Stapleton Construction Dba Revival Const
- Based in
- Oakland
- On San Francisco permits
- Aug 2016 to Apr 2018
- Last 24 months
- 0 permits filed
9 permits since 2000: 6 completed, 3 never finaled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 5, 2018 | Never finaled issued Apr 2018, no final | 290 Rutledge St | select window and siding repair / replacement. no interior workDetails
select window and siding repair / replacement. no interior work | $50,000 |
| Sep 14, 2017 | Completed final sign-off Feb 2019 | 187 Crescent Av | replace in-kind extg casement window in south gable. add 2 matching, custom wood windows flanking. replaced window. maintain u-factor of 0.32Details
replace in-kind extg casement window in south gable. add 2 matching, custom wood windows flanking. replaced window. maintain u-factor of 0.32 | $5,000 |
| Jun 28, 2017 | Never finaled issued Jul 2017, no final | 290 Rutledge St | interior remodel of existing single family dwelling. replace front door, 2 new windows, remodel kitchen and 2 baths.Details
interior remodel of existing single family dwelling. replace front door, 2 new windows, remodel kitchen and 2 baths. | $100,000 |
| May 31, 2017 | Completed final sign-off Feb 2019 | 187 Crescent Av | add interior stair from basement to main level. replace existing interior stair, replace existing rear sidewalk stair in-kind. new laundry & storage in basemenent. new hvac. remodel kitchen, bathroom & master bedroomDetails
add interior stair from basement to main level. replace existing interior stair, replace existing rear sidewalk stair in-kind. new laundry & storage in basemenent. new hvac. remodel kitchen, bathroom & master bedroom | $250,000 |
| May 2, 2017 | Completed final sign-off May 2017 | 3626 Folsom St | reroofingDetails
reroofing | $10,000 |
| Mar 30, 2017 | Completed final sign-off Sep 2017 | 181 College Av | interior renovation of extg 1 story addition at rear of house. work not visible from street and no additional square footage added. work includes minor layout changes. renovated kitchen and one bathroom. also new foundation work and interior finish fixture upgrades.Details
interior renovation of extg 1 story addition at rear of house. work not visible from street and no additional square footage added. work includes minor layout changes. renovated kitchen and one bathroom. also new foundation work and interior finish fixture upgrades. | $95,000 |
| Sep 22, 2016 | Completed final sign-off Jan 2017 | 1450 Rhode Island St | relocate 201608034038: underpin e west rear foundation which is currently sitting on surface. relocate sump pump locationDetails
relocate 201608034038: underpin e west rear foundation which is currently sitting on surface. relocate sump pump location | $2,000 |
| Sep 19, 2016 | Completed final sign-off Oct 2018 | 219 Douglass St | horizontal addition (+224 sf) ground floor at rear of house with 2nd level deck above. no work at front. added room to be a bedroom.Details
horizontal addition (+224 sf) ground floor at rear of house with 2nd level deck above. no work at front. added room to be a bedroom. | $100,000 |
| Aug 3, 2016 | Never finaled issued Aug 2016, no final | 1450 Rhode Island St | basement remodeled into storage/workshop. existing floor excavated. retaining walls poured and new slab floor. shear wall included finished with sheet rock and paint. plumbing and hvac rerouted. electrical installedDetails
basement remodeled into storage/workshop. existing floor excavated. retaining walls poured and new slab floor. shear wall included finished with sheet rock and paint. plumbing and hvac rerouted. electrical installed | $100,000 |