Oct 5, 2022 | Completed final sign-off Mar 2023 | 1925 48th Av | Modern Craft Construction | open air entryway of single family dwelling to be enclosed. 96 sq f of conditioned space added. no change to extg bldg footprint. new front door to replace extg front gate. 2 new skylights at 2nd floor living room. extg rear yard door to be replaced.Details
open air entryway of single family dwelling to be enclosed. 96 sq f of conditioned space added. no change to extg bldg footprint. new front door to replace extg front gate. 2 new skylights at 2nd floor living room. extg rear yard door to be replaced. | $40,000 |
| Mar 24, 2022 | Completed final sign-off Apr 2022 | 830 Alabama St | A S A P Construction | revision to pa# 202012311984. reduce scope of work. no alteration to rear yard stair.Details
revision to pa# 202012311984. reduce scope of work. no alteration to rear yard stair. | |
| Mar 21, 2022 | Completed final sign-off Nov 2022 | 244 04th Av | Graham Moore Construction Inc | revise bpa#202102124625. as requested by bldg inspector robert power. revisions include repair (e) property line wall, (n) fire-rated parapet details. revise 3rd fl bathroom. revise foundation details.Details
revise bpa#202102124625. as requested by bldg inspector robert power. revisions include repair (e) property line wall, (n) fire-rated parapet details. revise 3rd fl bathroom. revise foundation details. | |
| Nov 1, 2021 | Completed final sign-off Feb 2025 | 527 Alvarado St | Cameron Builders Sf, Graham Moore Construction Inc | addition to rear of building. no alteration to front. interior remodel & extension of 2nd fl kitchen & dining room. cantilevered extension of 3rd fl & layout reconfiguration with 1 (n) bedroom & bathroom. replace (e) interior stair, skylights & (n) flat roof construction. rear yard landscaping.Details
addition to rear of building. no alteration to front. interior remodel & extension of 2nd fl kitchen & dining room. cantilevered extension of 3rd fl & layout reconfiguration with 1 (n) bedroom & bathroom. replace (e) interior stair, skylights & (n) flat roof construction. rear yard landscaping. | $500,000 |
| May 10, 2021 | Never finaled issued Sep 2023, no final | 4277 23rd St | Bay Building Structures Inc, Belvedere Builders | addition of 2 new dormer windows @ gable roof. (n) sliding, window & fascia at dormers to match (e) house. interior work includes 1-(n) bathroom to replace (e) half bath and electrical upgradesDetails
addition of 2 new dormer windows @ gable roof. (n) sliding, window & fascia at dormers to match (e) house. interior work includes 1-(n) bathroom to replace (e) half bath and electrical upgrades | $50,000 |
| May 4, 2021 | Expired or cancelled cancelled Jan 2026 | 399 Duncan St | remodel rear elevation with revised deck & stairs. remodel entry at duncan st. rear yard landscaping work. kitchen & bathroom remodel. minor layout changes.Details
remodel rear elevation with revised deck & stairs. remodel entry at duncan st. rear yard landscaping work. kitchen & bathroom remodel. minor layout changes. | $190,000 | |
| Mar 5, 2021 | In progress issued May 2025 | 328 Missouri St | Cbp Construction Inc | horizontal addition to enclose the existing exterior roof deck at 3rd story. new primary br and enlarge bathroomDetails
horizontal addition to enclose the existing exterior roof deck at 3rd story. new primary br and enlarge bathroom | $150,000 |
| Feb 12, 2021 | Completed final sign-off Nov 2022 | 244 04th Av | Graham Moore Construction Inc | interior (e) stair removed @ 1st floor & 1st flr flat tob e restored.remove extg skylights. extg kitchen remodel. extg half bath remodel. new bifold door at french door 2/f.Details
interior (e) stair removed @ 1st floor & 1st flr flat tob e restored.remove extg skylights. extg kitchen remodel. extg half bath remodel. new bifold door at french door 2/f. | $150,000 |
| Nov 24, 2020 | Completed final sign-off Dec 2022 | 3225 Wawona St | Ecowave Inc | remodel of 2 story single familt residence. no sq footage added. window replacement (in kind) only at street facade, other exterior work includes remodel rear elevation with new deck & stairs. interior work includes layout revisions. remodel of kitchen and bathroom.Details
remodel of 2 story single familt residence. no sq footage added. window replacement (in kind) only at street facade, other exterior work includes remodel rear elevation with new deck & stairs. interior work includes layout revisions. remodel of kitchen and bathroom. | $190,000 |
| Nov 27, 2019 | Completed final sign-off Dec 2021 | 4277 23rd St | Bay Building Structures Inc | renovation of sfd cottage at rear of lot. not visible from street. remove rear stair bulkhead and removal of exterior wood stair at rear. new exterior doors to match (e). new kitchen, 2 new baths, 1 new powder rm. relocate interior stair. seismic upgrades throughout.Details
renovation of sfd cottage at rear of lot. not visible from street. remove rear stair bulkhead and removal of exterior wood stair at rear. new exterior doors to match (e). new kitchen, 2 new baths, 1 new powder rm. relocate interior stair. seismic upgrades throughout. | $140,000 |
| Sep 19, 2016 | Completed final sign-off Oct 2018 | 219 Douglass St | Stapleton Construction Dba Revival Const, At6 Design Build | horizontal addition (+224 sf) ground floor at rear of house with 2nd level deck above. no work at front. added room to be a bedroom.Details
horizontal addition (+224 sf) ground floor at rear of house with 2nd level deck above. no work at front. added room to be a bedroom. | $100,000 |